Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (388)
ROOT Contractor is responsible to check PROTECTION site plans and notify designer of 48.00/ ZONE any errors or omissions prior to , ET WEATHER EROSION NOTES: hb4jO/ 1h start of construction. Plans and bb specifications shall be approved '. DURING WET WEATHER SEASON VAIII `� bylocal buildingofficials prior OCTOBER 1-APRIL 30)ALL SOILS P XPOSED FOR MORE THAN 2 DAYS SILT FENCE �__ ' to the start of any construction. HALL BE COVERED WITH PLASTIC ,_' (TYPICAL) HEETING,OR A 2-INCH LAYER OF �` - ULCH,BARK,WOOD CHIPS, co ' ;�, SITE LEGEND: AWDUST,OR STRAW TO MINIMIZE , f�';-`r ROSION POTENTIAL. � ' UtilitySymbols: "1� y EXPOSED SOILS SHALL BE SEEDED, MUL/ ESTABLISH , �� t LATER THAN 7PTEMBER 1ST. GR .5 -c FIRE HYDRANT II CATCH BASIN ROSION CONTROL NOTES: , it x04' 168 Sq. SIMI C 1. A STABILIZED GRAVEL STREET LIGHT ONSTRUCTION ENTRANCE SHALL BE 7-0 Ft II 7' 0 PROPOSEDCC Fa NSTALLED AS FIRST SITE ;�r, . x b FENCE 4 SANITARY SEWER ACTIVITY. / - co .,.,°OA WOOD b a' (/ ERICAN STORM DRAIN 2. EROSION CONTROL MEASURES SHALL BE INSPECTED DAILY AND2 34-0" LL WATER LINE AINTAINENSURE THEDAS IR FUNCTION. TO ovu 0 .i ' > Fence Types: N o iri EROSION CONTROL MEASURESSHALL B PT IN PLACE UNTIL6 -0 WOOD FENCE EKE � QERMANENT GROUND COVER ISSTABLISH D. T.O.5.569.52 Tree T es: PROVIDE GRAVEL STAGINGYP AREA AT DRIVEWAY. GARAGE `( CORNUS FLORIDA (2"MIN QUARRY SPALLS 7' 0„ ;° CO sq"F FLOWERING DOGWOOD s- FOR SINGLE FAMILY SITES). 2"MIN CAL. Ir...4 18 2" ea FRAXINUS OXYCARPA4P0,74 1,47;.•„;,.... RElDE: I ` i/ 'RAYWOOD ASH' CF7NCt_a- ='' �f 2"MIN CAL. - .. '6RIVEWAr ' n Or irAjr O °o ACER CAMPESTRE riii- latI hb 14s,o 0 /!.� HEDGE MAPLE OO 2"MIN CAL. p v 4$.0� ` 'o ..EXACTTH LOCATION ON LOT N BE DETERMINED .® a kh y � NAT THE TIME OF HOUSE CONSTRUCTION. • �Qit Q -_ WATER ` / -----: EXISTING TREE METER SANI .y - STORM LATERAL LATERAL 5W MADDIE LN \ R.O.W. EXISTING TREE . ' ' ) \ / PROPOSED COVERAGE AREA: REVISIONS s Street Address: HOUSE: 1,098 Sq.Ft. MINIMUM BUILDING SETBACKS DRAWN: 11-07-2017 MJG SITE PLAN GARAGE: 484 Sq.Ft. GENERAL REQUIREMENTS FOR LOTS 3rI M M A E L I I� E HEIGHTS COVERED ENTRY: 53 Sq.Ft. FRONT HOUSE: 15 FT. (From P.L.) �. .. 13204 SW MADDIE L N 11807 N.E. 99th Street COVERED DECK: 0 Sq.Ft. FRONT PORCH 15 FT. (From P.L.) �! .Ft. CITY OF TIGARD, WASHINGTON CO, OREGON PATIO: (IMPERVIOUS) 168 Sq Suite 1170 GARAGE: 20 FT. P.L.) DRIVEWAY: (IMPERVIOUS) 363 Sq.Ft. (From HOME SITE # 1 0 0 20' LOCATED IN THE NE 1/4 OF SECTION 9, Vancouver, WA 98682 REAR YARD: 15 FT. (From P.L.) TOTAL COVERED/IMPER. AREA:...2,166 Sq.Ft. SIDE YARD: 5 FT. (From P.L.) I 1 TOWNSHIP 2 SOUTH,RANGE 1 WEST,WILLAMETTE MERIDIAN 5,495 Sq.Ft. Office: 360.258.7900 80% MAX. ALLOWABLE: =4,396 Sq.Ft. PROPOSED COVERAGE % =39.4% STREET SIDE: 10 FT. (From P.L.) SCALE: 1" = 20'-0" GRADING. STREET AND UTILITY EROSION AND SEDIMENT CONTROL CONSTRUCTION