Loading...
Plans (5) M EC201 - 00906 WINDWARD designservice lic S, .;;. 6. Storage: C. 2 8, 3 Sided.Wrap Installation (Figure 1) F. Through-Penetration Fire StopSystem (Figure 5 5 Neur_.. -it enance and Repair -' fir g9 ] 41 Thermal 4erarnics FastWrap® XL Fast'Jliap L must be stared in a dry warehouse environment on 1ll�hen ace does not allow 'tr a complete wrap applied tie the duct 'hien the duct penetrates a fire rated wall, ceiling, or:-ioor, an Iia maintenance is required when installed in ac ardar5oes with allot Pallet should not be stacked; on all four Ades Fast f'ka XLisa rayed for 2 or sided instal- p g 424 OLIVE STREET P p pp approved ire stop system must be employed. Thermal Ceramics installation inructlons. - Commercial Kitchen Grease Duct labors with mechanical attachment to a concrete or CMU assembly SANTA BARBARA, CA 93101 r. Ins ailot i ori F F ire Sil S _ Ifdarna a is limited to the fail faun aluminum foil tape can be used• Si or g. > Festa X L shall be installed bya 1iaGied c�antractor in icor- 'e FasttilUap XL is insta fled on the 2 or 3 sides of the duct as Tr em co Inc: T: 805.845.6601 ctEon Products dance with manufacturer's instructions Festal-3p described intone ofithe intallatioti methods described in sections A Sealant to`repairthe flail taping. and referenced standards. - - - E: INFO@WINDWARDENG.COM See figures 1 to 5 for complete details: or B with ti7e starting edge of blanl t attached to the concrete or Sp ecifi sed Techr�o to gi es Inc. Pens ifs 3DO - If an area of blanket is fond to be damagedthe fallowing procedure gip LMLI assembly and then wrapped around the duct until the other �� must be incorpor ed. Product Data & Installation Guide � _t F�ectoseal 635+ Sealant x i'1�afie�-ra'is atm' r�r�rr �f: end can be affixed to the other concrete or CMU assembly thusPROJECT 1. Product Description U x •Fastl 1-ap XL blanket encapsylating the dud with insi1ation around all ac:essible sides, HILTI Inc. FS One'4 Sealant • Ifthe_ damaged area is largerthan 8 x 8 the entire wrap section R :41651 - must be removed and replaced aceordin to Thermal Cel-amiss Thermal Ceramics new FireMaster® FastWrapXL is the thinnest • lun-inum fol tape The blanket is flange out onto the concrete or CMU assembly. `t p g FIRENZA TIGARD OR -: ; ~ ._ -,1 _ ., . Priorto installing this firestop mem the surfaces of all openings and instillation instructions. '11-'1 ;- -Minimum �� wide filament tape �ia�+arrad� small be:secur�edtothe adtvrnrn a�semhl write min /t�- diameter, � and lightest flexible wrap material available that passes the ASTM - , , � -. . penetrating items needs to be clean and dry. 12280 SW SCHOLLS FERRY RD ' Carbon steel or stainless steel bandingmaterial minima!! 3V, i. long concrete anchors .fatted to a minimum l' wide x 'l�. thick p E2336 test standard required by the 2006 IMC and NFPA 96 for .• .g. �� ' .��.� : a�de: g • .:. •]fthe damaged area is mall(less S x8 ,the damaged area a>� � � _ iTIGARD, OR 97223 reduced clearance enclosure materials used to , . _ ; _-. . . .�: 3 minimum 11115"thidt. with feel banding clips steel stnp ap with pre-dulled holes spaced a maximum 10 on Cutthe aluminum scrim facing off Fastllt ap XLblanket to expose the must be curt ainayand replaced with a new seoton 1"largeriri length e e •Hand banding tensioner and crimping tool center: The steel strip in to be placed around the entire perimeter core blanket: Fast J i XL scrap blanlet MITA be packed into the and width than the cut out are, suds that the new section can be provide 1 or 2 hour fire rating for kitchen exhaust ducts, The .4 ..,` _- r FastWrapXL core blanket is manufactured using Thermal _ Minimum 12 gag steel insulation pins;st�eel speed clips;minimum the duet in the exposure area. The Fas0.11tap XL insulation wrap is annular space at minimum 50% compression. The packing material compressed vghtlyinto the cut out area. All cut edges ofthe new Ceramicpatented Su erwoola fiber, a 2000°F rated, non-corn- ' 11 'x 1' 'square or 1 er dia., orequiv+ale:nt sized Cup-head pins; cured to the dui with minimum .'wide steel banding 10g`sen- mast be reed a minimum:4" m the surface of the corerete or section must be toed and sealed wth aluminum fail to e. The new CLIENT p p p bustible, alkaline-earth silicate wool with low biopersistence. a Capacitor discharge stud gun tern. The ends ofthe banding are to loop into the steel stripvetiaps gypsum wall• inaafi a minimum of ` of.approved irestop sealant section must .be held in place with either pinning or banding per •Firet,4aster F2-HT-XL3 Prefabricated Cob!" or Field Fabricated that foot the blanket to the concrete floor. or wall, and tightened intothe race u o enin . �l len th roe is no room in the remainin Thermal l Ceramics installation instructions/ FIRENZA FastVVrap XL is the product of extensive research and development ` p g g resultingin break-through improvements in fiberization technologyaper Hanjware down. The trapeze support system may be incorporated within annular space to wrap the duce with FastSllt-ap ,�L material, the. p -"` 'IC. Limitations 12280 SW SCHOLLS FERRY RD with significant enhancements in thermal properties beneficial to fire . � ; . ' •. approved firestop sealant wrap system enclosure may terminate aboxe and' below the 10°r/ceiling or wall • a applications. FastlNra XL when used in combination ry ` . k, assembly as shown in f' u[ 5 l mechanically attaching the Thermal Ceramics Fast` ap XL shall be installed in aocrdance TIGARD, OR 97223 protection pp p -; :q G` rar: D. I,r1ed-�anioal Attactrrr�aht A thods�for Insulation map FireMaster thetermination' Dint above and below the with these installation instructions. The integrity of FaseuVrap XL with an approved firestop sealant provides an effective through i p a on To rrinimize waste; FastUttap XL blanket should be rolled out tautly 1. Banding(Rg.:rre 2)-`ruinimum.I wide carton steel or stainlesss terns;is limited:to:the quality of the installation. penetration trestop in rated floor and wall assemblies. FastVVrap area with bands-or pins. beige measuring. Cut edges afthe blanket`ehall°betaped with alu- steel banding,0.01 .thick,is placed around the entire perimeter cif XL is UL Classified and is part of UL's Listing and Follow-Up Service 4. Performance Specifications SHEET INDEX to ensure the consistent qualityessentialto the critical rr num flail tape to prevent exposed edges of the insulation torn the ins..ilated du, wrtfr ma:bmum 10 spacing seaters and 1 tom =,arpar 0przirw� zqu gtr. �xnn. r s.