Loading...
PFI2018-00187 UTY OF TOC ARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00187 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/25/2018 Parcel: SEG2495 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Wave Plant Extension Project Description: SEG2495, SEG2496, and SEG3035, associated with 16290 SW Upper Boones Ferry Road.Wave is proposing a plant extension from SW Durham Road and SW Upper Boones Ferry Road to the entrance of PacTrust Business Center Park on Upper Boones Ferry Road. The build will consist of aerial 48ct fiber optic cable and underground 2"conduit and 48ct fiber in City of Tigard ROW. The build will then Owner: FEES Description Date Amount PFI Permit Fee 07/25/2018 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: JAISON KRUEGER 401 PARKPLACE CENTER, SUITE 500 KIRKLAND, WA 98033 PHONE: 503-383-5350 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant ept I(-/�'p 7-10 lu Signature: (J Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00187 Type: Condition Name: Status: Severity: PFI Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED JUL 18 2018 City ®f Tigard CI Ty Cr r� l PUBLIC WORKS ENGINEERING- PLANNING.,,b`03€VEEPINC h Public FacilityIprovement AFI �e�nit '7CYPE OF.WOIZK DESCRIPTION OF WORK(in the right-of-way) ❑x TYPE 1—Franchisee Utiliry\Fork. Check one: x❑ Utilities ❑ Sidewalk/driveway approach ❑ Streetimprovements performed by N\\/N, PGE and/or utility agency. Detailed description: Wave is proposing a plant extension from SW Durham Rd and SW Upper ❑ TYPE 2—Sidewalk/Driveway/Sewer Boones Ferry Rd to the entrance of the PacTrust Business Center park on Upper Boones Ferry Rd. Work performed for the purpose of: The build will consist of aerial 48ct fiber optic cable and underground 2"conduit&48ct fiber in Sidewalk installation or repair. City of Tigard ROW.The build will then continue onto private property. • Drivewaj-approach installation Property address/location(s): 16290 SW Upper Boones Ferry Rd,Tigard OR and/or repair C �I �����1 -� 3�is S • Sanitary sever lateral installation and/or main line tap ❑ TYPE 3—Full scale Development Applicant: Astound Broadband,LLC(d.b.a.WaveDivision Holdings) ppcanWork performed with Land use Address: 401 Parkplace Center,Suite 500 approval which includes an),of Clt`%/state: Kirkland,WA Zip: 98033 the following: Phone: 503-383-5350 Email: jkrueger@wavebroadband.com • Subdivisions or Partitions • Street widening Contact name: Jaison Krueger Phone: 503-383-5350 • ,Mainline installation for Sanitaf�, Contractor: Coastcom, Inc(d.b.a.WaveDivison Holdings) sever, Storm se\ver, Tigard water and/or Tigard Water Sei�rice area CCB#: 211650 Expiration: 8/8/2018 Address: 151 E.Olive St SUBMIT COMPLETED APPLICATION TO Cit}7�state: Newport,OR zip: 97365 City of Tigard Planning/Engineering Phone: 541-270-4416 Email: bwatson@coastcom.net 13125 SW Hall Blvd. Contact name: Brian Watson Phone: 541-270-4416 Tigard,OR 97223 Applications for"minor work in right-of-way." Engineer: Jaison Krueger on1v may be emailed to: rowperrnits&,.tigard-or.gov Address: 669 Glatt Circle O' STAFF USE6 ONLY City state: Woodburn,OR Glp: 97071 Phone: 503-383-5350 Ercall: ikrueger@wavebroadband.com Case No 1. �$ Utl Contact name: Jaison Krueger -�pphizatiori s ibmtttal fee(07%of:: Engineer's Esfimate F_stimated %clue of work is required(if o�%er X5,000): `� 1,500 Additional fees: (within the public right-of-way) application accepted: Date: . 