Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MAR2018-00001
MAR2O18 - 00001 Process Development Labs , LLC NOTICE OF TYPE I DECISION MARIJUANA FACILITY PERMIT MAR2018-00001 PROCESS DEVELOPMENT LABS, LLC TIGARD 120 DAYS = August 8,2018 SECTION I. APPLICATION SUMMARY FILE NAME: PROCESS DEVELOPMENT LABS, LLC CASE NO.: Marijuana Facility Permit(MAR) MAR2018-00001 PROPOSAL: The applicant is proposing a new non-retail marijuana facility inside an existing tenant space at 7350 SW Landmark Lane, Suite 120. Specifically, the applicant proposes marijuana processing; as defined under Oregon Administrative Rules, Chapter 845, Division 25, marijuana processing refers to "the processing, compounding or conversion of marijuana into cannabinoid products, cannabinoid concentrates or cannabinoid extracts." Additionally, marijuana processing is considered a general industrial use under TDC Chapter 18.60 Use Categories. APPLICANT: Process Development Labs,LLC Attn:Jorge Aviles 4207 SE Woodstock Boulevard,#110 Portland,OR 97206 OWNER: B-1 Landmark,LLC By Prentiss C. Hicks Trust 7350 SW Landmark Lane Tigard,OR 97224 LOCATION: 7350 SW Landmark Lane,Suite 120 WCTM 2S112AB,Tax Lot 300 ZONING DESIGNATION: I-H: Heavy Industrial Zone. The I-H zone. provides appropriate locations for intensive industrial uses including industrial service, manufacturing and production, research and development, warehousing and freight movement, railroad yards, waste-related and wholesale sales activities. Activities in the I-H zone include those that involve the use of raw materials, require significant outdoor storage and generate heavy truck and/or rail traffic. Because of these characteristics, I-H-zoned property has been carefully located to minimize impacts on established residential,commercial and light industrial areas. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.430.040 MAR2018-00001 Process Development Labs,LLC 1 SECTION II. DECISION Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request, subject to certain conditions of approval. The findings and conclusions on which the decision is based are noted in Section IV. CONDITIONS OF APPROVAL THE FOLLOWING CONDITION SHALL BE SATISFIED: The applicant shall prepare a cover letter and submit it, along with any supporting documents and/or plans that address the following requirements to the PLANNING DIVISION, ATTN: LINA SMITH (503)718-2438 or LinaCS@tigard-or.gov. The cover letter shall clearly identify where in the submittal the required information is found: 1. Prior to occupancy, the applicant shall submit documentation of approval from the State of Oregon Recreational Marijuana Program. 2. Prior to occupancy,the applicant shall submit a site plan and a photometric drawing.These plans shall clearly illustrate how proposed security lighting will meet the standard outlined in '1'DC 18.430.040.G. THIS APPROVAL SHALL BE VALID FOR 18 MONTHS FROM THE EFFECTIVE DATE OF THIS DECISION. SECTION III. BACKGROUND INFORMATION Site Information: The project is located at 7350 SW Landmark Lane, Suite 120; on the north side of SW Landmark Lane, south and west of SW 72nd Avenue, and east of Fanno Creek. The 1.06-acre site is made up of one (1) tax lot, and contains one (1) existing industrial building, with associated parking and landscaping. City records show the subject tenant space was previously occupied by a general industrial use. The applicant is proposing a new non-retail marijuana facility inside the subject tenant space for marijuana processing, which is also considered a general industrial use under'IDC Chapter 18.60 Use Categories. The site is located in the Heavy Industrial Zone (I-H). SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS 18.430 Marijuana Facilities: 18.430.040 Development Standards A. The proposed development complies with all applicable state requirements and requirements of this title. The proposed development complies or can be made to comply with all applicable state requirements and requirements of this Title,as demonstrated by the analysis contained within this decision,and through the imposition of conditions of approval. All necessary conditions must be satisfied prior to occupancy. This standard is met. B. The proposed development meets all of the following site location restrictions. All distances shall be measured at the closest property lines between the proposed site and nearest lot or MAR2018-00001 Process Development Labs,LLC 2 parcel containing the specified use or characteristic. 1. Marijuana facilities are prohibited within the MU-CBD zone. The proposed marijuana facility is not located within the MU-CBD zone;it is located within the I-H zone. This standard is met. 2. The proposed development is not within 1,000 feet of a public or private elementary school,secondary school, or career school attended primarily by minors. Staff reviewed city maps to confirm that the proposed marijuana facility is not located within 1,000 feet of a public or private elementary school, secondary school, or career school attended primarily by minors. This standard is met. 3. Sale-oriented retail and wholesale sales uses open to the public shall be subject to the following restrictions: a. Shall be located on a lot or parcel with frontage along Pacific Highway (Oregon Route 99W); b. Shall not be located within 1,000 feet of another state-licensed retail or wholesale marijuana facility within or outside of city limits;and c. Shall not be located within 500 feet of a public library or Tigard parks and recreation zone. This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use). Therefore,these standards do not apply. 