Plans (5) BU P2016 - 00086 01 00 00 GENERAL DATA 7. AT TOILET ROOMS USE 5/8'USG FIBERROCK BRAND AQUATOUGH INTERIOR PANEL FROM FLOOR TO 48-A.F.F. 26 00 00 ELECTRICAL : DESIGN/BUILD �/� GENERAL REQUIREMENTS ON WALLS BEHIND OR ADJACENT TO PLUMBING FIXTURES. NO SUBSTITUTES.(EXCEPTION:EXCEPTION AT EDITION LOCATIONS TO RELIEVE PLASTIC LAMINATE OR TILE WAINSCOT.) GENERAL -'1.. 1 1. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH THE LATEST EDON OF THE OREGON 8. AT TILE WAINSCOT LOCATIONS INSTALL CEMENT BACKER BOARD%'THICK WITH SQUARE,REINFORCED, 1. ALL ELECTRICAL FEEDS TO OUTLET,SWITCHES,ETC.MUST BE VERTICAL DROPS FROM CEILINGS U.N.O. ��, �✓ STRUCTURAL SPECIALTY CODE,AND ALL OTHER STATE OR LOCAL CODE REQUIREMENTS THAT APPLY. SMOOTH EDGES. PROVIDE DUROCK BRAND CEMENT 9. AT FRP,PLASTIC LAMINATE,ETC.,WAINSCOT PANELING INSTALL WATERBOARD OR APPROVED EQUAL EXCEPT FOR HORIZONTAL RUNS UNDER-RESISTANT GYPSUM BOARD. WINDOWS AND FIXTURES ON THE SAME STUD. *A y. #30$2 ✓� 2. VERIFY ALL DIMENSIONS AND CONDI TIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND 2. ALL ELECTRICAL FEEDS TO OUTLETS AND DATA BELOW WINDOWSILLS TO BE ROUTED THROUGH BUILDING TENANT IMPROVEMENT 101 MARTIN W. HANSOM NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK 10.TRIM ACCESSORIES SHALL COMPLY WITH ASTM C-1047. SHELL WALLS. DO NOT FEED FROM PERPENDICULAR INTERIOR PARTITIONS. 3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING 3. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER. CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL SUBMITTAL OFA PROPOSAL SHALL BE CONSIDERED 11.USE GEORGIA PACIFIC DENSGLAS GOLD ON EXTERIOR FACE OF EXTERIOR WALLS AND COAT WITH STO FINISH RECEIVED LatKnMns, OREGON,1 CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER COMPENSATION SHALL BE DUE SYSTEM. 3. PROVIDE UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS. THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. WALL CONSTRUCTION EXECUTION 4. LIGHTING ENERGY MANAGEMENT IS REQUIRED IN ALL BUILDINGS. . 4. BY SUBMITTING A PROPOSAL CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE 1. FASTEN FRAMING MEMBERS TOGETHER BY WELDING OR BY USING SELF-DRIWNGORSELF-TAPPING 5. OCCUPANCY CONTROL DEVI;ESSHALL BE LEVITON OR WATT STOP. MAR 23 2016 LANGUAGE LINE V �� EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK SCREWS. WELDING SHALL CONFORM TOAWS 013 WELDING PROCEDURE. ELECTRODES AND SCREW 6. TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS,EQUIPMENT �� DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE UMITEDTO CONNECTIONS SHALL BE AS REQUIRED AND INDICATED IN THE DESIGN CALCULATIONS. DO NOT FIELD WELD AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND CITY OF TIGARD OF O ALLF IN ETE AND INSTALLATION, TED BY P CEXCESS CLEANING AND(UALL LL PREPARATIONE FIPMATERIALS SHALL BE MATERIALS LIGHTER THAN 18 GA. l T►�JLA l ION SOLUTIONS �./ 1 IONtI.! LEFT MATERIALS DISP SAL OFEXCE SMATERGALLISHMATOF SUBSTRATE SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THAY OPERATE BUILDING DIVISION 1 �I SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. 2. PROVIDE ACCURATELY ALIGNED RUNNERS AT TOP AND BOTTOM OF PARTITIONS. ANCHOR TRACKS AS IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. 5. ITIS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING INDICATED IN THE DESIGN CALCULATIONS. BUTT WELD JOINTS IN TRACKS OR SPLICE WITH STUD INSERTS. OFFICE LIGHTING PROJECT NARRATIVE PROJECT #16010 FASTENERS SHALL BE AT LEAST 3 INCHES FROM THE EDGE OF CONCRETE SLABS. STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS 1. OFFICE LIGHT FIXTURES- LITHONIA 2PM3N G B 332 18LD MVOLT ADVANCE OR EQUAL(NO SYLVANIA INTENSION,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. 3. CUT STUDS SQUARE AND SET WITH FIRM BEARING AGAINST WEBS OF TOP AND BOTTOM TRACKS. POSITION BALLASTS) PROJECT CONSISTS OF REMODEL WORK TO 8,940 SF OF EXISTING OFFICE SPACE. WORK SHALL 6. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. STUDS VERTICALLY IN TRACKS AND SPACE AS INDICATED IN DESIGN. DO NOT SPLICE STUDS. PROVIDE AT LEAST TWO FULL HEIGHT KING STUDS AT DOORS AND OTHER OPENINGS 2 FEET WIDER PROVIDELARGER. PRODE 2. REST ROOM-WALL MOUNTED LIGHT FIXTURE(CLASS A SPACES)- PEERLESS CRW1-2 54TSHO SPR 2770E1310 INCLUDE BUT NOT BE LIMITED TO DRYWALL/METAL STUDS, SUSPENDED CEILINGS, 7. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPETWALK-OFF MATS'TO PROTECT EXISTING JACK STUDS OVER OPENINGS,AS NECESSARY,TO MAINTAIN INDICATED STUD SPACING. PROVIDE TRIPLE (1SE EMERGENCY MODULE PER PLAN) DOORS/FRAMES AND PAINTING. ALL WORK TO MEET ADA REQUIREMENTS. V CARPETS. AND BOTTOMTRACKSBBAT CORNERS, YWELDNGORSCREWINGBOTHFLANONED TO RECEIVE INTERIOR ANDGESTOTHETRACKS,RIOR FINISHES. FASTENSTUDSATTOP 3. RECESSED LED oovvHLIGHT: LITHRIALDN63510LO6ARLD277TRW WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT W 8. KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS 28 30 00 ELECTRONIC DETECTION AND ALARM �..( AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. 4. INSTALL ALL INTERIOR AND EXTERIOR GYPSUM BOARD PRODUCTS AND ACCESSORIES AS REQUIRED FOR THE PROJECT. GENERAL �I 9. PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITEDTO FIRE PROTECTION SPRINKLERING FFgi'y) COMMON CORRIDORS AND STAIRS,BUILDING ENTRANCES,SURE ENTRANCES,ETC. THE CONTRACTOR WILL 5. AT TOILET ROOMS TO RECEIVE SHEET VINYL FLOORING,INSTALL THE GYPSUM BOARD(OR AUQATOUGH) FOR HORN/STROBE DEVISES USE"SYSTEM SENSOR'SPECTRALERT ADVANCE DEVISES,OR APPROVED EQUAL. FIRE ALARM SYSTEMS r BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION WITH 1/4"GAP BETWEEN THE BOARD AND THE FLOOR. HEATING, VENTILATION&AIR CONDITIONING WORK ACTIVITIES. 6. COMPLY WITH USG GYPSUM CONSTRUCTION HANDBOOK AND MANUFACTURER'S RECOMMENDATIONS. ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE 10.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING 7. FINISH QUALITY: • RESTROOM FACILITIES. 1 AREA PROCESS TRADE NOMENCLATURE n 11.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER WAREHOUSE TAPE/FINISHCOAT' TIGHT DOUBLE BUILDING INFORMATION TENANT INFORMATION COMMON BUILDING AREA BE USED FOR STORAGE. OFFICE/OTHER AREAS TAPE/2 FINISH COATS•/ SMOOTH FINISH TAPED OWNER: PACIFIC REALTY ASSOCIATES, LP. TENANT: 0 C 12.KEEP THE ROOF FREE OF DEBRIS(I.E.NAILS,SCREWS,BOTTLES,ETC.)AT ALL TIMES. USG'FIRST COAT' •SAND AFTER TAPE/FINISH COAT(S) 15350 SW SEQUOIA PKWY#300 LANGUAGE LINE TRANSLATION CA 42 13.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. 8. FINISH EXPOSED INTERIOR GYPSUM BOARD WALLS AND CEILINGS SMOOTH STRAIGHT READY FOR FINISH AS PORTLAND, ORE 97224 SOLUTIONS 14.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL MECHANICAL SHOWN ON PLANS. ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. 09 91 23 PAINTING (503)624-6300 (PHONE) OCCUPANCY AREAS& LOADS: 15.LEAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. (503)624-7755(FAX) B 8,940 SF 90 OCC p.,N INTERIOR: N 16.CLEAN ADJACENT EXTERIOR AREA,I.E.WALKS,EXTERIOR GLASS,ETC. 1. WALLS: BLDG.