Loading...
Report (151) FW: Garage slab Page 1 of 3 FW: Garage slab Dors - 000`7 Tom Dicianno Sent: Tuesday,July 31,2018 5:47 PM i6kg c 7v'V crk / l To: Ken Wilde (, uIv Attachments: 10-S6.1.pdf(18 KB) lvfl4en� c Iw f looks like we need a footing w 16) Tom Dicianno 6b PROJECT MANAGER AT RIVER TERRACE tom.dicianno@)polyponhomes.com 503-577-4160 www,sol •onhomes.com A 40.43,010to, ��. I Rolm From: Arne Solomon [ASolomon@ctengineering.com] Sent: Tuesday, July 31, 2018 4:59 PM To: Tom Dicianno Subject: RE: Garage slab Tom, We need to support the (2)2x garage floor joists on a 2x4 cripple stud wall adjacent to the concrete stem wall similar to detail 10/S6.1 (see attached). The stud wall must have full bearing on the concrete footing. We can't use a 4x12 header& post down at each end and at the center because that would require a footing bigger than the concrete stem wall footing. FYI —I'm out of the office tomorrow at various meetings but will be back on Thursday. Thanks. Arne Arnold R. Solomon asolomon@ctengineering.com CT ENGINEERING Inc. Structural Engineers • 180 Nickerson Street • Suite 302 • • Seattle, Washington 98109 • • Phone: 206-285-4512 ext. 303 • Fax: 206-285-0618 • www.ctengineering.com From:Tom Dicianno [mailto:Tom.Dicianno@polygonhomes.com] Sent: Monday,July 30, 2018 5:25 PM To:Arne Solomon <ASolomon@ctengineering.com> https://www.lyonsync.com/owa/?ae=Item&t=IPM.Note&id=RgAAAADspFqrvYXJTKTI... 8/14/2018 Page 1 of 1 BEGIN FRAMING LAYOUT REFERENCE 1/51.1 0 FOR SHEAR NAILING SHEATHING. NAILING. AND WITH SHEATHING ANCHOR BOLTS PER LAPPED AT RIMi SHEARWALL SCHEDULE i i (P6 MIN. U.N 0.) SUBFLOOR: EL. 0'-Q" FINISH GRADE "' =111=111=1 I LI I I j� . • — il—III—I 11.-1 I I 1-11 . ' III 2Y4 @i 16' D.C, PONY WALL F ,;II JOIST SUPPORT W/ 1/2 DIA. J-BOLT 48" 0,C. EMBED 6" (CD 4 * "N118 • I, rQ M Q C. SEE DETAIL 7/56.0 FOR 8" BALANCE. f SCALE: 3/4" = 10 TYP. EXT. FOOTI \G (SAW\ LUV3ER PRP, ; asnx?t=att&id=RQAAAADspFgrvY... 8/14/2018