4. Non-retail uses and wholesale sales uses not open to the public shall not be located within 500 feet of one or more of the following zones or facilities: a. Residential zone; b. Parks and recreation zone; c. Public library. This proposal is for a non-retail marijuana facility for marijuana processing(a general industrial use) at 7350 SW Landmark Lane,Suite 120.Staff reviewed city maps to confirm the proposed facility is not located within 500 feet of a residential zone, the Parks and Recreation Zone (PR), or a public library.These standards are met. D. Hours of commercial operation shall be limited to the hours between 7:00 am and 10:00 pm. General industrial uses with no on-site retail activity are exempt from this restriction. This proposal is for a non-retail marijuana facility for marijuana processing(a general industrial use),with no on-site retail activity.Therefore,this standard does not apply. E. Primary entrances shall be clearly visible from Pacific Highway(Oregon Route 99W). This standard only applies to marijuana facilities for sales-oriented retail and wholesale sales open to the public that are located on SW Pacific Highway. This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use). Additionally, this proposed marijuana facility is located on SW Landmark Lane,not SW Pacific Highway.Therefore,this standard does not apply. F. The proposed development shall be located inside a permanent building and may not be located within a trailer, shipping container, cargo container, tent, or motor vehicle. Outdoor MAR2018-00001 Process Development Labs,LLC 3 storage of merchandise,plants, or other materials is not allowed. Staff reviewed the applicant's site plan to confirm the proposed marijuana facility is located inside a permanent building. Additionally, the applicant's narrative states there will be no outdoor storage of merchandise,plants,or other materials. This standard is met. G. Parking lots, primary entrances, and exterior walkways shall be illuminated with downward facing security lighting to provide after-dark visibility to employees and patrons. Fixtures shall be located so that light patterns overlap at a height of 7 feet with a minimum illumination level of 1.0 footcandles at the darkest spot on the ground surface. The applicant's materials do not address security lighting. Accordingly, staff has included a condition of approval that requires the applicant to submit a site plan and photometric drawing prior to occupancy.These plans shall clearly illustrate how proposed security lighting will meet the standard outlined above. As conditioned,this standard is met. H. Drive-through marijuana facilities are prohibited. The applicant is not proposing a drive-through marijuana facility; this proposal is for a non-retail marijuana facility within a permanent building.This standard is met. I. The proposed development shall confine all marijuana odors and other objectionable odors to levels undetectable at the property line. The applicant's narrative states that all marijuana odors and other objectionable odors will be limited to levels undetectable at the property line.This standard is met. J. Marijuana or marijuana products shall not be visible from the exterior of the building or structure. (Ord.17-22§2) ■ The applicant's narrative states that marijuana or marijuana products will not be visible from the exterior of the subject building.This standard is met. CONCLUSION: This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use), and is in compliance with the applicable requirements of this Title. SECTION V. PROCEDURE AND APPEAL INFORMATION Notice: Notice was provided to: X The applicant and owner Final Decision: A Marijuana Facility Permit is a Type I procedure. As such, the Director's decision is final for purposes of appeal on the date it is mailed or otherwise provided to the applicant, whichever occurs first. The Director's decision is not appealable locally,and is the final decision of the City. MAR2.018-00001 Process Development Labs,LLC 4 THIS DECISION IS FINAL ON APRIL 11, 2018. AND BECOMES EFFECTIVE ON APRIL 12, 2018. Questions: If you have any questions, please contact Lina Smith at (503) 718-2438 or LinaCSatigard-or.gov. 4111W ✓ April 11, 2018 APPROVED BY: Lina Smith Assistant Planner MAR2018-00001 Process Development Labs,LLC 5 "7-i'w- �_ 1�7 7350 SW LANDMARK LANE - mPR'6PQ.CoGl;ir ! 230' I . _ >_r:r7"r�+"rr->rr-, r •-�r7->'T r-•rs • r.�r>7 r> r>,. r _ • • /� / //, icei / /,////// / // ;/ ;; '`'AJ//,�11,/.// /%%i;'X>A</.il;, �/�'•//Z//' / i/ > I i I ( ,,,,,;;;;,(,/ /� �� 50' + 110' �f //� \V-' -' — lj ; t ' / _. :clt ,',/://.( ////// M 2 400 sq.ft. ' lic/ ' J i./ _ X� \ ///f 340 sq.ft. 340 sq.ft. J Dock j /� j/ �� 23' g �--23' 1 "'' I 2 ? -. Q / g 2.160 sq.R "F+--35'7. 3 / ';1/// /' / :: ,A / Approx. // / �� Existing � / ' , _ g ✓,/� w Water tineR / /' '',-,,, so ,,_ P7 i ':'-s'i$ ,--1--, 4i,/';!frithli / 1 -?r.1"LC-4.1 4 ' -', i --,, ,, 1,080 sq.ft. i 1_ e rold, RS 1' rijorr C-7/ /:,/ / a//zre , •/ O V IC: /;--------, ,„._ , ,/ . . , 1 / r 2 /4/ // Q! / /7/1/ //, ,,/ , o s. Landmark Lane )-0 Fri /v tit (1) F�1 F-4 1-4 , . . RECEIVED APR 05 2018 City of Tigard N COMMUNITY DEVELOPMENT DEPARTMENT• CITY OF TIGARDENGINEERING PLANNING/ Marijuana FacthtyPermit T e I Application 1 Yp PROPOSAL SUMMARY (Brief description) // REQUIRED SUBMITTAL sV Pant- A ginetAQ C1 u j'-"- 9 C C. ELEMENTS ♦ /f tr t3 n.,ck b ( �"Z1 I , Cf Owner's Signature/Written 7% /t / 4 7 ;--e_' L/i it 1ArAuthorization /5 �? /- el t: _/17 C I el.� --r i f I I. dTitle Transfer Instrument or Deed Ot( (r / ,Ki-5c (L'C CO 'u i2 ct 17 1 'S ,�. � / Site Plan(3 large plans drawn to scale a// Gcj j �U 7 yr-e)(4," ; and one reduced to 8.5x11/z ) Er_`�t /+� Applicant's Statement/Narrative Property address/locaation(s) ,��: Lci rm. k C L (3 copies) Address criteria in: --7-(y G'c et CJg 7 72 2 W j J (1:szla-0 .11)(i ,x;.4:31).,)1(, Tax map and tax lot #(s): r.5 112-4 6 to 3e0 LJ Filing Fee ,/7,7_, / Site size: I' 0E 6te oe 0._Q-15-622 5r (5 i-c. tic) FOR STAFF USE ONLY / / Case No.: M (2-101 - 00001 Applicant*: Pre a 5'5 /ig,'.e�[� i'vl./n I J bs 1-1.—C Related Case No.{s}: Address: Cf�,Zc q- 5e, u3645- t-r. c k- I t vel tHloApplication Fee: 7 City/state: /2Ur-T L,4,,d Ok Zip: Gi 7206., Application accepted: �j r Phone(3) $0"/ )`email: Jeiv i l.eS s _1.01,4 r/- 27/17. By: VY) () Date: Ii 1/ 16 J Application determined complete: PROPERTY OWNER/DEED HOLDER(S)* D Same as Applicant / Name: Fre Yl �" ► 5 5 141' C �_� /. By: � �S Date: /o e Address: Y 5-0 •j1.