Plans (412) ,,AN,S-t 7,J2A7 - 60 2. 7 9
761 5 5 LA) * e.e-u,-) t 1 5-k-' .
Alpine, an ITW Company
8351 Rovana Circle
Sacramento,CA 95828
ALPINE Fax:Phone:(800)877-36
808)8 7 078(916)387-0116
(9sacseals@itwbcg.com
—Site Information:
Customer: Oregon Truss Job Number: 1706155BDC
JobDescription: 2185A
Address: 9795 SW Frewing St. City,State,Zip: Tigard,OR 97132
Job Engineering Criteria:
Design Code: IRC 2012
Design View Version: 17.01.00.0525.17 JRef#: 1W224350004
Wind Standard: ASCE 7-10 Wind Speed(mph): 120 Roof Load(psi): 25.00-7.00-0.00- Floor Load(pst): None
10.00
This package contains a job notes page, 22 truss drawings and 0 details.
Item Seal# Truss Item Seal# Truss
1 180.17.0818.58287 AB1 2 180.17.0820.29527 AC1
3 180.17.0820.51047 ACV1 4 180.17.0820.55430 AGE
5 180.17.0821.01090 AM1 6 180.17.0821.14877 AV
7 180.17.0826.31010 AVS 8 180.17.0822.36387 B
9 180.17.0822.40920 BGE 10 180.17.0822.46430 CA1
11 180.17.0822.49633 CC1 12 180.17.0824.16487 CM1G
13 180.17.0822.57310 CS 14 180.17.0823.00507 D
15 180.17.0823.17967 DG 16 180.17.0823.27943 DGE
17 180.17.0823.32133 J 18 180.17.0823.35523 JA
19 180.17.0823.46750 M 20 180.17.0845.37087 M1GE
21 180.17.0824.29557 M2GE 22 180.17.0824.39270 MGE
v.ED PROp
S
O'Cli G1Nf t
0t� F
19575x 7
f
OREGON J
9'T0L o w•N*
Renews 6/30/2019
Printed 6/29/2017 10:16:17 AM
06/29/2017
Job Number: 1706155BDC Ply: 1 SEAN:23526 / T15 COMN Cust:R435 JRef:1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0818.58287
Truss Label: AB1 CY / GWH 06/29/2017
52
1""
"7 I- 10' I 14'9"9 I 19'10'6
5'2 7 49'9 4'9"9 5'0"13
=4X4
_ D
�� T
12 a 1.5x4 r 1.5X4
8 V C E
a7
f,-
B F
i
A - 1,
=3X4(A1) =3X7 _3X4(81)
I 10 9'10"6
1'4'81
10' I
19'10"6 i.
Loading Criteria(est) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed:120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.026 G 999 240 B 966 /- /450 /- /124 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.053 G 999 180 F 858 I- /395 /- /- /3.9
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.012 G - - Wind reactions based on MWFRS
42.00 EXP:B
Des Ld: HORZ(TL):0.025 G - - B Min Brg Width Req= 1.5
Des d: :10.00 Mean Height 15.00 ft Code/Misc Criteria CreepFactor:1.5 F Min B Width Req1.5
TCDL:4.2 psf
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.181 Bearings B&F Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.652
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.247 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0y5(0)/2(0) Maximum Top Chor
Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17 B-C 155-1168 D-E 140 -882
Lumber C-D 139 -882 E-F 157 -1167
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard Chords Tens.Comp. Chords Tens. Comp.
Loading B-G 904 -73 G-F 901 -76
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section Maximum Web Forces Per Ply(lbs)
301.5. Webs Tens.Comp.
Wind D-G 558 -62
Member design based on both MWFRS and C&C.
op PROFESS
0p aG%NFHOZ
,Q
19575 vi
- i
�r
/
. 29/2117
OREGON
.s+-1O �`DWN
Renews 813012019
**WARNING`" READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Watace Rd.
Trusses require extreme
reme care in fabricating,handlin shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI andSBCA)for safety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing per BCSI.Unless noted otflerwise,top chord shall have properly attached structural sheathin and bottom chord shall have a proppse y
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracingg ins-tailed per BCSI sections B3,B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the JoinTDetails, unless noted otherwise. refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Building Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
AN 11W COMPANY
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page
listing this drawing indicates acceptance of prooessionat engineeringresponsibility solely for the design shown. The suitability
and use of this drawing for any structure is the responsibility of the uilding Designer per ANSI/TPR 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinst.org;SBCA:www.sbcindustiy.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23530 / T14 COMN Cust:R435 JRef:1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0820.29527
Truss Label: AC1
CY / GWH 06/29/2017
5'2"7I 10' 14'9'9 19'10"6
52'7 4'9"9 I- 4'9"9 - 5,0"t3 -I
=4X4
C
12
^ 8 V k 1 85X4 1.D 4
0
r`
A Aligl116 ,.. Adilkih ... E
Iy
._. \ Sy9
F
-3X4(A1) -3X7 =3X4(81)
1 109'10"6
10' I-
19'10.'6 i
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL 1W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.025 F 999 240 A 863 /- /397 /- /106 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.053 F 999 180 E 862 /- /395 /- /- /3.9
BCDL: 10.00 Risk Category:II
EXP:B Snow Duration:1.15 HORZ(LL): 0.012 F - - Wind reactions based on MWFRS
Des Ld: 42.00 Mean Height:15.00 ft HORZ(TL):0.025 F - - A Min Brg Width Req= 1.5
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 E Min Brg Width Req= 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.204 Bearings A&E Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.656
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.252 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)12(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17 A-B 160-1184 C-D 142 -890
Lumber B-C 143 -892 D-E 159 -1175
Top chord 2x4 DF-L 18001-1.8E
Bot chord 2x4 DFL 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard Chords Tens.Comp. Chords Tens. Comp.
Loading A-F 924 -79 F-E 908 -78
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section Maximum Web Forces Per Ply(lbs)
301.5. Webs Tens.Comp.
Wind C-F 571 -66
Member design based on both MWFRS and C&C.
/CO& PROFSS�s
0 aG4N�k� ,OZ
19575 y
/- . /
I. 9/2117
OREGON
Air `alt•20,i9 V
-OC '
D w.'
Renews 6/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*'IMPORTANT"* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme
reme care in fyabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(BuildingryDayton OR 97114
bracingner SafetyI.Unless noted otherwise,,top chor
halfl havpractices ely attached performing
cturral these
annd bottom chord shall
have a rroorppaeeb (503)�1 s7a7 Ext
attached rigid ceiling Locations shown forpermanent lateral restraint of webs shall have bracinc�Installed per BCSI sections B3,B7 or B10'
as applicable. Apply plates to each face o truss and position as shown above and on the Joint:Details, unless noted otherwise. Refer to ` '
drawings 160A-Z for standard plate positions. A LPINE
V E
Alpine,a division of ITW Buildingg.�Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/IP! 1,or for handling,shipping,installation and bracing of trussesA seal on thip drawing or cover page, ""
listing this drawing,indicates acceptance of pro7essionaT engineeringresponsibility solely for the design shown. The suit-abili
ty
and use of this rawing for any structure is the responsibiity of the uilding Designer per ANSI/TPI 1 Sec.2. 8351 Rovana Circle
For more infonnabon see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinst.org:SBCA:www.sbcindustry.com;ICC:www.icesafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEAN:23552 / T10 GABL Cost:R435 JRef:1W224350004
2185A Qty: 7 FROM: DrwNo: 180.17.0820.51047
Truss Label: ACV1
CY / GWH 06/29/2017
I 5' I 10' 15' 19'10'6
5' 5 I- 5' 1' 4,10„6 I
1114X7
C
ii
12
D
8
B
5,
0
T
E
=6X6
4,
C•1 A
1Aiii
�3X5(F1) 12 /114X5 =3X4(B1) 1
5'1016 510"6
A�„� 6'3"14 I 12'2"4 I 19'10"6
g1
5
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pt 17.5 Ce:1.0 VERT LL): 0.155 G 999 240
BCLL: 0.00 Enclosure:Closed VERT(LL): 932 /- /421 /- /-19 /5.5
Risk Category:II
Lu: - Cs:not used VERT(TL): 0.314 G 747 180 E 947 /- /421 /- / !5.5
BCDL: 10.00 Snow Duration:1.15 HORZ(LL): 0.114 F - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B
Mean Height:15.00 ft HORZ(TL):0.231 F A Min Brg Width Req= 1.5
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 E Min Brg Width Req= 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.551 Bearings A&E Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.736
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.262 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chor
Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 289-2899 C-D 194 -1121
Lumber B-C 263-2590 D-E 179 -1373
Top chord 2x4 DF-L 1808f-1.8E
Bot chord 2x4 DF-L 1800E-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard:W2 2x4 DF-L 1800f-1.8E: Chords Tens.Comp. Chords Tens. Comp.
Plating Notes A-G 2483 -204 F-E 1057 -92
All plates are 1.5X4 except as noted. G-F 907 0
Loading Maximum Web Forces Per Ply(lbs)
Bottom chord checked for 10.00 psf non-concurrent Webs Tens.Comp.
bottom chord live load applied per IRC-12 section G-C 1898 -116
301.5.
Wind
Member design based on both MWFRS and C&C.
/kEO PROF
� % SS
P GNFF Sp
-tit
19575 41 p
;
' i
Aril
I
I
I. 29/2117
0 OREGON
1,4 '141•
20 i946
Renews 8/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
Oregon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component SafetyInformation,b TPI and'SBCA)tsafety practices prior to performing these functtiions. Installers shall provide temporary (503)581-8787 Ext
bracing
hed per
ceiling.Locations show fortppermanent lateral reproperly
t aint oattached webs all have braclnagtinstalled perpBCSI sect shall B3,,B7 oroB10'
as applicable. Apply plates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Defer to e
drawings 160A-Z for standard plate positions. A LP,N E
Alpine,a division of ITW Buildin Components Group Inc.shall not be responsible for any deviation from this drtwing,any failure to build the
truss in conformance with ANSI/IPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or over pa e._ "" COMPANY
listing this drawing,indicates acceptance of pro-fessionaf engineering responsibility solely for the des? n shown. suitability
and use of this drawing for any structure is the responsibiity of the Building Designer per ANSUTPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinsLorg;SBCA:www.sbdndustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23528 / T22 GABL Cust:R435 JRef: 1W224350004
2185A Qty; 1 FROM: DrwNo: 180.17.0820.55430
Truss Label: AGE
CY / GWH 06/29/2017
I t9'
10' I a
2'
(TYP) =4x4
G
a 12
=3X4(A1) M
=3X4(At) 1.
20'
14"8 0 114'8
20'
Loading Criteria(pst) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl!CSI Criteria ♦Maximum Reactions(lbs),or*=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udell L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.001 H 999 240 B 261 /17 /99 /- /152 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.002 H 999 180
BCDL: 10.00 Risk Category:II 96 /1 /39 /- /- /234
EXP:B Snow Duration:1.15 HORZ(LL): 0.001 J Wind
ind reactions based on MWFRS
Des Ld: 42.00 Mean Height:15.00 ft HORZ(TL):0.002 J - - B Min Brg Width Req= 1.5
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 B Min Brg Width Req= -
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.137 Bearings B&B Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.026
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.089 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind RD PROFESS
Member design based on both MWFRS and C&C. Gly ,1G)N� 0
41
Additional Notes 19575 9
See DWGS A12015ENC101014,GBLLETIN1014,& i
GABRST101014 for gable wind bracing (411.‘
requirements.
t 29/2117
OREGON
ROLD WBNti..�
Renews 8,30/2019
"'WARNING"* READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900Truss SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Compoper nent Safety Information,b TPI and SBCA)fosafety practices prior to performing these functions. Installers shall provide tempora (503)581-8787 Ext
attached rnig4iidd�ceiling.Locations shown forpermanent lateral restraint ie f webs shall have bracinag9t inssalled per BCSI sections 63,,B7 or B 1' '
as applicable. Apply plates to each faceoftrussand position as shown above and on the JoincDetails, unless noted otherwise. f2efer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Buildin Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracingof trussesA seal on thi$drawing or ver pa e,, ^" "COMPANY
listing this drawing,indicates acceptance of pro-fessronal engineeringresponsbility solely for the desr n shown. The suMbility
and use of this drawing for any structure is the responsibility of the uilding Designer per ANSI/TPI 1 Sec.2. 8351 Rovana Circle
For more information see this lob's general notes page and these web sites:ALPINE:www.alpineitw.Com;TPI:www.tpinstorg;SBCA:www.sbdndustry.com;ICC:www.ic safe.org Sacramento,CA 95828
J2ob1Number:85A Qty
1706155BDC Pty:: 31 SEAN:FROM: DrwNo:23532/ T20 MONO Cust:R435
180.17.0821.01090 JRef: 1 W224350004
Truss Label: AM1
CY / GWH 06/29/2017
569' 13'4,3
649 ! 6'713
X19(4
B
12
Q 8
13X4
'm
111
001141 D
GF E
X4%5 111.9X4
=3X :1)
d 649 I 8'8"13
6'89 13'49 /.
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT LL: 0.011 E 999 240
BCLL: 0.00 Enclosure:Closed ( ) G 574 /- /292 /- /146 /-
Risk Cat Lu: - Cs:not used VERT(TL): 0.024 E 999 180 D 586 /- /292 /- /- /3.9
BCDL: 10.00 Category*II Snow Duration:1.15 HORZ(LL): 0.005 A - - Wind reactions based on MWFRS
EXP:
Des Ld: 42.00 B
Mean Height:15.00 ft HORZ(TL):0.010 A G Min Brg Width Req= -
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 D Min Brg Width Req= 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.412Bearing D Fcperp=625psi.
Load Duration:1.15 MW FRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.356
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.651 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 C-D 0 -704
Lumber
Top chord 2x4 DF-L 18001-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 DFL 1800E-1.8E Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 DF-L Standard:W1 2x4 DF-L 1800f-1.8E:
Bracing F-E 494 0 E-D 497 0
(a)Continuous lateral restraint equally spaced on Maximum Web Forces Per Ply(lbs)
member. Webs Tens.Comp.
Loading F-C 172 -617
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
Left end vertical not exposed to wind pressure.
