Loading...
Plans (2) M EC2017 - 00812 NEW PUMP SCHEDULE RECEIVED • 0 MOTOR ELECTRICAL OPERATING H OCT 1 6 20'7 TAG MFG. & MODEL LOCATION TYPE SERVING PRESSURE VOLTAGE/ WEIGHT NOTES �{ �' TY NEW `'y GPM HP BUILDING MIS a i :S1.1, j�',is-,{� (3 DROP (FT. H20) PHASE (LBS) ., 0 rj N { r ' a. B & G � N �` > CP-1 BOILER ROOM INLINE PRIMARY LOOP 42 7 1/6 115/1 15 0 & 2 cn o, fN cn -,iP L-45 , °' O'z Tigard --- • fd W N O Notes: o O '-'-' . �TigardUnited � �7 LOT.>< j Methodist ,Church 23 rain drn t'_. Boat- W U o ' o Tigard Unit :jr- Methodist Methodist rch NEW BOILER SCHEDULE �; Reg U s - 0 GAS HEATER FLOW RATE ELECTRICAL OPERATING .q Oswego - TAG MFG. & MODEL LOCATION FUEL INPUT OUTPUT EFF, MIN. MAX. DESIGN VOLTAGE WEIGHT NOTES SW Mc_'or nald s-: (MBH) (MBH) (%) (GPM) (GPM) (GPM) (LBS) B-1 LOCHINVAR BOILER ROOM NATURAL 500 425 85% 21 55 42 120/1 414 1 CHN-0502-M13 GAS :W Bonita F?.i 1Tommy's AREA OF WORK (BASEMENT) legged LLC ,rf 2 Notes: TSC \ TY NAP - HVAC C3� 3UILDING MAP - HVAC 1. Verify boiler sits flat on ground, if not fabricate base rail so boiler sits flat. NTS 4 M1} NTS 4 i -- - - -__- (E) RADIANT FLOOR HEAT EXCHANGER (TYP. 2 ZONES) SPECIFIC NOTES E- BANCING . 6,9 VALVES, BALANCE WATER SUPPLY TEMPERATURE TO RADIANT FLOOR TO 125°F 1 . INSULATE NEW PIPING PER TABLE 503.2.8 OF THE 2014 1-1OEESC. 1 ( (EAIR VENT (E) CHECK VALVE }I 2. OPERATION AND MAINTENANCE MANUAL(S) SHALL BE 0 ( �- - - (E) PUMP (TYP. 4) PROVIDED TO THE BUILDING OWNER BY THE MECHANICAL I I s ( --- J (E) THERMOSTAT (TYP.) CONTRACTOR IN ACCORDANCE WITH SECTION 503.2.9.3 OF I I U I IF REQUESTED, PROVIDE AND THE OEESC. ( .1 INSTALL 5 GALLON POT (E} ISOLATION VALVES (TYP.) ,� CD I I FEEDER TO CUSTOMER. TIE 3. VERIFY MINIMUM 180 SQ. IOF MAKE-UP AIR OPENINGS. IF I INTO NEW PIPING. C\2 -..o.s:.--mniwr] EXISTING DUCT PROVIDES Ni.80 SQ. IN., DEMO BACK TO 12" I I N ISI F ii ) ) ---(E) HEAT EXCHANGER DOWN FROM CEILING. IF 180 SQ. IN. IS NOT ACHIEVED WITH I I E—h CD 1 I (E) PUMP #2 w EXISTING DUCT, TIE FAN INTO BOILER SO IT OPERATES U ( (E) CHECK VALVE , -� , WHEN BOILER OPERATES. �' 2i ( � 0 IF S IJ - I - -, J \ \ --(E) ISOLATION VALVE , rP Hi r SCOPE OF WORK I /47 4.0 .wp ,r 4r, (E) MOTORIZED CONTROL D I� I f s �� VALVES TYP. 2) E THERMOSTAT — H ( O %" PIPE - -- 4 - 1 . DEMO OLD BOILER WHERE NEW BOILER IS SHOWN. _ (E) EXPANSION TANK -- SPECIAL INSPECTIOI REQUIRED LCD ' State of Oregon Structural Specialty Code r (Th11 _ 2. FURNISH AND INSTALL NEW BOILER. CO 3--10x PIPE DIAMETER. STRAIGHT PIPE ONLY 0 ❑ Concre d Reinforcing Steeln CY) „ 4 -i •- 1 Installed in Concrete 3. FURNISH AND INSTALL NEW INLINE PRIMARY PUMP. (E) DRAIN �- 0 Special Moment-Resisting Concrete Frame ❑ Reinforcing Steel&Prestressing Steel Tendons Sj -...,_______ (N) 2" S/R WATER PIPING ❑ StnicturalWeldng 4. FURNISH AND INSTALL NEW GAUGES AND VALVES AS f REQUIRED. 