#. PCC BLDG. #7 (pCc231) NUMBER OF EXITS REQUIRED • �O a 17.FlLLALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. a. PRIME NEW DRYWALL WITH MILLER'S HIGH-BUILD"SUPER SEAL"PRIMER. 18.PROVIDE"AS-BUILT'DRAWINGS OF THE WORK AT THE CONCLUSION OF CONSTRUCTION.'AS-BUILT' B 2 EXITS "a 1:4 �0 In � DRAWINGS MAY BE IN THE FORM OFTWO COPIES OF CONSTRUCTION DOCUMENTS MARKED-UP WITH RED b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S 6200R CONST. TYPE.: III$ 1-j a„LiO (p PEN.DELIVER RECORD DRAWINGS TO THE ARCHITECT. COMPLETE OPERATION AND MAINTENANCE MANUALS 4480 WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER'S S/G LATEX ENAMEL MIS_-11 SHALL BE PROVIDED FOR ALL MECHANICAL,ELECTRICAL AND PLUMBING EQUIPMENT. STMAY HOLD z. oAND FRAMES: THIS BUILDING WILL HOUSES SEVERAL TENANTS INCLUDING THIS TENANT. THE E..I ca N CONTRACTOR'S FINAL PAYMENT UNTIL'AS-BUILT'DRAWINGS AND 08 M MANUALS HAVEE BEENBEEN a. NEW RECEIVED a. NEW HOLLOW METAL-PRIME,SAND,AND FINISH WITH TWO COATS OFSEMIIGLOSS OIL EXISTING BUILDING IS A PARTIAL TWO STORY BUILDING OF 57,160 SF AND IS FULLY ^^ AND APPROVED. 19.1T IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, b. EXISTING HOLLOW METAL-SAND,FILL IMPERFECTIONS WITH BONDO,SAND AND PRIME PATCHES WITH . THERE IS FRONTAGE ON ALL FOUR SIDES OF AT LEAST 152 FEET. C in In O O PROJECT INCLUDING ALL GENERAL,MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED ALKYD PRIMER,AND FINISH WITH SEMI-GLOSS OIL ENAMEL FUNCTIONING ‘...v TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED,REGARDLESS OF c. NEW WOOD-PRIME WITH ALKYD OIL UNDER-COATER,SAND,FILL ALL FASTENING HOLES WITHIA r:4 en WHETHER OR NOT SHOWN ON THE DRAWINGS. PAINTER'S PUTTY,CAULK ALL CRACKS IN CASINGS AND BETWEEN JAMBS AND WALLS USING DAP LATEX ALLOWABLE AREA-UNLIMITED (IBC 507.2) te)0 I W CAULK AND FINISH WITH SATIN OIL ENAMEL NONSEPERATED USES(IBC 302.3.1) 20.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED'N.I.C.'. 21'ALIGN'AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME d. EXISTING WOOD-PREP,REPAIR IMPERFECTIONS,PRIME AS REQUIRED,AND REPAINT WITH SATIN OIL PLANE,EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. ARNEL. IF FINISH IS NOT PAINTED,TOUCH UP STAIN,SEAL AS REQUIRED,AND RE-VARNISH WITH SATIN VARNISH. 22.D0 NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS.DRAWINGS ARE INTERRELATED. 3. CEILINGS: 23.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN a. EXISTING GYP BOARD/PLASTER-SAND,SPACKLE ALL IMPERFECTIONS,SPOT PRIME AND FINISH TO }h TWO WEEKS OF PROJECT AWARD.PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S 6200 OR 4480. REPLACEMENT AT CONTRACTOR COST. AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE b. NEW GYP BOARD /PLASTER -PRIME WITH SUPER SEAL AND FINISH TO ACHIEVE UNIFORM COVERAGE CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH.REPLACE SUCH PRODUCTS AS WITH MILLER'S 6200 OR 4480. Ill DIRECTED AT CONTRACTOR'S COST. 4. GENERAL NOTES: V 1 a 24.SUBMIT COMPLETE SHOP DRAWINGS FOR MILLWORK,SPECIAL SYSTEMS,MECHANICAL,ELECTRICAL AND a. KEEP ALL HARDWARE,HINGES,AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS,DRIPS,OR ROLLER / r. PLUMBING SYSTEMS(INCLUDING FIRE PROTECTION SYSTEMS). SUBMITA MINIMUM OF TWO COPIES OF ALLSPRAY O agi Z. ell 113 SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHIT ECT OF RECORD.ARCHITECT WILL RETAIN ONE COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR. b. ALL SURFACES TO BE SANDED BETWEEN COATS,PRIOR TO INSTALLATION OF NEXT COAT. ro.uxnum cµM�wligglk\ NilliaO O II 25.