#.'
co PROp�S
G�5 lyGINFF s/0
19575 7
I- i
�1
1, 9/2117
OREGON
w/
`
14i •0.20,10" �
OLD W. r
Renews 6/30/2019
"WARNING"* READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
"IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,b TPI and SBCA f
p ) safety practices prior to performing these functgions. Installers shall provide tempora (503)581-8787 Ext
bracing
naidCeilig.Unlesscations shown fortpoermanent lateral reproperly
t aint of webs shstructurallracinaggt installed bottom
BCSI sections B3,B7 properly
as applicable. Apply plates to each face of truss and position as shown above and on the JoinTDetails, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Buildingg_Compon nts Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA peal on this drawing or cover page,, ""n vCOMPANY
listing
gshi of drawing,
indicates
anyacceptance
of theresponsibilitysotni �ui dipornsibility solely or the desmon shown. The sui�ability
drawing structureg Designer per ANSUTPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinstorg;SBCk www.sbclndustry,cem;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23492 / T5 GABL Cust:R435 JRef:1W224350004
2185A Qty: 1 FROM: DnwNo: 180.17.0821.14877
Truss Label: AV CY / GWH 06/29/2017
5' 10' 15' 20'
II-
5. 5, 5. 5.
11467
/1
N
1 C
0
6
I... 7
T �%I n
H
Job Number. 1706155BDC Ply: 1 SEAN:23489/ T6 GABL Cost:R435 JRef:1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0826.31010
Truss Label: AVS
CY / GWH 06/29/2017
I
5' I 10' 15' 20'
6' 5'
I 4' I 2'-I
(TYP) ii6x10
G
7//00111:1
no
ili ':
mTL�,� llith 111
Y M- 1 � AC" M`=4X4t: N
w3X4(A1)
1'4"8 1 5'10"6 5'10"6 7'9"12
I _I 1 1'4"8
6'3'14 12'2"4 20'
5"
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc L/defl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pt:17.5 Ce:1.0 VERT(LL): 0.151 E 999 240 B 1048 /15 /481 /- /152 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.298 E 794 180 M 1062 /15 /484 /- /- /5.5
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.110 0 - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.216 0 - - B Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code!Misc Criteria CreepFactor:1.5 M Min BrgWidth Req 4.2 psf = 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.705 Bearings B&M Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.799
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:No Max Web CSI:0.382 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17 B-D 185-2702 G-J 215 -1090
Lumber D-G 230-2594 J-M 163 -1330
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard:W2 2x4 DF-L 1800f-1.8E: Chords Tens.Comp. Chords Tens. Comp.
Plating Notes B-U 2321 -54 R-M 1040 -40
All plates are 1.5X4 except as noted. U-R 907 0
Loading Maximum Web Forces Per Ply(lbs)
Truss designed to support 1-0-0 top chord outiookers Webs Tens.Comp.
and cladding load not to exceed 3.00 PSF one face U-G 1987 -78
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge(D-L).DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind '',��O PROFESS
Member design based on both MWFRS and C&C. ��' aG%N FF �O
Additional Notes 19575 y
r
See DWGS A12015ENC101014,GBLLETIN1014,&
/
GABRST101014 for gable wind bracing e i
requirements. I, 9/2117
OREGON
Renews 6/30(2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handlin shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component SafetyInformation,by TPI an SBCA)fo'r safety practices prior to performing these functions. Installers shall provide temporary (503)561-8787 Ext
bracing per BCSI.Unless noted 00herwise,top chord shall have properly attached structural sheathin and bottom chord shall have a proppeerly
attach riggid ceiling. Locations shown forpermanent lateral restraint of webs shall have bracint�Ins ailed per BCSI sections B3,B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. (Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITN BuildingComponents Group Inc,shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page,, ""n"COMPANY
listing this drawing,indicates acceptance of pro essionaengineering responsibility solely for the design shown. The suability
and use of this rawing for any structure is the responsibility of the uing Designer per ANSUTPI 1 S-eec.2. 8351 Rovana Circle
Sacramento,CA 95828
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinst.org;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org
Job Number: 1706155BDC Ply: 1 SEON:23472/ 17 COMN Cust:R435 JRef: 1W224350004
2185A Oty: 19 FROM: DrwNo: 180.17.0822.36387
Truss Label: B
CY / GWH 06/29/2017
4'415 8'6"7 12'8" 17'
114'4"15 " I H
4'1"9 419 4'4"
=4X4
C
12
8 2 .1.5X4 ,1.5X4
B I D
r .
in 1
A
E
=3X4(81) F*
=3X7
=3X4(B1)
r 8'61 8,5"9
861 I 17'
Loading Criteria(pst) Wind Criteria Snow Criteria(Pg,Pf in PSE) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pt:17.5 Ce:1.0 VERT(LL): 0.020 F 9
BCLL: 0.00 Enclosure:Closed 99 240 A 739 /31 /337 /- /- /-
Risk Cate Lu: - Cs:not used VERT(TL): 0.042 F 999 180 E 737 /31 /337 /- / /5.5
II
BCDL: 10.00 gory: Snow Duration:1.15 HORZ(LL): 0.009 F - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B
Mean Height:21.30 ft HORZ(TL):0.019 F A Min Brg Width Req= -
NCBCLL:10.00 TCDL:4.2 psf Code I Misc Criteria Creep Factor:1.5 E Min Brg Width Req= 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.126 Bearing E Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.434
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.206 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top omp. Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 136 -995 C-D 122 -751
Lumber B-C 122 -752 D-E 136 -991
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard Chords Tens.Comp. Chords Tens. Comp.
Loading A-F 767 -68 F-E 760 -67
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section Maximum Web Forces Per Ply(lbs)
301.5. Webs Tens.Comp.
Wind C-F 467 -56
Member design based on both MWFRS and C&C.
O PROFSSS
�5 (,I N ICI
r� HOZ
,.1019575 7
r r
I. 29/2117
OREGON
9 '40.20,190
ROLA W �,
Renews 8/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trussesprequire extreme care in fabricating,handling,shipping,installing,and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
bracing per BCSI. Information,
noted ottlerwise,top chor
shalll havpractices ey attached performing
sheathin I and bottomchordshall
have a porary (5m)5s1a7a7 Ext
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracinginstalled per BCSI sections B3,B7 or 0y
as applicable. Apply plates to each face oftrussand position as shown above and on the Joinf etails, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Building Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover pale *"n"
COMPAW
listing this drawing,indicates acceptance of proTessIonal engineeringresponsibility solely for the desi n shown. The sianibility
and Use of this awing for any structure is the responsibility of the uilding Designer per ANSI/TPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.corn;TPI:www.tpinst.org;SBCA www.sbcindustry.cwin;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23554 / T3 GABL Cost:R435 JRef: 1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0822.40920
Truss Label: BGE
CY / GWH 06/29/2017
8'6"7
17'
8'6"7 I 8'5'9
I--2'81 I 2'--I =4X4
(TYP)
UN..s\ Nh,
1 ito
A Aid
ip, ,
6N12
=3x4(81)
=3X4(81)
I 17' I
I
17
17'
Loading Criteria(est) Wind Criteria Snow Criteria(Pg,Pf in PSF) DeflICSI Criteria ♦Maximum Reactions(lbs),or*=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl U# Loc R /U I Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph PI:17.5 Ce:1.0 VERT(LL): 0.001 F 999 240
BCLL: 0.00 Enclosure:Closed 95 ti 5 /39 /- /6 /204
Wind- Cs:not used VERT(TL): 0.002 F 999 180 Wind reactions based on MWFRS
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ
EXP:B (LL):-0.001 B A Min Brg Width Req= -
Des Ld: 42.00 Mean Height:21.30 ft HORZ(TL):-0.002 D - - Bearing A is a rigid surface.