0 ❑ High-Strenght Bolting T (N) ISOLATION VALVES (TYP.) ❑ Structural Masonry -- 5. FURNISH AND INSTALL NEW PIPING AS REQUIRED AND (N) 3-WAY VALVE El Reinforced Gypsum Concrete INSULATE NEW PIPING. HI ❑ Insulating Concrete Fill (N) PRIMARY PUMP ❑ Spray Applied Fire-Resistive Materials ' 6. FURNISH AND INSTALL POT FEEDER (IF APPROVED BY REVISIONS ''''.0 ❑ Pilings, Drilled Piers and Caissons (N) P/T PORT WITH WELL OWNER). �- /�- N PRESSURE RELIEF ❑ shntcrete - ��ypg�G�� . (N) TEMPERATURE PORT m O ❑ Special Grading,Excavation and Filling 7. RECONNECT MAKE-UP WATER AND GAS REVIEWED COMPLIANCE ❑ Stook Control SystemsP� mer Inspections OTQ L 1 ' ---- 8. INSTALL VENT PIPING FOR BOILER. Pct --Cv - S - RECONNECT GAS PIPING (1 .25") ^� .,, 12._ v____1 l / c E -- 3t� �` � 1 L �_ Addreest ier'i Z"7 _ r!V Suite .. /IP RECONNECT MAKE-UPt M�CL� 1 urie Data .1LIY WATER (1 '') ZDATE 10/09/2017 USE OF HUNTER-DAVISSON, INC. DRAWINGS, (N) DRAIN (1 ") DRAWING INDEX FILE - OFFICE COPY J❑B # - SPECIFICATIONS AND OTHER DOCUMENTS These Drawings, Specifications and other documents are prepared V M1 - TITLE PAGE, EQUIPMENT SCHEDULES, SCHEMATIC < DWN RM CHK - by Hunter-Davisson, Inc. for this Project and unless otherwise D RAW I N G C provided, Hunter-Davisson, Inc. shall be deemed the author of 0 TITLE PAGE these documents and shall retain all common law, statutory and other reserved rights, including the copyright. The Owner shall be - - ---- -- permitted to retain copies of the Hunter-Davisson, Inc. Drawings, M2 WETSIDE I D E LAYO U T - I— Specifications or other documents for information and reference in connection with the Owner's use and occupancy of the Project. The documents shall not b us d by the Specifications oroothers other n Bother n B 0 ! LER PIPING - SCHEMATIC DRAWING M3 - DRYS I D E LAYOUT OLM 1 projects, for addition to this Project or for completion of this NTSW Agreement, except by agreement in writing and with appropriate compensation to Hunter-Davisson, Inc. -- OF - SHEETS I I I � • o -- IIq' _ ._._, 3.. illi f.l I =`� —��-- U illil —____:,___ ____•—__________ __ ____.,_,....„. 111 i.,.. _ 1 -----___---- ___---,_____________________ ■ru IhI 11111 ; ._sc co IF OWNER APPROVES, TIE WATER I � 1 0 e,�,, .. . 1"h _...J 3 fir. a) c POT FEEDER INTO NEW PIPING. I I I I i . ., � / w �O O co r_. r; \ ri. '._. -� -,•ti2 is o-)-. - NI/'\ 11101011O I TIE EXISTING MAKE-UP WATER =_---__ I I i./_.) Q I ' INTO RETURN WATER SIDE y� Z O 1 .--3 ' 1 1-000 o 74.Zit„1, ' j1 \ ,„..,....______} _ 441}-11) . .- , �, O lidrilrilliir ilarr.V°7- .44--. ' , C2 S ° I- �L U 41.141 WNW C_______..7. 4.440 F �ti ` �'11;1 ol.I r.' 1 © r, ' , rte f Nl / es 11i r� , D PIPE EXTENDS TO (E) GAUGES / , , I/BACKFLOW-PREVENTOR, DRAINS AND -� :::15,:44.0:';:i;_. 3I _ '` i` � _VALVES �. Y ! I 1 :�*I=11) Ilitait i -x -_ _ l i Mil 0 I 2 IF a :...,,,, ',4'ie „Ai INN •ill � � � � la ...\.-1 ---_..141.___ 10 ARP" iii 1 ., 1 ,.----. ' fi.... r ........_ ,_ 1).P1 . ej ELECTRICAL CONTRACTOR TO PROVIDE ri AND INSTALL EMERGENCY SHUT-OFF SWITCH WHICH SHUT'S THE BOILER OFF IN AN EVENT OF AN EMERGENCY. 111 1-1 1 3OILE PIPI \ G -- TOP VIEW 3 BOILER PIPING - ISOfv ETHIC VIEW 11 M 2 1/2" = 1'-0" M 2 1/2" = 1'-O" 0 1 s 1 I I U LICC HI S.; 0 R . i,...4.., F4 '-'-' o Hi _ . ___ __ __ I ____ _ _ ; _ 1- - 1 --1,-) [(7.,,,„, u i - 1 cf) 7_ ,< 0,1,aiRiricla:,,,, 0 j..■ri'„ :.�. ,,,..iu�:.{} � �_....... _ _._ __._-_ ill nu ,, j{{■ I I -m-... •,,,,,_,I,„,..•.,,,�!,___..... •.. Nii, i �lllllll[�. in I. 1 1 -. 