PFI2018-00192 I 8� 9TY F TIG�4R® PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12018-00192
a 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/23/2018
Parcel: SEG1154
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: SEG 1154. Installing conduit across SW McKenzie Street from an existing pole. PGE Job M2534565
Owner: FEES
Description Date Amount
PHONE:
Contractor:
MOORE EXCAVATION INC
PO BOX 30569
PORTLAND, OR 97230
PHONE: 503-252-1180
FAX: 503-252-1730
Applicant:
TOD SHATTUCK
10800 SW AVERY STREET
TUALATIN, OR 97062
PHONE: 503-612-2935
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: 6(
Issued By: Az6d�� AiWL
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF62018-00192
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECENED
JUL 2 3 2018
Pte. 4,
Cit ®�f°TiTigard
a h' aV ITY OF TIGARD
2�
,y 3 H its
�P �
,�e. PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING
Public Facility Improvement ( Permit
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
E��/ TYPE 1-Franchise Utility Work
Check one: E Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGE
Detailed description:
installingconduit across SW McKenzie Place and/or utility agency.
from an existing pole ❑ TYPE 2-Sidewalk/Driveway/Sewer-
PGE Job M2534565 Work performed for the purpose of-
-
f° Sidewalk installation or repair.
° Driveway approach installation
9675 SW McKenzie Street
Property address/location(s): and/or repair
iy54 Tigard, OR 97223 ° Sanitary sewer lateral installation
and/or main line tap
Applicant. Portland General Electric[Submitted by Amy Sweany] ❑ TYPE 3-Full scale Development
Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tualatin, OR Zip: 97062 the following:
Phone: 503-612-2935 Email: preregcoord@pgn.com ° Subdivisions or Partitions
Contact name: SDPM Tod Shattuck Phone: 503-672-5466 Street widening
° Mainline installation for Sanitary
Contractor: Moore Excavation, Inc. sewer, Storm sewer, Tigard water
and/or Tigard Water Service Area
CCB#: 28397 Expiration: 10/10/2018
Address: 5501 NE 223rd SUBMIT COMPLETED APPLICATION TO:
City/state: Fariview, OR Zip. 97024 City of Tigard
Phone: 503-674-0900 Email: Planaing/Engineeting
13125 SW Hall Blvd.
Contact name: Mike Burnel Phone: Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: NIA rowMermitsktigard-or.gov
Address:
gem§u'GW un emu
City/state: Zip:
Phone: Email: Case No.: � �s 'r�0'[Cl 2-
Contact name: Application submittal fee(.007%of
Engineer's Estimate)1.1
Estimated value of work is required(if over$5,000):$ Additional fees: $
(within the public right-of-way) Application accepted:
By: Date: Z ;
Is work related to a LAND-USE DECISION? ❑ Yes Y( No
Application reviewed:
If so,please specify (MLP,SDR, SUB, etc.) case #:
By: Date: l
Is work related to a BUILDING PERMIT? ❑ Yes L(No Applicant notified:
If so,please specify(BUILDING PERMIT)case#: By: Date:
i
I:\ENG\PermitApplications\pfi—application,Rev.10/16/2017
City of7Cigard 13125 SW Hall Blvd. ° Tigard,Oregon 97223 www.tigard-or.gov ° 503-718-2421 ° Page 1 of4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Steve Hursh 7/19/2018
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMIPROVEMENT PERMIT
CityofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of4
DEVELOPMENT ENGINEERING FEESo .
.S.TAFF',USE ONLY
Public Facility Improvement(PFI)Permit:
DETAILED SUBMITTAL
`RE UIREMENTS
APPLICA'T'ION FEE
Part 1: Required submittal fee$300.00 (minimum) (FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
Sketch
submittal fee)
Engineer's estimate X 2%Plan Review (including information below)
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name.
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair(less than 20 lineal feet) (6 sets;24x36 or 2204):
• Relocate or replace mailbox ❑ Cover'-Site,Xicinity;Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) -
• Weep hole repair El..Street'(P1an,'Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑. Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair Water Quality.Facilities
• Street tree pruning or planting Grading .
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan.
• Test wells ❑ Composite-Utility Plan,(Electrical,Phone,Gas,
Storm,Sanitary;Water,Signage,Street Tights,etc)
❑ Details.
Note: A cash/bond assurance maybe ❑ Traffic.Sight-Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑'Street Light Plan and Photometric
Engineers seal/signature
Sheet label(projeet.land use name,revision and
plan,log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
Ll Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
Proposed Plat
❑ .Pathway Design(if applicable)'
❑ Water Department Approval
❑ Engineers Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 3 of4
SAMPLE SKETCH:
I•,
cof Plavem end.