NOTES o r. 1, SEED USED FOR TEMPORARY OR PERMANENT SEEDING SHALL BE COMPOSED OF ONE OF THE FOLLOWING MIXTURES, 1 UNLESS OTHERWISE AUTHORIZED: z A. VEGETATED CORRIDOR AREAS REQUIRE NATIVE SEED MIXES. Li. Z \ SEE RESTORATION PLAN FOR APPROPRIATE SEED MIX. Q Q Li \"'� L B. DWARF GRASS MIX(MIN. 100 LB./AC,) E/) © 1. DWARF PERENNIAL RYEGRASS(805 BY WEIGHT) Z 0 O w 2. CREEPING RED FESCUE(205 BY WEIGHT) I Q <cr, co g / 2S1TAx LOT SAC C. STANDARD HEIGHT GRASS MIX(MIN. 100B,/AC.) (9 CO r O R C 1400 �'666.00 1W _ �b 0 /� 54T 1.ANNUAL RYEGRASS(405 BY WEIGHT) ELI - *"' Q s 2. TURF-TYPE FESCUE(60%BY WEIGHT) � � `P � � � `i �, a TEMPORARY SEEtxNG TO APPLIED BETWEEN SEPTEMBER 10 dt SEPTEMBER 15, 2014 TO ENSURE THAT VEGETATION = (� � O f . " ;y .q r� s o- .�'+ �f 587.5 BECOMES ESTABLISHED PRIOR TO THE RETURN OF THE WET WEATHER PERIOD. UJ CO N Q Ems',.. IX w� ..t_ 5. ; +,� ..� 10 5809 FG V IP''' - µ ,x". / / 667,5 ' 2. SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE THE SURFACE ROUGHENED BY MEANS OF Z O r (� o--,, a o t--a o } e ��s �!'? TRACK-WALKING CR THE USE OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES SEED BEDDING AND -� J -. �o 1 °�f © 1 j // gf f/ y �� 1 I REDUCES RUN-OFF VELOCITY. Q F� 'x ' Q / " `'"." , // © /"' I ii 3. LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER < O < 0 a 11 I / \ \ �0 ! 0 d-C�7° / / . er I I VIA SEWING WITH APPROVED MIX AND APPUCATION RATE. 2 co I"' \ / / / t I I O. /! \ /,p� \ t\ !! 1 f 0 t x 4. TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE; COVERING EXPOSED SOL WITH PLASTIC SHEETING, / `, ! 1 / ,?1 t1/ f ff /� rI' r STRAW MULCHING,WOOD CHIPS, OR OTHER APPROVED MEASURES. '� 0 •.sT...„.., ••• / LOT 1 ` LOT 2 �" ! j v / ` W I' 5. STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE LOCATION AND CONFIGURATION. DURING"WET I // / LOT 3 LOT 4 / / f� WEATHER"PERKS,STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW MULCH. SEDIMENT FENCE IS 1 ! LOT 5 / LOT 6 // LOT 7 LOT 8 f I "y e4 REQUIRED AROUND THE PERIMETER THE STOCKPILE. 1 - / �0 / ! / / ! / 6. EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE OF TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS OR MATS,MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OTHER APPROPRIATE j is iii, ( // ^ ~'�"' ,1P!/ f/ ik `./ " /. !� + MEASURES. SLOPES EXCEEDING 25%MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES. ~ rI-illifrY do _ moi`- �, , / I f/ / / ,r 1 g 7. AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST CONTROL MEASURES INCLUDING THE APPUCATION Z w © t _ _ _ / ! / q0 �� 0 a I 1 OF A FINE SPRAY OF WATER, PLASTIC SHEETING,STRAW MULCHING, OR OTHER APPROVED MEASURES. W a _ 1 -W ► "�'ii /° dif "n _- -. --- -. -_ ��r_-- -_�_ -- '- -----r I " 8. CONSTRUCTION EN?RANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE i I " DURATION OF THE PROJECT. ADDITIONAL MEASURES RICU}DING,BUT NOT LIMITED T0, TIRE WASHES,STREET SWEEPING, W C) Q .'Z\34.