Loading...
Specifications (71) MST DvA 00e)U. 1 131Go3 S\;', modc - Lk'\-:001'44 ---- ,,,,_,. ..,,, ,..,,,,, ,,, ,,:„,,,,, `or,,, f- 1 V 4 4 .k-i 4 t, Digitally signed 6 201P, by Dave Horn FEB Y) DN:cn=Dave MON H C E t'IT.,,, Horn,o=Horn Consulting a s * " Engineers LLC, 5 fl O�p.wA ou, -k<, ---t ,,:f, email=dave@ho rnce.com,c=US Date:2017.11.13 Structural Calculations 10:31:02-08'00' HCE Project#: LEN_16_30 Date: 11/13/17 Project Description: New House: MADELINE HEIGHTS LOT 7 Tigard, Oregon BAINBRIDGE English 3180E GR Subiect Sheet#'s Lateral Loads L1 — L7 Framing F1 — F3 Footing FTG— 1 I P'iFFs s� PE � �y iA 0, r 1' ,1 Oq� 12 1�(� /,0 J. NO Expires: 6-30-19 The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. Horn Consulting Engineers shall have no liability(expressed,or implied),with respect to the means and methods of construction workmanship or the actual materials used in construction. Horn Consulting•Engineers shall have no obligation of liability,whether arising in contract(including warranty),Tort(including active,passive,or imputed negligence)or otherwise,for loss or use,revenue or profit,or for any other incidental or consequential damage. 9320 SW Barbur Blvd,Ste 135 Portland,OR 97229 Phone:503.892.5782 Email:dave@hornce.com LI I I EC HORN CONSULTING ENGINEERS LLC New House: LEN-16-30 BAINBRIDGE 3180E GR Code Basis of Design: 20151.B.C. and 2015 I.R.C. with State Amendments Wind Loading: Per ASCE 7 Fig 28.6-1 See attached elevations for wind loading breakdown per level. 135mph 3-sec gust Exp B. The mean roof height of the house h = 24' approximately. • o ## # i g 44 le 00. 0 411., 04,4,4r- Case A Case B a = .10*40' =4.0' orforh = 24' a = .4(h) = .4(24')= 9.6' a must be larger than .04(40') = 1.6' or 3' a =4.0' controls Therefore: 2a= 8' see Fig 28.6-1 ASCE 7, and Figure above. CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD.• PORTLAND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAVE@HORNCE.COM 4 , G2 Hc E HORN CONSULTING ENGINEERS LLC Seismic Loading: D1 seismic design category per I.R.C. SpS= .83, R =6.5, W=weight of structure V = [1.2 Sos/(R x 1.4)]W V= .109W Roof Dead load = 15 psf Exterior Wall Dead load = 12 psf Interior Wall Dead load = 8 psf Floor Dead load = 12 psf Seismic in front to back: Wr= [.109 (39')(15+6+4)] = 106.3plf < 108.4plf therefore, wind governs. W2 = [.109(40')(12+12+8)] + 106.3 = 245.8pIf < 276.7plf therefore, wind governs. W1 = [.109 (35')(12+12+8)] +245.8 = 367.9plf < 409.5plf therefore, wind governs. Seismic in side to side: Wr= [.109 (40')(15+6+4)] = 109plf < 137.3plf therefore, wind governs. W2 = [.109 (40')(12+12+8)] + 109 = 248.5plf < 298.8plf therefore, wind governs. W1 = [.109 (40')(12+12+8)] + 248.5 = 388.0plf < 416.1 plf therefore, wind governs. Redundancy Factor= 1.0 per ASCE7 section 12.3.4.2 CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD. • P ORTLAND, OR • 97219 PHONE:5 03.892.5782• E MAIL: DAVE@HORNCE.COM L3 ticE HORN CONSULTING ENGINEERS LLC Roof Diaphragm: Right Wall Line Back Wall Line @ Bump Out P = (0.1084) klf x 20' = 2.2k P = (0.1373) klf x 2.5' =0.3k V= P/ (27.5)' =79p1f Type A Wall V = P/(11)' = 31 