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS C. DURING PROGRESS OF WORK,KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS,RUBBISH,CANS,AND exenfl g a CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER RAGS AT THE END OF EACH DAY. a-� LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE d. UPON COMPLETION OF WORK,CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING r_�.,� - ti i®-1 �` INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE AND SCRAPING,USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. l 160 CENTERED IN CEILING TILE(OR 2 x 2 MODULE OFA SECOND LOOK II TYPE OF CEILING TILE WHERE - �,� APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY e. PROTECT WORK OF OTHER TRADES. ; y� ' � '�% THE ARCHITECT PRIOR TO INSTALLATION. 1. PROVIDE'WET PAINT SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. I !E , � ttlesiftil�lli������ 26.COORDINATE ALL CONSTRUCTION SEQUENCING WITH O MINI STAND SCHEDULE ALL SERVICE 10 00 00 SPECIALTIES �L't- , lgtz al INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TOMINIMIZEINCONVENIENCE TOCURRENT TENANTS. �r_� � ` ) 1 0 GENERAL 10 28 13 REST ROOM ACCESSORIES 1 -- - -- 1. REMOVE ALL EXISTING VCT,SHEET VINYL,ETC.IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR 1. REUSE EXISTING ACCESSORIES WHERE POSSIBLE. C -rt, �r�- �� 0 �5j�.y� ; I� A TO INSTALLATION OF NEW FLOORING. 2. PAPER TOWEL DISPENSER AND WASTE SEMI RECESSED(ONE PER REST ROOM)BOBRICK B-3944 II. . T l _�,f.J ` V1 `� T/1 01 73 29 CUTTING AND PATCHING a LAVATORY MOUNTED SOAP DISPENSER 34 FL OZ.,6"SPOUT LENGTH BOBRICK B-6226 1Il JJVLil _, T - 1 a 1. PERFORM CUTTING AND PATCHING WITH SKILLED CRAFTSMEN EXPERIENCED WITH THE TYPE RWORK 4. SURFACE MOUNTED MULTI-ROLL TOILET TISSUE DISPENSER BOBRICK&2888 l .. +, o jil, I _ 1•; - I X A I/�, <YIBEING UNDERTAKEN. 5. SURFACE MOUNTED TOILET SEAT COVER DISPENSER OBRICK 84221 1 '�1____:Nsk �`�"1 / - .•nar --•-___ IL 2. PROTECT EXISTING CONSTRUCTION TO PREVENT DAMAGE. 6. MIRROR STANDARD SIZES 1/4'PLATE MIRROR WITH EDGES"FLATGROUND'BOTTOM EDGE SUPPORTED BY A 3. PERFORM CUTTING USING METHODS LEAST LIKELYTO DAMAGE ELEMENTS TO BE RETAINED. CONTINUOUS BRIGHT CHROME'J'METAL,5/16"X 3/8" (HEIGHT OF EXPOSED FACE)WITH CONCEALED LEG BUILDING LOCATION II 4. PATCH,USING MATERIALS IDENTICAL TO EXISTING MATERIALS THAT VISUALLY MATCH EXISTING ADJACENT SCREWED TO THE WALL TO CARRY THE WEIGHT CF MIRROR. 4 SURFACES TO THE FULLEST EXTENT POSSIBLE 7. GRAB BAR SATIN FINISH BOBRICK B-6806 SERIESEl 5. PATCH WITH DURABLE,INVISIBLE SEAMS THAT ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. 1223 16 CABINET SPECIFICATIONS ® LOCATION MAP Z� 6. AT CONCRETE SLAB REPAIRS(POUR BACKS),PROVIDE#3 x 17 LONG REBAR DOWELS AT 24"O.C. MIN.WITH 1. ALL CABINETRY TO BE INSTALLED OVER FINISH FLOOR AT ALL RESILIENT FLOORING LOCATIONS. NOT TO SCALE MIN.6'PENETRATION INTO EXISTING CONCRETE AND MIN.OF 6'EXPOSURE INTO POUR BACK CENTER 2. AVVI CUSTOM GRADE STANDARDS FOR CASEWORK AND COUNTER TOPS U.N.O DOWEL IN SLAB. V 1 7. REMOVE PATCHES THAT ARE VISUALLY UNSATISFACTORY IN THE ARCHITECTS OPINION AND REPLACE AT NO 3. HIGH PRESSURE LAMINATE(P-LAM HPL)ALL EXTERIOR SURFACES,INCLUDING 4"TOE KICK EDGE BANDING ADDITIONAL COST. (MATCHING PVC ACCEPTABLE),FIN ENDS,DOORS,AND LIGHT VALENCE ETC. UPPER CABINET BOTTOMS OPTIONAL HPL FINISH,STANDARD MELAMINE FINISH. OPEN CABINETS OPTIONAL HPL FINISH,STANDARD I 08 10 00 DOORS AND WINDOWS MELAMINE FINISH. 