Loading...
Report (145) My r, V 5: GREEN MOUNTAIN fEC 13 2017 1110 structural engineering 13 1 Si;IV` t 662..., C . - Lateral Analysis For Riverside Homes — Plan 2626 Elevation B Progress Landing Lot 5 12062 SW Redberry Court Tigard, OR Dec 6, 2017 fie NES s�0 49 SPE 'Q y cr r OREGON ‘110v. 1 9 oN q 2 NA MOW Exoires: 2 1 311$ Job No:17486 • * * LIMITATIONS * * ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT. DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS. Table of Contents Design Criteria Lateral Analysis L-1 — L- 15 I greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607 71GREEN MOUNTIIIN structural engineering STRUCTURAL DESIGN CRITERIA Governing Code: 2012 International Residential Code (IRC) 2012 International Building Code (IBC) Dead Load: A. Roof 15 psf B. Floor ...10 psf C. Exterior walls ..10 psf D. Interior walls with gypboard each side 5 psf Snow Load: A. Uniformly distributed snow load 25 psf Floor Live Load:. 40 psf Wind Load:based on ASCE 7-10 CH27 MWFRS Directional Procedure A. 3 Second Gust Wind Speed V=126 mph B. Importance Factor .. 1=1.0 C. Exposure B D. Topographical Factor .Kzt=1.0 E. Wind Directional Factor Kd=0.85 F. Structure classified as enclosed Seismic Load—based on ASCE 7-10 Section 12.14 A. Mapped Spectral Acceleration for short periods.....Ss=1.0 B. Mapped Spectral Acceleration for 1 sec.period S1=0.34 C. Ductility Factor ...R=6.5 D. Seismic Design Category D Foundation Soil Properties: A. Undisturbed sandy silt per IBC 20012 Table 1806.2....Soil Class#5 B. Maximum vertical bearing pressure 1500 psf Concrete: A. 28 days design strength F'c 3000 psi B. Reinforcing bars ASTM A615, Grade 60 II GREEN MOUNTIAIN aRoJECT: Riverside - Plan 2626 r; Itiffstructural engineering DATE: Dec. 2017 BY: CM JOB NO: . 17486 SHEET: ,r.. ak-1 LATERAL SEISMIC DESIGN BASED ON ASCE-7-10 1617.5 Simplified analysis procedure for seismic design of buildings 1.2-Sps SEISMIC BASE SHEAR V:= R •W (EQ.12.14-11 with F=12) Ss mapped spectral acceleration for Ss:= 1.00 short periods(Sec.11.4.1) from USGS web site Ss mapped spectral acceleration for Si:= 0.34 1 second period(Sec.11.4.1) Fa Site coefficient(Table 11.4-1) Fa'— 1'1 Based on Soil F,, Site coefficient(Table 11.4-2) F�:= 1.8 Site Class D SMs:= Fa•Ss SMs=1.1 (Eq.11.4-1) SMI:= F„•S1 SMi= 0.61 (Ecf 11.4-2) 11.4.43 Design spectrum response acceleration parameters 2 SDS 3-.SMS Sos= 0.73 > 0.50g SEISMIC 2 CATEGORY Sp,:= 3•SMS Spy= 0.41 > 0.20g D per Table 11.6-1 WOOD SHEAR PANELS 1.2 Sps R:= 6.5 Table 9.52.2 V:_ •W R 1.2.0.73 V:= •W V:= 0.135•W 6.5 12.4 Seismic Load Combinations E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.342) WSD:= 0.7•E 0.7.13.0.135•W 0.123-W WOOD SHEAR PANELS IA GREEN MOUNTAIN PROJECT Riverside - Plan 2626 Ilestructural engineering DATE: Dec. 2017 BY:_„y CM JOB NO: 17486 SHEET: L-2 LATE RAL SIMPLIFIED WIND AND SEISMIC COMPARISON WIND '—)' AM' 11 —j 7.4 ps f 11111 psf Wind base Shear -- Ill ---) Length L:= 50•ft Height Ht:= 24•ft WIND:= L•Ht•(11•psf+7.4•psf) SEISMIC WIND= 22080 lb Fr _> Wroof F2 -} — Wfloor — Seismic Wwa)I ease Shear Aroof:= 504t•46•ft Aroof= 2300ft2 Afloor 42•ft•34.ft Afloor= 1428ft2 Wwalls 4.50•ft•20•ft Wwails=4000ft2 SEISMIC:= (Aroof•15•psf+ Afloor15•psf+Wwalls'10•psf)•0.123 SEISMIC= 11798.16 lb WIND GOVERNS DESIGN Pk - GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB No: 17486 SHEET: L-3 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE VELOCITY PRESSURE qz:= .00256•Kz•Kzt•Kd•V2•I (Eq.6-15) EXPOSURE B WIND SPEED(3 second gust) Vas:= 126 mph IMPORTANCE FACTOR I:= 1.0 TOPOGRAPHICAL FACTOR Krt:= 1.0 WIND DIRECTIONAL FACTOR Kd:= 0.85 (Table 6-4) EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:= .00256•Kz•Kzt•Kd•V3s2•I qz= 19.69 (varies/height) 15'-20' KZ:= 0.62 qz:= .00256•Kz•Krt•Kd•V3s2•I q = 21.42 20'-25' Kz:= 0.66 qz:= .00256•Kz•Kzt•Kd•V3s2•I qz= 22.8 25'-30' Kz:= 0.70 qz:_ .00256•Kz•Kzt•Kd•V3s2.1 qz= 24.18 II = GREEN MOUNTnIN PROJECT: Riverside - Plan 2626 11111, structural engineering DATE: Dec. 2017 BY cm JOB NO: 17486 SHEET: L-4 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. WIND PRESSURE P:= 9Z•G•C, G:= 0.85 Gust factor CP pressure coefficient AT WALLS For Working Stress Design Mu Itiply WIND PRESSURE by 0.6 per IBC 1605.3.1 0'-15' WINDWARD P,„:= 12.4•psf•0.85.0.8 P,y= 8.43 psf LEEWARD PL:= 12.4-psf•0.85.0.5 PL= 5.27 psf 15-20' WINDWARD PW:= 13.49•psf•0.85.0.8 P,r= 9.17 psf LEEWARD PL:= 13.49.psf•0.85.0.5 PL= 5.73 psf 20'-25' WINDWARD PW:= 14.36•psf.0.85.0.8 Py,= 9.76psf LEEWARD PL:= 14.36.psf•0.85.0.5 PL= 6.1 psf AT ROOF 0'-'5' WINDWARD PN,:= 12.4•psf•0.85.0.3 P,H= 3.16 psf LEEWARD PL:= 12.4•psf•0.85.0.6 PL= 6.32 psf 15-20' WINDWARD PN := 13.49•psf•0.85.0.3 P,,,= 3.44 psf LEEWARD PL:= 13.49•psf•0.85.0.6 PL= 6.88 psf 20'-25' WINDWARD PW:= 14.36•psf•0.85.0.3 Pw= 3.66psf LEEWARD PL:= 14.36•psf•0.85.0.6 PL= 7.32 psf -30' WINDWARD Pb.,:= 15.23•psf•0.85.0.3 P,y=3.88 psf LEEWARD PL:= 15.23•psf•0.85.0.6 PL= 7.77 psf 11 GREEN M0UNT� IN PROJECT: Riverside Plan 2626 \✓ .... _. *if structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-5 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. 3-44 \ 6 88 Assume Cp-0.5 psf psf 8 := 35 r Cp--0.6 8.5 ft 8 ft 9.17 p111111111111111111111111 sf 6.1 psf Mean Roof Height 18+ 25 = 21.5 2 Loads at Roof roof-max roof-ave Windward 3.44•psf•8.5•ft= 29.24plf 3.44..psf•5•ft= 17.2plf Leeward 6.88•psf•8.5•ft= 58.48pIf 6.88 psf-5ft= 34.4pif Wall loads at upper level at main level Windward 8.43psf•4•ft= 33.72pIf 8.43•psf•8.5•ft= 71.66 plf Leeward 5.73•psf•4•ft= 22.92pIf 5.73 psf•8.5•ft=48.71pIf GREEN MOUNThIN PROJECT: Riverside Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB JOB NO:... 17486 . ..._.0. SHEET: " mW.,..L-6 LATERAL ‘hr1l10 toJ�i 3►> rt r + 1 II n l% LOii :ii ii e,4he, IIIIII II II II il 0 I • ( 79 1 ift II II II 11 II �it6M �- .