- Lc,v1 a rviti r /e I:\CommuniryDevelopment\landUseApplications\02_Forms City/state: rfi tin,L� and Templates\Land Use Applications Rev.12/14/2017 3c r O R. Zip: C/f}L4- Contact name: P;e/\ +155 H t C ��S Phone number: cf 7-I - ,Z g - Cg 7zs- .When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner.The owner(s) must sign this application in the space provided on the back of this form or submit a written authorization with this application. APPLICANT'S STATEMENT The applicant's statement must include a summary of the proposed changes. Criteria in either I S.4I.Th.O4(I must be addressed with a detailed response to each criterion. Failure to provide the information needed to process the application would be reason to consider an application incomplete and delay review of the proposal. In addition,the Director must find that the proposed change is in compliance with all applicable requirements of Title 18 of the Tigard Development Code.To complete this review,the Applicant's proposal must include a discussion indicating how the site expansion/change will continue to comply with the maximum setback,building height,parking,and landscaping standards. Other requirements of this title such as clear vision, solid waste storage,non-conforming situations,signs,and tree removal may also be applicable depending on the type and location of the proposed modifications. City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 2 APPLICANTS To consider an application complete,you will need to submit ALL of the REQUIRED SUBMITTAL ELEMENTS as described on the front of this application in the"Required Submittal Elements"box. THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true; and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGjai • M.O.,ilL: . •• - of the subject property required. AIM la II , �oCCI e. A\li L. s 5 /8 Applicant's �na• � Print name V Date - -.1,- --. L Z L t rt l I�- K S Li /'-, Owner's signature Print name Date Owner's signature Print name Date ADDITIONAL OWNER/DEED HOLDER INFORMATION Name: Name: Address: Address: City/state: Zip: City/state: Zip: Signature: Signature: MARIJUANA FACILITY PERMIT APPLICATION City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 2 ASTATE OF OREGON SS TICOR TITLE I NSU RAN( Cc of Washington ,, Jerry B. Hanson, Director of Assess- ment and Taxation and EX-officio County Clerk for said county,tioreby certify that the within instrument o#. rwas received FULL RECONVEYANCE For Recc and recorded in'Ig -,fiords of said county. ";' . 'I` LIU File No: 8017771 "•'.' ,:i.,":: I... Jerry :'ri�Sdti,Director of recording, mail to: Asses&mbi�t'a,Dt�lfaxation, Ex- After Officio County'CIerk CC ATTN: 0 PRENTISS HICKS Doc : 96032273 (.„) 7350 SW LANDMARK LANE Rect: 16239B 13 . 00 r TIGARD, OR 97224 04/11/1996 03: 45: 14PM Ref: TICOR TITLE INSURANCE COMPANY 10r— d FULL RECONVEYANCE LI CU The undersigned on behalf and by authority of the Trustee under that certain Deed of Trust, dated October 21, 1977, in which PRENTISS C. HICKS AND NANCY D. HICKS is grantor and WARD COOK, INC. , AN OREGON CORPORATION is beneficiary, recorded on October 24, 1977 as Fee No. 77-14471 in Book 1210, at Page 763, records of WASHINGTON County, OREGON, having received from the beneficiary under said Deed of Trust a written request to reconvey, reciting that the obligations secured by the Deed of Trust have been fully satisfied, does hereby reconvey, without warranty, to the person(s) entitled thereto all of the right, title and interest now held by said Trustee in and to the property described in said Deed of Trust, and described herein: AS SET FORTH ON SAID DEED OF TRUST Dated: April 10, 1996 By authorit. of Trust rporation By: Thomas C. Mc olloch, Asst Vice Pres TICOR TITLE INSURANCE COMPANY STATE OF OREGON, COUNTY OF Multnomah The foregoing instrument was acknowledged before me on April 10, 1996 by Thomas C. McColloch, Asst Vice Pres of TICOR TITLE INSURANCE COMPANY on behalf of the trustee corporation. n A \jo.62itr a 1 Notar ublic fo OREGON My appointment expires "V:11:. OFFICIAL SEAL .• - SALLY JO BOTTGER NOTARY PUBLIC-OREGON "0' COMMISSION NO.047080 MY COMMISSION EXPIRES SEPT 14, 1999 Ticor Title Insurance Company 110' ,., I ,_ ,------. -i-. 1 0t overhead door (grade-level) SUITE 120 t . 5,622 sf 12' overhead door Covered i --\ Bath' 'Z`'' Dock Office Office Office -- Bath lBath �. REC8VED APR 0 5 2018 CITY OF TIGARD PLANNING/ENGINEERING Process Development Labs LLC, DBA, Original Extract 03/29/2018 7350 SW Landmark Ln Ste 120 Tigard OR 97224 RECE !ED APR 05 2018 Applicant statement/ narrative CITY OF TIGARD PLANNING/ENGINEERING Per Tigard City code 18.430.040: • Original Extracts is an OLCC licensed cannabis processor. Compliance, compliance, compliance is our philosophy; the success of our business depends on it. We are already compliant with the State and we will comply with all requirements from the City of Tigard. • We have been to the City of Tigard planning services counter and have verified that the facility at 7350 SW Landmark Ln is allowed to operate as a marijuana facility in the City of Tigard. Our operation is non-retail and the building is zoned I-H, heavy industrial. City staff has looked at the location and have determined that it meets the 500 feet rule found in the discussed city code. • The proposed site location is approximately 5622 SF of warehouse and office space. Our operation is located inside this building. All operations will be contained within this building and we will not have any storage of merchandise or any materials outside. • Our parking lot accommodates approximately 17 off street parking spaces. Our primary entrance, parking lot and surroundings are well lit and we will also have one camera outside our entrance for security purposes. • We have no drive through services what so ever. • Since we are not growing any marijuana, we are able to mitigate odor concerns by sealing and storing raw material in a sealed room behind a steel door.The only time marijuana is exposed in the open is when we are loading our processing machine. Our machines capacity holds 16 pounds of marijuana at a time. Our previous location was half the size of the proposed site and was located inside a build with multiple tenants. We never had any odor complaints. • There will be no marijuana products visible from the exterior of the building. O l J Qo '):741 0-1 till O `"SOCITY/COUNTY USE ONLY 04-14 ,0-1-141.1.4%� OREGON LIQUOR CONTROL COMMISSION REQUEST Date delivered by license applicant: nf MCC ° zmpri Land Use Compatibility Statement RECEIVED What is a land use compatibility statement(LUCS)?The LUCS is a form used by a state agency APR 0 5 2018 and local government to determine whether a land use proposal is consistent with local govern- CITY OF TIGARD ment's comprehensive plan and land use regulations. RRhiGNb3111'13{ENGINEERING Why is a LUCS required?OLCC and other state agencies with permitting or approval activities that 4 IN - Sk1 en4 affect land use are required by Oregon law to be consistent with local comprehensive plans and to have a process for determining consistency. Section 34(4)(a) of 2015 Oregon Laws, Chapter 614, Initial: requires OLCC to request and obtain the LUCS and have a positive LUCS