�,:themes Program Reference Standard Standard No. Performance wioiing moisture tom condensation orgrease tom a compromised each blanket edge or 1 "'.fromi each collar edge w hen using the butt ioswriai)Ctwriks a a a� !ark r. an Ou�� .s c. ,psiv,ak Ft*Mxrrra l nature of this life-safety application. G001 COVER GreaseDuct Enclosure leaking duct joint into the material and causing.degradetion of the joint and collar•method., When banding,filament tape can be used Fowl asiare nxo,ma.ifr1ar Teams,c-tr $�rtz-. l sr1015•Aaprrr rs .i iu- ASTM.E2336 Pass --- - Product Features System ire barrier. Crrlaps are used to block heat transfer in the event of 'to terr}oorarily hold the blanket in place until the banding is applied. 1;.:n r ',fl T11sIAta1 r !r im.avid w4a•-rrAhuradb +!toss mr zils•g 4bumrs, A001 GENERAL NOTES •Approval as a 1 or 2 hour shaft alternative in kitchen grease duct Section 16.1 - Non- duct deformation resulting from thermal expansion. FaA ap XL The banding is placed around the material and tightened syr as to Tksvr_ and.9,7* 5JUa Gr � s�s�rxakic+a.Um -. applicationsASTM E136 Pass blanket maybe installed with either a mechanical banding em or irmlyrholdthe Fast ita X Lin lace a ainstthe duct,but not cause pp Combustibility y 9 1 p p g A101 SITE PLAN • Zero clearance to combustibles at any location insulation pins and dips (see Mechanical Attachment Methods any cutting or damage to the blanket Thermal CeramicsTI�Dl7Tl• l C>'re�i-flit Section 16.2-Fire • Thin and Lightweight at 1X inch thick, 6 pcf density ASTM Ell Pass below and figures 1 and 2). Support hanger systems do not need ., _ A102 FLOOR PLAN Resistanance (wall) . . Pirrhmg(Ftgure 3)- For duct spans 24"or larger, min. 12 gage. • Contours easily to complex duct designs - to be wrapped provided that the hanger rods are at least a minimum g g Firetelaster Fast' ap XL 2 Sided Wrap Detail for Firelelaster FastWrap XL 3 Sided Wrap Detail for __-___ Section 16.3 - 5 long el insulation pins are welded-to the duet in columns ACCESSIBILITY, EGRESS & • Butt Joints on inside layer to save labor and material ASTM C51$ Pass of "diamelJer and spaced a maximum of BIS"on center.along the aced 12" apart6" -12" tom each edge and on 10:x` centers Adtaching to Walls/Ceilingst 1 ,or 2 Hour !Attaching to WeilsiCeiIingsr 1 or 2 Hour A103 SIGNAGE • Fully foil encapsulated for fast and clean installation Durability Test length'of the duct, and the angle iron is a minimum-oft"x 2" x '/i` • Completely inorganic and non-combustible Section 16.4 - along bottom horizontal and outside vertical runs to preterit blanket Grease or Air Duct t ea�C or Air Dust p y g ASTM E2336 Pass br:Sl Nf�equivelerrt support m (Sr 1ACf51Aband trap sup mg. Pins are also required 1" torn the end of a dud and 1"-tom A104 RCP& FRAMING • Contains 2000°F rated fibers for added safety margin internal Fire Test port do not apply). Horizontal support system m_may incor any-edge near a 01:1'bend, spaced on 6"cerrlaers. Pins are locked -- - 3• 3• -- • Contains no low temperature mineral or glass fibers Section 16.5 - Fire \ - porated into the wrap enclosure. ,� ,, 0 A501 ARCH DETAILS • Wide varietofthrou hpenetration systems ASTM E814/E119 Pass into place with 1efdiameter round or square, galu3nized steel, }- N. -� � g y Engulfment (duct) CO ___ • Resistant to mold growth (ASTM D6329) A. First Layer - Butt Joint (Figure 2) speed dips or cup head pins. Pins that extend beyond the outer e a., • Extensive Listings and detailed installation instructions Surface Burning Characteristics The fret layer of Fastififap XL is outto completely imp around the .blanket W rap layer shall be turned down to eliminate sharp edges or ,e.N. N . N A502 ARCH DETAILS • Recognized and accepted b inspectors requiring less job-site penmeterofthe dud with enough excessta proeide atight butt joint the excess length cut off. "� ` �` "" ' 9 p y p q g J Flame Spread ee e ee> -N. Nee.-\e-ex.- - . - ee Ne - e; 7``-,.%N''e -Z.- "�-` l ' e_Nee ^s A503 ARCH DETAILS engineering judgments ASTM E84 5/0 where the blanket ends meet. The joint, of adjacent blankets are .,���-,� ' '4- - �`'`- iii h-'''',..7 ,.%-� N. �N''' �,. ,-s,. ,..N".'.�k':` . �- -a t � .,, ,�, � ,,,. �: ,,. . (foil/blanket) E. Grease Duct Aces Door Installation (Figure 4) b ti �"�,'� '�.,� *, �� ", �- '�� `��. . "� I _ , .„ -. •Available in space saving 50 and 100 square foot rolls for optimal Smoke Developed it rangy G=d agar each oitrer. This int riorlayeroan be held tem- Four galvanized steel threaded rods, 'diameter by4 ' to 5"long ,. '`: "`, % A801 INTERIOR ELEVATIONS job-site storage ASTM E84 5/0 poranlyin place with filament tape spaced 1-112 tom each blanket :,(foil/blanket) - are welded to the duct at the comers of the door opening. Four 4" .� •Available in 48 inch widths for less joints and installation labor edge, and spaced on nominal 10-112" centers along the center of '� '' ''S...“'"* . lon steel tubes fait over the threaded rods to hold the door tothe : ,. A802 INTERIOR ELEVATIONS Thermal Resistance the blankest. 'fhile not required, the inside layer man be installed g ` ``�� 2. ApplicationsASTM C518 (70F) 4.2 per inchduct and protect the wrap from damage as the door is removed. ,'`,,�-'� P (R-value) with 3"overlaps along perimeter and adjacent blankets. " �'„ k A901 RENDERINGS •Applied in`2 layers to provide 1 or 2 hour fire protection to grease Mold Growth (75% -- Four 5" long 12 gage insulation pins are welded to the door panel ,�,. ducts exhausting Type 1 hoods per IMC 2006, NFPA 96 and 2006 ASTM D6329 Resistant B. Second Layer -3" Overlap or 6" Collar (Figure 2) for installation of the blanket: Three layers of FastWrap XL are '� .,�� ,; humidity) impaled oxer the 12 a e insulationpins onthe16 gauge door ` ell P101 WASTE &VENT PLAN iAPMO UMC The second layer of Fastllap XL is out to completely wrap around mp g g g g 0 _ _ ` Mold Growth (95% -1/41,-,::,-, . IC ASTM D6329 Resistant the perimeter of the first layer,with enough excess ssto overlap itself panel and held in place with speed dips. Each layermusthaee min- �-,,. ma.. 3. Physical Characteristics humidity) not.lessthan 3". Joints in the sernd la +er should be staggered a iris m 1" ov+erthe rev�ousla r: ' hen the door isins�talled, "-'-k- P102 WATER&GAS PLAN overlap p - '}e N ,e -N. N. N.. `-'Z''' minimum of 12 inches from joints on the inner layer. Adjacent blan- this firms and second layermust*tightly against the wrap surround- '- N. N. N ,� N. ," �, , _ Duct FireMaster 5 Listings/Building Code Reports kers on the'second laser must overlap each other by not less than in the door opening to form tight butt; Dints. Fins that extend __ M001 MECH PLAN units! Wt./ y P 9 p ; , g J ' w� Fire Protection Unit Size Ctn. Ctn. 3". 