1. RE-USE EXISTING DOORS AND FRAMES WHERE POSSIBLE 4. TOE KICK PLYWOOD 4'H WITH P-LAM COVER I 2. APPROVED DOOR,FRAME,AND HARDWARE SUPPLIERS INCLUDE: 5. DOORS AND DRAWER FRONTS PLASTIC LAMINATE OVER 11/16"PARTICLE BOARD WITH MATCHING P-LAM OR a. BAXTER AND FLAMING. (503)225-0486 PVC EDGES. b. D 8 D DOOR (503)2055521 6. MELAMINE(LOW PRESSURE LAMINATE/LPL)ALL INTERIOR AREAS,DRAWER PARTS,SHELVING ETC. c. BENSON INDUSTRIES (503)907-2203 7. FLUSH OVERLAY/FRAMELESS STYLE CONSTRUCTION. ® d. GRANT SUPPLY (360)887-0647 8. HINGES-GLUM#75M3580,110 DEG.SELF CLOSING CLIP R(OR EQUAL). �-�- I -� _ Q _ Q _ Q _ _ Q _Q - 4� _ �l _ 4}l _ �l _ ® _. y_(�_p_t - ` 3. FIELD VERIFY EXISTING FRAME AND HARDWARE FINISH PRIOR TO ORDERING. ALL NEW DOORS, 9. DRAWER SLIDES-BLUM #230M SERIES EXTENSION(OR EQUAL)75 LBS.MIN.FOR STANDARD DRAWERS. C$---- I II--_ I I _-_I _-. I ) "� I---I ---I I I I Ii_- W ACCURIDE#4032(OR EQUAL)HD/FULL EXT 150 LBS.MIN.FOR HD AND ALE DRAWERS. � I I I FRAMESLD VERIFY AND HARDWARE EXISTING O DOOR,FRA EXISTING BUILDING STANDARDS. ■___�__ I 4. ALL INTERIOR DOORS SHALL BE SOLID CORE WOOD UNLESS NOTED OTHERWISE. 10.PULLS-96 MM C-TO-C WIRE PULLS. FINISH TO MATCH DOOR HARDWARE. --- I 5. DOOR HARDWARE SHALL BE SCHLAGE AL SATURN OR D RHODES SERIES U.N.O. 11.GENERAL CONTRACTOR TO PROVIDE CABINET MAKER WITH SINK TEMPLATE(SPEC SHEETS)FOR EACH SINK T � m� �MAR "" + T -: -1 4 SINK CUTOUT SHALL BE DONE IN SHOP WHEN FEASIBLE AND BEFORE BACK SPLASH IS INSTALLED IN ALL I_ �a` I II I1 C 6. ALL DOOR HARDWARE SHALL BE INSTALLED WITH A 5'BACKSET. CASES TO ALLOW CUT OUT TO BE POSITIONED PROPERLY. ALL RAW EDGES OF CUT OUT AND BACK SPLASH _ I I __ TO BE SEALED. MINIMIZE COUNTERTOP BUILD UPS AT FRONT AND BACK OF SINK CUT OUT TO � -. -� -C -t --rt-1 1.. _ 7. DOOR FINISH SUBMITTAL:CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DOOR FRAMES,DOOR ACCOMMODATE PLUMBERS SINK CLAMPS CLEARANCE. I I I I I I .- W HARDWARE AND DOORS AS WELL AS A CONTROL SAMPLE OF THE FINISHED DOOR SKIN VV/STAIN AND FINISH LA APPLIED(IF NEW DOORS ARE BEING PROVIDED). BEFORE FINISHING OF DOORS IS COMMENCED ARCHITECT 12.R ESTROOMS LAVATORIES(WHERE APPLICABLE)-24'D P-LAM TOP ON PLYWOOD DECKING WITH 4'H P-LAM -� -- ----'�- +.-. :LSLC�. V r i SHALL APPROVE CONTROL SAMPLE. FINISHED PRODUCT IS SUBJECT TO REJECTION BY ARCHITECT IF THIS BACK SPLASH. 5'H FACE MOUNT AT 34'A.F.F. P-LAM WAINSCOT 46'H. SEE PLANS IF REQUIRED. I I I I I I I �� 7 � PROCESS IS NOT FULLY ADHERED TO AND FIELD PRODUCT DOES NOT MATCH THE APPROVED CONTROL 21 00 00 FIRE SUPPRESSION : DESIGN/BUILD _ - �- - _ "'PpM p- ;���■ N SAMPLE. iF Q� N 09 FINISHES 1. ADJUST EXISTING SPRINKLERS BELOW SUSPENDED CEILING PER CODE. SPRINKLER HEADS SHALL BE I I I I I i I I I I I I �. �I I p1 CENTERED IN 2 X 2 CEILING TILE.LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD ,,__.1. _�--__I-,-.L_ _J----L_-. ■cM!r�: D 0 a GENERAL CEILING AREAS(GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO __-1-�.- '..- -.-I-_-L_ _L.-_L_._ _ _�- -_-I-_-_L__. _ __.I-�-J- - !'r aO 1. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. INSTALLATION. ,p ^ 22 00 00 PLUMBING --1-1-1- . - -- -- - - -- ----1- ■ - �� I �_�_� P4 O 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: Cn a. FLOOR COVERINGS,BASE AND TRANSITION STRIPS GENERAL REQUIREMENTS Q H b. PLASTIC LAMINATES 1. CONTRACTOR TO SUBMIT LAYOUT ON ELEVATIONS AND PLANS PROVIDED FOR ALL SHUTOFF VALVES,CLEAN AREA OF WORK w.1 l CO 0 v1 OUTS,ACCESS DOORS,AND FLOOR DRAINS TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. e. ALL NATURAL WOOD(INCLUDING DOORS AND CASEWORK) 2. PLUMBING CONTRACTOR TO PROVIDE AND INSTALL(1)MASTER SHUT OFF VALVE FOR EACH SET OF .�-i d. PAINT RESTROOMS. LOCATE VALVE BEHIND HANDICAP TOILET IN MEN'S RESTROOM. I I 0.! .�-i ray e. TILE,MARBLE,GRANITE,STONE,GROUT AND SCHLUTER TRIMS 3. ALL DOMESTIC WATER PIPING TO BE TYPE L COPPER-NO EXCEPTIONS. ALL EXPOSED PIPING TO BE ® BUILDING PLAN (ID f. TOILET PARTITIONS INSULATED. g. HARDWARE 4. WATER O HEATER(ELECTRIC)30 GAL AND LARGER 277V LESS THAN 30 GAL 120V. PROVIDE HUB DRAIN AT SCALE 1"=30' REVISION 3. EXTEND FINISH FLOORING UNDER ALL NEW CASEWORK 5. POINT OF DEMAND WATER HEATER-BOSCH POWER STREAM PRO-MODEL RP2P 277V/30A. ADJUST WATER 09 21 00 GYPSUM BOARD FLOW SETTING TO PROVIDE A HEATING RANGE OF 105 TO 120 DEGREES. CONTACT MESHER SUPPLY FOR 1. GENERAL AVAILABILITY,(503)236-4148. 1. ALL GYPSUM BOARD TO BE A MINIMUM OF 5/8'THICK VERTICALLY ATTACHED TOMETAL STUDS 24'O.C.WITH 6. FLOOR DRAINS SHALL BE INSTALLED IN TOILET ROOMS CONTAININGTWO(2)OR MORE WATER CLOSETS OR 2 2. 1'TYPE S-12 SCREWS 12'O.C.UNLESS OTHERWISE NOTED. OR MORE WATER CLOSETS AND URINALS IN COMBINATION. THE FLOOR SHALLSLOPE TOWARD THE FLOOR DRAIN. 3. 2. ALL OFFICE GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND TWO FINISH COATS WITH SANDING BETWEEN 7. FLOOR DRAINS TO BE INSTALLED WITH PRIMER VALVE WITH ISOLATION VALVE. NO ATMOSPHERIC PRIMERS. FINISH COATS. APPLY USG SHEETROCK BRAND FIRST COAT. PAINT AS INDICATED. DRAINS TO BE PRIMED FROM TOILET FIXTURES UNLESS APPROVED BY OWNER. PROVIDE A MIN.OF 17 - 4. a ALL OTHER GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND ONE FINISH COAT WITH SANDING AFTER FINISH ACCESS DOOR. ART COAT. PAINT AS INDICATED. PLUMBING-REST ROOM FIXTURES CITY Op TIGA1tD _ S. 4. ALL ONE HOUR RATED WALLS(WHERE APPLICABLE): ONE LAYER 543-TYPE XGYPSUM WALLBOARD,EITHER 1. REUSE EXISTING FIXTURES WHERE POSSIBLE REVIEWED FOR CODE COMPLIANCE AT RIGHT ANGLES OR PARALLEL TO FRAMING ON EACH SIDE OF METAL STUDS SPACED AT 24"O.C. FASTEN 6. WITH 1'TYPES DRYWALL SCREWS 8"0.C.TO VERTICAL EDGES AND 12"O.C.TO TOP AND BOTTOM RUNNERS 4. TOILET W/FLUSHOMETER-AMERICAN STANDARD AS 2234.015AT NON ACCESSIBLE STALLS AND 2305.100AT ' AND INTERMEDIATE STUDS. STAGGER ALL VERTICAL AND HORIZONTAL JOINTS 24"O.C.(OR ONE STUD ACCESSIBLE LOCATIONS. FLUSHOMETER SLOAN FLUSH VALVE 111 OR TANK TYPE TOTO CST744SL AS Approved: SPACING),EACH SIDE AND OPPOSITE SIDES. INDICATED ON PLAN. OTC; (Lk-, c1 C.i \pi L' (\ '7. 5. IN FINISHED SPACES FURR-OUT BUILDING COLUMNS AND EXTERIOR WALLS WITH 5/8"GYPSUM BOARD OVER 5. TOILET SEAT: BEMIS 1955SSC OR OLSONITE 1OSSCT Permiti 8. METAL STUDS. /1������J�! 6. COUNTERTOP LAVATORY KOHLER K-2196-4,OR AMERICAN STANDARD RONDALYN Address; ( (•�5 -_-, - ( GAr 6. PROVIDE ACOUSTIC GASKETS WHERE WALL INTERSECTS MULLIONS OR GLAZING. 7. LAVATORY FAUCET-DELTA 501 DST 7 7. AT ALL EXISTING WALLS,REMOVE ALL NAILS,SCREWS,FASTENERS,ETC.LEFT BY PREVIOUS TENANT AND 8. SEALANT OF PLUMBING FIXTURES: Suite #: ESP tI� PATCH HOLES READY FOR PAINT. 