prior to issuing a license. When is a LUCS required?A LUCS is required for all proposed marijuana facilities before an OLCC license can be obtained. How to complete a LUCS: • Step 1: Applicant completes Section 1 of this form and submits it to the appropriate city or county planning office. Applicant verifies with local jurisdiction whether additional forms,applications,or permits are required. • Step 2:Local jurisdiction completes Section 2 of this form indicating whether the proposed use is compatible with the acknowl- edged comprehensive plan and land use regulations and returns signed and dated form to the applicant. • Applicant completes payment to local jurisdiction for processing application. • Local jurisdictions are NOT required to begin processing LUCS forms until January 4,2016 at 8:30 AM. • Step 3:Applicant submits this date-stamped form and any supporting information provided by the city or county to the OLCC with the license application.This form may be submitted while Section 2 is in process with the local governing body. Applicant Name: Pro 2__55 E j l,Piy-t2rl Phone: 503 8:11 Mailing Address: 1?C 5( L/z.-)C) ='cic/5" c C1 A'/vcA. Rm/Ste: // City: A.,--/24 ,,_„( State: (3 ZIP: 72 t_� Site plan of the subject property and proposed development attached? (required) Proposed Premises Address: • 5-t 5 - -cin rACI Rm/Ste: City: A r cL. County: C:�.)��k t �j ZIP: �� 7 2 Z Tax Lot#*: 5 1 1 Z,A R CO 340 Range/ Section*: t. Latitude: 3 25_ C . ( f'v, Township*: 2 Map*: ..7>( I, A i . Longitude: /22. '/S c 2 . 2- Ct) Proposed use/permit type sought(A separat- - ..a be necessary for each proposed use even if it is on the same property): Producer Wholesaler Processor Retailer Laboratory Research Certificate Note indoor or List endorse- I outdoor below ments below Details of proposed use(note any attachments): • tc - Site Location: ✓ Inside city limits ❑ Inside UGB Outside UGB Name of Jurisdiction: City of Tigard Property Zoning of I-H: Heavy Industrial Zone Proposed Premises: The proposed land use has been reviewed and is prohibited. ✓ The proposed land use has been reviewed and is not prohibited. If the proposed land use is allowable only as a conditional use, permits are required as noted below. Comments: The proposed non-retail marijuana facility for marijuana processing(a general industrial use)meets the development standards outlined in the City of Tigard Community Development Code,Chapter 18.430 Marijuana Facilities. Applicant has obtained a Type I Marijuana Facility Permit that has been approved,subject to certain conditions of approval.Please see attachment. Name of Reviewing Local Official (print): Lina Smith Title: Assistant Planner Date: April 11, 2018 Email: LinaCS@tigard-or.gov Phone: (503) 718-2438 Signature: -.C=1 Check this box if there are attachments to this form: ✓ • 4F- -11Ir 111 REMINDER: Local jurisdictions are N required to begin processing LUCS forms until Januar 4 2016 at 8:30 AM NOTICE OF TYPE I DECISION MARIJUANA FACILITY PERMIT MAR2018-00001 1111 PROCESS DEVELOPMENT LABS, LLC T I GARD 120 DAYS = August 8, 2018 SECTION I. APPLICATION SUMMARY FILE NAME: PROCESS DEVELOPMENT LABS, LLC CASE NO.: Marijuana Facility Permit (MAR) MAR2018-00001 PROPOSAL: The applicant is proposing a new non-retail marijuana facility inside an existing tenant space at 7350 SW Landmark Lane, Suite 120. Specifically, the applicant proposes marijuana processing; as defined under Oregon Administrative Rules, Chapter 845, Division 25, marijuana processing refers to "the processing, compounding or conversion of marijuana into cannabinoid products, cannabinoid concentrates or cannabinoid extracts." Additionally, marijuana processing is considered a general industrial use under'l'DC Chapter 18.60 Use Categories. APPLICANT: Process Development Labs,LLC Attn:Jorge Aviles 4207 SE Woodstock Boulevard,#110 Portland,OR 97206 OWNER: B-1 Landmark,LLC By Prentiss C. Hicks Trust 7350 SW Landmark Lane Tigard,OR 97224 LOCATION: 7350 SW Landmark Lane,Suite 120 WCTM 2S112AB,Tax Lot 300 ZONING DESIGNATION: I-H: Heavy Industrial Zone. The I-H zone. provides appropriate locations for intensive industrial uses including industrial service, manufacturing and production, research and development, warehousing and freight movement, railroad yards, waste-related and wholesale sales activities. Activities in the I-H zone include those that involve the use of raw materials, require significant outdoor storage and generate heavy truck and/or rail traffic. Because of these characteristics, I-H-zoned property has been carefully located to minimize impacts on established residential,commercial and light industrial areas. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.430.040 MAR2018-00001 Process Development Labs,LLC 1 SECTION II. DECISION Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request, subject to certain conditions of approval. The findings and conclusions on which the decision is based are noted in Section IV. CONDITIONS OF APPROVAL THE FOLLOWING CONDITION SHALL BE SATISFIED: The applicant shall prepare a cover letter and submit it, along with any supporting documents and/or plans that address the following requirements to the PLANNING DIVISION, ATTN: LINA SMITH (503)718-2438 or LinaCS@tigard-or.gov. The cover letter shall clearly identify where in the submittal the required information is found: 1. Prior to occupancy, the applicant shall submit documentation of approval from the State of Oregon Recreational Marijuana Program. 2. Prior to occupancy,the applicant shall submit a site plan and a photometric drawing.These plans shall clearly illustrate how proposed security lighting will meet the standard outlined in 'I'DC 18.430.040.G. THIS APPROVAL SHALL BE VALID FOR 18 MONTHS FROM THE EFFECTIVE DATE OF THIS DECISION. SECTION III. BACKGROUND INFORMATION Site Information: The project is located at 7350 SW Landmark Lane, Suite 120; on the north side of SW Landmark Lane, south and west of SW 72nd Avenue, and east of Fanno Creek. The 1.06-acre site is made up of one (1) tax lot, and contains one (1) existing industrial building, with associated parking and landscaping. City records show the subject tenant space was previously occupied by a general industrial use. The applicant is proposing a new non-retail marijuana facility inside the subject tenant space for marijuana processing, which is also considered a general industrial use under TDC Chapter 18.60 Use Categories. The site is located in the Heavy Industrial Zone (I-H). SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS 18.430 Marijuana Facilities: 18.430.040 Development Standards A. The proposed development complies with all applicable state requirements and requirements of this title. The proposed development complies or can be made to comply with all applicable state requirements and requirements of this Title,as demonstrated by the analysis contained within this decision,and through the imposition of conditions of approval. All necessary conditions must be satisfied prior to occupancy. This standard is met. B. The proposed development meets all of the following site location restrictions. All distances shall be measured at the closest property lines between the proposed site and nearest lot or MAR2018-00001 Process Development Labs,LLC 2 parcel containing the specified use or characteristic. 