Loading...
Report (93) Durham Education Center 11�IR .JVC 1495 ZEPHYR AVE,AVYWARD,CA 94544 PITCHED ROOF \ao` mE,HA�a.., - 105 - PV Mounting Details \2�cx� --C"\ . SOLD SV. Project Details NAME Durham Education Center DATE 2018-06-12 LOCATION Portland,OR,97224 TOTAL MODULES 376 MODULE REC Solar:REC350TP2S72(30mm) TOTAL WATTS 131,600 DIMENSIONS 78.94"x 39.41"x 1.18"(2,005 x 1,001 x 30mm) ATTACHMENT PTS 750 Load Assumptions Building Details WIND EXPOSURE B ROOF SLOPE 6 deg WIND SPEED 100 mph BUILDING HEIGHT 30 ft GROUND SNOW LOAD 10 psf RISK CATEGORY I ATTACHMENT SPACING 3.5 ft Engineering XR10 SPAN DETAILS(Portrait) MAXIMUM REACTION FORCES(Portrait) Roof Zone Max Span Max Cantilever Roof Zone Down Uplift Lateral 1 5'4" 2'2" 1 184.00 -89.00 11.00 2 5'4" 2'2" 2 184.00 -167.00 11.00 3 4'6" 1' 10" 3 184.00 -271.00 11.00 XR10 SPAN DETAILS(Landscape) MAXIMUM REACTION FORCES(Landscape) Roof Zone Max Span Max Cantilever Roof Zone Down Uplift Lateral 1 7'6" 3' 1 94.00 -46.00 6.00 2 7'6" 3' 2 94.00 -85.00 6.00 3 6'3" 2'6" 3 94.00 -139.00 6.00 System Weight TOTAL WEIGHT 19550 lbs WEIGHT/ATTACHMENT 26.1 lbs DISTRIBUTED WEIGHT 2.4 psf RACKING WEIGHT 1311.2 lbs Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 1 of 15 LA Durham Education Center 14 IRVI\RIYVVC 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Details Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices A 5 11 PORTRAIT 16'9" 1'4" None 374'[22 x 17'] 110 132 0 16'9" m NMI 72'4" Nan IBMmu NM u Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 2 of 15 Durham Education Center 14 IRVI9RIVVG 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices B 2 1 LANDSCAPE 13'4" 1'5" None 28'[2 x 14] 8 6 0 13'4" 3'3" 111111111 Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 3 of 15 Durham Education Center MINIM,IRVI\RIVVC 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices C 13 6 PORTRAIT 43'3" 7" None 528'[48 x 11'] 1 156 168 36 43'3" 1111111111111111111111111 39'6" 1.11111111111.11111 Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 4 of 15 Durham Education Center 14 IRVIIRIVVC 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices D 1 2 PORTRAIT 3'5" 0" None 44'[4 x 11'1 8 8 0 3'5" II 13'2" in In Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 5 of 15 Durham Education Center 14495 Rv.R�V` 1ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices E 13 1 PORTRAIT 43'3" 7" None 88'[8 x 11'] 26 28 6 - 43'3" 4. 6 '7" • Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 6 of 15 Durham Education Center Z r""R""` 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices F 36 2 PORTRAIT 120' 6" None 480'[8 x 11',28 x 14'] 140 152 32 119'12" 13'2" HIIHHHliIHfl1IHHHH Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 7 of 15 Durham Education Center .r.4 IRVI•RIVVC 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices G 11 • 5 PORTRAIT 36'7" • 10" • None 390110 x 11',20 x 14'] 110 • 120 20 36'7" 32'11" Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 8 of 15 ri Durham Education Center RILJVG 1495 ZEPHYR MINIM I AAVEVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices t# 3 3 PORTRAIT 10'1" 1'6" None 66'[6 x 11] 18 24 0 10'1" 1111 