Ditch
3 reelfi+gfrh IN�d�&.W a�Elms*
Fir lm:t_
--- a Gass '.U_jIk
,
_.. -
' 'i apt a cB" ewelITIC
(D aI
rfvO
IN Drkeeway
LD
I IF r
9L
0,, r
, :1 �.
}
_ t
95
:_...... _ -- fro gI i n rrr -
e F 1 re Hard raint(1'H)
,lel, f
E
I �
MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable):
North arrow Property lines & dimension Slope of property
Street & street name(s) Existing building, structures Utility& street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of4
COMMERCIAL LEGEND
00041 NEW PGE FACILITIES TO BE INSTALLED
1962-60 (UNLESS OTHERWISE SPECIFIED)
O O\ ---------- INSTALL 1-#350 AL-QX IN 2 OF 2-3"PVC CONDUIT
\ PROVIDED & INSTALLED BY CUSTOMER
�J 00023 \ CITY OF TIGARD ROW PERMIT NEEDED
1966-35
L -14 CONSTRUCTION NOTES: CMDEV
00896/18- 1 00 T \ \\ 1.CUSTOMER IS RESPONSIBLE FOR ALL TRENCH,CONDUIT,VAULTS,PADS AND
O PL00072 QL PL00041 \ B-2 AL-0 ROAD CROSSINGS.
P 2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS
0072 ATO Q 9Cw- JUNCTION BOXES,AND EQUIPMENTIFACILITIES,INCLUDING CONNECTION OR INS
tALLATION
-Y \ OF CONDUITS AND PULL STRINGS.CALL SERVICE COORDINATION AT 503-323-67W
19090-75 �� \ TO SCHEDULE A PGE STANDBY CREW.
[[yy` 5 01819- `\ 3.ALL CONDUIT 70 BE INSTALLED WITH 30 INCHES(MIM COVER AT TOP OF CONDUIT
07256/ 1, \ FROM FINAL GRADE.
\ 2-350rx
4,ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL GRADE,
PL O3H49 \ ` PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST),PGE TO DETERMINE
THE SIZE AND NUMBER OF CONDUITS REQUIRED.MAINTAIN 12 VERTICAL INCHES AND
24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES.ALL ELBOWS
4 INCH&SMALLER TO BE 36 INCH RADIUS.ALL BENDS MUST BE FACTORY MADE.
ALL ELBOWS LARGER THAN 4 INCH TO BE 60 INCH RADIUS.RIGID STEEL OR PGE
! / \
APPROVED.FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET LONGER.
S
�, � OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES IN BENDS.PVC SCHEDULE
/' 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL
1965-
1-142 /! \ BENDS IN ANY CONDUIT RUN IS 270 DEGREES.
1965-45 F 651 �� 5. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE) DUCT
PL03849 // A OR SCHEDULE 40 PVC WnnEEITH A MECHANICAL CONNAS AN ALTERNATIVE TOECTION HOPE DSCERTA-LOK OR LIKE MCT.HOPE SHALL MEETECHANICAL
CONNECTION PRO DUCMTHE
ANAGER FOR15 FETYSREAS NS THE DUPECIFICATION 2CTiSHALL E BLACK WIITHAVAILABLE ON OUEST FROM THREE EQUALL E SPACE PROJECT
/.
< ALWAYS
. T3-142 A16 416 i/` / \ HDPE EXTRUDED
ISE EQVIREDSAF ERICNSTA SPECIN WTION RENUIREME R .MA NDREL TEST OF
F6T C 25 79650 \ / %/' / T.
6.ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIB FROM ANY COMBUSTIBLE
BUILDING,WALL OR OVERHANG AND 4 FEET(MINS FROM ANY FIRE HYDRANT.
L00072 / /� '� PGE TRANSFORMERS MUST BE WITHIN15FEEOFA DRIVEABLE AREA.
MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
7.TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 21NCHES ABOVE
PEN FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL
A 100 5616 ` /< 9` % / AND TO EXTEND 1 INCH ABOVE THE PAD.
\ C 25 539628. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
100' -
/ ,4 / �S TO VEHICLES.
9.ALL SWITCH VAULTS TO BE SET AT FINAL GRADE WITH 6 INCH GRAVEL BASE AND
Q' ` \ %/ /J L, A-� CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERM-A-DUCTS).
04806 `•� �� i/J T/,Q (SEE DETAILS ON SKETCH
1971-3 120/240V\\ \ l 10.PGE TO BE NOTIFIED AND INSPECT ALL CONDUIT,VAULT AND PAD INSTALLATIONS
\ 600AMP . i' 4/0 BEFORE BACKFILIP.LL NEW VAULT B PADLOCATIONS TO BE FIELD VERIFIED
12,568 �" �l 2 WITH PGE AND CUSTOMER REPRESENTATIVE.
�O 11.REFER TO PGE ELECTRICAL SERVICE REQUIREMENTS BOOK FOR FURTHER DETAILS
&SPECIFIC REQUIREMENTS.LINK TO WWW PQRTI ANnr.FNFRAI r`nMmFnannK
12.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD
UNDERGROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO
THE CUSTOMER.
C 13.THE POINT OF DELNERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER AND
•.� \, /' \ %-.!' PGE WILL BE AT THE LINE SIDE OF THE NEW CUSTOMER PROVIDED SWITCH GEAR-
0012
EAR.0012 PGE CONSTRUCTION DRAWING
AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED
This document accurately represents FIELD Construction.
PL-3849 Foreman: Date:
INSTALL 3"POLE CONDUIT UNIT General Foreman: Date:
\ j WITH WEATHERHEAD ON 12"BRACKET Signature only required for field construction changes.)
SDPMJENG REVIEW: JASBUILT BY DESIGNER:
DATE: 7/77/1018 SCALE: 1":60' ACCOUNT: 1070001 AIVO 1000004599 X06 NO,M2534565
2 NEW _
---!" 3"CONDUITS YI �� TITLE
STORE QUEST
CIRCUIT SIZE
\ TIGARD -TIGARD 13KV
/PPGE LOCATION
9675 SW MCKENZIE PL.,TIGARD,OR 97223
TTENTION: CALL 811 BEFORE YOU DIG 1 ` DESCRIPTION
THINKOREGON UAW REQUIRES YOU TO FOLLOW RULES ADOPTED �'I? ��� NEW 600AMP 1"40V 3 PHASE
SAFET�L�vQ�vRe�y Y THE OREGON UT?TTY NOTIFICATION CENTER. i
Y EL f! CONTACT SERVICE COORDINATOR RIGHT-OF-WAY PERMIT NOTICE: THOSE RULES ARE 5Ei FOR771 fN OAR 957-001-0010 , lYq q COUNTY ECTION(SJ WORK WITH SHEE1
FIRST!
��pp� �q FOR rRENCH 4N0 CONO(III WSPECIION PRIOR A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF 'Y{: _ WASH C21--02B
B �8®�8 0 TO E-SCKFILL.PGE WLLL NOT INSTALL WIRE WORK IN THE RIGHT-0F-WAY MAY BE PERFORMED.ONLY PGE APPROVED { t" BEAVERTON I OF I
a uvra TRENCH Is Ira*;BACKFILLED. THE RULES BY GALLING THE OREGON UTILITY -
cONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL OTIFIUTION CENTER ADMINISTRATION @ (503-737-1987) LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY
SERVICE COORDINATOR AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT.
503-323-6700 OR 800-542-0878 THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS TO REQUEST UTILITY LOCATES CALL THE OREGON2213 SW 153RD DR TOD SHATTUCK 672-5466 PENKA TANTILOVA
BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE. UTILITY NOTIFICATION CENTER,877 AT LEAST Knorr BYIIOrf below. BEAVERTON,OR 97006
2 BUSINESS DAYS PRIOR TO EXCAVATION. Call bdele you 9• 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
p ————————————————
n U'I V7 A A w W N N
`�' `s' MM aC, Single Fla er Operation (Optlow
9 99 P m
07 i for Low Volumes "AB
(Optional) ® Q
�✓- WIE N w (ADT<400) ROAD0 AHEAD
0 0 o n 9` BE0
�O°ER PREPAREDONE LANE
H H c 2• TO STOP ROAD
CL
o cwi o OD .W t mile AHEAD ,
O O O �� C — — — mT
��< • ROAD
WORK
cwi e n o C7 K°K a K R "
CD AHEAD
O O O Pmtectlon Vehicle /
wI TMA{bath OptlOnal) rtif
I PREPARED See ChHptefA
ONE LANE TO STORoAD
P
(J7 C7 Ul N O(n O N% I AHEAD 1YY
0 0 0 0 G.n O
'.; «,la an • A
i --= ----------------�
L 1 mile
r' max.
• • MA-1-
$Ala •• P �:
C B B A
Buffer
/ Protection Vehicle
ROAD ® w/TMA(both Optional)
WORK See Chapter 4
AHEAD :!
BE
ONE LANE PREPARED
{� ROAD PREPARED
' Two Flagger Operation
v
AHEADTO ,`
h
CD
CD
(Optional) Ems'; co