1. Marijuana facilities are prohibited within the MU-CBD zone. The proposed marijuana facility is not located within the MU-CBD zone;it is located within the I-H zone. This standard is met. 2. The proposed development is not within 1,000 feet of a public or private elementary school,secondary school, or career school attended primarily by minors. Staff reviewed city maps to confirm that the proposed marijuana facility is not located within 1,000 feet of a public or private elementary school, secondary school, or career school attended primarily by minors. This standard is met. 3. Sale-oriented retail and wholesale sales uses open to the public shall be subject to the following restrictions: a. Shall be located on a lot or parcel with frontage along Pacific Highway(Oregon Route 99W); b. Shall not be located within 1,000 feet of another state-licensed retail or wholesale marijuana facility within or outside of city limits;and c. Shall not be located within 500 feet of a public library or Tigard parks and recreation zone. This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use). Therefore,these standards do not apply. 4. Non-retail uses and wholesale sales uses not open to the public shall not be located within 500 feet of one or more of the following zones or facilities: a. Residential zone; b. Parks and recreation zone; c. Public library. This proposal is for a non-retail marijuana facility for marijuana processing(a general industrial use) at 7350 SW Landmark Lane,Suite 120.Staff reviewed city maps to confirm the proposed facility is not located within 500 feet of a residential zone, the Parks and Recreation Zone (PR),or a public library. These standards are met. D. Hours of commercial operation shall be limited to the hours between 7:00 am and 10:00 pm. General industrial uses with no on-site retail activity are exempt from this restriction. This proposal is for a non-retail marijuana facility for marijuana processing(a general industrial use),with no on-site retail activity.Therefore,this standard does not apply. E. Primary entrances shall be clearly visible from Pacific Highway(Oregon Route 99W). This standard only applies to marijuana facilities for sales-oriented retail and wholesale sales open to the public that are located on SW Pacific Highway. This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use). Additionally, this proposed marijuana facility is located on SW Landmark Lane,not SW Pacific Highway.Therefore,this standard does not apply. F. The proposed development shall be located inside a permanent building and may not be located within a trailer, shipping container, cargo container, tent, or motor vehicle. Outdoor MAR2018-00001 Process Development Labs,LLC 3 storage of merchandise,plants,or other materials is not allowed. Staff reviewed the applicant's site plan to confirm the proposed marijuana facility is located inside a permanent building. Additionally, the applicant's narrative states there will be no outdoor storage of merchandise,plants,or other materials.This standard is met. G. Parking lots, primary entrances, and exterior walkways shall be illuminated with downward facing security lighting to provide after-dark visibility to employees and patrons. Fixtures shall be located so that light patterns overlap at a height of 7 feet with a minimum illumination level of 1.0 footcandles at the darkest spot on the ground surface. The applicant's materials do not address security lighting. Accordingly, staff has included a condition of approval that requires the applicant to submit a site plan and photometric drawing prior to occupancy.These plans shall clearly illustrate how proposed security lighting will meet the standard outlined above. As conditioned, this standard is met. H. Drive-through marijuana facilities are prohibited. The applicant is not proposing a drive-through marijuana facility; this proposal is for a non-retail marijuana facility within a permanent building.This standard is met. I. The proposed development shall confine all marijuana odors and other objectionable odors to levels undetectable at the property line. The applicant's narrative states that all marijuana odors and other objectionable odors will be limited to levels undetectable at the property line.This standard is met. J. Marijuana or marijuana products shall not be visible from the exterior of the building or structure. (Ord.17-22§2) ■ The applicant's narrative states that marijuana or marijuana products will not be visible from the exterior of the subject building.This standard is met. CONCLUSION: This proposal is for a non-retail marijuana facility for marijuana processing (a general industrial use), and is in compliance with the applicable requirements of this Title. SECTION V. PROCEDURE AND APPEAL INFORMATION Notice: Notice was provided to: X The applicant and owner Final Decision: A Marijuana Facility Permit is a Type I procedure. As such, the Director's decision is final for purposes of appeal on the date it is mailed or otherwise provided to the applicant, whichever occurs first. The Director's decision is not appealable locally,and is the final decision of the City. MAR2018-00001 Process Development Labs,LLC 4 THIS DECISION IS FINAL ON APRIL 11, 2018. AND BECOMES EFFECTIVE ON APRIL 12, 2018. Questions: If you have any questions,please contact Lina Smith at (503) 718-2438 or LinaCS@tigard-or.gov. April 11, 2018 APPROVED BY: Lina Smith Assistant Planner MAR2018-00001 Process Development Labs,LLC 5 7350 SW LANDMARK LANE �- ... 400444941414 230, i �, _ ._ m —,-7•r�-7,•r�' -r.r, r;.�'rr�r•Ti rr—ir.