Loading...
Specifications (77) 4 E, RECEIVED 4'1'44-- OCT 24 2017 HCECITYCr . iG,ARU �wD.,kw� BUILDING DiViS!ON i Digitally signed by Dave Horn `l DN:cn=Dave Horn,o=Horn Consulting Engineers LLC,ou, email=dave@hornce.com,c=US Structural Calculations Date:2017.10.20 09:28:10-07'00' HCE Project#: LEN_16_30 V r `37 `7— OQ I,e Date: 10/20/17 1 275 1/\ Project Description: New House: MADELINE HEIGHTS LOT 3 Tigard, Oregon BAINBRIDGE American 3180A GR Subject Sheen#'s Lateral Loads L1 — L7 Framing F1 — F3 Footing FTG — 1 1I ,,,R,0 PRO. „ ,,\-. NF• `�Jio 51319P • oyN1 1, . Expires: 6-30-19 The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. Horn Consulting Engineers shall have no liability(expressed,or implied),with respect to the means and methods of construction workmanship or the actual materials used in construction. Horn Consulting Engineers shall have no obligation of liability,whether arising in contract(including warranty),Tort(including active,passive,or imputed negligence)or otherwise,for loss or use,revenue or profit,or for any other incidental or consequential damage. 9320 SW Barbur Blvd,Ste 135 Portland, OR 972.19 Phone:503.892.5782 Email:dave@hornce.com V E H HORN CONSULTING ENGINEERS LLC New House: LEN-16-30 BAINBRIDGE 3180A GR Code Basis of Design: 2015 I.B.C. and 2015 I.R.C.with State Amendments Wind Loading: Per ASCE 7 Fig 28.6-1 See attached elevations for wind loading breakdown per level. 135mph 3-sec gust Exp B. The mean roof height of the house h = 24' approximately. 00 00 4 ar .�� 4 •444 1* # X40 41 ../ Case A ',►, i {� 4t.�� */ Case B a= .10*40' =4.0' or for h = 24' a = .4(h)= .4(24') = 9.6' a must be larger than .04(40') = 1.6' or 3' a = 4.0' controls Therefore: 2a = 8' see Fig 28.6-1 ASCE 7, and Figure above. CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD.• PORTLAND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAVE@HORNCE.COM 4 ICE. CZ HORN CONSULTING ENGINEERS LLC Seismic Loading: D1 seismic design category per I.R.C. SDS= .83, R =6.5, W=weight of structure V =[1.2 Sps/(R x 1.4)]W V = .109W Roof Dead load = 15 psf Exterior Wall Dead load = 12 psf Interior Wall Dead load = 8 psf Floor Dead load = 12 psf Seismic in front to back: Wr= [.109 (40')(15+6+4)] = 109plf < 148.9plf therefore, wind governs. W2 = [.109 (40')(12+12+8)] + [.109 (20')(15+6+4)] + 109 = 303p1f < 317.2plf therefore, wind governs. W1 = [.109 (35')(12+12+8)] + 303 = 425.1 plf < 450plf therefore, wind governs. Seismic in side to side: Wr= [.109 (40')(15+6+4)] = 109plf < 149.8plf therefore, wind governs. W2 =[.109 (40')(12+12+8)] + 109 = 248.5plf < 323.5pIf therefore, wind governs. , W1 = [.109 (40')(12+12+8)] +248.5 = 388.0plf < 446.2plf therefore, wind governs. Redundancy Factor= 1.0 per ASCE?section 12.3.4.2 • CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD_• P ORTLAND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAV ECR HORNCE.COM 4 4 C L3 E HORN CONSULTING ENGINEERS LLC Roof Diaphragm: Right Wall Line Back Wall Line @ Bump Out P = (0.1489) klf x 20' = 