's an alternative'to oiserfa s on adjacent blankets installed on be nd the outer layer.of Fastkilia XL shall be timed down, to11111 . Product Listed Uses Agency Listing p i ' p ___..`rte the second layer, adjacent blankets can be tightly butt jointed and avoid sharp points on the door. The steel tubes are placed overthe 0 M501 MECH DETAILS Grease Duct Enclosure System (Zero U L G18 wrapped- with a 6"wide Fast Ira X L collar centered over the butt threaded rods. The insulated doorpanel isplaced over the thread- -- FastWrap,XL Roll 114"x 24"x 25' 1 37.5 lbs, Clearance) -AC101 (ASTM E2336) p ed rodso ue E101 ELEC PLAN &SCHEDULE Grease Duct Enclosure System (Zero Joint. This outside layer can be held temporarily in place with fila- c red bythe steel tubes and held in place with warners FastWrapXL Roll 114"x 48"x 25' 1 75 lbs. IGC-ES* ESR 2213 rr rit tape spaced 1..k..1'tf-om each blanket edge, and spaced on nom- and wing nuts. Fireh,laster F2-HT-X1 cess Doors are tested and ,� Clearance) -ASTM E2336 ; ut" E102 POWER PLAN incl 104" centers along the center of the blanket. !mechanical approved per ESR 2213 as alternatives to field fabricated doors. - Through Penetration FireStop System UL C-AJ-7119 attachment as described in Section 0 must be used to make the installations instructions-forthe F2-HT-AL3. door are included with 1 Concrete slab : Air gap. " !ra imam FaslWrap XL Collar Roll 1 x 6"x 25' 4 37.5 lbs, permanent ELECTRICAL ELEVATIONS - ASTM E814/U L 1479 installation permnent the complete assembly. 2. Tool aye rs F i reru1 anter F astiV ra p XL 8. Duct Color White blanket with silver foil encapsulation *international Code Council--Engineering;Servvice 3. Concrete fastener system 7. Steel banding 12" wide minimum TO01 ENERGY ANALYSIS 4. 1, "thick X 2'=3".uvide bar stock per $ Banding clip ��Iltih�rrucitilr� for ated 12" a.c. -Thermal Ceramics Therm Thermal Ceramics Thermal Ceramics Thermal Ceramics Finel bAer FastivVrap XL FireMaster FastWrap XL Fast Wrap XL Commeraal Kitchen Grease Dud System 1 or 2 Hour Shdt Alten i ivl Typical Insulation Pin Layout Through Penetration System "I or 2 Hour Grease Duct Zero Clecanc to Combustible For Duct,Spans . 24" Wide To Prevent Blanket Sag 1 ri.... ,_ • . . ____ , 4, . a ill . 2 \. o - - --- - . 3 .,...' , 4 0 I I 4.. , . . a .; -en s . ,. ,...., . , . a, ,. _ II I� rr` • J I- I.E. - 74 E , t . O . .. v 40,00,9' " ,�� . " If. 11 ` �5 � i t I I 1 I I ! I ! i= " , 4 ba at cux ^ ' � 0O' 4 ` 11111/141 It• r SIDE ELEVATION II fN' tb.."1444 * 400,. ei IF 4 14 _ , . : : 2 EA144 0 .0 al 60 O [ED ELEVATIN -� i 0 : 0 c -10 Il : _ SECTIONA_ SECTIONA-A • 5 � o cd A , 4 0 ., .. f i : „1/4 . 1 1 12Figure 3 y ___ _ - BOTTOM VIEW CI ..k, z, - ' . • , 1. Minimum 12 gauge steel insulation pins •�. A A AE7AcS 1 I ,• ., RO Sir�,=w�. _ e ��� D Del , 4,, `G.; a Thermal,Ceramics 9A FireMaster FastWrap XL n. M25944 1,k- 1112111 sn Is 4131 l T- l�T�'� � AR.. Access Door Systems Commercial Kitchen Grease Duct * Exp. 613I}/i9 FLOOR VIEW FLOOR VIEW NSF C Pa' O BL TTJ 1 .T OL AR. V. • - a FastWrap XL I+ast�1':rap XL iiiiipp Terminated At The Top And Bottom Continuous Through FImire 2Surface Of filo itocriCoitiog Assembly ribs Flcs r,`C;c lEm Assembly 1. T�uq layers Firel,�as'ter Fas�t'�ltrap XL 14111.1P::) 11114111111114°P°111 .. is9„,,oclio RENEWAL 2. Steel banding '112"wide minimum ,r/ ' 73131119co 3. Tight butt joints on inner layer1► .10,,e# . . ''s Figure 5 61155. r ' l ''' 1 Duct . : 4• ,-- Minimum S" overlap on perimeter and , „",, between adjacent blanket on outside layer -#H0 0 - Jr ' : 2 Two layers FastWrap XL q 5, Minimum " diameter tan ger rod g 3 Scrap pieces of FastWrap XL 6: Minimum' Z! > 18'" angle FireMaster DuctMate Ai Ill FireMaster Field 0 0 4 Approved Through Penetration FireStop Sealant 7. Optimal 6' Fastinfrap XL collar F2-HT Door. System .Fabricated Door System 5 Rated floor or wallAT E D S 11/2/2017 INITIAL Figure 4 DuctMate® F2-HT Access Door or 16 1. gauge cover plate 5. Seta pieces g 2, All thread rods 6. Wing nuts and washers Barth America-Salesflftrces South America-Sales Offices Colombia Canada Argentina Tr 457(2)'2282935/2282803/2262799 3. Installation pins with speed clips Outer cover plate T.+1 (905)335 3-414 T. +54 (11)4373 4439 F: +54'01)4372 3331 F; +57 (2)2282935/2262803123722085 PLOTTED: 11/10/2017 F-+1 (905)335 5145 Brazil Guatemala Three layersyFastWrapXL with mini- labeled "ACCESS Mexico T +65(21)2418 1366 F: +65 (21)2416 1205 T;'+50(2)4733 295,9 7. T:+52(555)576 6522 Chile F:+50 (2)4730 601 SCALE AS NOTED 4. mum 1" overlaps and all edges sealed DOOR-DO NOT F:452 (555)576 3060 T +56(2)854 1064 F;+56 (2)854 1952 Venezuela OBSTRUCT" United States of America T:+58(241)878 3164 CREATED BY: WE w#Ih aluminum tape r Eastern T;+1.800.330.9284 F:+1.666.785;2764:: 7:458 (241)8706712 Western T:+1.866.785.2738 F +1 Bf .784.2760 SHEET 04.081714-236/5.0M GOMECH DETAILS -- FASTWRAP MECH DETAILS NOT TO SCALE WIND AKD design services, Ilc irrAVCOMcheck Software Version 4.3.5.2lic COMcheck Software Version 4.3.5.2 COMcheck Software Version 4.3.5.2 COMcheck Software Version 4.3.5.2 COMcheck Software Version 4.3.5.2 Envelope Compliance Certificate Name-Title Signature Date Interior Lighting Compliance Certificate Exterior Lighting Compliance Certificate Mechanical Compliance Certificate Inspection Checklist ei424 OLIVE STREET Energy Cone: 2015 IECC SANTA BARBARA, CA 93101 Requirements: 100.0%were addressed directly in the COMcheck software Project Information Project Information Project Information Project Information Text in the"Comments/Assumptions"column is provided by the user in the COMcheck Requirements screen.For each T: 805.845.6601 Energy Code: 2015 IECCEnergy Code: 2015 IECC requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception Energy Code: 2015 IECC Energy Code: 2015 IECC is being claimed,Where compliance is itemized in a separate table,a reference to that table is provided. E: INFO@WINDWARDENG.COM Project Title: Firenze TigardProject Title: Firenze Tigard Project Title: Firenze Tigard Project Title: Firenze Tigard Location: Tigard,Oregon Location: Tigard,Oregon , Project Type: Alteration Project Type: Alteration Sect1 WF ,- � 4.: .'