Loading...
Report (152) M5TTW1• ooi-77 . 1666g 5w5glotAPJAR, 54. Aetaw(f4oln,OK 4-7v1967 Lo4- Ikt16 KONDESIGNk) FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: Clayton Cochran Project Name: River Terrace East Date: 8/6/2018 Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 263 Arrival: 0800Departure 0840 Weather: Clear, 60s Permit#: TBD Site Visit Requested By: Tom (Polygon) Met With (on site): Tom (via phone) Purpose: Observe Lot 115 and 116 subgrade Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) - Decommission temporary storm and sewer lines through Tract E FR252B(7/10) -Vertical cut at base of retaining walls on lots 119 and 126 Upon arrival I observed lots 115 and 116 had been prepared to final subgrade elevation. I observed subgrade consisted of generally brown silt with varying amounts of gravel. I used a%z"diameter steel foundation probe to evaluate the consistency of the subgrade. Based on probing and resistance to penetration, subgrade appears generally stiff to very stiff. Based on observations and probing, it is our opinion that lot 115 and 116 subgrade observed today,where indicated on the attached site plan, has been prepared in general accordance with our geotechnical recommendations. I Distribution: Attachments: Site Plan (1) Reviewed by: 4/1,.� 2�i This report presents opinio�as a result of our observation of activates relating to pentechnical engineering ore ironmental services.We rely on the Contractor wconrply with the plans and specifications throughout the duration of the project of the presence of our represenu t+e<Our work does not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible ftu'site safety,This Reid report is a DRAFT representation of our field observations,testing,and preknertary recommendations.The report can only be considered final upon review*ON Gent:lesion project manager,as indicated by initials in the*Reviewed By-section, Signature: ta-..... 61---,--- 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com JM 2011,- oo "71 0 6 i 5 cv ha441011c,5, . 7/- "RIVER TERRACE EAST" Geave(414, ok 97M LOT 116 HUB AND TACK CERTIFICATION 14;4 4‘116 NE & SE 1/4 SEC. 6, 12 S. R 1 W, WM CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED JULY 23, 2016 PREPARED FOR. SW SNOWDALE STREET POLYGON NORTHWEST COMPANY 703 BROADWAY ST,, SUITE 510 — --_--._ — VANCOUVER, WA. 98660 — — — — _ ------- — -.. (s, . ..... . (.:k. 1_1=42.14 -- (7) -- 4.. o _— cv E o - — — — — ———— — 0, 6' PUBLIC UTILITY I tP. o EASEMENT ' 4.00--0- 0) - b 1-, _• in LOT D r- --1 . r— 1— 117 0.1 P LOT 0 .,: Li 0 w t 116 01 w 1-... = cm LOT — " op / 5 —4.1 **-4,00' 0 ,4 0 C z 0 4--. O , REGISTERED cu 0, O PROFESSIONAL 0 ,-- LAND SURVEYOR oi - s 04 so, il ,..,_ ,I. OREGON ,..- JULY 9,2002 579.5902 'N < TRAVIS C.JANSEN ("13 57751 -0. 0 RENEWS:6/30/2019 ..-. ..c. I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 20 0 10 20 o I HAVE ACCURATELY SURVEYED AND STAKED THEETS OFFS 'IlliWall61111111.11. 9 TO THE FOUNDATION ENVELOPE FOR LOT 116 OF THE PLAT 1 INCH -- 20 FEET F; OF "RIVER TERRACE EAST". (`CI (1. DRAWN BY: FAA DATE: 7/23/18 --\$ IP: PACIFIC COMMUNITY DESIGN , REVIEWED BY; TCJ DATE: 7/23/18 Z PLANNING - ENGINEERING - SURVEYING NO,. 395-041 , PROJECT \-. (503) 941-9484 _,)