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.054 Members not listed have forces less than 375#
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.030
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.056
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind ���ED PROFFs+
Member design based on both MWFRS and C&C. O.5 oG I I S E' 'O
Additional Notes 19575 419
See DWGS A12030ENC101014,GBLLETIN1014,& i'
GABRST101014 for gable wind bracing �-
requirements. 1 I. 9/2117
OREGON
.9-,0` 20, Nom;
Renews&30,2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,h ndlin shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI and Sbfor safety practices prior to performing these functions. Installers shall provide temporary (�)581-8787 Ext
bracingper BCS!.Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a pro erl
attachd rigid ceiling Locations shown for Permanent lateral restraint of webs shat have bracin insjalled per BCSI sections B3,B7 or B10y
.44116
as applicable. Apply plates to each face o truss and position as shown above and on the Joint-Details, unless noted otherwise. Defer to
drawings 160A-Z for standard plate positions. ALPINE-
Alpine,a division of ITW Building Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI PI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page,
/WOW OMPANV
listing this drawing indicates acceptance of prolessionaf engineeringresponsibility solely for tr design shown. The suitability
and use of this drawing for any structure is he responsibility of the uilding Designer per ANSI TPI I Sec.2. 8351 Rovana Circle
For more information see this lob's general notes page and these web sites:ALPINE:www.alpineitw.com;WI:www.tpinst.org;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number. 1706155BDC Ply: 1 SEQN:23504/ T12 COMN Cust:R435 JRef: 1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0822.46430
Truss Label: CA1 CY / GWH 06/29/2017
6'10"6
I- 6'10"6 13'10"6 H
7'
io4X5(R1)
4.
12 1111
8
r`
0
b M
in
A C
3X4(81) 1111.5X4 :-"-1 D
3X4(A1)
6'10"6 7'
I- 610"6 I 1310"6 1 1'4"8-{
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defi/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pt:17.5 Ce:1.0 VERT(LL): 0.006 E 999 240 A 595 /- /275 /- /91 /3.9
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.011 E 999 180 C 707 /- /331 /- /- /5.5
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.005 E - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.009 E - - A Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria CreepFactor:1.5 C Min BrgWidth Req1.5
TCDL:4.2 psf =
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.362 Bearings A&C Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.293
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.126 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)12(0) Maximum Top Chor
Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17 A-B 100 -711 B-C 101 -712
Lumber
Top chord 2x4 DFL 1800f 1.8E Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 DF-L 1800f-1.8E Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 DF-L Standard
A-E 499 0 E-C 499 0
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
�
&iEO PROFSSS
�5 t4G
GIN i0
19575 �41 9
�- i
�r
I, 29/2117
OREGON0 v
9-.OL D W.
N�,
Renews 8/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*"IMPORTANT"* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of SCSI(Building Dayton OR 97114
Component Safety Information,by TPI and SBCA)fr safety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing r BCSI.Unless noted 0therwise,top chord shall have properly attached structural sheathingand bottom chord shall have.a proppeert
attached riq id ceiling. Locations shown for permanent lateral restraint of webs shall have bracintq insalled per BCSI sections B3,B7 or B10y
as applicaf�le. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
drawings 160A-Z for standard plate positions. A LPI N E
Alpine,a division of ITW Building�Components Group Inc.shall not be responsible for any deviation from this drawing any failure to build the µ�
truss in conformance with ANSIT P1 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page ,COMPANY
listing this drawing,indicates acceptance of prooessionar engineering responsibility solely for the deskin shown. The suitability
and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Simi. 8351 Rovana Circle
For more information see this lob's general notes page and these web sites:ALPINE:www.alpirieitw.com;WI:www.tpinst.org;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number. 1706155BDC Ply: 1 SEQN:23506 / T11 COMN Cust:R435 JRef:1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0822.49633
Truss Label: CC1
CY / GWH 06/29/2017
I• 6'10"6 13'10"6
7,
iii 4X5fR1)
12
8
L
0
in
A
_ k ■1111h66C
i
D
3X4(61) III 1.5X4
----7-3X4(A1)
6'10"6 T
610"6 I 13'10"6 i
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.008 0 999 240
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT TL 0.016 D A 602 /- /277 /- /- /3.9
( ) 999 180
BCDL: 10.00 Risk Category:II
C 602 /- /277 /- / /5.5
EXP:B Snow Duration:1.15 HORZ(LL):-0.004 D - - Wind reactions based on MWFRS
Des Ld: 42.00 Mean Height:15.00 ft HORZ(TL):-0.009 D - - A Min Brg Width Req= 1.5
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 C Min Brg Width Req= 1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.376 Bearings A&C Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.298
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.127 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 104 -725 B-C 104 -723
Lumber
Top chord 2x4 DF-L 1800f 1.8E Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 DF-L 1800f-1.8E Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 DF-L Standard
A-D 511 -11 D-C 511 -11
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
•c47°)PRQFc
19575
Ar
I, 29/2117
OREGON
1p.` 20.19� ...1RD W.N .
Renews 6/30/2019
"WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
Oiegon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI and SBCA)for safety practices prior to performing these functions. Installers shall provide tempora (503)581-8787 Ext
bracing per BCSI.Unless noted aherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a proper
attached rigid ceiling. Locations shown forfpermanent lateral restraint of webs shall have bracing iinstalled per BCSI sections 63,B7 or B10y
as applicable. Appplates to each face o truss and position as shown above and on the Joint-Details, unless noted otherwise. Defer to
drawings 160A-Z for standard plate positions. ALPINE
.4461
Alpine,a division of ITW BuildingComponents Group Inc.shall not be responsible for any deviation from this drawin anyy failure to build the
NY
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesAseal on this drawing or weer pee._ ""TM O PA
listing this drawing Indicates acceptance of ro-fessionar engineering responsibility solely or the den shown. The su bd
and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. mr 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinsLorg;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23548/ T24 GABL Cost:R435 JRef: 1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0824.16487
Truss Label: CM1G
CY / GWH 06/29/2017
46
I
413.15 i TO.14 8'8'15 ta8.3 12'8.3 i
413.15 25•t4 ! 1F1 i 1'11'4 2 i
OH
8
Ili
� at2 a
(a) C
Itil
A I w113 --6.
A "®
.4X :1) 82X4 .4X4 ..34j -
..3X4
46.15 4.1.15 4'57
4'8.15 i 58°15 i 1375 'iqy•
44.6
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R I U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 0.035 L
LL VERT : 999 240
VERT(LL): A 1433 /- /19 /- /- /3.9
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.073 L 999 180 J 1433 /- /1559 /- /- /-
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.014 B - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.029 B - - A Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria CreepFactor:1.5 K Min BrgWidth Req 4.2 psf = -
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.240 Bearing A Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.816
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.980 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 0-1805 C-D 0 -915
B-C 0-1112
Lumber Wind
Top chord 2x4 DF-L 1800f-1.8E Wind loads and reactions based on MWFRS.
Bot chord 2x4 DFL 1800f 1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard:W3,W6,W7 2x6 DF-L Right end vertical not exposed to wind pressure. Chords Tens.Comp. Chords Tens. Comp.