?, ;s h7 ams Climate Zone: 4c Exterior Lighting Zone 0(Unspecified) Climate Zone: 4c # h Plan iierfletirt r it " -c>ssn Ile tiij' kg, ,▪efe r▪ i',, Project Type: Alteration Project Type: Alteration &i Req ID„j r -„ ,,,;,,a. r"�,,,k°; ,� ry..a ,,e,:, PROJECT Vertical Glazing/Wall Area: 12% Construction Site: Owner/Agent: Designer/Contractor. C103.2 :Plans and/or specifications provide all ;❑Complies ;Requirement will be met. Construction Site: Owner/Agent: Designer/Contractor. [PRlp information with which Compliance ❑Does Not J7�/� ir* TIGARD, OR Construction Site: Owner/Agent: Designer/Contractor. ;can be determined for the building •❑ Observable Not Dbble ;envelope and document where FI RE N f ! Construction Site: Owner/Agent: Designer/Contractor. Allowed Interior Lighting Power :exceptions to the standard are ❑Not Applicable A B C D Allowed Exterior Lighting Power claimed. 12280 SW SCHOLLS FERRY RD Area Category Floor Area Allowed Allowed Watts A B C D E Mechanical Systems List C103.2 :Pians,specifications,and/or OComplies Requirement will be met. Building Area Floor Area (ft2) Watts!ft2 Area/Surface Category Quantity Allowed Tradable Allowed Watts Quantity System Type&Description [13112p :calculations provide all information ❑Does Not TIGARD, OR 97223 with which compliance can be 1-Dining:Cafeteria/Fast Food:Nonresidential 2150 Watts 1 Wattage (B X C) 2 HVAC System(Single Zone): ❑Not Observable Y ( n9 ) determined for the mechanical 1-Dining:Cafeteria/Fast Food 2150 0,90 1935 Heating:teach-Central Furnace,Gas,Capacity=60 kBtu/h (systems and equipment and ;❑Not Applicable : Total Allowed Watts= 1935 Total Tradable Watts(a)= 0 Proposed Efficiency.130.00%Et,Required Efficiency=80.00%Et document where exceptions to the Envelope Assemblies Total Allowed Watts= o Cooling:2 each-Single Package DX Unit,Capacity=65 kBtulh,Air-Cooled Condenser,Air Economizer ;standard are claimed.LoadC L I E N T Proposed Interior Lighting Li htin Power Proposed Efficiency 14.00 EER,Required Efficiency 11.00 EER +12.6:EER i calculations per acceptable • R-Value Proposed Max.Allowed A B C D E Total Allowed Supplemental Watts(b)= 500 Fan System: FAN SYSTEM 1-Compliance(Brake HP method):Passes :engineering standards and Post-Alteration Assembly (a)wattage tradeoffs are only allowed between tradable areas/surfaces. handbooks. Cavity Cont U-Factor SHGC LI-Factor SHGC Fixture ID:Description!Lamp!Wattage Per Lamp l Ballast Lamps! p of Fixture (C X D) (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Fans: Fixture Fixture Watt C103.2 ;Plans,specifications,and/or '❑Complies ;Requirement will be met. FI RENZA Floor.Unheated Slab-On-Grade,[Bldg-Use 1-Dining: -.- - 0.540 - FAN 4 Supply,Constant Volume,2200 CFM,1.0 motor nameplate hp,0.8 design brake hp(1.0 max.BHP),80.0 fan efficiency [PR4p calculations provide all information Qpoes Not ` Cafeteria/Fast Food] FAN 5 Supply,Constant Vo€ume,2200 CFM.1-0 motor nameplate hp,0.8 design brake hp(1.0 max.BHP),80.0 fan efficiency :with which compliance Dining:Cafeteria/Fast Food(2150 Sq fta Proposed Exterior Lighting Power FAN 3 Exhaust,Constant Volume,106 CFM,0.3 motor nameplate hp,0,1 design brake hp(0.1 max.BHP[,85.0 fan efficiency p ce can be ❑Not Observable EAST ILP F104 43.30W LED UNIV 4000K CHAN:Lt:ILP F104:Other. 1 1 30 30 'determined for the interior lighting , 12280 SW SCROLLS FERRY RD FAN 2 Exhaust,Constant Volume,350 CFM,0.3 motor nameplate hp,0.1 design brake hp(0.1 max.BHP),85.0 fan efficiency ❑Not Applicable Ext.Wall:Wood-Framed,16in.o-c.,[Bldg.Use 1-Dining: - - - - - --- Elite LED2-0.11 W-DIMTR-120:L2:Elite LED 27k.LED A Lamp11 W 1 30 11 330and electrical systems gad equipment PP Exterior Lighting TBD:Exterior lighting zone not specified(see project screen) and document where ecce Cafeteria/Fast Food],Exemption:Framing cavity not exposed. BORDEN 552-9-MW.L3.BORDEN 552-9-MW.Other: 1 2 14 28 ptions ti TIGARD, OR 97223 LITHONIA LHOM LED:L4:EXIT SIGN:Other 1 2 2 3 the standard are claimed.Information SOUTH provided should include interior 6X ELITE ET-LED-401-10W L5:6X ELITE ET-LED:LED Other Fixture Unit 60W 1 6 60 360 lighting: power calculations,wattage of Ext.Wall:Wood Framed,16in.o,c.,[Bldg.Use 1-Dining: - - - - - - LFTHONIA 2ACL 331 LP835:L6:LITHONIA REC LED:LED PAR 18W 1 8 18 144 :bulbs and ballasts,transformers and c Cafeteria/Fast Food],Exemption:Framing cavity not exposed. LITHONIA ELM2 LED:L7:LITHONIA ELM2 LED:Other 1 4 2 6 'control devices. SHEET INDEX Mechanical Compliance Statement Total Proposed Watts= 901 0402.4.1 'The vertical fenestration area�=30 I❑Complies Requirement will be met. WEST Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building [PR10p .percent of the gross above grade wall '':❑ices Not Ext.Wall:Wood-Framed,16in.o c.,[Bldg.Use 1-Dining: - - - - - - plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been area. Cafeteria/Fast Food],Exemption_Framing cav Hied with Interior Lighting PASSES, ❑Not Observable Al designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.2 and to comply with any applicable mandatory G001 COVER insulation. Interior Lighting Compliance Statement requirements listed in the Inspection Checklist. ❑Not Applicable ; Window Metal Frame:Fixed,Clear,Fixed,Fixed,(Bldg.Use 1- - - 0.380 0.400 0.380 0.400 C402.4.1 ;The skylight area<=3 percent of the ❑Complies :Requirement will be met. Dining:Cafeteria/Fast Food] PRllp =gross roof area. ❑Does Not (a)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Compliance Statement The proposed interior lighting alteration project represented in this document is consistent with the [ A001 GENERAL NOTES ans,scifications,and other(b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. sysftems ding have been designed to meet the 2015:IECC ons requirementsubmittedls th in COMcheck Versionthis permitlon.4 35Th2 e ndped toscomplyrwith any lighting • ❑Not Observable applicable mandatory requirements listed in the Inspection Checklist, ❑Not Applicable Envelope PASSES A101 SITE PLAN Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building A102 FLOOR PLAN plans,specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. A103 ACCESSIBILITY, EGRESS& SIGNAGE A104 RCP& FRAMING A501 ARCH DETAILS II'High Impact(Tier 1) I2_iMedium Impact(Tier 2] I_-3-Low Impact(Tier 3) • Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 A502 ARCH DETAILS • Data filename: Page 1 of 17 Data filename: Page 2 of 17 Data filename: Page 3 of 17 Data filename: Page 4 of 17 Data filename: Page 5 of 17 Data filename: Page 6 of 17 A503 ARCH DETAILS A801 INTERIOR ELEVATIONS • • - - ._. : . :. -_- `:•'4,- _ _. . ;-� .- -r- -r ..,.--s.,,-.--,,,,,,,,,-----. ::: . ,'.._ ,r - - Section ' rSQ[ttOrr_ ____ - __ .- � :_[_, - _ - : ... , -.�: ��' .. - .- &A: nt) - -' " --- - _� Ass A802 INTERIOR ELEVATIONS . , n� _ .�_ . t_ _ v s- . . - r��--__,. . CoinmentsfAssumtions # Footing !ns ecti6n Complies? . .: - f - -` r -min� ---A_-u h -n-on_�e�.r_on4n_ a_2 _ ��-_�_. a�ma�_ �� -� �._�- Pumdn -Ro 9h.1 Inspection Complies?, Comments/Assumptions tions . ... ,-#, MlechanlcahRou h to InsPettlon ...t m! . c : �-_ omental satt � 4_ ibi - - sCAnt Ir s.2 - -. o-mrensm P as . .-.. " �w - � .r_ -_: .. • t iD - _ . -.... ._ � - ." - _ _.. .-. _ i A901 RENDERINGS 04024.2 .In enclosed spaces>2,500 ft2 I❑Complies ,Requirement will be met. 0303.2 Slab edge insulation installed per ❑Com Iles :Requirement will be met. 031,3Fenestration products rated in ,❑Com Ixes :Requirement will bemet. C9� . Heated water supply piping conforms OCom Iles Requirement will be met. C4 .22.6 Thermal/ ineffective panel surfaces of.❑Com Eies :Requirement will bemet. C40� 9_.Ductwork rk opor tin >3in.water r ❑Com Iles 'Exception:Requirement doesnot apply. (P111411 directly under a roof with ceiling ❑Does Not [F041, :manufacturer's instructions. ;❑Does Not j -#z -al accordance with NFRC. ❑Does Not C4D4S1 to pipe length and volume ❑Does Not (ME411' :sensible heating panels have ❑Does Not _ column requires air leakage testing, '❑Does Not heights>15 ft.and used as an office, ---- C4.0_4.:52.2:.],:-J'requirements.Refer to section details. insulation>=R-3.5. FMIEIi ONot Observable '❑Not Observable '= ❑Not Observable ❑Not Observable: ❑Not Observable; ❑Not Observable; P 101 WASTE&VENT PLAN !lobby,atrium,concourse,corridor, IPL61' -, storage,gymnasium/exercise center, ❑Not Applicable ;❑Not Applicable I __-ea'•-.1 ❑Not Applicable ❑NotAppficable ❑Not •Applicable i ❑N4tApplicable convention center,automotive 0303.2.1 Exterior insulation protected against i❑Complies :Requirement will be met. C303.1.3 ;Fenestration products are certified as °❑Complies :Requirement will be met. C402:5:5, Stair and elevator shaft vents have :❑Com lies :Requirement will be met, 0403,3 ;Air economizers provided where ;❑Com (fes :Requirement will be met. service,manufacturing,non- [F06]' damage,sunlight,moisture,wind, ❑Does Not [FR13]' to performance labels or certificates '❑goes Not 0404 6 3:Pumps that circulate water between a ;❑Complies :Requirement will be met. C4032,4,'. motorized dampers that automatically ❑Does Not (ME62]' -required,meet te requirements for -❑Does Not :refrigerated warehouse,retail store, 'landscaping and equipment provided- [PL7P: :.heaterand storage tank have controls '❑Does Not 3 ` `;close. design capacity,control signal, P102 WATER&GAS PLAN distribution/sorting area, t ;maintenance activities- :❑Not Observable ❑Not Observable: ;that limit operation from startup to (ME313 ❑Not Observable ;ventilation controls,high-limit shut-off, '❑Nat Observable :transportation,or workshop,the ❑Not Applicable :❑Not Applicable ; ,<=5 minutes after end of heating ❑Not Observable; ❑Not Applicable integrated economizer iotrol,and ❑Not Applicable following requirements apply:(a)the 0402.2.5 'Slab edge Insulation R-value. ❑Com lies ;Seethe EnvelopeAssembliestableforvalues. -,cycle. ❑Not Applicable i 0402.4.3 :Vertical fenestration SHGC value. i❑Com hes !Sett the Envelope Assemblies table for values p p - provide a means to relieve excess M001 MECH PLAN daylight zone under skylights is>= [F03iz ❑Does Not [FR1O]' =❑Does Not 0444 7 )Water distribution system that pumps ;❑Complies Requirement wilt be met. C402.5 5 :Outdoor air and exhaust systems have:❑Complies Requirement will be met. outside air during operation. :half the floor area:(b)the skylight tPI.8P :water from a heated-water supply ;❑Does Not 0403.2,4: motorized; dampers that automatically;❑Does Not ;area to daylight zone is>=3 percent ❑Not Observable ioNot Observable i e back to the heated-water source : 3 >" .' shut when not in use and meet Cgo3 44 `,Multiple zone VAV systems with DDC i❑Complies Requirement will be met. with a skylight VT>=0.40:or ❑Not Applicable ❑Not Applicable i pipe P ❑Not Observable 3 ❑Not Observable; {:_ of individual zone boxes have static ❑Does Not g pp ;through a cold-water supply pipe is a IME58] maximum leakage rates,Check a_' see theMechanicarSystems rist for values. M501 MECH DETAILS minimum skylight effective aperture See[heEnveioeAssemolestabieforvaiues. -'?demandrecirculationwatersstem, i❑Not Applicable ;gravity dampers whereallawed. :Not Applicable jtAEiiO ;pressure setpoint resetcontrofs. 