11 I , . ....3 I I - Tui 111 �r iiiI1 , .._a1 :) 0, _�.ij- I rlill E., -- fllr St�_� ■�Ii �\I 3 ■r/r -ill _ .a ._ 5' < 1 �' K .i. -_ _ M IS _- o I �Ji C . I r II• 111 • 0 �� \ ?1 1111 -- =II' � g. I i , Hi I 111 : I I *,...: i I Irli • I REVISIONS (7 id 1 t; ml a CO2 3OILE � PIPING - FO \ T VIEW 3OILER PIPING - SIDE VIEW M2 1/2" = 1'-0" 1/2" = 1'-0" 7 DATE 10/09/2017 FILE - USE OF HUNTER-DAVISSON, INC. DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS J❑B # - These Drawings, Specifications and other documents are prepared D W N R M C H K by Hunter-Davisson, Inc. for this Project and unless otherwise LAYOUT ❑F PIPING provided, Hunter-Davisson, Inc. shall be deemed the author of CI these documents and shall retain all common law, statutory and other reserved rights, including the copyright. The Owner shall be permitted to retain copies of the Hunter-Davisson, Inc. Drawings, (— Specifications or other documents for information and reference in - connection with the Owner's use and occupancy of the Project. The Hunter Davisson, Inc. Drawings, Specifications or other documents shall not be used by the Owner or others on other CL projects, for addition to this Project or for completion of this I ' I M 2 Agreement, except by agreement in writing and with appropriate compensation to Hunter-Davisson, Inc. CL - OF - SHEETS TIE INTO VENT CAP u) HWH (40 MBH INPUT) - — BOILER (500 MBH INPUT) . o L 1 ,1 ., .0 Vi{ 0 cn N O � N N +. NI 0 N 41 - gym' ° � �' �z �_ w o r ,. f O to I � /'' � N -----__ i:4; ) t .I. \-, a) Ct 1'0 :.d ei , y�` P E N MAKE—UP AIR FAN (EXISTING) sw / •o o o � ,n 0, �- It fzi,f I 0 O QJ Lo i i O o Q ,_ ,_ i - C r K _vim..— .. i'f1 Si� — _— .- � L �/ a E Vi ti 'f t: / r/F-i., ac ? - _ a) 3 ry xf/ �1� ax - ._-'--fir rte" �� / ,. - r i2tI a4r 1 .: - f'._ jI / . — — /f / HI UD i 1-1n FLUE VENT - TOP VIEW � FLUE VENT - ISOMETRIC VIEW 0 ii N 33' METAL CHIMNEY I LINER (SIZE(SIZE 8 ). B—VENT TO RUN UP AND TURN 90 . LINER TO RUN VERTICALLY. U ' 11 1 I o0 I o MAXIMUM 10 FT. HORIZONTAL RUN - - — (N) BOILER 4 } MAXIMUM 5 FT. HORIZONTAL RUN WITH B—VENT F I II I HI I I --L._ , Y" DIA. HILTI KWIK BOLTS t �' I U ' � TZ EMBED 3.5". WASHER C ir, 0 co IF READ. (TYP. ALL) I 6-7916 4"0 C Y2 THREADED ROD ` THRU BASE LEG W/ I 0J 0-3 co EYELET ENDS. MIN. 3' VERTICAL RUN WITH B—VENT - _ �I I MIN. 5' VERTICAL RUN WITH 0 _ I B—VENT 8" BAROMETRIC DAMPER �' a �` 4 litim IP I z ___ Ii. ,__,_ E` BASEMENT FLOOR 4c E o RECONNECT SUPPLY SLAB I L_-- II FAN TO BOILER HI I , I I � JI 6"0 CONNECTION WITH B—VENT REVISIONS ij =MI= _ . I a- A 0 FLUE VENT - FRONT VIEW 3FLUE VENT - SIDE VIEW 1/2- = 1'-a„ M3,1 1/2" = i'-o" CD _. Z DATE 10/09/2017 FILE - USE OF HUNTER-DAVISSON, INC. DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS JOB # - DWN RM I CHK - These Drawings, Specifications and other documents are prepared t , by Hunter-Davisson, Inc. for this Project and unless otherwise LAYOUT ❑F EXHAUST provided, Hunter-Davisson, Inc. shall be deemed the author of Q these documents and shall retain all common law, statutory and VENTING other reserved rights, including the copyright. The Owner shall be permitted to retain copies of the Hunter-Davisson, Inc. Drawings, -.-® (— Specifications or other documents for information and reference in connection with the Owner's use and occupancy of the Project. The Hunter Davisson, Inc. Drawings, Specifications or other documents f shall be used bPy the Owner or others on other (= M 3 B O I L E A T T A C H E M E N T DETAIL projects, for addition to this Project or for completion of this rpAgreement, except by agreement in writing and with appropriate CLcompensation to Hunter-Davisson, Inc. NTS - OF - SHEETS