1800f-1.8E: Additional Notes
:W8 2x4 DF-L 1800f-1.8E: A-M 1412 0 L-K 848 0
See DWGS A12015ENC101014,GBLLETIN1014,& M-L 1401 0
Bracing GABRST101014 for gable wind bracing
(a)Continuous lateral restraint equally spaced on requirements. Maximum Web Forces Per Ply(lbs)
member. Brace all exposed vertical surfaces for lateral Webs Tens.Comp. Webs Tens. Comp.
wind forces.Anchor the perimeter of exposed M-B 507 0 D-R 0 -1114
Special Loads vertical surfaces using sistered truss or nailer at
-(Lumber Dur.Fac.=1.15/Plate Dur.Fac.=1.15) edge of lower roof diaphragm.All diaphragms, B L 0 -655 R-S 0 -1140
TC-From 67 plf at 0.00 to 67 plf at 13.36 braces,and connections shall be designed by L-N 1119 0 S-K 0 -140.5
BC-From 10 plf at 0.00 to 10 plf at 13.36 the engineer of record. N-D 1194 0
BC- 241 lb Conc.Load at 1.93,3.93,5.93,7.93
9.93,11.93
Plating Notes
All plates are 1.5X4 except as noted. �°�E,U PRO.
Oft
Loading `0 G(NE F ,o
Truss designed to support 1-0-0 top chord outlookers to 19575
and cladding load not to exceed 3.00 PSF one face � 9
and 24.0"span opposite face.Top chord may be %,
notched 1.5"deep X 3.5" periodically along top ail
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch I.29/2117
in overhang or heel panel. GI OREGON
Bottom chord checked for 10.00 psf non-concurrent 9 `en.20 189
bottom chord live load applied per IRC-12 section O N
R LDW. 4
Renews 6/3012019
'*WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
"IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI anc7'SBCA)fr safely practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracinggr BCSI.Unless noted etherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a proppeflly
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3,B7 or B10
as applicab-Ie. Ap Ty plates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to'
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of 11 W B ildin Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSUTPI 1,or for handling,shipping,installation and bracingof tru sA al on this drawing or cover pa e• "" O"""
listing this drawing,indicates acceptance of rooessonaengineering responsbility solely tor the design shown. The suitgabrlity
and use of this awing for any structure is the responsibilit�of the Building Designer per ANSI/TPI I.c.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineilw.com;WI:www.tpinst.org;SBCA:www.sbcindustry.com;ICC:wwwaccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEAN:23502 / T9 GABL Cost:R435 JRef:1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0822.57310
Truss Label: CS CY / GWH 06/29/2017
7' 14
I. 7' I 7• �
7'
F- 3' -1 2'---H =4X4
- (TYP)
12 i
8
0
in
i
in
V
1111111 H
syi i
ille -
c_7=3X4(A1)
14"8 , 14'
1'4"8
14' 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.061 J 999 240 B 763 /78 /354 /- /116 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.117 J 999 180 H 763 /78 /354 /- /- /5.5
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.039 C - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.076 C - - B Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria CreepFactor:1.5 H Min BrgWidth Req1.5
TCDL:4.2 psf =
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.256 Bearings B&H Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.554
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.153 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
GCpi:0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17 B-E 144 -761 E-H 145 -761
Lumber
Top chord 2x4 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 DF-L 1800f-1.8E Chords Tens.Comp.
Webs 2x4 DF-L Standard
B-H 553 0
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Peo
Member design based on both MWFRS and C&C. ���'C�¢NG N q�`rSjO
'L
Additional Notes 19575
See DWGS A12015ENC101014,GBLLETIN1014,& ' %,
GABRST101014 for gable wind bracing
requirements. /1111 .
,29/2117
OREGON
9-1 OL20,107 1
Renews 6/30/2019
'"WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
"IMPORTANT"" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI anft SBCA)fr safety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing r SCSI.Unless noted ofherwise,top chord shall have properly attached structural sheathing�1 and bottom chord shall have a propper)
attach per
id ceiling. Locations shown forpermanent lateral restraint of webs shall have bracing instailed per SCSI sections B3,B7 or B10y
as app''icable. Apply plates to each face o truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Buildin .Components Group Inc.shall not be responsible for any deviation from this drawing any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or over pa AN riw`OMPANY
listing this d wingg indicates acceptance of pro7essionar engineering responsibility solely for the fes n shown. The su bil
ity
and use of tris drawing for any structure is the responsibiity of the Building Designer per ANSI/TP 1 Sec.2. 8351 Rovana Circle
Sacramento,CA 95828
For more information see this job's general notes page and these web sites:ALPINE:www.alpineilw.com;TPI:www.tpinst.org;SBCA:www.sboindustry.com;ICC:www.iccsafe.org
I
Job Number: 1706155BDC Ply: 1 SEAN:23466/ T2 COMN Cust:R435 JRef: 1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0823.00507
Truss Label: D CY / GWH 06/29/2017
6'6" 13
1 -1
6'6" 6,6" H
1114XX5
II
12
8
v
A
-
.414
111
D
3X4(81) III 1.5X4
=3X4(61)
6'6" 6'6"
k 6'6" 13, A
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in lac L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 :VERT LL 0.004 D 999 240
VERT(LL): A 564 /19 /258 /- /73 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used :VERT TL 0.009 D 999 180
Risk Category: VERT(TL): C 564 /19 /258 1_ /- 15.5
BCDL: 10.009 ry:II Snow Duration:1.15 HORZ(LL): 0.004 D - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.008 D - - A Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:20.62 ft TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 C Min Brg Width Req= 1.5
s
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.321 Bearings A&C Fc perp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.255
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.118 Members not listed have forces less than 375#
FT/RT/PT:6(0)/5(0)/2(0) Maximum Top Chord Forces Per Ply(lbs)
Loc.from endwall:Any Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 99 -670 B-C 99 -670
Lumber
Top chord 2x4 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Bot chord 2x4 DF-L 1800f 1.8E Chords Tens.Comp. Chords Tens. Comp.
Webs 2x4 DF-L Standard A-D 470 -12 D-C 470 -12
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
, 4iLe0 PROpk.
0�5 �G 1 N FF.Q
-,02
19575 9
cis,
1. 29/2117
OREGON
t
14` 90 in.20,1 .
0L NOP
W"1r
Renews 6/30/2019
*"WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handlin shipping,installing,and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component SafetyInformation,by TPI and SBCA)for safety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing per BCSI.Unless noted oTherwise,top chord shall have properly attached structural sheathingand bottom chord shall have a propefly
attached rigid ceiling Locations shown forpermanent lateral restraint of webs shall have bracinfg insalled per BCSI sections B3,B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions.