---� . IL.6r10 .1 ❑ ❑ 1 4 0 0 0 a ❑ ,� ...a...x. 4 t ic to.%3 i___ _ _ I ,4., . I ,., v r D a Q7 I - ❑ xtei1' ❑ 1..11 ; it M , +� ri—c,.„ n ,n to ++++` +0 4 na — i.- — —IR ILS GI ► ❑ LD* 14905 V* P I I, f -----.._,___t__________:,........_„— &I+, IA �s GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17 4 8 6 .,.., . ._ SHEET: L-7 LATERAL IAANo9 toys e., 1" ii.e.01=;34 -....r...ussie �i i O D 1 • 0 1 la I IIii t � I = o �.N A.w • = S I -4- 8 i r 1 I NI . weoRo 'i rwo 1 t 4t. -J 1 1 Iw li I 144 . M in If I g Van 1I 1 l—_+.----� ! !! r tommtmemotomi W. _ I , PART Al.Rt6VA,10t4 FOR'1 r O' r t ��19t t 1 74t' h . I V GREEN MOUNThIN PROJECT: Riverside - Plan 2626 lop structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486SHEET L.43 LATERAL ,.. SEEM ... �M/1411A tifAi Fito tax _ ", 440b16 gasimais4 qt---- Iii " 1 GROAT ) ROOM Oil 0 a I ) ii Ei ,, . , . _J II II 11111111 11111111 I II pp roar ea.. OWO II ii 1 CI CA f Q, 6651 II. I r-'''4 , L 2x004.. 150 r. °' ;` ,moo e flco 110,1` eh GREEN MOUNTnIN PROJECT: Riverside - Plan 2626 Mr structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-9 LATERAL SHEAR WALL DESIGN Pdl Pd I l dl 4, 1 V l P 00 P:= wind V:= seismic h R=Hol down V Force Based on IBC Basic Load Combinations 0.6D+ W (Equation 16-11) 0.6.D+ 0.7•E (Equation 16-12) Overturning Moment: Mot:= P h L2 Resisting Moment: Mr:= 0.6•(Wdl + Wwali)•{ + 0.6•Pdi•L Mcrt Mr Holdown Force R L 11 a GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 4101, structural engineering SATE Dec. 2017 BY: CM JOB NO: 17486 ,. ..,.. SHEET: 1,71O LATERAL Left Elevation Exterior Walls Second Level Wind Force P:= 1700.1b P=1700 lb Length of wall L:= 3.5•ft+6•ft+11•ft L= 20.5ft P Shear v:= — v= 82.93p1f A L 3.5 Overturning Mot:= P•8•ft Mot= 2321.95lb•ft Moment 20.5 (3.5•ft)2 Resisting Mr:= 0.6.(15.psf•17•ft+10•psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft Moment Mr= 2491.13lb•ft Mot— Mr Holdown = —48.34 lb Force 3.5ft Main Level Wind Force P:= 4400•lb P=4400 lb Length of wall L:= 4•ft+4•ft+ 6•ft+ 13•ft L= 27ft P Shear v:= - v= 162.96 plf B 4 OverturningMot:= P•9-ft 2— 7 Mot= 5866.671b•ft Moment (4•ft)2 Resisting Mr:= 0.6•(15.psf•17-ft+ 10.psf•17•ft)• 2 + 0.6.800•Ib•4•ft Moment Mr= 3960lb-ft Mot— Mr Holdown =476.67 lb Force Oft II -m. GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 It structural engineering DATE: Dec. 2017 BY: CM JOB NO:,,. ....17486 SHEET: L-11 LATERAL Front Elevation Exterior Walls Second Level-F'le vA Govdesign Wind Force P:= 2859•lb P= 2859lb Length of wall L:= 5•ft•2+3.5•ft•2 L=17ft P Shear v:= — v= 168.18plf S 3.5 Overturning Mot:= P•8•ft• 17 Mot= 4708.94lb•ft Moment (3.5•ft)2 Resisting Mr:= 0.6•(15.psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft Moment Mr=1774.5lb•ft Mot— Mr Holdown = 838.41 lb Force 3.5•ft Main Level -not considering the 3rd car