Loading...
Permit (81) CITY OF TIGARD BUILDING PERMIT 1114 -1 COMMUNITY DEVELOPMENT Permit#: BUP2018-00212 Date Issued: 08/09/2018 Tri. ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113B000300 Jurisdiction: Tigard Site address: 8040 SW DURHAM RD Project: Durham Education Center Subdivision: None Lot: None Project Description: Installing 131.600 KW photovoltaic roof mounted system. Contractor: A AND R SOLAR CORP Owner: TIGARD-TUALATIN SCHOOL DISTRICT 1887 SW MILPORT RD 6960 SW SANDBURG ST MILWAUKIE, OR 97222 TIGARD, OR 97223 PHONE: 503-939-7663 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 08/08/2018 $774.63 Demolition Occupancy Grp: Occupancy Load: Solar Photovoltaic System 08/08/2018 $180.00 Dwelling Units: 12%State Surcharge-Building 08/08/2018 $114.56 Stories: Height: ft Info Process/Archiving-Sm$0.50(up to 08/08/2018 $25.50 Bedrooms: Bathrooms: 11x17) Value: $55,065 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $1,094.69 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800:3.32.2344. Issued By: Permittee Signature: Je. , Call 503.539.4175 by 7:00 a.m.for the next available i spection date. This permit card shall be kept in a conspicuous place on the job site til completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit ApplicatioElIFIVn Commercial ,.,(Hz()FF1cI. ► sl:()Nl.1 T City Of Tigard J U L 11. 2018 Received •eimit No.: ���� t � 1 Date/By: /(L //4 ,,,,,Ai. t .'i/,^ Z Date 1,1 . 13125 SW Hall Blvd.,Tigard,OR 97223 g µa � Plan Review Other Permit: / ,v ` Phone: 503.718.2439 Fax: 503.59 0y 0 IGA �..t Date/By: , I'' EL I. c_ �i 1 1.09 Inspection Line: 503.639.4175 '`� �1 i 't� `ri c' '!' Date Ready/By: / Suns. fa See Page 2 for Internet: www.tigard-or.gov D u/L-1-1!°S"' �J't'Ise Atified/Method: iol //-� Supplemental Information 1 T� OF WORK REQUIRED DATA:I-AND 2•FAMILYDWELLING; 0 New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Er Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONST ILUC1'ION" work indicated on this application. Valuation: $ 0 1-and 2-family dwelling Er Commercial/industrial 0 Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATiON AND LOCATION i Total number of floors: Job site address: 8040 SW Durham RD New dwelling area: square feet City/State/ZW: Cortland OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: I Project name: Durham Education Center Covered porch area: square feet _ Cross street/directions to job site: SW Hall and 79th Ave Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIEflON OF WORK work indicated on this application. Valuation: $ 55,065.00 Installation of 131.600 kW photovoltaic roof mounted system Existing building area: square feet New building area: square feet 11 'PROPERTY OWNER0 TENANT Number of stories: Name: Tualatin Tigard School District Type of construction: Address: 6960 SW Sandburg Occupancy groups: City/State/ZIP: Tigard, OR 97223 Existing: Phone:(503) 431-4000 Fax:( ) New: W APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name: A& R Solar �� (Please refer to fee scheda Structural plan review fee(or deposit): Contact name: Tina Kayser y FLS plan review fee(if applicable): Address: 6800 NE 59th Place Total fees due upon application: City/State/ZIP: Portland, OR 97218 Phone:( 503) 420-8680 Fax: :( ) Amount received: E-mail: permits@a-rsolar.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: A& R Solar Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 6800 NE 59th Place Solar Installation Specialty Code checklist. City/State/ZIP: Portland, OR 97218 Permit fee(includes plan reviewand administrative fees): $180.00 Phone:(503) 420-8680 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 207641 Total fee due upon application: $201.60 Authorized signature: --/--' ,/.---,(i This permit application expires if a permit is not obtained l71-414- l% within 180 days after it has been accepted as complete. Print name: Tina Kayser Date: 07/11/18 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) J IN , I Building Division Accessibility: Barrier Removal Improvement Plan IIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 ligBuI ill ilding Division Plan Submittal Requirements .1 I G A R U Commercial& Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional,drawn to scale) labeled with: A. 0 map&tax lot# 0 project name g site address ❑ suite number ® zoning [' applicant name [a' phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey,and full set of architecture drawings. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 • I ii Building Division Plan Submittal Requirement Matrix 116 A It u Commercial& Multi-Family-New,Additions or Alterations - ' of Submittal (Index new,additions and alterations) Requ at Subn tl Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval,the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire &Rescue),if applicable. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 8040 SW DURHAM RD, TIGARD, OR, 97224 Record Type: Record ID: Commercial - Building BUP2018-00212 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor