Report \--A-qC\ LQ_Ckti, e-- .
ROGERS
ENGINEERING
Structural Engineering■Building Design•Code Consulting■Inspection Services
558 S.E.Jackson St
Roseburg,Oregon 97470
Ph: (541)672-0315
Fax: (541)672-1787
roRerst(iurasen et.net
January 15, 2018
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Mark VanDomelen
Building Official
Rogers Engineering: Structural Review
Project: Hampton Inn & Suites, 11795 SW 69th Ave.
Rogers Engineering has completed a structural plan review of the submittal for the Hampton Inn
& Suites project on behalf of the City of Tigard. Rogers Engineering recommends approval
of the associated construction documents.
Documents are as specified on the attachment, Project Documents.
Should you have questions or need additional information, contact me at your convenience.
Respectfully Submitted,
/
11/1fr71/
Tom Rogers,P.E., CBO
Project Documents
Hampton Inn& Suites
11795 SW 69th Ave.
Plans prepared by Hill Architects dated 06-Sept-2017
Geotechnical report by PBS Engineering+Environmental dated February 4, 2016
Structural calculations by Allstructure Engineering, LLC, Vol. 1-2 dated September 6, 2017
Geotechnical Addendum 1 by PBS Engineering+Environmental dated October 5, 2017
Review response by Allstructure Engineering,LLC dated October 25,2017
Supplemental calculations by Allstructure Engineering, LLC dated October 25, 2017
Revised structural drawings by Allstructure Engineering, LLC—issued with the response
Review response by Allstructure Engineering,LLC dated November 17, 2017
Supplemental calculations by Allstructure Engineering, LLC dated November 17, 2017
Revised structural drawings by Allstructure Engineering, LLC—issued with the response
Revised sheet A101 dated 2017.10.06
Supplemental calculations by Allstructure Engineering, LLC dated January 12, 2018