8. UPON REMOVAL OF WALL BASE,REMOVE RESIDUAL ADHESIVE AND PREP WALL TO PAINT READY CONDTTION. ,a il•Ll. Date: ��•�� R.M.T. ALL SEALANT SHALL MATCH GROUT COLOR ATTILE SURFACES, By: WALL CONSTRUCTION MATERIALS b. SUBMIT SEALANT COLOR PRIOR TO INSTALLATION FOR ARCHITECT APPROVAL FOR ALL OTHER a APPLICATIONS. DATE: 1/15/16 1. PROVIDE STUDS,TRACKS,BRACING,FASTENING AND OTHER ACCESSORIES NECESSARY FOR COMPLETE JANITOR CLOSETS D 1� 1/n INSTALLATION. PERIvil l/DID 2. FRAMING MEMBERS SHALL HAVE THE STRUCTURAL PROPERTIES INDICATED WHERE PHYSICAL STRUCTURAL 1. REUSE EXISTING FIXTURES WHERE POSSIBLE. OFFICE COPY PROPERTIES ARE NOT INDICATED,THEY SHALL BE AS NECESSARY TO WITHSTAND ALL IMPOSED LIVE LOADS. 2. JANITOR FLOOR SINK-MUSTEE 63M MOP SERVICE BASIN 24'X24"X 10'OR SWAN MS2424 24"X 24". DESIGN FRAMING IN ACCORDANCE WITH DISI SG-673. 3. JANITOR FLOOR SINK FAUCET-CHICAGO FAUCETS 897 OR AMERICAN STANDARD 8344.112. 3. COLD-FORMED FRAMING SHALL BE GALVANIZED METAL CONFORMING TO ASTM A446/A446 M GRADE A(33030 PLUMBING-MISCELLANEOUS CITY OF TIGARD PSI)G60. 1. DRINKING FOUNTAIN-USE ELKAY NO-LEAD TWO-LEVELSWIRLFLO NON CHILLED DRINKING FOUNTAIN,WALL Approved by Planning 4. PROVIDE THE LISTED GYPSUM BOARD PRODUCTS BY U.S.GYPSUM,GEORGIA PACIFIC,NATIONAL GYPSUM OR MOUNTED,BARRIER-FREE ACCESS WITH SURFACE MOUNTING PLATE,MODEL#EDFPBM117C,OR APPROVED AN APPROVED EQUAL EQUAL Date. /2? /11, 5. STANDARD GYPSUM BOARD SHALL BE TYPE'X,5/8'THICK WITH TAPERED EDGES CONFORMING TO ASTM Ai_ C-36. _ 6. R RESISTANT GYPSUM BOARD SHALL BE 5/8'THICK WITH TAPERED EDGES. CONFORMING TO ASTM Initials: On /s Ca. BUILDING DEPARTMENT USE 1 ���375' 0" 14 5TIhHANSON is- - cfl CLA,KAM4S, OREGON,, , 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 12'-6" 12'-6" 1 2'-6" —' ��41 OF Q1 ) PROJECT #16010 I 1 I I Cd o W r � ) v I I I I I I rrilI � o 0 rtCONFERENCE 4.2 —, — ,m\ Il IRECEPTION- - - -il 111-4-1 '°° I 1 • app ii I I O V1 STORAGE OFFICE OFFICE g- I STO GE 1 > MEN c0+�n 118 117 tts �m -, no TESTING I C 104 W O l ` 112 ..-.-..- vT E _� — 1, I 9 r - - - Ell — —+— �— �� — — =J I- JAN,/ y I — -F - "� moi. O OLrt-ir ' ' Intl UQ J v�i� � -m_o____ I I I CIRC 'f I I M O kel lin II ADD SIDELITE ADD 6 X 36 LITE KIT TO DOOR -�� • _a_.") JTO DOOR REMOVE LEVER LATCH MID ' ��r �a f \ �/�,! 102 .�-i a(Sy INSTALL R1SH/PI1LL HARDillARENo , I pJ \�/ \�/ `J `J y AREA OF WORK ` CONFERENCE Lr it? CONFERENCE 103 F N t 106 1 II AREA OF WORK Cin -- i © OPEN OFFICE Z U O OPEN OFFICE ,4-3 11061 0 gl a_ ON GRADE DOCK HIGH 19 o - . I I I I a NI 0 A of , 7 =@ u \N_____ 0 EK,%____C..7 j D 1 i I,\,Ny- Z PI n_ig ' I OFFICES OFFICE I OFFICE OFFICE �� 1 0 110 108 108 107 fall CO El N T /1 ' I I ,- L — n n - I p V1 ....„iz 0 PARTITION AND POWER PLAN ru CD1,0J SCALE 1/8 l'-0" E+ Fal aWO WWZE-� ; 1"1 U � 0. v Opa ao-O E., Z W � vi0 Di � - U -4a h-- ata REVISION I. 2. 3. 4. 5. 6. 7. 8. R.M.T. DATE: 1/15/16 PERMIT/BID 0c2 it ILII 1011111 I I 01111111 I I ~ MARTIN#W.$HANSON A • II X III � MEN I I I I tf1 CLA KAM\S, OREGON, L�-=yr \ I- - ___ 1 - -I_ ((I } IV MAX SPAN 5/8' PLYWOOD DECK WITH •A �O 104 I h I < SHEET METAL SCREWS OVER `9t' �P O II \/\/ 11 -- _ / AREA INDICATED ON PLAN �,� 11 - I \/ I ( ( '� Y S005250-54 METAL STUDS AT r _ I • '61 6' O.G.,ALIGN WITH WALL STUDS © - — `r — J J/ I / \ I • - EI F.G. INSULATION ` METAL CEILING STUD LOAD CHART = ° - C — PROJECT #16010 p JAN. - — �.. MAX.SPAN m' v Mo U MAX SPACING a s a c MAX.POINT LOAD 315 LB/STUD to Q > r � 1 • A �"� (\�/' zi I - ', . . . , I - 5/8' GYP.Bim. P `MI ! 