0402.2.6 ,Radiant heating systems panels ;❑Complies ,Exception:Requirement does not apply, C402 4.3, :Vertical fenestration U Factor, ❑Complies p Y ❑Nat Observable: >=1 percent. [F012]3 insulated to>=R-3.5 on face opposite ❑Does Not C402.4.3. ❑Does Not ;Pumps within this system have :See the Envelope Assemblies faire for values. "--controls that start the pump upon C403i2.i3 i Unenclosed spaces that are heated :❑Complies ?Requirement will be met. ❑Not Applicable Additional Comments/Assumptions:tions: space being heated. P 4 ME" , 0406 2,2 ]Air outlets and zone terminal devices :❑Com lies !Exception:Fans with fan motors of 1 h (0.74 kW)or less, E101 ELEC PLAN &SCHEDULE p ❑Not Observable [FR8]' '❑Not Observable; receiving a signal from the action of a : [ 711 use only radiant heat. ❑Does Not p P R ❑Not Applicable :❑Not Applicable user of a fixture or appliance and ONot Observable F531 ;have means for air balancing- ❑Does Not • ,limits the temperature of the water Observable', E1 O2 POWER PLAN 0403,2,4„;Snow/ice melting system sensors for '❑Complies Requirement will be met. ❑Not Applicable 5,• ::future connection to controls.Freeze ❑Does Not C402.5.1 ;The building envelope contains a QComplies :Requirement will be met. entering the cold-water piping to ❑Not Applicable 0403.2:4, ;protection systems have automatic [ • FR16]' continuous air barrier that is sealed in ❑Does Not :1104°F. C403�2 3 ;HVAC equipment efficiency verified. ;❑Complies See the mechanical systems list for values- ❑Not Observable: an approved manner and either [ME55F ❑Does Not Additional Comments/Assumptions: 6 controls installed, ❑Not Observable; Additional Comments/Assumptions: [F0913 ONotApplicable constructed or tested in an approved ❑Not Observable' E801 ELECTRICAL ELEVATIONS manner-Air barrier penetrations are :❑Not Applicable • sealed in an approved manner. ❑Not Applicable Additional Comments/Assumptions: Con 5 2 Factory-built fenestration and doors ❑Complies Requirement will be met, .C40.32-.*:-.Fault detection and diagnostics ,❑Complies !Exception:Requirement does not apply. 040?54 :are labeled as meeting air leakage ❑Does Not 7 Installed with air-cooled unitary DX l❑Does Not T001 ENERGY ANALYSIS (FRI$]a requirements. [;[yf[3113]z :units having economizers. ❑Not Observable: ❑Not Observable - , :: AggigiEgg ]❑Not Applicable : -eeetasignitilitati ❑Not Applicable ; Additional Comments/Assumptions: C403.2.6. ;Demand control ventilation provided ❑Complies 'Requirement will be met. P 1 Efor spaces>500 ft2 and>25 :❑Does Not [ME59]r ;people/1000 ft2 occupant density and • served by systems with air side ❑Not Observable i, 'economizer,auto modulating outside Applicable air damper control,or design airflow >3,000 cfm. £403::2:6.:' ;Enclosed parking garage ventilation ;❑Complies lException:Requirement does not apply. 2 :l has automatic contaminant detection !❑Does Not [ME11.51r ,and capacity to stage or modulate ;fans to 50%or less of design capacity- ❑Not Observable. ❑Not Applicable C403.2.7 :Exhaust air energy recovery on ;❑Complies ;Requirement will be met- (ME57]t systems meeting Table C403.2.7(1) ,❑Does Not :and C403.2.7(2). ❑Not Observable; ❑Not Applicable C403.2"8 Kitchen exhaust systems comply with :❑Complies ;Requirement will be met. [ME116P replacement air and conditioned ❑Does Not supply air limitations,and satisfy hood ❑Not Observable: rating requirements and maximum exhaust rate criteria. ;❑Not Applicable C403.2.9 ';HVAC ducts and plenums Insulated. .❑Complies ;Requirement will be met. [ME6OIr•' Where ducts or plenums are installed ❑Does Not in or under a slab,verification may • need to occur during Foundation Not Observable', Inspection. :❑Not Applicable C403.2.9 . Ducts and plenums sealed based on '❑Complies Requirement will be met. [ME10i. ;: static pressure and location. :❑Does Not ❑Not Observable ❑Not Applicable 11High Impact(Tier 1) _ Medium Impact{Tier 2} ';3.:.Low Impart(Tier 3) 11High Impact(Tier i) f2Medium Impact(Tier 2) 1,31 Low Impact(Tier 3) 1 1'High Impact(Tier 1) �'Medi m Impact(Tier 2) �3j Low Impact(Tier 3) 1'High Impact(Tier 1) F2AMedium Impact(Tier 2) �3�Low Impact(Tier 3) � 1[High Impact(Tier 1► WIM diem Impact(Tier 2) F3IL w Impact(Tier 3) �1!High Impact(Tier i) RA Medium Impact(Tier 2) �.-3Law Impact(Tier 3 ) Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Data filename: Page 7 of 17 Data filename: Page 8 of 17 Data filename: Page 9 of 17 Data filename: Page 10 of 17 Data filename: Page 11 of 17 Data filename: Page 12 of 17 ▪ '- ---. - .. ._. _._.. ...._ ._---.._-.-..___.... .._. .:-,.. __. ..: , .., ...- .. a."'S:. - =-� _ 5 w^a - :wF.. -w.. w" 'G y '�-G - _Fy a:...-- - k '9..., _ - - - �_ i. ,._..... -__ . ...,_-..- ._< ..... . .._ . ... .. ._ �:>w .. �, ..Scotian. � ...� j'SeFth�tfi »•r. -n"' w #r �S CCA w�-_ �. .•,ter R .� ���- . _ - _ .... .... . . ... . . ,. Section ,. . E.K -: ` <- � " F - - .�::.=. - t� rt i ,"4 - - ..fes n - _� T' _ ,,... ...._.. .. __ _:..:: - - ...n._.. ..z. ': ..._ r....Y.. �... rte._. .t .-...... i _ AI - Y� SW�#rx .'." ',•� :'.: _�� ._;'� ..::>.tn: W n• �� c, lr ,f_ .' �� � F t3"'� R. c, _..�-�:,_ �.� , _..a. , tin m lie 3 n ,Itself t1 _ -_ IY h e f f a __Co est. _ _ . _ ... = .. � t -. ,t�: . i ' ..I� ir .l s7-: -n nig J n ". ,� _t€in .3h �t::am Iasi= � 5 ,..-. ': - -. ..... __.,_ - # MechanicalRou h In Inspection o Ca s ,, ,.....,<.:...__.. _."......Gamma ts/ nt grtiF�. .. .,.,r� ... ,........#_. ._.._au I _ _@!�!�. 0 � - '�,. C. A�ciitu[ O � - �. _�A _ ��. _ -. . nl h..n:.n _..:. m f es7 .. .. Comm nt: Assum tions - p p .._. P � -..ft.tom- mP_ (,.. , :.�,. - � fi tl.. �� the coif Rnu i Bctlon. Go 1 _ e s! : 9 _..,. ...-: _ .....� .P �-1� �. P - - ' s��.�, .._. _. ._... .. >_..... -----..... -- _. _...._ --.:::,!...7!--,•',.!;::::,,i,'::::::- .. ..,.. ... � ..... ....�... 'm x '�. �-<."tea. rr_. r. m.Y..., :r - - .. _ _. ._mak , �._ ... _ �. _. .. -- - - -_ :. ....... .... ..>..._ _ t-.. .. ...................• ... ... .__-. __,. -- .. ,,:. :r...._. . .... _. ..._..N,..._._._�-,sem , ,_..r.. a .., .. t' , ,., .,-x .,.,_,. ... �.... .... ..:s_ ..,.._ ,�._.:.. ..._ _ .-� '3` �...�. .. s. -- ..... ....,. ..�4.r.a �-� �F � - }_.�:�._. ���" `Re .lD ...,,» ... .__ �._.._ 8r fC It? _�..__ --- : . . .. ,... BSc. .„ : : ,'a. '�, -�.�. �s & � app � ��.. .. t� ...: , _ " - ' : ->:, See. the interior!Lighting fixture schedule for values. Requirement not Icontrols installed touniformly,❑Com lies ;Exception:Lighting that is related to means of egress in .1 1 :ea Budding envelope insulation Is labeled.❑Com lies Requirement will be met. 03.3 .Furnished M Instructions for ❑Com lies !Requirement m nt will met. 4 .4.3 Int n r m tailed lam and fixture ❑Com Les CA02.2,6-=,Thermally ineffective panel surfaces of.