Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (229)
1. Casa Schroeder-Brandt Garage Conversion Preparation Clear work area Secure building permit South Wall Removal Remove and save siding Remove exterior door Remove sheetrock Remove electrical Install temporary supporting wall Remove sheeting and studs Concrete Cutting Mark foundation and floor cut-lines Cut foundation and floor concrete Foundation Dig and frame footings Pour footings Build block walls and fill void with concrete Backfill Install mud sill South Wall Close- n Install glulam support beam Remove temporary wall Install exterior walls and housewrap Install exterior doors and trim Install siding Caulk, prime, and paint exterior West Wall Modifications Frame, install, and trim window on west wall Plumbing Rough-In Remove floor concrete at cut-out Install in-floor DWV and water supply piping Leak test and inspect pipes Patch floor concrete Interior Finish Install subflooring Install wall framing Install in-wall DWV and water supply piping Install electrical Install insulation and vapor barrier Install bathtub/shower basin Install and tape sheetrock Paint Install finish flooring Install interior doors Install interior trim Plumbing and Mechanical Finish Install mini-split heat pump (bedroom) Install hydrophonic heating (bathroom) Connect water and DWV lines Install bathroom plumbing fixtures / Blocking (existing)with screened vents r 1/2" Plywood sheeting over 2x4 frame / provides lateral &verticle bracing for �� bump-out wall Yvi Screened soffit vents (area not less Roof truss (existing) ---- than vent area in existing blocking) 5/8"Type X sheetrock 3-1/2"x13-1/2"Glulam Header per APA publication "Nailed on storage room walls Structural-Use Panel and Lumber Beams" & ceiling ......................... I' 1,6,E Ill 12'0"x6'8"4-Panel sliding patio door Not Shown: * 1/2" Interior sheetrock - *Vapor barrier& FG bat insulation on all cold walls (R-11) - & ceiling (R-38) * 1-1/2"foil-faced rigid insulation between floor sleepers * Exterior building wrap * Cedar lap siding (recycled) * Finished flooring (hardwood) 23/32"T&G OSB subfloor over Foundation stem wall (existing) 2x4 @ 24"O.C. sleepers Sleeper supports @ 16" O.C. P.T. 2x Mudsill w/ 1/2" HDGx10" / �� •` @ 48"O.C. over sill seal gasket 5z ' ►:_ #4 Reinforcing: verticle @ 48" O.C.; IMMEMMInning horizontal @ footing & bond beam s e •:.• •:. Filled 8"x8"x16" CMU on 12"x6" • ,.___._.._ footing 3-1/2"Sloped slab (existing) 7,40#44"':::..:::::..;::::. Casa Schroeder-Brandt _ Construction Detail .......;..•:...;.,;...;. . ..........•. ..•.•......•:•:•:•:hi.. 3" Drain w/ filter fabric sloped Scale: 1/8" = 1" Revision 1.1, 2013/09/21 :•:••:::::e:: •.:; ;4 ::• 0• 1/8" pf, stone backfill Submitted By: Seth Brandt, Property Owner (503) 639-8936 -..:.f..:::4.' ... {r < C.,.'.:�: ` . t < . .1.5 •...4...