3.0k P = (0.1498) klf x 2.5' = 0.4k V= P/(27.5)' = 108p1f Type A Wall V= P/(11)' = 34p1f Type A Wall Mot= 11.3kft Mot= 1.5kft Mr= 11.8kft No HD Req'd Mr=3.1kft No HD Req'd Left Wall Line Back Wall Line P = (0.1489) klf x 20' = 3.0k P = (0.1498) klf x 21.5' = 3.2k V= P/(33.75)' = 88p1f Type A Wall V= P/(6.75)' =477plf Type B Wall Mot =4.lkft Mot = 25.8kft Mr= 3.3kft Mr= 6.8kft T= 0.1k NoHDReq'd T=2.8k Type8HD Front Wall Line P = (0.1498) klf x 20.5' = 3.1k V= P/(20)' = 154plf Type A Wall Mot=4.9kft Mr=2.0kft T = 0.7k Type7HD CAPITAL PLAZA SUITE 135'9 320.S\V BARBUR BLVD. • P ORTLAND, OR • 97219 PHONE:5 03.892.5782• E MAIL: DAVE@HORNCE.COM E I IC HORN CONSULTING ‘ ENGINEERS LLC 2"d Floor Diaphragm: Right Wall Line Back Wall Line @ Bump Out P = (0.1683)(20')+3.0k= 6.4k P = (0.1737) klf x 2.5' + 0.4k= 0.8k V= P/(56)' = 114plf Type A Wall V= P/(3)' = 278p1f Type A Wall Mot = 57.3kft Mot = 7.5kft Mr= 163.6kft No HD,Req'd Mr= 1.3kft T= 2.1k Type 8 HD Above Left Wall Line Type 1 HD Below P= (0.1683) klf x 20' + 3.0k= 6.4k V= P/(33.5)' = 190plf Type A Wall Back Wall Line Mot = 27.4kft P = (0.1737) klf x 19.25' + 3.2k = 6.6k Mr= 21.2kft V= P/(9.75)' = 671 plf Type J Wall T = 0.4k No HD Req'd Note: No 3x Sill Req'd w/DBf..A.B.'s Mot= 27.2kft Mr= 2.7kft T= 5.4k Type 9 HD Above Type 3 HD Below Wall Line @ Back of Garage P = (0.1737)(22.25)+(0.157)(8.5) + 3.1k= 8.3k V= P/ (19.25)' =431plf Type BWall Mot = 35.9kft Mr= 10.3kft T= 2.8k+ 0.7k= 3.5k Type 8 HD Above Type 1 HD Below Check Sill Plate P = (0.109)(20.5)+(0.1395)(30.75') • = 6.5k/ 19.25' = 339plf No 3x Sill Req'd Front Wall Line P = (0.157) klf x 11.5' = 1.8k V= P/(14.5)' = 125p1f Type A Wall Mot = 2.Okft Mr= 0.9kft T = 0.5k Type 1 HD CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD. • P ORTLA ND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAVE@HORNCE.COM 4 c ILs E HORN CONSULTING ENGINEERS LLC Main Floor Diaphragm; Right Wall Line Back Wall Line @ Bump Out P = (0.1328)(20)+6.4k= 9.1k P = (0.1227) klf x 2.5' +0.8k= 1.1k V= P/(56)' = 162plf Type A Wall V= P/ (16)' = 69p1f Type A Wall Mot=9.2kft Mot = 4.4kft Mr= 14.8kft No HD Req'd Mr= 12.2kft • Left Wall Line Back Wall Line P = (0.1328) klf x 20' + 6.4k= 9.1k P = (0.1227) klf x 15'+ 6.6k= 8.4k V= P/(63)' = 144p1f Type A Wall V= P/(24)' = 352plf Type A Wall Mot= 27.2kft Mot = 33.8kft Mr= 118.9kft No HD Req'd Mr=23.8kft T= 0.4k No HD Req'd CAPITAL PLAZA SUITE 135 9 320 S W BARHUR BLVD.• P ORTLAND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAVE@HORNCE.COM Asce 1- ns ttp et esfP. F, 3-Sec. 41457 z4,i1---1 lets Z�i z �.fl A 3 t1 5 c.) . t32a "/' 6 .2'� • %. r2 '1 11y�.s 221•� �- S' act' 8' C.. vo /1 M / NV 1 -1/11LJ1111� : - , 7 /. • %�.�Illh!�IIIIII�I�i V'� ��, J1►1li,,. (n)g v. 14%1 11riLi Nli i i • r:__ 11 • ,SII II■ ■1- 6 ® _ ,, ,4,A_,_ .■p L sjii.. oiee/i iililCi7lia�lhnr_ii1 o - - -� 1N z 1111 rl1!i [f_IL_ILJ' 1711ILH' III F(] III 1.III 11111IIIIIlIII!! 111f111111i!I- �1! 11111 1!!! III!!j 1111!1: ii 11!!1!!11!!!11 z I II- IIl 11111 Iiia IIIII IIIII,1111111111IIII!l — — — — ,� — A - II!I!ai!IIIIl!