plf Type A Wall Mot = 8.2kft Mot = 1.4kft Mr= 11.8kft No HD Req'd Mr= 3.1kft No HD Req'd Left Wall Line Back Wall Line P = (0.1084) klf x 20' = 2.2k P = (0.1373) klf x 21.5' = 3.0k V = P/(33.75)' =64p1f Type A Wall V= P/(6.75)' =437plf Type B Wall Mot = 2.8kft Mot = 23.6kft Mr= 3.3kft No HD Req'd Mr=6.8kft T=2.5k Type8HD Front Wall Line P = (0.1373) klf x 20.5' = 2.8k V = P/(20)' = 141 plf Type A Wall Mot =4.5kft Mr=2.0kft T= 0.6k Type 7 HD CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD.• P ORTLAND, OR • 97219 PHONE: 5 03.892.5782• E MAIL: DAVE@HORNCE.COM LY Hc • E HORN CONSULTING ENGINEERS LLC 2nd Floor Diaphragm: Right Wall Line Back Wall Line @ Bump Out P = (0.1683)(20')+2.2k= 5.6k P = (0.1615) klf x 2.5' +0.3k= 0.7k V= P/ (56)' = 99p1f Type A Wall V= P/ (3)' = 235pff Type A Wall Mot =50.1kft • Mot = 6.3kft Mr= 163.6kft No HD Req'd Mr= 1.3kft T= 1.7k Type 8 HD Above Left Wall Line Type 1 HD Below P = (0.1683) kif x 20' +2.2k= 5.6k V= P/(33.5)' = 166p1f Type A Wall Back Wall Line Mot = 23.9kft P = (0.1615) klf x 19.25' + 3.0k= 6.1k Mr= 21.2kft V= P/(9.75)' =627p1f Type J Wall T = 0.2k No HD Req'd Note: No 3x Sill Req'd w/DBL A.B.'s Mot= 25.4kft Mr= 2.7kft T = 5.0k Type 9 HD Above Type 3 HD Below Wall Line @ Back of Garage P = (0.1615)(22.25')+(0.1335)(8.5) + 2.8k= 7.5k V = P/(19.25)' = 391 plf Type B Wall Mot = 33.4kft Mr= 10.3kft T= 2.4k+ 0.6k= 3.0k Type 8 HD Above Type 1 HD Below Check Sill Plate P = (0.109)(20.5')+(0.1395)(30.75') = 6.5k/ 19.25' = 339p1f No 3x Sill Req'd Front Wall Line P = (0.1335) klf x 11.5' = 1.5k V = P/(14.5)' = 106plf Type A Wall Mot = 1.7kft Mr= 0.9kft T= 0.3k Type 1 HD CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD.• P ORTLAND, OR • 97219 PHONE:5 03.892.5782• E MAIL: DAVE@HORNCE.COM HORNCE.COM r • E HORN CONSULTING ENGINEERS LLC Main Floor Diaphragm: Right Wall Line Back Wall Line @ Bump Out P = (0.1328)(20')+5.6k = 8.3k P = (0.11 73) klf x 2.5' +0.7k= 1.0k V= P/ (56)' = 147plf Type A Wall V= P/(16)' = 62p1f Type A Wall Mot =8.4kft Mot =4.0kft Mr= 14.8kft No HD Req'd Mr= 12.2kft Left Wall Line Back Wall Line P = (0.1328) klf x 20' + 5.6k= 8.3k P = (0.1173) klf x 15' + 6.1k= 7.9k V = P/(63)' = 131 plf Type A Wall V = P/(24)' = 328p1f Type A Wall Mot = 24.8kft Mot = 31.4kft Mr= 118.9kft No HD Req'd Mr= 23.8kft T = 0.3k No HD Req'd CAPITAL PLAZA SUITE 135 9 320 S W BARBUR BLVD. P ORTLAND, OR • 97219 PHONE:5 03.892.5782• E MAIL: DAVE@HORNCE.COM hsGt= } /3S .4014 exP. 3 3-SEC G.us7- Zfol tees 2(ot 'A to A. 34/8 INt ° 1 1 FlAvt...zat.4 OA ; 132•. "/, d=274 8 42-`!/ C. rep %` IPI� II ` � — — — � ..,.... / --.- WV ICS°�`� ,. - — _�s...�..� _.�, � _ � IIII--. iii �: � il l _lri- rii :ME 11���111 �1\`��1 G �� : — _� Wta 110`-.3 *4 — — A� — _ II 1i'1! i: POIIIINI( IIIII mom!IIIII �!�i 1{III'III!!! IIIII IIII 11111 111. IIIII 111{1111111le IN\ ; ���� 11111 III 111111111,1 11111_IIIIII I IIIII11111 U.'" III 1' 11 i.l I1 — — - = 132.`7' "l' I �, - 1111. III III,. SII{. 1111.all!. 111!..111. w, - - I Zg13•C0 Zo8.+ 2$ 3.to - . 1-.1 .\ WV 0• ' z:4- $" s - 73o.to 2.4.1. 