—r- -rrr rrrr-a•-•y r- i-: ri-fr. _ ri�•ri- . _..-r, •7-�•-..ri� ;-�: /-: �.s•, / ,�/ / • / / / / / • //` � / ✓ // ,/,J/ ,//// / / r f / .•/ / ! i // // ,/ �/ fj/ ////// „/,/? Imo+ 60' a �-, —— — —— — 110' _.- �. /f//; , ,, ! ' X„,.// ,_ „....., // , t, ,..., ./._, . , , ,,,, , . ,' •� , / 2400 sq.ft. F) ; I / ..-:;,i ! / //7/4 OK r/ �. - 340 sq.ft. oil .//7✓7 / 340 sq.ft. a i 0 sq. / ////4 — Dock - """."7 r �'9 '// a 2,160 sq.ft. 35'rj, / /j - 4 APProx / /� , tr _ i i / ` Existing 1, _ , i/ \ . 9 r Water lined/,./ // % " 4 1_ _1, '' ,,, I 1.080 sq.ft. i o // _ --_ �).�•///,`�i�. %G J// / : r� CC i i_ i f" ...".------ --tsiailliftWOWilmilidalliii. ..- 0,-14.,Pi / , ---- . r;_,:::...____, r .6. / , -,_ ' \., / r / ...,4',.ff ,/ 7/ . , Cil r i\--_,,.. ! .0.4,,..erie / /7 .... I— 1 ..,r-j / / / U. -1:1 . .... / I./U// I LYA.400,(1.y / 4 /21/// :''''''-`---, ' 1 / U L N cts ///./X:,7.1////y/ ///;„ /'''/1///,/: et. rti //,// ,,.; "/A '7 I/ // ..,7,7 IF - -- V//ii%///// %///////%%%I \%//%/00//////% // ,/ /.)//Zi r Landmark Lane CITY OF T I G A R D 7/5/2018 . , 1:25:52PM 13125 SW Hall Blvd. T I G A Tigard,OR 97223 (503)639-4171 RD Conditions Associated With Case #: MAR2018-00001 Project Name: Process Development Labs, LLC # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 01. SUBMIT DOCUMENTATION OF APPROVAL FROM Met 7/5/18 Lina Smith Lina Smith OLCC 01. Prior to occupancy, the applicant shall submit documentation of approval from the State of Oregon Recreational Marijuana Program. 02. SUBMIT PHOTOMETRIC PLAN Met 5/29/18 Lina Smith Lina Smith 02. Prior to occupancy,the applicant shall submit a site plan and a photometric drawing. These plans shall clearly illustrate how proposed security lighting will meet the standard outlined in TDC 18.430.040.G. Page 1 of 1 Lina Smith From: Lina Smith Sent: Tuesday, May 29, 2018 9:50 AM To: 'Earl Levin' Cc: Jorge Aviles Subject: RE: [QUAR] Re: City of Tigard Thank you. I reviewed this with my supervisor, and we find these light readings and levels to be acceptable. We were primarily concerned about the front entrance/parking area, which your plan shows has a level of 1.4 footcandles. I spoke to Earl on the phone and he noted that since this reading was taken at ground level, if it had been taken at 7 feet high (as the Code states) the reading would be much brighter. Therefore, city staff has determined you've demonstrated compliance with the lighting standard. I signed off this condition in our permit system. Let me know if you have any questions, Lina Lina Smith Assistant Planner City of Tigard I Community Development 13125 SW Hall Blvd.Tigard,OR 97223 E-mail: LinaCS@tigard-or.gov From: Earl Levin <elevin@keylight.ws> Sent:Thursday, May 24, 2018 8:36 AM To: Lina Smith <LinaCS@tigard-or.gov> Cc:Jorge Aviles<javiles83@gmail.com> Subject: Re: [QUAR] Re: City of Tigard Importance: Low Hi Lina, Foot candle readings were at ground level. If readings need to be at 3' above ground or some other height, please let me know. Thanks, Earl On Wed, May 23, 2018 at 5:49 PM, Lina Smith <LinaCSgtigard-or.gov>wrote: Thank you. I'll review this with my supervisor, and I'll let you know if we have any questions or concerns. Lina Lina Smith 1 Assistant Planner City of Tigard Community Development 13125 SW Hall Blvd.Tigard,OR 97223 E-mail: LinaCS@tigard-or.gov From: Earl Levin <elevin@keylight.ws> Sent: Wednesday, May 23, 2018 5:47 PM To: Lina Smith <LinaCS@tigard-or.gov> Cc:Jorge Aviles<iaviles83@gmail.com> Subject: [QUAR] Re: City of Tigard Importance: Low Re. Acceptable Security Light Levels for Process Development Labs, LLC, 7350 SW Landmark Ln, Suite 120, Tigard, OR 97224, Jorge Aviles at 503-871-5707 Hi Lina, See attached. The foot candle readings as shown on the sketch were taken by me with a Calibrated Minolta T-1 Foot Candle Meter. These are absolute readings for a specific point in time. My understanding is all of the fixtures on the back side (LED) are new. These readings do not account for the age of the fixture and any related light losses. When I do a design, I factor in the expected losses over the life of the fixture, which are usually 30% at 50,000 hours of operation for LED's and 20% for dirt accumulation over this same period. Total expected losses over the maintained life cycle would be 46%. Since LED's seldom burn out, if they are not maintained (replaced and or cleaned over the 50,000 hour expected life) and will drop below the designed maintained foot candle level. The Atlas claim of 200,000 hours of life is highly suspect with no supporting LM-79 and LM-80 data. LM-79 and LM-80 data is an accepted standard, which verifies that this fixture meets this IESNA (Illumination of Engineering Society of North America) Standard. Regardless, a 50,000 hour life for this LED fixture is a reasonable expectation. The fixture at the front entrance is Metal Halide and has an expected average maintenance life of 15,000 hours with an expected loss of approximately 30% and a 20% loss for dirt accumulation over at the time of replacement. This lamp is not the same as an LED lamp and will fail sometime before or at the end of its expected average life of 15,000 hours. Above the front entrance, above the loading dock, there is a supplemental fluorescent fixture that produces a high level of light. I did not take a foot candle reading at the loading dock. At the driveway entrance, there is a light pole, most likely maintained by the City of Tigard. The light distribution is partially blocked by trees on the east 2 side of the driveway entrance. While light levels are reasonably good, they can be improved with proper tree pruning. Visibility is about managing contrast within acceptable limits. These fixtures have no glare shielding and are not dark sky friendly. It is more about good visible contrast and not just about foot candle levels. The City of Tigard may want to adopt the National Model Lighting Ordinance Standard to minimize objectionable glare, light trespass and best dark sky practices. Let me know if these light levels are acceptable as is. If not, let me know the minimum standard I need to design to, as well as the exact area that needs to meet this standard and I will produce an acceptable lighting plan for implementation. Thanks, Earl F. Levin, LC, IALD, IESNA CTK Member/ Senior Lighting Designer KEYLIGHT+SHADOW, LLC Forwarded message From: Jorge Aviles <javiles83@gmail.com> Date: Wed, May 16, 2018 at 10:01 AM Subject: City of Tigard To: Earl