1 SUSPENDED CEILING Q - Q W J �� 36 2 5131-33 METAL 511.05 AT 16' O.G. SOAP PAPER TOWEL SAN.NAP. PAPER TOWEL/ RECESSED E el - - - DISPENSER DISPENSER DISPENSER DISPENSER/ TO ELL 0•14 NSER x 'o c)90. i. N 111�ffI�ID�®�; I_hi_ _ 4 - - -I— �A V i .. I IIIm1�1mm1m�1� 1 I I. I I 5/S' TYP WR - L - ;° CI- - - L GYP.BRD. / CENTER LINES OF STUD 0 0 — r `4 1 �4 o - • - • 3-I/2'F.G. INSULATION O a CA O II I I 6' MIN. BASE �'j / CA Vk 4' RUBBER BASE-TYP. ;t M % (----- WOMEN \� II 1 I SEE FINISH SCHEDULE �� / ATTACH BOTTOM TRACK TO �Q S })� - VVV/// FLOOR WITH POWDER DRIVEN `^IO I - - FOR MATERIAL r ANCHORS AT 12' O-C. C'i�. 1 Qrj - - - - - I FINISH FLOOR SEAT COVER TOIL.PAPER/ GRAB BAR MIRROR FINISH FLOOR-TOP OF SLAB DISPENSER SEAT COV. DISP/ N REST ROOM SIDE OFFICE SIDE SAN. AP 1 I I I DI5P 0C:A CD In 1:4 CD� ®RR DEMO PLAN ®RR EXPANSION CEILING DEMO PLAN I C 5� REST ROOM WALL SECTION ACC. - MOUNTING HEIGHTS W N N SCALE 1/4"= 1'-0° SCALE 1/4"= 1'-0" A-3 SCALE 1" = 1'-0" A-3 •o NOT TO SCALE 0. 55 I I/\I III I I I I I I I I ISI I U I I oo w — 12 0 1k o NEW GYP BOARD CEILING a+ CL NEW TOILET -RW PARTRILN DOOR r0 MATCH EXISTING AND LED FIXTURE o cif F�LOI Ka N-TILE E-TILE MEN O RACO HEAD `q •• WALLS TO 104 (!I CDA) r /MATCH EXISTING7, imiXXXXXXXXXXXXXX - rREPLACEOEXHAUST ..�. . ,L�.INSTALL FRP RELCATE MOP SRdC IGTRE ❑ _ . - FAN � ' ❑� I l 6' cc RR PARTITIONS �+ 0 • WAINSCOT a '� • V-0' q LITE KIT WERE SPECIFIED ^ 1 W RELOCATED C) ,.y FIXTURE - - w �( M 0 n.`\ RELOCATE M1/41AN. 111 Uyggi DRIW.NG J I U _n..,u'iFOUCNTAINS .�� 0 RETAIN ALL EXISTING FINISHES AND N. •- v XX1(XXXXXX N< '' k / - - - - a— �E-1 p, tt jj�� N9@JL PLAIN �X ,L fl I 1 I 1 a Q L ' G Im Mara EXISTING FOR NEW FINISHES. '/-1, ]/�1 �i vaNITY roP� i�1 4 - - NEW RR p / ADDITIONAL SWITCH - W r O O\/h O 1 ExlstNGH n�ti9 BAR LIGHT ill w \ GANG LOCATION z �r� I PATCH IN NEW k = V \ 5' V NEW TOILET I AND LED - X FLOOR TILE TO x - FIXTURE - - O /4 a F �, e �' HATCH EXISTING. �C Q 0- `T//�J A E-TILE [N-TILE I� � • • \zo v' U Z — + NEW DOOR • •REP ACE • - • a ELECTRICAL T u a w PI UU NEW PARTITION WITH CLOSER w _' EXHAUST OUTLET U 3,:;;- DooR FAN /11\ \ OR J-BOX //���� WOMEN WALL TILE TO • TTT ((( S »), TTT B-- w O O MATCH EXISTING ON - TT TT fl -I - ALL NEW WALLS MID.LED AND LED - J B r 105 FIXTURE FIx URE UNDERCUT DOOR A5 m e 4 n - _ 0 REQUIRED TO CLEAR\ w M v an FLOOR FINISH EXPANSION PLAN RR I 1 (I) � EXPANSION CEILING PLANErb K 6 MOUNTING HEIGHTS 1--1 SCALE 1/4"= 1'-0" SCALE 1/4"= 1'-0" \A-3/ SCALE 1/2" = 1'-0" Cli7 111> W 4 a go 0 U god ox ao w OpEz c CONSTRUCTION LEGEND ...) x d iii ai) Ai a T I EXISTING TO REMAIN T c EXISTING TO BE REMOVED REVISION wNEW STANDARD WALL 0 NEW STANDARD WALL WITH INS. 1. 2. 3. atEXISTING ELECTRICAL TO REMAIN t SPECIAL OUTLET 4. 0 DUPLEX RECEPTACLE 4 TEL/DATA MUD RING WD-H PULL STRING 5- za FOURPLEX RECEPTACLE a ELECTRICAL PANEL 6. D O DEDICATED OUTLET Q POWER J-BOX FLOOR MONUMENT W/SERVICES SHOWN 7• ® 8- CEILING LEGEND >.< 2 4 FLUOR.FIXTURE E R.M.T.PARABOLICX LENSE TILSPRINKLER HEAD DATE: '�IIIW"- 2 X 4 FLUOR.PICTURE 9 EXIT SIGN(LED RED) DA i JG: 1/15/16 ►pl PARABOLIC LENSE/STEADY BURN BALUST 141 HORN/STROBE FIRE ALARM(WALL MOUNTED) PERMITBID tralLIN SURFACE MOUNTED 1 X 4 FLUORESCENT FIXTURE EIO STROBE FIRE ALARM(WALL MOUNTED) RECESSED INCANDESCENT LIGHT ON RHEOSTAT(TYP.) 00) HORN/STROBE FIRE ALARM(CEILING MOUNTED) XSUPPLY DIFFUSER 0i0D STROBE FIRE ALARM(CEILING MOUNTED) RETURN DUCT a FIRE EXTINGUISHER IN RECESSED CAB. A. 3 O THERMOSTAT T ® FIRE EXTINGUISHER-SURFACE MOUNTED ® EXHAUST FAN