Loading...
Report (87) ItiAt "Ft 14 iq FINAL SUMMARY REPORT kpff August 28,2017 Mr.Adolfo Reutlinger Shawmut Design&Construct 10800 Biscayne Blvd.,Suite 1000 Miami, FL 33161 Re: Nespresso Portland Permit No. BUP2017-00102 Dear Adolfo, In accordance with Section 1704.2.4 of the 2012 International Building Code, we have performed special inspection of the following inspection categories per our inspection reports only. • Epoxy Anchors • Welding Any non-compliance items recorded for any of the above inspection categories, as listed on the non-compliance report, have been either re-inspected by KPFF for compliance or reviewed and accepted by the engineer of record for the project in the "as-built" condition. All requested inspections and tests were performed and reported according to the requirements of project documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards as well as approved design changes and approved as-built conditions. Our construction special inspection services were provided and intended to meet the IBC requirements for special inspections and do not constitute a warranty or guarantee of any type. Even with diligent construction inspections, construction defects, deficiencies or omissions in the contractor's work may exist and it is the contractor's responsibility to perform their work in accordance with the approved construction documents. KPFF has provided special inspection services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be representations of fact. Our reports pertain to the material inspected only. Special inspection services do not include responsibilities related to supervising, control of means, methods,sequencing or scheduling of 111 SW Fifth Avenue, Suite 2500 Portland, OR 97204 503 227-3251 kpff.com Mr.Adolfo Reutlinger,Shawmut Design&Construct Re: Nespresso Portland Permit No. BUP2017-00102 August 28,2017 Page Two construction. Additionally, special inspection responsibilities do not include evaluating or reporting on job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions please do not hesitate to call. Sincerely, Mark Powlison Special Inspection Quality Manager MP/jkd cc: AReutlinger@shawmut.com SHinger@shawmut.com Travis.smith@kpff.com 2017_08_28_N espresso_Portla nd_10021700826_Final_Su mma ry_Letter