Levib Keylight+ Shadow<elevin@keylight.ws> Earl, I just got back from the City of Tigard and they are OK with the current lighting measurements you took last night. They did ask for some pictures (which I can provide you with). Also, I have attached the correct cut sheets for the fixtures in the front and back of the building. I have also attached an updated floor plan with the measurements you took, fixture locations and distances. If you need anything else of have any questions please let me know. 3 Best Jorge Aviles 503-871-5707 EARL F. LEVIN, LC, IALD, IESNA CTK MEMBER/ SENIOR LIGHTING DESIGNER KEYLIGHT+SHADOW, LLC 16459 LEXINGTON CT LAKE OSWEGO, OR 97034-5069 LIGHTING DESIGN AND CONSULTING SERVICES ARCHITECTURAL PHOTOGRAPHY 503.635.7203 ELEV IN @KEYLIGHT.W S WWW.KEYLIGHT.WS DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e- mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." EARL F. LEVIN, LC, IALD, IESNA CTK MEMBER/ SENIOR LIGHTING DESIGNER KEYLIGHT+SHADOW, LLC 4 16459 LEXINGTON CT LAKE OSWEGO, OR 97034-5069 LIGHTING DESIGN AND CONSULTING SERVICES ARCHITECTURAL PHOTOGRAPHY 503.635.7203 ELEVIN@KEYLIGHT.WS WWW.KEYLIGHT.WS 5 ( ;•----- --- -7- -- )._42 X KA(("5 ii , 1 i _._ ---\-- CC,-; k• (Cj -Ft (•(..1'L Pi 11 3 L 4.-...,±.. L/:7>L,1-)e- /3 ) 4c oc: i f;) \ / :7 - 1 45 47, n i , . / ,7-?(-- 1----+-1,,,r 1- , V---- 1 . , . , , 1 I /./- , \ I I /7 , . , j \ / , // I _ 1 1 , , , . ' .71"-.'---- ___--- „... / 1 CY overhead door (grade-level) .-) 0 - (. .,- -r-4 c). •-) ---1-- . I ' . 4 SUITE 120 5 622 sf b b to 121 overhead door „----• ._, .....- . -.,,,,, .....„. .... ., I ...._____ ..... *.1 4 4 L_) N._ cs _______ Covered .. Bath '.4./.) if) Dock „ :. ,c), Office Office ( E V4 / , Office \ ---. -Bath Bath --, / ,-..., .... \ 21 I- 23' , .e.,c .,,.:‘ . \ \ 44' .11 1 - - ( 7-iic,/c /(Y-,-,. 6., c(/ /7 I.-I 1)) ..', 17 ,J U. \,-,_\ . k,7"_:, k- 1 16.h T CO3-+-c,(0 TO. 2 /0 I . 2.i>7, (,,c,c4A--- t\-A•E. ,---c,.t j-i--e„1:Cke Sw Lardmark Ln 9 i ..,.,., .,.,, ., ,..‘„..... . .._......v_..,,._. . . ,. . . ,. •,-.,.•- - • le,--,• - • eit • ;. ' 4. • .. * • 2P- . ; - •. .10* A- " • -'.'• . .. - -• • " . .- . .. ., :c.!,*".". •' ' .2 . - : '-' . , '.. 44* , ,... . ...4*:1;'2..":-.1'st: -.1'-.,'' ..!,„i-,:;,.•,, . , . .. . •..•..,--,...4,•:.:-,- -, --..-.. ,.,o ' •- -...-: -., --.• . . • -- ..,..... . • ,.. ..., _•,,,,,:.-... ., . , .- ,, ..,-,•.-y.,.,-..,' . . ..- • . ,,.,* .,.._ - --: 7 -,.. _ .• ,. - '..- --..-,.„.. - - ,,: 7 • 'v-*';'...-..- . .; ,,,.,,,' .:•4-- ., , -N:n'.;•4.-'. ; .*.•P, - ,,r"rte4.7.:"" .,4-- "IL • .- - . '' ''''''.-:.'";41----:t.‘".':'- .:--4.`i'.',.',,'' ', •...1: 'r - _, .., -,.'..-... ..-..t.' • ., -,-; -- ' r..,„. .., ., - • . , 1 , -,:..,----.--,..--'44t,.. .-...........' ....;,4i.,...,--..,777-11 I III 'All III I , • ,i14,-,,.----„--..--, .. - :::„,_,,,,.-: :_.., : ...." ........,- - - 'WIIIII --mps.-- ..b.'-..:7,_.7--- .4.`-g 1:*--,-...-,--:-.,--_' : ,,. ,-._ •-.I-.., •.-,z4 . v. , mil\ . isprik_,-.-,-:.-,;_:::,-_,....-,-_-.7, _._.. .•.-, ..,:- m-.....,4,.fti, • •.7-''''-...i -,,. , '' , ._.... „.. • '' - -41111% . -•'--.„..,.. - NW' - . -'''. '''''.2tr''' '' ....- .. .,.... _--..._.11:—.41-"`"-----"Ns,,..2•-;,i.y...---•:,,''''' -'.ve A A - - ....— .1 i .'0.;4 ,'4.- - .. 055KOittpi‘ ' . ..,..A, 1-,...• .. _--.,__ - , --• 43 , ilIrti' :‘ ' .,.),,-..-•-.A.'..4''., .....r.4,21,011k -...;.‘--, 4 ... ',... • - ...,:A .,,*kir .;-,...:'•4''..-lif.,...,-._ ..„ , - , .. - ' , ,,,, ;...w, ....,...... t"!..... - ,.. ..,. ........ - • •••• c • , "7,41Lk ,=_. v.. ii, • *, '.. '''' 4-• ' :.-171.,-.• .. •,•.,. u.,•-,'' - L. - .• . ,••, , • ':::-.:•"" ' *- - ,,,,_ Z.. .- 4,:-iZ,:•,-•' i: • . , r , ..,,,..... „.:. .„,. _.,.... ,. ,... .,,.. . ,..03.441. N--t, ...,:i.,.,,... ,1‘, ., ,.,.5 •,N....,, , .-+..,t,,•'.r.,..,I,' -. i, -. V --- --' ,i,--.•-. •:t.,7' '`,4. r - -:-'",''.,.• -• ."--al 43.7. ,s,i, , • , -.0„,1 L ,).,t,,,,-. .,..,... ,,, ..,.,,-,...., . ,„,..,,,._•,..,,..,.... ..---, ,--;-,,-- .,.• , .•,.. ,.....• ,.Th, " '41"` ' -" `.-4:`--i,./-,•,".'it'll''^.3 , / , ,,..._1, -..• . . .,. .1k- te,..14r.,,,Y.,--•:'.....',•. IL • ' ''' '.t. ..,-•'-' •.,,,. .,- : , ...... Lighting area 1.4 footcandles (measurement taken at ground level) WP3H250PSQ RAB Project: Type: Prepared By: Date: *:�r; ,; . Lamp Info Ballast Info �g%''....----•:''••` -i,:!--„,... . - Type: ED28 Type: CWA-HPF QT Watts: 250W 120V: 1.4/2.5A I Shape/Size: N/A 208V: .8/1.2A ~�`"` Base: N/A 240V: .7/1.0A ANSI: N/A 277V: .6/1.1A Hours: 15,000 Input Watts: 288W 1 Large wallpack with aluminum precision die cast construction and tempered glass Lamp Lumens: 25000 Efficiency: 87% refractor.Lamp supplied. Efficacy: 87 LPW Color:Bronze Weight:25.5 lbs --1 i Technical Specifications Listings Reflector: Electrical UL Listing: Specular anodized aluminum,removable for Pulse Start: Suitable for wet locations.HID fixtures can be wired installation.Symmetrical light pattern maximizes Pulse Start metal halide for increased lamp life,lumen with 90°C supply wiring if supply wires are routed 3" distance between fixtures. maintenance,color uniformity and efficiency away from the ballast. Finish: Other Construction Formulated for high-durability and long lasting color Buy American Act Compliance: . Housing: RAB values USA manufacturing!Upon request,RAB Die cast aluminum 1/2"NPS tapped holes top,both may be able to manufacture this product to be sides and back for conduit or photocontrol.Hinged compliant with the Buy American Act(BAA).Please 1 refractor frame,Continuous silicone rubber gasket. contact customer service to request a quote for the product to be made BAA compliant. Dimensions Features 1 7" Hinged door frame opens and remains captive for easy relamping 1 43 cm 1 >, Precision die cast aluminum housing with durable polyester powder 1 coating 25.4 cm ;, • Drilling template for easy box mounting ■ Silicone gasket remains in place during relamping g" Tempered glass refractor 22.9 cm Long life lamp included iiti, 41111/11■ Need help?Tech help line:(888)RAB-1000 Email:sales@rabweb.com Website:www.rabweb.com Page 1 of 1 Copyright©2018 RAB Lighting Inc.All Rights Reserved Note:Specifications are subject to change at any time without notice tia tuaS LE s Wa I I Light Project Information lighting Products D Job Name WLM43LED 43 Watt LED Wall Light Fixture Type 43 Watt LED Die Cast Wall Light C uL US �Ilghting CQP jjjjjuRE* O °L Catalog Number WLM43LED GRA dY LISTED facts os,0 &TESTED IN USA Approved by