Report (139) Bend Office (541)330-9155
Geotechnical Office (503)601-8250
Carlson Testing, Inc. Eugene Office
Salem Office (541)345-0289
(503)589-1252
Tigard Office (503)684-3460
Special Inspection c\C\ - `75
FINAL SUMMARY LETTER \\ kK)0-1Vr-\
Date: May 11, 2018
Job#: T1803891
City of Portland
Bureau of Development Services (BDS)
1900 SW 4th Avenue, Suite 5000
Portland, OR 97201
Attn: Special Inspections
Re: Project Name: Gaarde Residence- Remodel
Address: 11825 SW Walnut-Tigard, OR
Permit#: MST2018-00055
This is in accordance with Section 1704.1.2 of the International Building Code and Chapter 24.20, Title 24, we have
performed special inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Doug ICes•Rees Th
Project Manager
DL/jng
cc: NORTHSTAR REMODEL LLC-CHRIS TEETER
CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT✓
PWU ENGINEERING INC
MOUNTAINWOOD HOMES -WADE ZUVER
MOUNTAINWOOD HOMES-GREG SPANGLER
P:\Projects\General\2018\T1803891\05-11-18 Final Letter.doc Updated 11/30/11