Alpine,a division of ITW Buildin�gg.�Components Group Inc.shall not be responsible for any deviation from this drawin any failure to build the µR Y
truss in conformance with ANSI TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover pa e,
listing this drawing indicates acceptance of proessional engineering responsibility solely for the design shown. The suitability
and use of this cawing for any structure is tiise responsibility of the Building Designer per ANSIfTPI 1 Sec.2. 8351 Rovana Circle
For more information see this lob's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinst.org;SBCA:www.sbclndustry.com;ICC:www.ic safe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23478/ T1 COMN Cust:R435 JRef: 1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0823.17967
Truss Label: DG CY / GWH 06/29/2017
36"366
I " 95"13 13 f
3'6"3 2'11"13 2'11"13 3'6"3
5X7
C
ib
12
8 V %1.85X4 ///1.5X4
D
in �� ��
v
AhlkhII
L E
G F C
4X7(B3) 1114X8 1114X8 =4X7(83)
4'6"2 311"12 4'6"2
1 48.2 8'5"14 -I- 13' 1
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT LL: 0.053 G 999 240
BCLL: 0.00 Enclosure:Closed ( ) A 3046 /176 /- /- /- /5.5
Lu: - Cs:not used VERT(TL): 0.105 G 999 180 E 2412 1137 /- I- /- /5.5
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.019 B - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.039 B - - A Min Brg Width Req= 3.2
NCBCLL:10.00 Mean Height 20.62 ft Code!Misc Criteria CreepFactor:1.5 E Min BrgWidth Re 2.6
TCDL:4.2 psfq=
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.240 Bearings A&E Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.683
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.850 Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply(lbs)
Loc.from endwall:Any FT/RT/PT:6(0)!5(0)/2(0) Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17 A-B 221 -3462 C-D 194 -3324
Lumber B-C 200-3376 D-E 216 -3414
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x6 DF-L 1800f-1.8E Maximum Bot Chord Forces Per Ply(lbs)
Webs 2x4 DF-L Standard Chords Tens.Comp. Chords Tens. Comp.
Special Loads A-G 2835 -173 F-E 2785 -168
G-F 1976 -118
--(Lumber Dur.Fac.=1.15/Plate Dur.Fac.=1.15)
TC-From 67 plf at 0.00 to 67 plf at 6.50
TC-From 67 plf at 6.50 to 67 plf at 13.00 Maximum Web Forces Per Ply(lbs)
BC-From 10 plf at 0.00 to 10 plf at 10.56 Webs Tens.Comp. Webs Tens. Comp.
BC-From 20 plf at 10.56 to 20 plf at 13.00 G-C 1924 -88 C-F 1825 -77
BC- 739 lb Conc.Load at 0.56,2.56,4.56,6.56
8.56,10.56
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Wind loads and reactions based on MWFRS. _so PRop..
4oGiNe . 0,
19575 '7
- i
/r
I
1$29/2117
OREGON
"9,p°L D, 'W. r
Renews 6/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI anb SBCA)fr safety practices prior to performing these functions. Installers shall provide temporary ( )581-8787 Ext
bracing per BCSI.Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a proppeerl
attached rigid ceiling. Locations shown forpermanent lateral restraint of webs shall have bracinggj�rnst fled per BCI sections B3,B7 or B10Y
as applicable. Applplates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALP IN E
Alpine,a division of ITW Buildin g.Compon nts Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing,of trussesA seal on this drawing or cover pa
listing this drawing,indicates acceptance of promessnar engineering responsibility solely for the design design
8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:W WW.tptnst.org;SBCA wwwsbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEAN:23468/ T4 GABL Cost:R435 JRef: 1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0823.27943
Truss Label: DGE CY / GWH 06/29/2017
6'6"
13'
6'6" 6'6
2.6' I 2'--I --=4X4
4
(TYP)
12
8
'v
i
A'� G
_ f r r i i i`
immime
3X4(B1) -3X4(61)
1 13' 1
13'
13'
Loading Criteria(pat) Wind Criteria Snow Criteria(Pg,Pf in PSF) Deft/CSI Criteria ♦Maximum Reactions(lbs),or"=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.001 E 999 240 A 133 /_ /79 /- /82 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.001 E 999 180 G* 86 /11 /38 /- /- /150
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.001 F - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.001 F - - A Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:20.62 ft Code/Misc Criteria CreepFactor:1.5 A Min BrgWidth Req -
TCDL:4.2 psf =
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.051 Bearings A&A Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.030
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.029 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind �¢,6,Q PRQFF-
Member design based on both MWFRS and C&C. '� S
Additional Notes 19575
See DWGS A12030ENC101014,GBLLETIN1014,& �/
GABRST101014 for gable wind bracing
requirements. /-
1. 29/2117
OREGON
9R0L D W.
Renews 613 012 01 9
"*WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Watlace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(BuildingDayton OR 97114
Component Safety Information,by TPI and SBCA)fr safely practices prior to performing these functions. Installers shall provide teporar (503)581-8787 Ext
bracing per BCSI.Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a prone
attached nngqid ceiling. Locations shown for permanent lateral restraint of webs shall have bracinc�Inssalled per BCI sections B3,B7 or B10'
as applicable. Apply plates to each face of truss and position as shown above and on the Joint:Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Buildin Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page "" C0 APANV
listing this drawing,indicates acceptance of ro7essionat engineering responsibility solely for the design shotnirt. The suitability
and use of this rawing for any structure is Me responsibilit�of the Building Designer perANSIITPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;WI:www.tpinst.org;Sack www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23538 / T21 MONO Cost:R435 JRet 1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0823.32133
Truss Label: J CY / GWH 06/29/2017
210" I3'
2'10" 2
1111.5X4D
C
12
8N
'v
(V th
B (h
C.)
4.7
0-11111.11111.11111111116 .__L
►--�
FE
A
III 1.5X4
3X4(A1)
H---1,4"8 2'10"
1 2'10" �H
3
Loading Criteria oast) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed:120 mph Pf:17.5 Ce:1.0 VERT(LL):NA B 258 /- /132 /- /48 /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL):NA E 101 /5 /56 /- /- /-
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL):-0.000 D - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.001 F - - B Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 F Min Brg Width Req= -
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.107 Bearing B Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.040
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.018 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
Right end vertical not exposed to wind pressure.
� 16.0 PRop
G,5 x.%GINe. NI
41 19575 y
(- i
/r
I. 9/2117
OREGON
Renews 6/30/2019
**WARNING*" READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
"*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI and SBCA) fsafety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing per BCS!.Unless noted otherwise,top chord shall have properly attached structural sheathing and bottomhord shall have a proppeefl
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracin installed per BCSI sections B3,B7 or B10y
as applicable. Applylates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Building_qComponents Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page " "4CONp""
listing this drawing indicates acceptance of proiessiona�engineering responsibility solely for the design shown. The suitgability
and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 .2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;WI:www.tpinst.org;SBCA:www.sbcindusiry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23540/ T17 MONO Cust:R435 JRef:1W224350004
2185A Qty: 2 FROM: DrwNo: 180.17.0823.35523
Truss Label: JA CY / GWH 06/29/2017
210" 13'
2'10" 2
III 1.5X4
BC
12
8 i
N
'v
(V
A
•
41
_L Will—i.111.11111111111111.M
►�—� ED
1111.5X4
3X4(A1)
2'10"
2'10" H A
3!"
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed:120 mph Pf:17.5 Ce:1.0 VERT(LL):NA
TL:NA A 1291 /- /63 /- /3- /5.5
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT
Risk Category: ( ) D 131 /10 /73 /- / /-
BCDL: 10.00 II Snow Duration:1.15 HORZ(LL): 0.001 E - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.002 E - - A Min Brg Width Req= 1.5
NCBCLL:10.00 Mean Height:15.00 ft TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5 E Min Brg Width Req= -
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.070 Bearing A Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.045
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.023 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver.17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
Right end vertical not exposed to wind pressure.
.(44 PROFE`S'S
0
�5
NAG 11%1E-4.
�0
19575 '17
/s i r
t, 9/2117
OREGON
*9-LOLD.W.
Renews 6/30/2019
.I **WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and fellow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,b TPI anr7 SBCA)fr safety practices prior to performing these functions. Installers shall ILTreivide temporary (503)581-8787 Ext
bracing er SCSI.Unless noted o herwise,top chord shall have properly attached structural sheathin and bottom chord shall have properly
attach I naid ceiling. Locations shown forpermanent lateral restraint of webs shall have bracing installed per BCSI sections B3,B, or B10 /11116
as app ice e. Apply plates to each face of truss and position as shown above and on the Joinf Details, unless noted otherwise. (tefer to'
drawings 160A-Z for standard plate positions. ALPINE
Alpine,a division of ITW Buildin Components Group Inc,shall not be responsible for any deviation from this drawing,any failure to build the �nwc
truss in conformance with ANSITTPI 1,or for handling,shipping,installation and bracing of tnissesA seal on this drawing or cover page
listingthis drawing,indicates acceptance of ro ssiona engineeringresponsibility solely for the design shown. The suiFabil
and se of this drawing for any structure is the responsibility of the uilding Designer per ANSI/TPI 1 Sec.2. 8351 Rovana Circle
For more information see the job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.ipinst.org;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23536/ T19 MONO Cost:R435 JRef: 1W224350004
2185A Qty: 6 FROM: DrwNo: 180.17.0823.46750
Truss Label: M CY / GWH 06/29/2017
2" 52'8 54'8
5'0"8
1111.5X4
Co
12
dH
HG F E
1111.5X4 1114X5
5'0"8
Al 578 IA
f 14"8
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs)
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL):-0.006 A 297 240 H 241 /- /153 /- /63 /-
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL):-0.014 A 141 180 E 226 /88 /14.4 /- /- /-
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.005 C - - Wind reactions based on MWFRS
42.00 EXP:B
Des Ld: HORZ(TL):0.018 C - - H Min Brg Width Req=
Des d: :10.00 Mean Height:16.66 ft Code!Misc Criteria CreepFactor:1.5 F Min BrgWidth Req 4.2 psf =
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.345
Load Duration:1.15 MWFRS Parallel Dist 0 to h/2 TPI Std:2007 Max BC CSI: 0.211 Members not listed have forces less than 375#
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.104
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard:W3 2x4 DF-L 1800f-1.8E:
Bracing
(a)Continuous lateral restraint equally spaced on
member.
Loading
Bottom chord checked for 10.00 psf non-concurrent
bottom chord live load applied per IRC-12 section
301.5.
Wind
Member design based on both MWFRS and C&C.
End verticals not exposed to wind pressure.
PROFS
A,Ck€ ,%.,
Op aG 1 N EF �O
19575 41 7
I/►
%'
I. 9/2117
OREGON
in v
9RDL D W.'
Renews 6/30/2019
"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Dayton OR 97114
Component Safety Information,by TPI and SBCA)fsafety practices prior to performing these functions. Installers shall provide temporary (503)581-8787 Ext
bracing r BCSI.Unless noted o'therwise,top chord shall have properly attached structural sheathing and bottom chord shall have a propper!
attached ceiling. Locations shown forpermanent lateral restraint of webs shall have bracingq�installed per BCSI sections B3,B7 or B10Y
as applicable. AppTy plates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to
drawings 160 -Z for standard plate positions. ALPINE
Alpine,a division of ITW Building Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover ""n"COMPANY
listing this drawing indicates acceptance of o essionaengineering responsibility solely for the design shovdn. The su bility
and use of this drawing for any sructure is tte responsibie(it of the Building Designer per ANSIRPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alpinettw.com;TPI:www.tpinstorg;SBCA:www.sbdndustry.corn;ICC:www.iccsafe.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:5760 / T18 GABL Cust:R435 JRef:1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0845.37087
Truss Label: MIGE CY / GWH 06/29/17
711.13g 5 13'4' t
711'13 '51 41r11
I-2,3-72'-! I r
I
rrvr) H1
�
w4,..
m4/;>10,74,12 ,
' J
1) O N K
N.ax12r")
1 13B' A
711'13 416'11
T11-13 Ig 5 174'
Loading Criteria(psf) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or*=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc Udefl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.002 F 999 240
Enclosure:Closed A. 99 /- /52 /- /- /95.8
BCLL: 0.00 Lu: - Cs:not used VERT(TL): 0.003 F 999 180 N* 110 /21 /52 /- /- /60.7
BCDL: 10.00 Risk Category:11 Snow Duration:1.15 HORZ(LL):-0.004 F - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):0.009 L - - A Min Brg Width Req= -
NCBCLL:10.00 Mean Height:15.00 ft Code I Misc Criteria Creep Factor:1.5 N Min Brg Width Req= -
TCDL:4.2 psf s rigid 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.069 Bearings A&N are a surface.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.055
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.226 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00.0315.15
Lumber Additional Notes
Top chord 2x4 DF-L 1800f-1.8E See DWGS A12015ENC101014,GBLLETIN1014,&
Bot chord 2x4 DF-L 1800f-1.8E GABRST101014 for gable wind bracing
Webs 2x4 DF-L Standard:W2 2x6 DF-L 1800f-1.8E: requirements.
:W4,M5 2x4 DF-L 1800f-1.8E:
Bracing
(a)Continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
(**)2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face. Top chord may be ' PROF S
notched 1.5"deep X 3.5" periodically along top '� 'V
edge.DO NOT OVERCUT.No knots or other lumber •"J 1 1NFF O
defects allowed within 12"of notches.Do not notch 19575 y
in overhang or heel panel. f
Bottom chord checked for 10.00 psf non-concurrent /1
bottom chord live load applied per IRC-12 section /' i
301.5. I, 29/2117
OREGON
Wind
Member design based on both MWFRS and C&C. 1 VS^.20,19e�' '4*
Right end vertical not exposed to wind pressure. RSL s W W.ON'
Renews 6/30/2019
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT'' FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Buildin Dayton OR 97114
Component Safety Information,by TPI and SBCA)fr safety practices prior to performing these functions. Installers shall provide temporar ( +)�187s7 Ext
bracing per BCSI..Unless noted otherwise,top chord shall have properly attached structural sheathingand bottom chord shall have a props y
attached rigid ceiling. Locations shown forpermanentlateral restraint of webs shall have bracin nsalled per BCI sections B3,B7 or B10, ..41164
as applicable. Ap y plates to each face o truss and position as shown above and on the JoinTDetails, unless noted otherwise. Defer to
drawings 160A-Z floor standard plate positions. ALPINE
Alpine,a division of ITW Buildin q,Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSIITP1 1,or for handling,shipping,installation and braci
ng of trussesA seal on this drawing or cover pa e
listing this drawing,indicates acceptance of proiessionaf engineering responsibility solely for the desi n shown. The suit-abili
and use of this awing for any structure is the responsibility of the Building Designer per ANSIITP11 Sec.2. 8351 Rovana Circle
For more information see this lob's general notes page and these web sites:ALPINE:www.aipineitw.com;TPI:we SBCA:www.sbdndustry.com;ICC:www.iccsare.org Sacramento,CA 95828
Job Number: 1706155BDC Ply: 1 SEQN:23500 / T8 GABL Cost:R435 JRef:1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0824.29557
Truss Label: M2GE CY / GWH 06/29/2017
133• }�'4re
137
��
F 1.418—I-2--i
A Al
dililL
3XNe1)
I Ire I
133'133' II%'�IreI
Loading Criteria(psi) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(lbs),or*=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:H PP Deflection in loc Udefl U# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.002 G 999 240 J. 100 /8 /48 /- /18 /160
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.003 G 999 180 Wind reactions based on MWFRS
BCDL: 10.00 Risk Category:11 Snow Duration:1.15 HORZ(LL):-0.003 G - - A Min Brg Width Req=
Des Ld: 42.00P'B HORZ TL:-0.005 G - - Bearing
Mean Height:15.00 ft ( ) A Fc Pere=625psi.