❑Camphes Requirement will be met. C403.2s9, Ductwork: operating>3 in.water ❑Complies .Exception.Requ tome t does apply, C405.2.1 ;Lighting co o s std ed p p g g '�# 3, 4i 9 p q C3 O& R qu e e be a COS e o s p p !9 9 ME41]'. =sensible heating panels have ❑Does Not 1.3 .column requires air leakage testing. ❑Does Not [EL15]' reduce the lighting load by at least i❑Does Not =stairways,ramps,corridors,or emergency routes. Ittati z -.,with 11-value or insulation certificate ODoes Not C408.2:5" systems: and equipment to the ❑goes Not [FI18p lighting power is consistent with what !❑Does Not ( ]insulation>=R-33. [MEnT 1 • 50%. s4 ;providing R-value and other relevant 2 • • building owner or designated is shown on the approved lighting _ ;❑Not Observable i ❑Not Observable; ;❑Not Observable; data, ❑Not Observable ❑Not Observable ;(]Not Observable£ ❑Not Applicable ; ;❑Not Applicable ❑NotAppficable ; f:s ❑Not Applicable ! [11173' representative. :❑Not Applicable plans,demonstrating proposed watts ❑Not Applicable „v_ ,, PP RP are less than or equal to allowed S Stair and elevator shaft vents have ;❑Com lies !Requirement will be met. C403.3 Air economizers provided where ❑Complies :Requirement will be met, C405.2.1 !Occupancy sensors installed in ClComplies ;Requirement will be met. C303.2 Above<grade wall insulation installed ;❑Complies Requirement will be met. watts. - p q r 3 0303.3, Furnished O&M manuals for HVAC ❑Compiles Requirement will be met. • x,4#3 motorized dampers that automatically;©Does Not [ME62]1required,meet the requirements for ❑Does Not [ELlel :required spaces. ❑Does Not [tel7j per manufacturer's instructions. ❑Does Not C408.2.1 :Commissioning plan developed by ❑Complies Requirement will be met: dose. design capacity,Control signal, 0408.2:5. systems within 90 days of system ODoes Not [FI28]3 :registered design professional or ❑Does Not iM3N ❑Not Observable: ;ventilation controls,high-limit shut-off,;❑Not Observable: ❑Not Observable ,❑Not Observable i 3 acceptance, ❑NotAppficable : :Integrated economizer control,and ❑Not Applicable ❑Not Applicable : ❑Not Applicable [F€8]3 ❑Not Observable approved agency. ;❑Not Observable; provide a means to relieve excess ❑Not Applicable ;ONot Applicable 0405 2 1.:#Independent lighting controls installed ❑Complies ;Requirement will be met. G303 tri 'z Exterior insulation is protected from :❑Complies ;Requirement will be met. PP" 0402-5 5„_;Outdoor air and exhaust systems have 1_❑Complies ;Requirement will be met, :outside air during operation. :0054.2- i_per approved lighting plans and all ODoes Not -111.414:1-Wtdamage with a protective material. ❑Does Not C408.2.3. ,HVAC equipment has been tested to :❑Complies Requirement will be met. r' m that automatically i i I n Verification for exposed foundation C402.5.3 :Where open combustion air ducts DComplies Requirement will be met: 0403 2 4` moto:zed dampers a ❑Does Not 3 manual controls readily accessible e a d: 0443 4 4:,;Multiple zone VAV systems with DDC QComplies ;Requirement will be met. ,{]Not Observable i p i❑Not Observable [F€51]3 provide combustion air to open ❑Does Not 1 ensure proper operation. ❑Does Not '3. shut when not in use and meet [E43j ;visible to occupants. ;insulation may need to occur during [F131]' []Not Observable; 6 =of individual zone boxes have static ❑Does Not = ❑NotA Applicable = ;❑Not Applicable : combustion fuel burning appliances, ;❑Not Observable' {MESSp maximum leakage rates:Check (ME1101;::E pressure setpoint reset Controls- :See the Mechanical Systems list for values - r: =gravity dampers where allowed. ❑Not Applicable ❑Not Observable; PR j Foundation Ins action. • Not Applicable Inspection. []Not Observable: • the appliances and combustion air = ti controls to shut off all ❑Com lies !Exception:Areas such as securityor emergency areas that 0402.2.3 -Above-grade wall insulation R-value. ❑Complies See the Envelope Assemblies table for values opening are located outside the ,ONot Applicable J� ❑Not Applicable Cft054 .3Automa c eo aP P g y [IN6]' ❑Does Not building thermal envelope or enclosed 0408,2,3, 'HVAC control systems have been ❑Complies :Requirement will be met. G4A3 2.}3::Unenclosed spaces that are heated ❑Complies Requirement will be met, I = :building lighting installed in all ❑Does Not need/ continuous lighting. ME71 ,use onlyradiant heat- ° C40811;Air outlets and zone terminal devices ;❑Complies :Exception:Fans with fan motors of 1 hp(0.74 kW)or less. buildin s. Not Observable' in a room,isolated from inside the 2 tested to ensure proper operation, ❑Does Not I _ 1T Does Not 3. ;":have means for air balancin i❑Does Not , g N ❑ pe-Such rooms are [FI14]' calibration and adjustment of controls-; g. ❑ of Observable± thermal envelope. Observable! ❑Not Observable (1ME53]3 -I ❑Not Applicable ; tApplice a 'sealed and insulated, ONotb ❑Noe ❑Not Observable; - ❑Not Applicable ONot Applicable X4112 Floor insulation R-value. ;❑Complies !See the Envelope Assemblies table for values. 0402-5.$.;Recessed luminaires in thermal ❑Com lies ;Re uirement will be met. • ;❑Not Applicable i 0405 Daylight zones provided with :❑Complies Requirement will be met: 1114043,--4, 3 p q 0408.2.3. ;Economizers have been tested to ❑Com lies ;Requirement will be met. 0403 HVAC equipment efficiency verified, ❑Complies See the Mechanical Systems list for values. [E1161= s individual controls that Control the ❑Does Not T ❑Does Not [F126] 'envelope to limit infiltration and be IC 1❑Does Not P q ME55 ❑Does Not Additional Comments/Assumptions:tions: Ili lights independent ofgeneral area .❑Not Observable:, rated and labeled-Seal between 3 /ensure proper operation. Does Not P g P ;❑Not Observable} interior Finish and luminaire housin ❑Not Observable [F1321' <lighting. .❑Not Applicable g` ONot Observable ONot Observable; ❑Not Applicable ; i❑Not Applicable ❑Not Applicable ❑Not Applicable C4O-24.6 ;,Radiant panels and associated ❑Complies !Exception:Requirement does not apply, 0405,2,3,;Prima sideli hted areas are ;[]Complies :Requirement will be met. 0403.2-2 `.HVAC systems and equipment :❑Complies Requirement will he met. 1r▪d 2,"A.:'Fault detection and diagnostics DCom lies Exce tion:Requirement does not I ;Primary g RNIB]' v components,designed far heat ❑Does hot f 3 0408.2.4 'Preliminary commissioning report ❑Complies Requirement will be met. U3 g p p q apply. 