SPECIFICATIONS: Lumens: 4350 ' Watts: 40.79 Lumens/Watt: 106.6 *1 ' CRI: 82.2 'i,}, CCT: 4579 - ' 1 Lifespan: 200,000+hrs.' '1 - - Construction: Rugged Traditional aluminum die cast housing provides proven ,,.,,iimei �_ ' .v, environmental protection for LED modules.Traditional fixture designs providea familiar look and standard installation requirements.Retaining this look allows the ability to upgrade fixtures gradually,while retaining the same - - -- overall fixture appearance throughout a facility. WLM43LED Design is Protected Glare Free: by U.S.Patent No.9,482,395 Positioning of the LED modules within the housing result in light directed to desired locations and eliminates offensive light. Lens: DIMENSIONS: Lens assembly is designed to provide high efficiency and to target the light where needed to satisfy outdoor lighting requirements. knockout Positioning of the LEDs(along with Patent Pending thermal management 12.72"! • system)results in the light being directed to desired locations eliminating glare and offensive light. — , Thermal Management: o 9.02" o Atlas'Patent Pending exclusive Thermal Management SystemTM features a u ' - F unique internal design that allows for lower operating temperatures which Y i 7.33 results in a brighter,whiter light,more stable color and longer LED and driver life. < Listings: 11.06" Luminaire is certified to UL/cUL Standards for Wet Locations 1. 14.2" Lighting Facts Certified 7.27"—' DesignLights Consortium qualified luminaire,eligible for rebates from DLC 1 " member utilities.DLC Product ID:PDG4N6GHG .75" AC Input: knock out 1 a Ldli °on both 87" o it y. ; 120/208/240/277 V ;;, ' 9.02" sides ,,;,, , Driver: '''i%""` Constant current,Class 2,120-277 VAC,50-60 Hz High Efficiency-min.88% ---1—7.85"—=l 0-10 V Dimming LEDs: 4500K CCT Epoxy Guard1M protective conformal coated boards Atlas LEDs provide higher lumen output,greater energy efficiency and more reliable fixture performance.They are tested and binned at 700mA which is the actual operating current used in Atlas LED luminaires,giving a better representation of actual performance. Warranty:Five-year limited warranty Testing: Atlas LED luminaires have been tested by an independent laboratory in accordance with IESNA LM-79&LM-80,and have received the Department of Energy"Lighting Facts"label. Installation: Fixture retains the same knock-out sizes and positions as previous models,reducing wiring costs. Photo Control: For factory installed 120V button photo control add suffix PC to part number. Emergency Back-up: For factory installed Emergency Back-Up add suffix EB to part number. 480 Volt:For 480V add suffix 4 to part number. Weight:9.25 lbs. 'LED Life Span Based Upon LM-80 Test Results ATLAS LIGHTING PRODUCTS, INC. *The majority of Atlas Lighting Products are assembled in USA facilities by PO BOX 2348 I BURLINGTON,NC 27216 an American Workforce utilizing both Domestic and Foreign components. 800-849-8485 I FAX:336-227-0110 I www.atlaslightingproducts.com Meets Buy American requirements within the ARRA. mIas Atlas Wall Light Lighting products LED g WLM43LED 43 Watt LED Wall Light PHOTOMETRIC ENERGY SAVINGS 10' 15' 9.9 9.2 LED HID 53 TOTAL ANNUAL SOURCE WATTAGE ANNUAL ANNUAL 3.0 7.9 WATTAGE COST WATTAGE USED COST SAVINGS 43 $19 100 129 $77 $58 45° 3.6 43 $19 150 185 $100 $81 43 $19 175 210 $112 $93 FOOTCANDLES 90° 12'Mtg.Height Atlas Lighting Products.Inc. I fiitIiia MOUNTING DETAIL r • a A Program of the U.S.DOE I ■ • • o o • • 011 111 ""\\ Lig Output (Lumens) 4350 Watts 40.79 ° 8.8" ° ILumens per Watt (Efficacy) 106.65 II .1.• o • o • • • '� Color Accuracy Color Rendering Index(CR1) 82 r 11.6" LightColor OC or Temperature(CCT} 4579 (Daylight) Warm White Bright White Days i t 2700K 3000K 4500K 6500K Alt rea,. ..i . dreg to IESNA LM•79-2008. Approved Method for the Electocat and Photometric leshng of Sobd-State Lrghhng The U S Department of Energy(DOE)verifies product test data and results Visit www.lightingfacts.com for the Label Reference Guide. Registration Number PRB4-2DAOOF(8/1/2016) Model Number:WLM43LED [Upgrade 8/1/20161 Type Luminaire Area'Roadway ATLAS LIGHTING PRODUCTS, INC. The majority of Atlas Lighting Products are assembled in USA facilities by PO BOX 2348 I BURLINGTON, NC 27216 an American Workforce utilizing both Domestic and Foreign components. 800-849-8485 I FAX:336-227-0110 I www.atlaslightingproducts.com Meets Buy American requirements within the ARRA. r0 F - O 00 �F: 1:o lIIregon Liquor Control Commission 9079 SE McLoughlin Blvd. 8 s." Kate Brom'r1,(.4 it Portland,Oregon 97222-7355 RECEI"ED 503-872-5000 1800-452-6522 JUL 0 5 2018 www.oregon.gov/olcc CITY OF TIGARD PLANNING/ENGINEERING June 22, 2018 Process Development Labs LLC(Oscar Aviles,Jorge Aviles, Luis Espinoza) 4207 SE Woodstock Blvd#110 Portland, OR 97206 RE: Original Extracts#100427194F1 7350 SW Landmark LN Tigard,OR 97224 Approval for Change of Location Dear Oscar, The Commission has received and approved your application for a change of location. Your current licensed location is 5100 SE Harney DR Suite#111 Portland,OR 97206. Our records now will reflect your business will be located at 7350 SW Landmark IN Tigard, OR 97224. We will update the online licensing system to reflect your new premises address. Please provide a copy of this approval letter to METRC in order to allow the transfer of inventory, if applicable.As a reminder,you are required to notify us of any changes to your Processor license prior to making changes. Examples would include but not be limited to adding financial investors, changing the designated use of a room,adding endorsement types,changing LLC membership,etc.. If you should have any questions, please contact our marijuana department at marijuana@oregon.gov or by calling 503-872-5219. Sincerely, Matt e66ekt- Matthew Cobos OLCC Marijuana License Specialist OREGON LIQUOR CONTROL COMMISSION MARIJUANA PROCESSOR LICENSE THIS CERTIFICATE MUST BE DISPLAYED IN A PROMINENT PLACE ON THE PREMISES ISSUED TO: PROCESS DEVELOPMENT LABS TRADE NAME: ORIGINAL EXTRACTS LLC LOCATED AT: 7350 SW LANDMARK LANE #120 TIGARD, OREGON 97224 ENDORSEMENTS: EXTRACT RECEIVED SALE OF MARIJUANA FOR MEDICAL PURPOSES JUL 0 5 2013 CITY OF TIGARD PLANNING/ENGINEERING 'YCie t " LICENSEE SIGNATURE STEVE MARKS - EXECUTIVE DIRECTOR Effective : 01 / 10/2018 to 01 /09/2019 RECORD ID# 100427194F1 CTS#030-100427194F1 This certificate verifies OLCC licensure. It does not verify compliance with other state and local regulations.