4 Is work related to a LAND-USE DECIS.IONP ❑ Yes R No Application reviewed: If so,please specify (MLP, SDR, SUB, etc.) case #: IC( BNF: Date: Is work related to a BUILDING PERMIT? ❑ Yes ❑x No Applicant notified: If so,please specify(BUILDING PERMIT)case#: BY: Date: I:\ENG\PermitAppIications\pfi_appIication Effective 10/16/2017 City of Tigard a 13125 S\X'Hall Blvd. ° Tigard,Oregon 97223 ,v,, wtigard-or.gov • 503-715-2421 Page 1 of 4 APPLICANTS NOTE: Person specified as `Applicant" shall be designated "Permittee"and shall provide financial assurance for work,if required by the city=pursuant to TMC 15.041.140. With the exception of a utility()peratin(,pursuant to a valid franchise%Xnth the CIt\/of T gird,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in with wrtttcu authorization from the owner or an agent of the owner. The must sigli this application in the space provided or submit a written authcniration with this application. 1"ranchiscd Utilities are not required to obtain the owner's sigmature cm the application BY SIGNING BELOW,THE APPLICAN'T'(S) SHALL CERTIFY THAT: • The above request does not violate arw recorded deed restrictions that map be attached to or imposed upon the subject Ip opera. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in anp plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued, based on this application,may be rex oked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. �DigiFally signed by g., Knieger Jaison Krue er DNC=US.E=jkreeger@ wavedroatlband com,OU Ware g dose:2D18."1812.°64;.0 Jaison Krueger 7/18/2018 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date O-\wner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 S\ti/Hall Blvd. • Tigard, Oregon 97223 • %vyvwtigard-or.gov 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING ]FEESFORSTAFF USE ONLY Public Facility Improvement(PFI) Permit: DETAILEDSUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00ry �' P a K= FRANCIISECJI'ILI I'Y-AND SIDEWAI,I�/ ' PERMIT FEE DRIVEWAY AND yUTII ITY ' '(' CONNECTIONS ETC� ' Y Part 2: All non-Water s�TStem 1I71prOVe11ne1ntS I ' 4x J J (WOII�111 t11C,iigllt(7t U✓a�) .: Engineer's estimate,K 5% (less$300.00 submittal fee) ftm7s } ,1 x k . T 0 .l 3a 1=E'ngineer] X s estimate 2%Plan Review Sketch e s x< w - � (including`inforination�below)� WATER SYSTEM FEE �f nensons Part 3: All public Water system improvements t" w0` street < ame S,� Y x �: En rineeT'S estimate 12% 7 ❑,Slte �C1dreSS. y :, ,^ � �,.» +y. b PFI Permit Fee Exemptions: , ;a` s FULLSCALE:DEVELOPMENT There will be no permit fee charged,or assurance required a(�ul7divi5ic1114/Pa1r1t1on5 and Sttcct Trnp1o�cmuit�) �i for the following t�pes of work: a 4 iklli xY i� kip • Sidewalk repair(less than 20 lineal feet) �'° Design Plans� r • Relocate or replace mailbox • Ditch cleaning that does not involve regrading. t • Weep hole reP air ®�Cover—bite;�'ic duty, �bbievlation,�Legend` • Curb repair or replacement(less than 20 lineal feet) 3=' ❑ General ivotes{Clt�,`Fater,�e� eL,erc:) g' y • Lawn sprinkler system installation or repair ❑ street(Plan,rI'rofile) • Street tree pruning or planting ,❑ Water,,torm and nitary (Plain Profile) �� ❑ �Y'ater(�uaht `F is iltties • Planter strip landscape maintenance �- Test wells ❑ Gradin ❑ Landscaping/1 ree'Plan ❑ Compose Futility Plan(Flectrical it ,Phone,Gas, i f s 4toim:5anlrai�,Waiter �1gnage,,street Note: A cash assurance may be required per ;w TMC 15.04.140.