Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (428)
,, , b -1- ? c")(7- 0 03 3 0 Sl,g bVJ L / . 1 Bulletin MILBRANDT AR(HITE(TS Bulletin#: MA-21 Date: 10-23-17 ATTACHMENTS: MA-21.1-MA21.3 Job Name: Polygon at River Terrace East(Area 3)-Plan 7A,Lot 206 Job No: 1503 Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.At Lot 206,the building was placed too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into the living area on the attached bulletin page:MA-21.1-MA21.3 and any accompanying structural documents. Distribution Job Site Paul McColm Client Chris Walther Angela Grajewski Nichole Thorpe Struct.Eng. Arne Solomon City of Tigard Tom Hochstatter .... -- 25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM cLAY C �� - 36" /� a FACTORY-BUILT APPROVDI DIRECTWIDE FLUSH ABOVEBEAM) 4,..L.,., UL VENT GAS FIREPLACE 2' 6x6 POST r� W/ GWB FINISH--..g—'7.. Entry I co I r; l 1 5Y2 ... N 1 -� 1 Living 2x6 39" HIGH 1 m I II L. 11 WALL W/ FINISH in �' TRIM AT TOP + 1 SAFETY 1.,i ....*C",' GLAZING , ?-1'-111 \ 12" TILE I. LI HEARTH 1-6 p-10 F cn —c1 20 � m 1 2'-0Y4"1 2'-8Y2" 2 In N� A10 4 X A' 1 �- N I \ \ , 3'-9/6 5;0 SH 2-6,5-0 F 2- 5-0 F 2r6 5-0 / 4" I 3'-0" I 3'-0" .1, 3'-0" I, 3-9J4 Po rc X 16'-6Y2" 9'-5Y2" --, / \ T / 20 �.��' All Y1, 9'-0" 10'-7y' PLAN 7A FIRST FLOOR 1/4"=1'-0" ENGLISH REVIVAL 31 L1J i I 13/a" x viiLVL ___ " i r--r__,30,30,10- nI 1 FOOTING W/ __ _ 18"x18"x10" FTG. `n I .%____1_ 1 (3) #4 EA. W W/ (2) #4 EW \ I 1 I 6x6 P.T. PO TYP. U.N.O. � L�1 'in 10 13'4" x 9Y2" LVL I SIM.S6.0 a SIM. ___t___— ^ 2x4I PONY 7 n ri WALL I r -113" i 1 S6.0 SIM I 6 TART FRMG. 1 r I �n L • 1 t 1 ei S6.0 q S l 1 w - �' 31" CON STHD14 m d. I STHD9,_5y2. 3/" � 16'-6Y2" � Ai 1 C.) I ~' I r-THICKENED SLAB EDG co r • ABU44 /MOP,I o \ TOP OF SLAB I -61/2" 6'-0" 83/4" 9'-2.. 10'-73/2" i PLAN 7A FOUNDATION PLAN 1/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN N GE: DATE: 10-23-17 SCALE 1/4" = 1'-0" PREPARED BY: Alexia Fukui REF. SHEETS: A3, A6 MA-211 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. .0 • RJ RJ RJ RJ 1 04 11 MO I 41 0 Alk Aft • Mir I E LJ 20 All PLAN 7A ROOF PLAN I/4"=I'-0" ENGLISH REVIVAL x �y — INcs �� LJ t 6X6 POST I o r-_- r I o 2 , 9 I 1 S9.0 O GT ABOVE GT ABOVE "'© n--tel I 0 STHD14 STHD14 4x8 HDR 4x8 HDR 4x8 HDR 4x8 HDR co d 1 �N S9.0 o¢ ® Q 8 S1.2 I -�- -� 6x6 POST L ---- --- W/ ACE4 PLAN 7A UPPER LEVEL FLOOR FR MING I/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 10-23-17 SCALE: 1/4" = 1'-0" PAGE: PREPARED BY: Alexia Fukui REF. SHEETS: A7, A8 MA-21.2 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. A 12 A10 STOP OF PLATE _----- FIBER-CEMENT LAP SIDING -- --. 5" EXPOSURE t -,- 1 [ . ... Aik 2ND FIN. FLOOR_ ~ GARAGE _1 u ' _ e TOP PLATE 1 4 - _ \\ M - 0 20 0 a' -- = All -t---- _1ST FIN._FLOOR I'--1 1 r G.9 PLAN 7A LIVING SIDE ELEVATION 1/8"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN N GE: DATE: 10-23-17 SCALE: 1/8" = 1'-0" PREPARED BY: Alexia Fukui REF. SHEETS: A9 , MA-213 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. Si r