►IIII!!!!:!I'l!i!IIIUI! ;!!I!I — — — w, = /32.2 "/• 30 143.z. (:r .1 zeta.i(6)1..i0.' *Y. • • . no.b M3' •to 0 2 1-1 r---iA14..a no.v64= (.6?)-= 44/. • I, b• zir s ' ZP V •StIZ ,S4 .S) .SksjIZ •Sb r -- -\77------ - /11/:*:------- It T.1 V � �--— — — — �� 4'bM =ate., g — — — — _ // Q .111� pig iii 10.11,1ll�l��1ITIM11.11 a12 12 .C1 .S.�t)Z •S•4 ,42.. 4 /+= I MaYll %Ice Is"i, w-,vs-,c 2 •dX.3 Ho" ' SLI -ix. 4,TV .1,, i.s7 (r)t,•t,a= Wr)h•t14' (2.24*Z/6)o$1 =L*N1 4 tt 4 H �.t..-1 L 13 SHEET r �"' HORN PROJECT DATE 1 r!-/6 E CONSULTING ENGINEERS LLC SUBJECT fil `)may' By imi r. �e 11 x ® L^►s W^ , oC L4/Z .r. o. 4L5sx )371 *.___._ rr ‘4 IA.? a.J.c (lc) IS IT,'‘ b ___ _ �►23•,r Tejo- F3b ,'� S r • .,c 0 L. t► W= 0sSCl1.2. k , 1 I, a 6 , 2..7x 1 t 4r---'- - ,, z.... ' ------ z•= � 2,°t q�'(z — v,z�' t Z 6. "1, • ` Y: .4 li aa Las.: ,N� . ac,5'�t�k,a! � • to N, tiC ��, .� 3-�t. Z-.7xti?. R., Gytl W a.o Si;(�-) s17•`c _' X141, r 1.3 Cc)t .r)(---)z. ... 33 N rr 2' Pp �,3�(>.3J i t 1.3�t3 _ g .kk ,MII 1: ''''''r* $e* - !,k 1, V. 43 k y h v„� .dcs[�.. 4. a 4.00.64\-a o. a• 1 momPI' 1•31` ?-I,` "u : I 4J 1 : ,b tZ, M ,. 1.3(�)* 43 �. . Z t Z, a, 1'- -Alas- 3064. -a3.v13Z x . - d .......__..____ -----..--- t3W-SeteriiALVD • PDRTLAND, OTC • 97219 • TIC HORN PROJECT Lf,,_ �'\P.13 SHEET f CONSULTING DATE IC 'gyp E ENGINEERS LLC SUBJECT T1610r.0100 BY PcsuA l' X • L'-'Ls' )01,1" ,it 401 if �.S L. • 3 •• • • • • 1302 SW BERTHA BLVD. • PORTLAND, OR • 97219 n.......:• G01 201 5747 . F..•rt• 1•1 Aur(rlUno,,rc rnm• t C HORN PROJECT LAN— il^i' SHEET #3 ' CONSULTING 7 DATE .oil)0ily E ENGINEERS LLC SACT ?FA141/ 16 By x lIkil 4s S'' w , oif 39 /7 ell ,� �:5, "{Si . A 2.22 1 2,3 613 3.,"7 , )1. F.1 I--- s W c . DrC[11/1.1 .:-714144' , .s /..4 ! 44 4.1t . 0 4... , w. .0 sc Ciii2, ..,..,.,.. (, =. cas . 4_1 .4/, ?' 4ok' T ,3,21t 4 r, .� 3.? \ , 76 a., 3(2.c� 4 z 7 '`� 7.r .1.�('2tc .2.). � �.5� --1,� (11� c 3zdor, 6.1.;, . tzPiJil 2.t Q.ts_.) $2 Lx ,, jam' 1;A. w-:. ,i,4c" tti • v1s /) 5:44/3.r- 7.4 • Fa , e°1 (of) ice ''" :lily. ^ 130 3,L i" t vy , o 9 O%3\i ' 2.91' 1 ...474, r I ' 15 L*$s w. ,-a 4c' 4z, = os'�'i`/, Si o .` . x % 3`)7)%1, (zi "40 ,.sL,lsa p# a.v t Cgx) .. 2: 1‘ '4._ I Po •'4 ( i " 1c GLa..."�7...0 x L.3 . k z �.c(7.1.r)/3 . -r. ?al' 7.1 k. hc(7,1) ^ 3c/A 715 L Pc A, 1," ,/IS61 > 1302 SW BERTHA BLVD. • PORTLAND, OR • 97219 Puma• 503 R92 57R2 • EMAIL: DAVE(U,HORNCE.COM C HORN PROJECT LEN" 1L-J3 tr6- CONSULTING SHEET f E ENGINEERS LLC SUBJECT FineeriNU.S DATE j o. 1- le BY bsH e 31 S•6 } 2,'Lk• 163(2.u.),z ... �r)112.pi4v/ J5b�km041- ?a , 4. frA, 1 -µ1►3 GI 'exit. tri, 4 ,( rd (..s,,►, 'psi, Pe -04‘S 6Ay ►4.3 . , Oft!. 4..44 v"7 3-4, `S GA. t"►`t' • Vit 2.3x S,a-0,C k4f4 s3 4 3 0 xrt'` ), +s FA t..AY lappa P , ,174 S' -'�;. �Z� 6 Ze t' ,>e� ��,�Z ^ /1 .........._ . 1,4 Lc" - 6.3f i -► 3Z,`' xe 6.,,. 1st% 1.11415 f.A wa N,- n 2' C,,,.� fill, 3- $ pi JAA 1302 SW BERTHA BLVD. • PORTLAND, OR • 97219 Pump• SDZ R99 47R9 FmAII• nSVCnu...ep rnxrt -