Ell19'9" III Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 9 of 15 Durham Education Center /45ZEPHYR IIWINIMI1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices I 9 1 PORTRAIT 30' 1' None 62'[2 x 14',2 x 17'] 18 20 2 r 29'12" 6'7" Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 10 of 15 i . Durham Education Center 1495 ZEPHYR YR AVE,HAYWARD,CA 94544 PITCHED ROOF Array Cols Rows Orientation Row Length Cantilever Violations Provided Rails Attachments Clamps Splices ' ] ® 3 PORTRAIT 89'8" 1'1" None 540'[24 x 14',12 x 17'] 156 168 30 89'8" 1111MMIMMINIMINNIUMMIM 19'9" Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 11 of 15 Durham Education Center "i1RV1YRIVVG 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Note:The images displayed in this report are meant to represent one portion of the array.The use of a break line indicates that the array may continue on beyond that point. Last updated by Daniel Harp on 2018-06-12 14:06:46 -0700 Page 12 of 15 Durham Education Center 14RIVVG 1495 ZEPHHYRYRAAVEVE,HAVWARD,CA 94544 PITCHED ROOF Splice Detail -------------------- SELF-DRIVING SCREW RAIL TOP-FACING SLOT 11111111111111112=111.01.111 -- INTERNAL SPLICE Splice Connection I ___............_.___-....INTERNAL SPLICE / --------------------- GROUNDING STRAP(AS NEEDED; ------- SELF-DRIVING SCREW ------- SIDE-FACING SLOT ly----17 a RAIL INTERNAL SPLICE XR10 --- -,,--- 1"MIN Expansion Joint Clamp Detail ----PV MODULE ------ UNIVERSAL - RAIL _�// ----STOPPER FRAME FASTENING 1„ . 1„ `J\ SLEEVE ' OBJECT ;> PV MODULE ___ G � FRAME ?'- UNIVERSAL -- —UNIVERSAL �L — FASTENING O. OBJECT 1 FASTENING PV ` I�`(-g, OBJECT —�-- FRAMEULE = }';___-._. +-UNIVERSAL _'V'�' MiI_ 7 FASTENING I------- OBJECT _ _� \LY - RAIL RAIL _- -STOPPER � _ _ i � PV MODULE SLEEVE FRAME Mid Clamp,Plan Mid Clamp,Front End Clamp,Plan End Clamp,Front Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 13 of 15 Durham Education Center 14 rt`���"�"� 1495 ZEPHYR AVE,HAYWARD,CA 94644 PITCHED ROOF Grounding Diagram m.0? ^W @ o p< 0 > p= 0 >0:11 =o Q= : _ =o 1001 ‘o= OUFO Clamp • Grounding Lug* Fault Current Ground Path 1 Min 10 AWG Copper Wire* Bonded Splice(Rail Connection) *Grounding Lugs and Wire are not required in systems using Enphase microinverters. Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 14 of 15 Durham Education Center 14952 IRVI\RILJVC 1495 ZEPHYR AVE,HAYWARD,CA 94544 PITCHED ROOF Bill of Materials GROUP PART DESCRIPTION TOTAL QTY RAILS&SPLICES XR-10-132A XR10,Rail 132"(11 Feet)Clear 84 XR-10-168A XR10,Rail 168"(14 Feet)Clear 76 XR-10-204A XR10,Rail 204"(17 Feet)Clear 36 XR-10-SPLC-BD Kit,XR10 Bonded Splice 126 RS-GDXP-001 Kit,Grounding Strap Expansion Joint 2 CLAMPS&GROUNDING UFO-CL-001 Kit,4pcs,Universal Module Clamp 207 UFO-STP-30MM Kit,4pcs,Stopper Sleeve,30MM,Clear 37 GD-LUG-003 Kit,2pcs,Grounding Lug,Low Profile 18 ATTACHMENTS FM-LFT-003 Kit,4pcs,Slotted L-Foot,Mill 188 FM-SQ-BHW-V2 Kit,4pcs,Square-Bolt Bonding Attachment Hardware 188 ACCESSORIES XR-10-CAP Kit,End Cap XR10(10 sets per bag) 7 MI-BHW Kit,1/4 x 3/4 Microinverter Bonding Hardware,T-Bolt 188 Last updated by Daniel Harp on 2018-06-12 14:06:46-0700 Page 15 of 15