330.to W2.3ni FTAvL.a so4A 'tvb 3 !. N. ,$ Al - .8 kAag. 4 %h2 _A-,z — Eit2. s0Z 'I ( ,, Vitt Llrv] c di 41 _ _ _ _ _ Y. sem 7M.SY£1 111q' e 147d ....me /\. X a .7 70 SA11312°17/ CP i..1 a Q .4,2 .9; •/* L'-h11=C41')S•Sbl `.1AVI I 1f :OM ,..As r17 )x-t Ec &x9 No'W si 14. a7c-V z�, v. .r _(o;Js•ZiZ=(h•t,�£•zt t Ca/S)o,•2£ = M . • , .. . 1 iiHORN PROJECT L{h'Iti1 ' 13 Eex)1SN 24 SHEET 1 CCONSULTING DATE 1rH��r E ENGINEERS LLC Sv '� T A�"'�n'�' BY 131 164 LI'is W 4 . oc L4• /,Z 4 O. 41. i At i X I S .a� s a f, .0.AL 4)2 IA* a./‘ (IF) g 11 11681 .--.. a/23 irf. --r .... F-33,-.„4 S z$i- • . 3 / .t9 e • f 2 • y‘g, p,tl 61I a 2e ' F4 e,Z C. 616 kis. 1. - 4- F*4u . f" 4.14. 6•3"--col39Z . z-axtk t-- ' al JAI; 4 ...1s(o) ' mow, t.31 X toi.s* 2 1 v,1 . i j 4.tv s 1,3t�t.r76.)1. '^ 3.3 r ,r 21 1. 1 FIs ♦.o1Z�L ♦.o4C��� •3 1.1 . � w,- ,des C .. 4,. 1 . p., c. 0 .411• C4tit i•3(ti)•t , 3 IV �,c�' �3�. 7.4f-V1�vr1 t_rC rt. - $obi 1302 SW BERTHA BLVD. • PORTLAND,OR • 0219 , • ITC HORN PROJECT Giro. f.3 grtr;gH 24 SHEET f z + CONSULTING DATE tC••I��1�D ENGINEERS LLC SUBJECT fr 9By DzbA LEI L 1145' vs.„mitt- (11-2,1"N *A. 'de Il i ; I,0 U'b ?'L 4 ...�cof jc i..�i Z 1 _� i.•b(i. t , (3",4.. ' t(1i'� Z- ^ $S z' l 4.c''F 11► Z 1 ‘ 4. CI* ` 4 . X .o 0 �Z 3.`1k x le- s • q,;'` ,.)k OP% . I), c , col< ( -i, II, 4 4 4 4, �z. , �4s.� `� \ \ \ ' t ` , r z' L ,zt- 4.3 city 17 (?; )t 1.-76:-,c)-7(�c, 2v �� � C = 3. St 3gk .0 r q 6s )1' 2(-L' • . 4 -f3 L 3. • S�tw� 9,;•g�'n ,�� S . '3 3 2 10 in • • 1302 SW BERTHA BLVD. • PORTLAND, OR • 97219 • .. • HC HORN PROJECT LA «. Op^I'S rov4Lf S,. Z C SHEET f3 :it; CONSULTINGDATE law ago 11r ri ENGINEERS LLC SUBJECT ' BY 1 7'7i1') -3 '' 134s S 1�v- • a 0:131/11 : 0.3e% rko .� �. r� X F o •$8[51S A 2.1! k 4_ , \ ,21360 - 2r, I� • N. ELL L»: g W s . a=� r 1-lit I 71.1411 � � 1 Vitr L �` $4 .1i (')4. " (. 11' . q ,...;-- x on 6P \ k s' >r L♦ � y„� ,o SS Ciii... t. ..1� C. ) = do3 /I 1. o,L= 1, . k r;.S 0 4!•'1� 4.1 5.0 r-7 'a 4'114 1 F 41 (2A -- b3(z Vii' $'33 a • g'3 (n� s d4+n 504.+; • 613s- .1E.) .7 I Z�6 • . c.). 114 W+^t, • � - a211 g .° k 'RI �" o+1� �'ti� '�•+ ' ask /�� 1 S GG ) jr�Lb YU d, g $ 1251 1-'; . r ,-o 4;: (V;/Z, e S II .. . q•4�. % 3.77), A - - SW) - x.31` o 93.3 +r4 . r. o,v4C/sAIt. . +I* Jaco X L°3 w13)-1: 41 .". ix(z-.�c /3 t= 7.1r k► z.t� 1 T-r.+k '_=-� . Az s 2.41` �s 7,1670 Q S,3 ,-_,4 Alvah)... Z�►sQ• .�c> . 1302 SW BERTHA BLVD. • PORTLAND, OR• 97219 n ...+ nnn ego•, . r....... n....nu..�... ..... 1 f v HORN PROJECT GEN" !b-j; fin.►i- fl - Z G SHEET Fri. ECONSULTING DATE !e- ENGINEERS LLC SUBJECT F•.TM►vg !b BY ,0,414 �w- sy, . �� /fir `--- J5 k a b5"-. )a.4 Utz ---"---- Ftp. ` 1--it'1`j - 3L'.13xr" 4206 rri, ?T. 4 r� k .1.4s (tit l�)y i 114Y'a Ls-1"r. 6,3 F ,.. � ,. t5 a %Ay- • . 4. rs x vy 3-04's oA '-AY cBS r„w ta. } • P7] w OST 4 • • sAxi-et '•^V.. to. Y Yc � " Z y /RA's p. C7.) } 2 ,-.-k 1 ,c - in S 3 itt �---r. 3 a T n��, , i`s)► 4 4'/ z..at`S rA +...AY ,, C Low. p'- .wi S(fr. )1- — 6 e} .ft46 OM; is Yk 4 k..: 4.3 i --+ 3Z,•`0 xit•` 4-4... $i . ../ 7-1441s M t.'41" . . K A xi 41,0% ilivALAr • & µ6 pe "7.t I It a 9 .../ . $ A I^AY • 1302 SW BERTHA BLVD, • PORTLAND, OR• 97219 Dun.,r.• [AQ QG'f 5040 . F...,,. r'1...crrd T7nuw•v r•r...