0405.2.3. :equipped with required lighting ❑Does Not [ t27j capacity does not exceed Calculated '❑Does Not 1 ;transfer from the panel surfaces to the [F129] completed and certified by registered ❑Does Not linstalIed with air-Cooled unitary DX ❑Does Not 1, controls. ONot Observable; loads. [N 1'13r units having economizers. ❑Not Observable 0405.2.3- ;❑Not Observable: `occupants or indoor space are ONot Applicable ;❑Not Observable I ;design professional or approved ;insulated with a minimum of R-3.5. ': ❑Not Observable ❑Not Applicable : ❑Not Applicable !agency, .a 2 ❑Not Applicable _ ] ❑Not Applicable IEL20]' 0402.5.1. ,All sources of air leakage in the ❑Complies Requirement will be met. C403.2.4. Heating and cooling to each zone is ❑Complies .Requirementwill be met. 0403.2.6. ;Demand control ventilation provided !❑Complies ;Requirement will be met. 1 :building thermal envelope are sealed, 0Does Not 1 'controlled by a thermostat control, ❑Does Not C408,25 jFumished HVAC as-built drawings ❑Complies Requirement will be met. [INl]r :caulked,Basketed,weather stripped [F147]3 'Minimum one humidity control device '1 .submitted within 90 days of system Does Not 1 for spaces>500 ft2 and t>25 i❑Does Not ❑Not Observable' ; [ME5911 !people/1000 ft2 occupant density and C405.2.3, !Enclosed spaces with daylight area °❑Complies :Requirement will be met. or wrapped with moisture vapor- per installed ❑Not Observable (f]71 aceptance. ONot Observable; C405.2.3. :under skylights and rooftopmonitors ❑Does Not !permeable wrapping material to ❑Not Applicable humidification dehumidification :❑Not Applicable ❑Not Observable: `served by systems with air side g ❑Not Applicable ; :economizer,auto modulating outside ❑NotAppficable 1, are equipped with required lighting minimize air leakage. system. • " :air damper control,or design airflow [Not Observable 0405.2.3- 'controls. C4 040$ZS Furnished as-built drawings for ❑Complies Requirement will be met. 9 ❑Not Applicable Additional Comments/Assumptions: 0403.2 4. `Thermostatic controls have a 5°F ❑Complies Requirement will be met. >3,000 cfm, 3 [EL211t -1.2 'deadband. ❑Does Not 1_ 1electric power systems within 90 days Opoes Not C47Y3 2 6 ;Enclosed parking garage ventilation ❑Complies Exception:Requirement does not apply. [F138]' • ]Ff16} of system acceptance. ❑Not Observable ❑Nat Observable; 7; <has automatic contaminant detection ❑Does Not _ ❑Not Applicable j (A1Ei15)3 ;and capacity to stage or modulate i C405.2.4 !Separate lighting control devices for ❑Complies !Requirement will be met. :ONot Applicable ❑Not Observable s P 9 9 C408.2.5. ,An air and/or hydropic system DComplles ;Requirement will be met. 'fans to 50%or less of design capacity-; [EL4]' :specific uses installed per approved ❑Does Not C403.2.4. !Temperature controls have setpoint '❑Complies Requirement will be met, 3 :balancing report is provided for HVAC ❑Does Not :ONot Applicable 1,3 •overlap restrictions, ODoes Not r !lighting plans. ;ONot Observable 4 3 [FI431 systems. - C403.2.7 Exhaust air energy recovery on OComplies Requirement will be met. IFS2p] :❑Not Observable ^❑Not Observab]e [ME57]' :systems meeting Table C403.2.7(1) ❑Does Not ❑No[Applicable ❑Nat Applicable ❑Not Applicable • and 0403.2.7(2}, 0405.2.4 !Additional interior lighting power ❑Complies Requirement will be met. C408.2.5. :Final commissioning report due to ❑Complies ;Requirement will be met. • i‘ ©Not Observable i [ELBP' :allowed for special functions per the nDoes Not 0403.2"4,;Each zone equipped with setback ❑Complies Requirement will be met, 4 building owner within 90 days of ;❑Does Not 1 C S • :ONot Applicable ; 2 controls% using automatic time clock or :Does Not 3 approved lighting plans and is []Not Observable 3 [FI301 !receipt of certificate of occupancy- z tioti% r+ O 403-2 Kitchen exhaust systems comply with !❑Complies ;Requirement will be met. :automatically controlled and [F€391 ;programmable control system. ❑tint Observable; [ME116' re replacement air and conditioned ❑Does Not :separated from general lighting, 'ONot Applicable ❑Not Observable /� 1 P P ❑Not Applicable • :❑Not Applicable a, ��/ RENEWAL �► ,supply air limitations,and satisfy hood C405,3 Exit signs do not exceed 5 watts per €❑Complies ;Requirement will be met. C408.3 ;lighting systems have been tested to :❑Com lies !Requirement will be met- r 3131119 1 ,rating requirements and maximum '[Not Observable: 1 g R 0403.2.4, .Automatic Controls:Setback to 55°F '❑Complies Requirement will ire met. 3 g p CO :❑Not Applicable [EL6} :face- ❑Does Not [F133] !ensure proper calibration,adjustment,:❑DoesNot Q exhaust rate criteria v _ -[e `• HVAC ducts and plenums insulated. ❑Complies Requirement will be met. '❑Not Observable: 2.1, .(heat)and 85°F err d;,10-h fur Z- s❑Does Not . programming,and operation. Elliot Observable C403.2.4.. :hour occupant override,10-hour sONot Observable ONot Applicable ` >/ 2.2 backup '• .,11--- Where ducts or plenums are installed :awes Not ❑Not Applicable [F140)3 ❑Not Applicable Stein or under a slab,verification may need to occur during Foundation ❑Not Observable; Additional Comments/Assumptions: Additional Comments/Assumptions: ,❑Not Applicable • '9�1► 0403.2-4- .Systems include optimum start ❑Complies :Exception:Requirement does not apply. '4 OF e�� Inspection. C40- • _-. • Ducts and plenums sealed based on ❑Complies ;Requirement will be met. 2.3 :controls, ❑Does Not i jiME;r e.e7 static pressure and location. '❑Does Not [Fi413' CI Observable - ❑Not Observable' ._,{--._--T-- ❑Not Applicable • ❑Not Applicable I 1'High Impact(Ter 1) 141 Medium Impact(Tier 2) 113 Low Impact(Tier 3) 1 1'High Impact(Tier 1) MMedium Impact(Tier 2) 1 3:Low Impact(Tier 3) j I 1 High Impact(ter 1) pMedi m Impact(Tier 2) N14 Low Im act(Tier 3) 1 rHi h Impact(Tier 1! V:*IMedium Impad(Tier 2) I3:[Low Impact(Tier 3} 1'High impact(Tier 1) R.AMedi m Impact(Tier 2) 1731Low Impact(Tier 3} 11 IHi h impact(Tier 1) (--T Medium impact(Tier 2} }3Law impact(Tier 3 ) DATES Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenza Tigard Report date: 11/02/17 Project Title: Firenze Tigard Report date: 11/02/17 Data filename: Page 11 of 17 Data filename: Page 12 of 17 Data filename: Page 13 of 17 Data filename: Page 14 of 17 Data filename: Page 15 of 17 Data filename: Page 16 of 17 11/2/2017 INITIAL PLOTTED: 11/10/2017 SCALE AS NOTED CREATED BY: WE SHEET _ ENERGY ANALYSIS