¢ 7.. Gam-" d �4 I II a AND VACUUMING MAY BE BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF > Lr Y�fs� �rr��11� � [r3�A�� THE PROJECT. V I- G 5ti-51) v SD ., CC C of �7` so-i so so / 0 SO SE .r �. ^n en © a� CL CI 0 4. �� 0 SW WADDLE LANE �� // c.,^� `_� o. 4 0....40......(0.100"5 . II \g m G. ACTIVE INLETS TO STCBM WATER MEASURES. ALL INLET PROTECTION MEA$UR S AREEMS SHALL BTO BE REGULARLY THROUGH NSPECTEDUSE AND MAINTAINEDD IN ETEEDED.PROTECTION CC Q ..0•49.,,,56.1 ��r i sfit,. W / `� / •r. y- © 1 3 10.SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE 2 < 0 +"�" 1�1i, _ •��istis rw�'✓�watnizzat � �Ip.00 ?I\VI SPILLAGE OF SEDIMENT AND SEDIMENT-LADEN WATER. - CC z ow ,�� �" -.., �_ �'--a P` c. 11. AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE TRUCKS IN A LOCATION THAT DOES NOT U 4 `. , �'.'�.< _-- -0-j -..-!7.. . ►! �. 1 PROVIDE RUN-OFF THAT CAN ENTER THE STORM WATER SYSTEM.IF THE CONCRETE WASH-OUT AREA CAN NOT BE O 0 pia�sO .00i���� v.----- Ts ig• 1 rn I \ CONSTRUCTED GREATER THAN 50'FROM ANY DISCHARGE PONT, SECONDARY MEASURES SUCH AS BERMS OR ".I (f)o /rz44yy�lts��3�� 4a:`: I, , 1 1 IRAET1 TEMPORARY SETTLNG PITS MAY BE REQUIRED, THE WASH-OUT SHAD BE LOCATED WITHIN SX FEET OF TRUt K CO\' O✓58 ` ( ` STOCKPILE AREA . :Z. A I r ACCSS AND BE GLEANED WHEN IT REACHES 50%OF THE CAPAaTY. D O AA 581.90TWV ��.zzo•�,�p,,s MAINTAIN SILT FENCE AROUND BASE OF Oil 55190 FII. C)., cc ra pNd >k <.[D 600.0 T '\\. , 12.SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE TRANSFERRED TO THE STORM WATER SYSTEM. •y pDIM5 rxlt STOCKPILEOWS DWG 875) t `� Q r •`-'` ; y51.75 c I SWEEPINGS SHALL BE PICKED UP AND DISPOSED iN THE TRASH. W I ' a+ /.r * _ / /'G 1 / ; 0 y 568.ffi Ft3 '.. s) I� LOT 16 -'- �- w" / I ,� / O 7 I�`�56140 1W I 13.AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF INTO THE STORM WATER SYSTEM, B �I LOT 15 r LOT 14 LOT 13 N._ -' --LOT 12' " --_l.. _ .... .. . ... 669.0 TW 3 558.E FO O 1 �� T1X x x % 5820 PG 14.USE BMPs SUCH AS CINECX-DAMS,BERMS, AND INLET PROTECTION TO PREVENT RUN-OFF FROM REACHING I f VE.......- �/' !� -ti r�T9i / LOT iu ac LOT 9 I. f gy2F %5 DISCHARGE POINTS h B �- _%-- i --ii �i /" 572 -' ' qt° /� 383.0 tV11 �. Q 15.COVER CATCH BA9NS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN APPLYING SEAL COAT, TACK COAT, ETC, TO ! © ,�.-'" ,� / X3600 fa Q too TW PREVENT INTRODUCING THESE MATERIALS TO THE STORM WATER SYSTEM. 'x srGx., x x / / '!► 563.0 TW 58L00 FG - / "^^�.'