garage Wind Force P:= 3680-lb P= 3680lb Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25•ft L= 6.75ft 2.25.35= 7.88 P Shear Wind v:= — v= 545.19plf E 2.25 Overturning Mot:= P•7.88•ft•— Mot= 9666.13lb•ft 6.75 Moment (2.25•ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.800•Ib•2.25•ft Moment Mot— Mr Mr=1292.63lb•ft Holdown = 372156 lb Force 2.25•ft HITS II GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 -51EETa, L-12 LATERAL Right Elevation Exterior Walls Second Level Wind Force P:= 1700-Ib P= 1700Ib Length of wall L:= 3•ft+ 6•ft+10•ft L=19ft P Shear v:= L v= 89.47plf A 6 Overturning M0:= P•8-ft•— Mot=4294.74 Ib•ft Moment 79 (6-ft)2 Resisting Mr:= 0.6.(15.psf.17•ft+10-psf•8•ft)• 2 + 0.6.600•Ib•6•ft Moment Mr= 5778lb•ft Mot– Mr Holdown = –247.21 lb Force 6•ft Main Level Wind Force P:= 4400.1b P=440016 Length of wall L:= 15•ft+ 7-ft+4.ft L= 26ft P Shear v:= L v=169.23plf S 4 Overturning Mat:= P•9•ft•26 Mot= 6092.31lb•ft Moment (7•ft)2 Resisting Mr:= 0.6-(15•psf•17•ft+ 10.psf.17ft)• 2 + 0.6.800.1b•4-ft Moment Mr= 8167.5lb•ft Mo– Mr Holdown = –518.8 lb 4 ft Force GREE MCJUNT�IIM PROJECT: Riverside — Plan 2626 My structural engineering DATE: Dec. 2 017 BY: CM JOB NO: 17 4 8 6 SHEET: L-13 LATE RAL Rear Elevation Exterior Walls Second Level Wind Force P:= 3043•lb P= 3043 lb Length of wall L:= 8•ft+ 7•ft L=15ft P Shear v:= — v= 202.87 plf L 7 Overturning Ma:= P•8•ft15 Ma=11360.53 lb•ft Moment (7•ft)2 Resisting Mr:= 0.6•(15.psf•2•ft+10.psf•12•ft)• 2 + 0.6.600•Ib•7•ft Moment Mr=4725lb•ft Mo— Mr Holdown — 947.931b 7 ft MSTC40 Fo me Main Level Wind Force P:= 4303•Ib P=43031b Length of wall L:= 3•ft+4•ft+ 3.5•ft L=10.5ft P Shear Wind v:= — v=409.81 plf D L 3 Overturning Ma:= P•9•ft•— M�=11064.86Ib•ft Moment 10.5 Resisting Mr:= 0.6•(15•psf•4•ft+10•psf•8•ft)•(34'022 + 0.6.800•lb•3•ft Moment Mot— Mr Mr=18181b•ft Holdown =3082.29 lb Force 3.ft HTTS II GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-14 LATERAL Interior Shear Walls at Garage Main Level Wind Force P:= 3797-lb P= 3797 lb Length of wall L:= 12-ft L=12ft P Shear Wind v:= - v= 316.42plf C Overturning Mot:= P-9-ft Mot= 34173lb•ft Moment (12•ft)2 Resisting Mr:= 0.6•(10•psf•12•ft+10.psf•9•ft)• 2 + 0.6.1200•lb•12•ft Moment Ma— Mr Mr=17712lb-ft Holdown = 1371.75 lb Force 12ft HITS A GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 14111, Dec. 2 017 BY: CM structural engineering DATE: JOB NO: 17486 SHEET: L-15 LATERAL �� •. WIND ON PORCH ROOF 126 MPH,EXP B w:= 6•ft•(4.43•psf+ 8.86•psf) w= 79.7 plf 14, r II II w II II II T w II DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 12•ft w•L2 M:= 2 M= 3987 lb ft support beam on post in wall at house with M Simpson HUCQ-SDS C:= T:= C C= 398.7 lb 12 SDS 1/4x21/4 screws(min)x172 lbs=2064 in combined withdraw w•L Nail top and bottom chord of first truss to wall with v:= p v= 66.48 plf (2)16d nails at 16"o.c.(web to studs) II