NCBCLL:10.00 TCDL:4.2 psf Code/Misc Criteria Creep Factor:1.5
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max IC CSI: 0.051 Members not listed have forces less than 375#
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2007 Max BC CSI: 0.017
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.156
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard:W1 2x4 DF-L 1800f-1.8E:
Bracing
(a)Continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch
in overhang or heel panel. P
� .
.6, ROFS,p_
Bottom chord checked for 10.00 psf non-concurrent 'tl�
bottom chord live load applied per IRC-12 section i' e4G i N e• O
301.5. 19575 R 7
Wind • %1
Member design based on both MWFRS and C&C. I- r
Right end vertical not exposed to wind pressure. I,29/2117
OREGON
Additional Notes 9 20 190
Ra ��.
See DWGS A12015ENC101014,GBLLETIN1014,&
GABRST101014 for gable wind bracing L p w"
requirements.
Renews 6/30/2019
*'WARNING*` READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
**IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handling,shipping,ingtalling and bracing. Refer to and follow the latest edition of BCSI(Building DayOR 97114
Component S fety Information,by TPI and SBCA)fsafety actices priorton to performing these functions. Installers shall provide tempora (503)581.8787 Ext
bracing r BCSI.Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a pro erl
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracingjnstalled per BCI sections B3,B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint-Details, unless noted otherwise. Refer to ALPINE LPI N E
drawings 160A-Z for standard plate positions.
Alpine,a division of ITW Building_Components Group Inc.shall not be responsible for any deviation from this drawing any failure to build the v COMPANY
truss in conformance with ANSI/TPI 1,or for handling,shipping,installation and bracing of trussesA seal on this drawing orover pageAN
listing this drawing indicates acceptance of pro7essIonat engineeringresponsibility solely for the desi'gan shown. The su ' bility
and use of this drawing for any structure is the responsibility of the uilding Designer per ANSI/TPI 1 c.2. 8351 Rovana Circle
Sacramento,CA 95826
For more information see this job's general notes page and these web sites:ALPINE:www.alpineitw.com;TPI:www.tpinst.org;SBCA:wwwsbdndustry.com;ICC:www.ictsafe.org
Job Number. 1706155BDC Ply: 1 SEQN:23534/ T16 GABL Cust:R435 JRef: 1W224350004
2185A Qty: 1 FROM: DrwNo: 180.17.0824.39270
Truss Label: MGE CY / GWH 06/29/2017
I13'4- .8.
13'4'
[1---PIPi Y--i
(TYP) H1
AiIIwu :
I 13'9' 1
I 13'.41
13'41 1191
Loading Criteria(pst) Wind Criteria Snow Criteria(Pg,Pf in PSF) Defl/CSI Criteria A Maximum Reactions(lbs),or*=PLF
TCLL: 25.00 Wind Std: ASCE 7-10 Pg:25.0 Ct:1.0 CAT:II PP Deflection in loc L/defl L/# Loc R /U /Rw /Rh /RL /W
TCDL: 7.00 Speed: 120 mph Pf:17.5 Ce:1.0 VERT(LL): 0.001 F 999 240 A* 105 /- /51 /- /48 /60.0
BCLL: 0.00 Enclosure:Closed Lu: - Cs:not used VERT(TL): 0.003 F 999 180 J* 97 /18 /47 /- /- /102
BCDL: 10.00 Risk Category:II Snow Duration:1.15 HORZ(LL):-0.003 F - - Wind reactions based on MWFRS
Des Ld: 42.00 EXP:B HORZ(TL):-0.004 F - - A Min Brg Width Req= -
NCBCLL:10.00 Mean Height:15.00 ft Code/Misc Criteria CreepFactor:1.5 P Min BrgWidth Req -
TCDL:4.2 psf =
Soffit: 2.00 BCDL:6.0 psf Bldg Code: IRC 2012 Max TC CSI: 0.060 Bearings A&P Fcperp=625psi.
Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std:2007 Max BC CSI: 0.033
Spacing:24.0" C&C Dist a:3.00 ft Rep Factors Used:Yes Max Web CSI:0.130 Members not listed have forces less than 375#
Loc.from endwall:Any FT/RT/PT:6(0)/5(0)/2(0)
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:17.01.00E.0525.17
Lumber
Top chord 2x4 DF-L 1800f-1.8E
Bot chord 2x4 DF-L 1800f-1.8E
Webs 2x4 DF-L Standard:W1,M6 2x4 DF-L
1800f-1.8E:
Bracing
(a)Continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 3.00 PSF one face
and 24.0"span opposite face.Top chord may be
notched 1.5"deep X 3.5" periodically along top
edge.DO NOT OVERCUT.No knots or other lumber
defects allowed within 12"of notches.Do not notch ��$D PROP .
in overhang or heel panel.
Bottom chord checked for 10.00 psf non-concurrent �y �G t M e• �O
botto chord live load applied per IRC-12 section G 19575 R y
1
Wind �- .....„
Member design based on both MWFRS and C&C. 1. 9/2117
Right end vertical not exposed to wind pressure. OREGON
as v
See AdditionalDWGS A12015ENC101014,GBLLETIN1014,& 9R OL20,
'W W.
r
GABRST101014 for gable wind bracing
requirements. Renews 6/30/2019
*`WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Oregon Truss
*"IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS 17900 SE Wallace Rd.
Trusses require extreme care in fabricating,handlin shipppin installing and bracing. Refer to and follow the latest edition of SCSI(Building Dayton OR 97114
Component Safety Information,by TPI and SBCA)for sarety practices prior to performing these functions. Installers shall.provide temporary (503)581-8787 Ext
bracingper BCSI.Unless noted o7herwise,top chord shall have properly attached structural sheathin and bottom chord stlall have a proper)
attached rigid ceiling. Locations shown for ermanent lateral restraint of webs shall have bracing insg�,Iled per BCSI sections B3,B7 or 61u
as applicable. Apply plates to each face oftrussand position as shown above and on the Joint-Details, unless noted otherwise. Defer to
drawings 160A-Z for sandard plate positions. A LPI NJ E
Alpine,a division of ITW Building_Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the
truss in conformance with ANSI/TR1,or for handling,shipping,installation and bracing of trussesA seal on this drawing or cover page "" "` `""
listing this drawing indicates acceptance of prolesslonar engineering responsibility solely for the design shown. The suitability
and use of this drawing for any structure is the responsibility of the Buildifig Designer per ANSUTPI 1 Sec.2. 8351 Rovana Circle
For more information see this job's general notes page and these web sites:ALPINE:www.alp neitw.cwn;TPC www.tpinsLorg;SBCA:www.sbcindustry.com;ICC:www.iccsafe.org Sacramento,CA 95828