�. r p I ®558.5 ,ii1 g JJ I s""'Lx, / /' ' II,/ � I - i\minitostI� / ERASION AND SEDIMENT CQNTROL BMP IMPLEMENTATIONN-"./ �"-'� -�7Q - o o p i. ALL BASF ESC MEASURES(INLET PROTECTION,PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCES, a a s *)' ETC.)MUST BE IN PLACE,FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION,PRIOR TO COMMENCEMENT OF N ' ti J __ '- © /// 0 CONSTRUCTION ACiiNTIE5.ux Lor 6633 TW r251 908 C f0 LOT 4�1' N �,L' D ' 4 ©� f0© .5 �. / 2. ALL"SEDIMENT BARRIERS(TO BE INSTALLED AFTER GRADING)"SHALL BE INSTALLED IMMEDIATELY FOLLOWING @ shoo 251 3 V TM LOT TM LOT TF " t', Q i , I ! ESTABLISHMENT OF FINISHED GRADE AS SHOWN ON THESE PLANS. $ 5600 251 306 25 908 5700 1600 TAX LOT sD 5639 TW / 3. LONG TERM SLOPE STABIUZATION MEASURES "INCLUDING MATTING'SHALL BE IN PLACE OVER ALL EXPOSED SOILS BY 2S1 BOB TAX LOT 6669 Fc a/ *ii, OCTOBER i. 1 A g 5500 2S1 9DB TAX LOT '' I c 5400 2S1 90B 4. THE STORM WATER FACILITY SHALL BE CONSTRUCTED AND LANDSCAPED PRIOR TO THE STORM WATER SYSTEM 5300 1 FUNCTIONING AND SITE PAVING. z 4E1 i 3 5. INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING ACTIVITIES. $ a d STOCKPILE BMPS SOLID WASTE AND HAZARDOUS MATERIALS BMPs0 s 6 SMP LEGEND STABILIZE SOIL STOCKPILE AT REUSE AND RECYCLE CONSTRUCTION WASTES WHERE PRACTICAL. $ END OF EACH DAY. PROPERLY STORE, APPLY, AND DISPOSE OF TOXIC OR OTHER HAZARDOUS MATERIALS. ` w§« S GRADE SO AS TO PREVENT PROVIDE WRITTEN SPILL PREVENTION PLAN AND RESPONSE PROCEDURES. - - - LIMITS OF GRADING 0 PONDING UPHILL OF STOCKPILE, TRAIN EMPLOYEES ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES. �. z�°�,' 1 INSTALL SEDIMENT FENCE PROVIDE REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY. ,, ` 58 E R•' 2 -z-x- INSTALL SEDIMENT FENCE(CWS DWG 875) ® GRADING LEGEND AROUND STOCKPILE. PROVIDE MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, COVER STOCKPILE(CWS DWG MATERIAL USE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPUES. � ig~'$�c INSTALL DOUBLE SEDIMENT FENCE DWG 875)WITH ORANGE 160 EXISTING CONTOUR 810)AS NECESSARY. 5 ��_ . -xx-xx- CONSTRUCTION FENCE BEHIND IT C x g C I. 424 PROPOSED CONTOUR g " ' INSTALL ORANGE CONSTRUCTION FENCE 0 r�r�q� 7 INSTALL TREE PROTECTION FENCING EXISTING TREE PERMIT L•-'-C m MO 70 REMAIN TOP AREA i • .�..R THESE EROSION AND SEDIMENT CONTROL PLANS SLOPE BOUNDARY 44fi•: INSTALL GRAVEL CONSTRUCTION ENTRANCE(CWS DWG 855) ) ASSUME "DRY WEATHER" CONSTRUCTION. "WET x o .. • H/2BUT2FT, ` "!� WEATHER" CONSTRUCTION MEASURES NEED TO BE MINIMUM AND 10 I INSTALL INLET PROTECTION(CWS DWG 915 OR 920) Q APPLIED BETWEEN OCTOBER 1ST AND MAY 31ST. GRADING SETBACK DIMENSIONS FT.MAXIMUM hi. a INSTALL OUTLET PROTECTION (CWS DWG 820) 0 ,`� } N.T.S.PERMIT ` N s�ss `r1" eel INSTALL 910 BAGS N CWS EROSION CONTROL DETAILS REFERENCED BOUNDARY SLOPE SLGWE / ` 2 AREA TOE OF CUT OR FILL /n��n,,,., HEREON CAN BE FOUND ON SHEET 25, ,.. r� 91 cm0 CONSTRUCT KEYSTONE RETAINING WALL O H/2 BUT 2 FT. MINIMUM NTUAL FIA HRA OR - /C i11 SCALE AND 20 FT. MAXIMUM °ANtEV_ ==0 CONSTRUCT ULTRA BLOCK WALL OK 30D t5 3D - L 1 //f/i WASTE STAGING, �T MAINTENANCE, FUEL,PORTA-POTTY AND SOLID AREA L IiNCH 4 30 FEET FOR GRADING SECTIONS � 1 T I C-C & D-D SEE SHEET 9p�SHEET //// e CONCRETE WASHOUT (/ NATURAL OR O J g FINISH GRADE ` , , 25 z CITY OF TIG RD CASE NO.SU62416.00003 tf