Loading...
Report (139) Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office Salem Office (541)345-0289 (503)589-1252 Tigard Office (503)684-3460 Special Inspection c\C\ - `75 FINAL SUMMARY LETTER \\ kK)0-1Vr-\ Date: May 11, 2018 Job#: T1803891 City of Portland Bureau of Development Services (BDS) 1900 SW 4th Avenue, Suite 5000 Portland, OR 97201 Attn: Special Inspections Re: Project Name: Gaarde Residence- Remodel Address: 11825 SW Walnut-Tigard, OR Permit#: MST2018-00055 This is in accordance with Section 1704.1.2 of the International Building Code and Chapter 24.20, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Doug ICes•Rees Th Project Manager DL/jng cc: NORTHSTAR REMODEL LLC-CHRIS TEETER CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT✓ PWU ENGINEERING INC MOUNTAINWOOD HOMES -WADE ZUVER MOUNTAINWOOD HOMES-GREG SPANGLER P:\Projects\General\2018\T1803891\05-11-18 Final Letter.doc Updated 11/30/11