Permit (184) CITY OF TIGARD SITE WORK PERMIT I . COMMUNITY DEVELOPMENT Permit#: SIT2018-00007 T I(,Ali O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/16/2018 Parcel: 2S1010001600 Jurisdiction: Tigard Site address: 7670 SW HUNZIKER RD Project: The Fields Apartments Subdivision: FIELDS APARTMENTS Lot: None Project Description: Site work for(5)new apartment buildings and(1)clubhouse. Contractor: KEN LEAHY CONSTRUCTION INC Owner: FIELDS, FRED W REVOCABLE LIVING PO BOX 489 111 SW 5TH AVE#3675 CORNELIUS, OR 97113 PORTLAND, OR 97204 PHONE: 503-357-2193 PHONE: FAX: 503-357-3649 FEES Description Date Amount Specifics: Permit Fee-Site Work 08/16/2018 $27,147.76 Plan Review 04/03/2018 $17,646.04 Type of Use: MF 12%State Surcharge-Building 08/16/2018 $3,257.73 Class of Work: NEW Info Process/Archiving-Lg$2.00(over 08/16/2018 $210.00 11x17) Project Valuation: $5,966,000.00 Info Process/Archiving-Sm$0.50(up to 08/16/2018 $150.00 11x17) Erosion Control w/Development 08/16/2018 $4,586.40 Site Specifics: Excavation Volume: 78700 cu.yd. Fill Volume: 73300 cu.yd. Impervious Surface: 297079 sq.ft. Engineered Fill: Yes Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Stom Drains: Retaining Wall: Yes Fire Underground: Yes Accessible Parking: Yes Fence: No Total $52,997.93 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct question OUNC by calling 503.232.1987 or 1.800.332.2344. Issued B Permittee Signature: -=17/4/jti Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Banding Permit Application Site Work _:c '; FOR OFFICE USE ONLY City of Tigard Received ir�7,� 14a 13125 SW Hall Blvd.,Tigard,OR 97223 ,i Date/B .3 / r � Permit No� � ������ Dan Review? -J, • Other Permit: � Phone: 503.718.2439 Fax: 503.598.1960 Date/B � /' T IGA R D Inspection Line: 503.639.4175 .,, Date Ready/By: hats ® See Page 2 for Internet: www.tigard-or.gov4 ct+,4. Notified,Method: Supplemental Information TYPE OF Arc -' t�'''" s t a At rz e REQUIRED DATA:1-AND 2-FAMILY DWELLING ®New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment.materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ ❑Accessory building ®Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: 07670 JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:SW Hunziker,North of SW Wall Street 1 G New dwellingarea: square feet 7 3€; 7?9o; ,,,, q City/State/ZIP:Tigard,OR 97223 7p#0Z '7Jcj 0 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Fields Apartments Covered porch area: square feet Cross street/directions to job site:Project fronts east bound SW Hunziker Deck area: square feet Street north of SW Wall Street. Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision:N/A Lot no.: 1600 Permit fees*are based on the value of the work performed. Tax map/parcel no.:2510100 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Private site work and associated private infrastructure work associated with a 6 Valuation: $5,966,000 building multi-family site. Buildings will include 5 multi-family apartment Existing building area: square feet buildings(264 Units)and 1 clubhouse. New building area: square feet of PROPERTY OWNER 0 TENANT Number of stories: Name:DBG Properties,LLC Type of construction: Address:2164 SW Park Place Occupancy groups: City/State/Z_IP:Portland,OR 97205 Existing: Phone:(503)807-6279 Fax:( ) New: 0 APPLICANT Eg CONTACT PERSON NOTICE Business name:Otak,Inc All contractors and subcontractors are required to be Contact name:Kyle Childers licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:808 SW Third,Avenue Suite 300 jurisdiction in which work is being performed.If the City/State/ZIP: Portland,OR 97204 applicant is exempt from licensing,the following reasons apply: Phone:(503)415-2304 Fax::( ) E-mail:kyle.childersaotak.com CONTRACTOR Business name:TBD 14.,rj Lel' 6‘)/4 '.1- C t I0 BUILDING PERMIT FEES* Address: PO . r4- (Please refer to fee schedule) Structural plan review fee(or deposit): City/State/ZIP: c.c. 12.14v,-, a, 4111 i ; Phone:(SS's ) 3 "i - 2 (CI '; Fax:(Sc 3) � FLS plan review fee(if applicable): CCB lie.: ( � Total fees due upon application: Amount received: Authorized signature: �. ( - —_ ..-.N This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Walter O. Grodahl, III Date: 3/28/2018 * Fee methodology set by Tri-County Building Industry Service Board. I:ABuilding\Permits\SIT-PermitApp.doc 08/02/2016 440-46131(11/02/COM/WEB) ` 4 City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards (5 dump truck loads), or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain, drainage way, or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below, unless otherwise noted. Excavation Volume: 78,700 cu. yds. Grading Volume: (Soils report required for>5,000 cu. yds.) 5,000 cu.yds. Fill Volume: (Fill exceeding 12" in depth shall be compacted to 90% of maximum density) 73,300 cu.yds. Retaining structure? (Check one) (1 Rock ® CMU 11 Concrete ® Other: Soil Nail Wall *Total new impervious area including all buildings, sidewalks, and paving: 297,079 sq. ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application- Plan Submittal Requirements"attached. The following must accompany this application: ® Site Plan with Vicinity Map showing ADA ® *Parking(including ADA) and Lighting compliance Plan Grading Plan and details ►( *Landscaping Plan Erosion Control Plan and details // Soils Report(if required) Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction Commercial 3 thereof to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof to and including $25,000.00. One-&Two-Family Dwelling 3 $25.000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50.000.00 and $5.38 for each additional$1,000.00 or fraction thereof to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof I:\Building\Permits\SIT-PermitApp_doc 08/02/2016 2 Albert Shields From: Albert Shields Sent: Thursday,August 16, 2018 3:08 PM To: Tom Hochstatter; Dianna Howse; Mark VanDomelen Cc: Gary Pagenstecher; Mike White Subject: Fields Apartments - Site Work SIT2018-00007 I found the arborist's report. Planning and Engineering are OK with issuance of the site work permit for THE Fields Apartments. Albert. 1 Albert Shields From: Todd Prager <todd@teragan.com> Sent: Thursday,August 16, 2018 2:04 PM To: Gary Pagenstecher Cc: Slade Leahy; Mike Ober;Albert Shields Subject: Fields Apartments - Tree Protection Inspection Report Gary/Albert, This is a summary of my inspection of the tree protection fencing for compliance with the approved urban forestry plan for the Fields Apartments project: • The tree protection fencing was in the process of being installed. • The proposed fence location was staked and we adjusted the stakes as needed to provide protection at or beyond the requirements of the approved urban forestry plan. • In certain locations where the fence was had already been installed,we staked areas where additional tree protection fencing was needed to provide additional protection.The trees that required additional protection fencing were as follows: o Tree 507 o Tree 514 o Tree 579 o Tree 637 o Tree 663 o Tree 743 o Tree 759 • Note that tree 435 (originally to be retained) may need to be removed since it is leaning against adjacent trees approved for removal. I collected information and photographs of this tree in the case that it is removed as part of the upcoming tree removal operations. • Finally, my understanding is that the City has approved the 4' orange plastic fence that is currently being installed. Based on my site visit today,the tree protection fence installation will be in compliance with the approved tree protection plan and City of Tigard tree protection standards. Please contact me if you have any questions or concerns. Todd Prager ASCA Registered Consulting Arborist#597 ISA Board Certified Master Arborist ISA Tree Risk Assessment Qualified AICP, American Planning Association Direct 971.295.4835 todd@teragan.com teragan.com 1 Albert Shields From: Albert Shields Sent: Monday,April 9, 2018 5:27 PM To: 'matt.neish@otak.com' Subject: The Fields Apartments, BUP2018-00091, -00092, -00093, -00094, -00095, &-00096,and SIT2018-00007. Attachments: Albert Shields.vcf;Conditions Fields Apts -04-09-2018.pdf Matt, upon reviewing your applications and plans for the above permits for The Fields Apartments we note that most of the Conditions of Approval for the underlying Land Use Case, PDR2017-00004 remain Not Met. I have highlighted on the attached list the conditions that must be met before either a site permit or a building permit can be issued. Accordingly, I have classified the SIT permit and these BUP permits as "Approved (for Plan Review) but Not Released." Plan Review will proceed but the permits will not be released for issuance until the appropriate conditions have been met. Please let me know if you have any questions. Albert Shields City of Tigard Permit Coordinator i5:31 71E-242tWork 113trt ttigard-or,go, 13125 SW Hall Blvd. Tigard,Oregon 97217 www.tigard-or.gov 1 City of Tigard 114 q COMMUNITY DEVELOPMENT DEPARTMENT ■ T i c ARo Building Permit Review — Commercial - With Land Use Building Permit #: .Si% /f - CI 17 9l 70,/ 0lt773oj? , 7 mac, 9c/l, 7 o • ? Site Address: -(v vzic,L tc)iz Si C(oc? /t o 6 Suite/Bldg#: Project Name: I\Qk.1) ,Ape.4rvIAI-- ;1(. Lifrk (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review tt L} Proposal: frV J s�� i.,t;`r`i c^v1ti�1 ti,jjc �U r-kall i'�N�)f. r',-C; c ,Ar' CiieC ti4t1 tilkfk e, 5, billO', S-itwi r'h'1 mil h"iv.,ly 54t. Lily!1i3 A ink 1Juti Piaui"CM ly G.(�,:;r ,i01- 6.., i.,, 5 ( L.1.-1 ; Engineering Review Slope at building pad: .LTJ PFI Permit#: El Conditions "Met"prior to issuance of building permit El Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) ,Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: El Yes ,No Assess Water Quantity Fee in-lieu: El Yes -Er No LIDA Facility on lot: El Yes ,.ayNo ❑ NOT Approved by Engineering: Date Notes: J4.0/--� U P TI L P f 1 15 (95iL D i Approved by Engineering: A/6Cw Date: 4/1/i/ e) :4Revisions (after Building Submittal only) Reviewer S Ilte Revision 1: ❑ Approved El Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved El Not Approved Permit Coordinator Review El Conditions "Met"prior to issuance of building permit Approved,NOT Released: Approved, diffate: .cf/4/) otes: ` Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: El Yes N/A Tigard Trans SDC: CI N/A Parks SDC: El Yes N/A OK to Issue Permit SiApproved by Permit Coordinator: Date: f le J t I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_070915.docx