Loading...
Correspondence I-1 uLcov. TRANSMITTAL To: Project#: Date 15721 2018-01-24 Dan Nelson Project Name: City of Tigard-Building Dept. Tigard Hampton Inn& Suites 13123 SW Hall Boulevard File Under: Tigard,OR 97233 Response to Comments Items Relnw are: SentVia: Sent For Status/Response; ® Enclosed/Attached 0 Mail 0 For Your Information 0 No Exceptions Taken ❑ Sent Separately ❑ Express ® For Your Records 0 Comments Noted ❑ 0 Fax ® For Review/Comment 0 Revise and Resubmit ❑ 0 Messenger 0 As Requested 0 Rejected ❑ ® Hand Deliver 0 0 Copies(Sheets) Date Description 2 ea 01/23/2018 Architectural Drawings,complete set 2 ea 01/11/2018 Exiting Summary(from commentary)-Part of response to#9 2 ea 12/28/2017 ComCheck Compliance Report 2 ea 01/10/2018 Revised Civil Drawings(for Reference) 2 ea 01/11/2018 Structural drawings as recently approved(included with Architectural set) 2 ea 01/11/2018 Revised Structural Calculations as submitted to 3rd party reviewer 1 01/23/2018 Response Letter 1 01/11/2018 FPS Application Comments: Dan, Please find enclosed drawings for your use and review for the building permit submittal. Feel free to call or email if you have any comments,questions,or concerns. Thanks, Dan Salvey I Project Manager I Hill Architects Dan Salvey 15721 Project File By Signature/Initial Distribution HILL ARCHITECTS 1914 WILLAMETTE FALLS DRIVE • SUITE 280 • WEST LINN OR 97068 • TEL 503 305 8033 • FAX 503 305 8034 1-1 To: Dan Nelson,Senior Plans Examiner City of Tigard Community Development 13125 SW Hall Blvd. Tigard,OR 97223 dann@tigard-or.gov 503-718-2436 From: Dan Salvey,Project Manager Hill Architects dan.salveyna,hillarchitects.com 503-305-8033 Re: City of Tigard BUP#2017-00254 Hampton Inn&Suites 11799 SW 69th Avenue Response to BUP#2017-00254 Plan Review Comments dated 20-Dec-2017 Mr.Nelson, Thank you for your comments dated December 20,2017 regarding review for building code compliance. We really appreciated your taking the time to meet with us to bring these items to our attention in a face to face forum. We believe that the following responses to your comments should address most,if not all,of your concerns. Comments/Responses: 1. Provide Permit Application for Fire Underground(FPS) Response:Please see include FPS Permit form. 2. Provide Number of Occupants in Refuge Zones per 1025.4 Response:Not Applicable-The design of this project does not include Refuge Zones as it is fully sprinklered. Per Section 1007.3, exception 2, refuge zones are not required. 3. Provide 2-hour floors/ceilings at horizontal fire barrier exits per 1025.2 Response:Not Applicable-The design of this project does not include horizontal fire barrier exits. Ground and Second level exiting utilizes Atrium per Section 404.10,see tiem#9 responses for additional information. 4. Change Door Schedule for Rated Doors Response:Please see revised door schedule(A900), hardware schedule(A903-904), and floor plans (A200-A203). 5. All glass in rated assemblies shall be rated as per 716 Response:Please see revised door schedule(A900), and window schedule(A910). 6. Provide Energy ComCheck document Response:Please see attached ComCheck documents. HILL ARCHITECTS 1750 BI ANKBN5HIP Roan • Sorrr_ 400 • WF,sT LINN OR 97068 • Tei. 503 305 8033 • Fax 503 305 8034 7. Show Class B rating for interior finishes in Atrium and Exit Stairways Response:Please see revised A000 Cover Sheet with General Notes addressing Class B finishes, and Code plans(A020-A023). 8. Horizontal Exits to be two hours rated Response:Not Applicable—See item#9 responses for additional information. 9. Detail Exiting System Response: Ground&Second Level exiting incorporates 2-story atrium space as defined in Section 202. Atrium requirements are listed in OSSC Section 404&summarized on sheet A022. Atrium (&entire building)will have sprinkler system as required by 903.3.1.1 so approved uses are allowed per 404.2 exception. Smoke control is not required per 405.5 exception. Separation of adjacent spaces is not required per 404.6 exception 3. (Please see attached IBC code commentary for some clarification of separation and smoke control requirements for 2-story atriums.) While adjacent spaces are not required to be separated from the atrium (as noted above), other code required separations would still apply. Therefore, hotel guest rooms are separated by 1-hour fire partitions&20-minute doors with smoke seals. The atrium ceiling(third level floor)is 1-hour rated. The extent of the atrium space is delimited by 1-hour fire barriers separating it from the remainder of the ground&second floor. As required by Section 404.9 exit access travel distance within the atrium space is limited to less than 200 feet on the Second Level. Exiting for levels above the second is provided by exit stairs located at opposite ends of the building. Dead end corridors do not exceed 50 feet in compliance with 1018.4. Garage level exiting is provided by exit stairs at either end. 10. Provide 10-foot separation from window to unprotected wall(stair) Response:All exit discharges include accessible route from exit to public way, therefor exterior areas of rescue assistance&separation required by section 1007.7.1 are not required 11. List Deferred Submittals Response:Please see revised A000 Cover Sheet with list of deferred submittals added. 12. Three-hour columns in podium to be confirmed Response: Columns, as part of the Structural Frame, are denoted as being required to be constructed with a 3-hour rating on the Code Plan,A020. We have added additional notes to the A020 to provide greater clarity of this requirement. Additionally, we have confirmed with the Structural Engineer that proper rebar coverage is included in the design. Additional Changes include: • Updated address in the title block(all sheets) • Added insulated walls(furring)at exterior walls of basement • Wall type clarifications throughout • Added relite at first floor vending room • Revisions to the door schedule coordinating fire ratings and clarifying door types • Added new interior details sheet A871 • Revions to open parking structure details,sheet A104 • General clean up on the cover sheet. 2 We have also included is a set of the Structural drawing changes as submitted to 3rd party reviewer which has recently been approved,and an updated Civil"For Reference"set matching the current resubmittal that is under revew with planning/engineering. We hope that you find the above responses to comments to be acceptable and we look forward to hearing from you concerning this review. If there are any comments,questions,or concerns,please don't hesitate to contact me. Thanks,and hav a great . , Salvey I Project Manager IH I C H I T E C T S I tel 503-305-8033 3