(customer deposit) ❑ Details _� ❑ ;Traffic�iglzt Distance t` ❑ Signing and`Striping ' ❑ StrcerLighr;l'lan' acid Pho;torne.t>_ic { A ❑ Engineers sea sigiiatufie" Shcet:label(prolecr.l and use name revision and r plan log libel dates and sheet numbers)` Additional Submittals ;(per Laird Use:conditions). ❑ Traffic Report ❑ .Storm water Drainage Calculations Geotechnical Report El Preh ninar�,recess Report-(Sight Distance) ❑.Proposed Plat ❑ Path�vav Design(if applicable) ❑ Nater Departlnent:rlpproval ❑ Engineer's Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SSU Hall Bhrd. • Tigard,Oregon 97223 e ww,vtigard-or.gov • 503-718-2421 ° Page 3 of 4 SAMPLE SKETCH: wy", Edge of Pavement I Ditch '— Streetlight I ■—.�._.�.—.—.—.—r—.! nraLin e I FErr Twee A r a r, n � Ful T' Prolaos cf'SerTne®_ r lir rs �� 4kz.ur' ��MEkxistrng�:Hause��t -=I I Existing >1 ° Driveway �r a' �r��r S s 01 O 8 f ■ - I -m Lcri ? d ` YaFad�Sh; ■ ;° 0I • w fhy s;4 ■ e � �E�€Isting�Sh4pi �' • c e x • ¢�z fir^ �, � i Power-pole CD O ■ ` 75;pert L ne- A I • x='28 I Fire Hydrant(FH) I i � I . Scale: 'I"=30' I I I I � � I I � A I I I • a MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Propert-\T lines & dimension Slope of propertN.T Street &street name(s) Existing building, structures Utility- &street light poles Proposed Nvork Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/\\/' apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard ,1'l 25 S�%HallBlvd. • Tigard,Oregon 97223 • v wvv.tigard-or.gov • 503-718-2421 • Page 4 of 4 CONY OF T'IGARD RECEIPT 1 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 Project Name: Wave Plant Extension Site Address: Receipt Number: 418585 m 07/25/2018 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID PF12018-00187 PFI Permit Fee 100-0000-43114 $300.00 Total: $300.00 PAYMENT METHOD CHECK# CC RUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Check 215445 SCOPELAN 07/25/2018 $300.00 Payor: Wavedivision Holdings, LLC Total Payments: $300.00 Balance Due: $0.00 Page 1 of 1 WAVEDIVISION HOLDINGS,LLC 215445 REFERENCE INVOICE DATE DISCOUNT PAYMENT PF12028-00187 2018-07-23 0.00 300.00 100018273 Oregon State Treasury astound by wave 16290 SW U Boones Ferry Rd 401 KIR LAND HOLDINGS LLC 401 K AND, D 98033 ACE SUITE 500 KIRKLAND,WA 98033 Tigard , OR REV DESCRIPTION DATE BY 1 ORIGINAL ISSUE 07-18-18 JK 2 3 4 5 6 General Location Scope of Work Tit-�E <i . .�, ,. � � y � � ,�. , _- 1 - Overlash 271' of 48ct fiber along SW Durham Rd to SW Upper Boones Ferry Rd. ;::y� 2i7, t. f C 2 - Install 465' of new 48ct fiber and strand along SW Upper Boones Ferry Rd. iii' ' �f � It ,•_ _ ,+ I 1[.-`TAl3 - Bore 140' of 2" conduit and 48ct fiber leaving Upper Boones Ferry Rd and continuing 41� on private property, ending with a new 24'x36"x30" utility vault. Bon it J�_e. 4 - Add 750 of 48ct fiber using existing conduit path to customer communications room. - ,J i�;� I` { �, ^, 'r�__ry�.. Aerial Labor: 'f`� '� '� Q�• -'�`�` O I h 271' Underground Labor: �� 1 = -lir= L (l��l a�- �- ,� ? ver as , c ;r=:, { .' !! - Trench: 10 ..,_- ��. � —__-�,r� New Strand w/ Fiber: 465Manager ; ,fi - , Bore: 130 Construction =yam,' t(( 1 IF- iJ Splice tails: 100 Jeff McConville K i n c - ;.- ;GT;I _:_.c�� - a , _� l�_. �_� fit . .. f Storage: 100 -;—, •-!'�r ' Storage: 150 (1 loop) g , jmcconville@wavebroadband.com �, .� �'at,�` { } 8 ��i�t f ii{; �_ri,_cl' Demark footage: 850 (100 tail) 503-318-9804 Cii tY �' :t- Total Aerial Footage: 836' 4_ 1 Total footage: 1000' Existing Poles: 7 Permit Technician ,�`',;f y �,';� � .,: � g New Risers: 1 Jaison Krueger R�sevro�d � �";�? Astound Make Reddy Poles: 1 ger f + _6 iii , New Vaults: 1 3rd Party Make Ready Poles: 2 jkrueger@wavebroadband.com 503-383-5350 GG — ,I t , ;: ;�� i._., ;�*.'�. -- Fiberglass Arms: 2 ,. Anchors: 1 Vicinity Map Packet Description N /r Sheets s� Leave ROW- O j Remaining path on .+.,,,/� 1.1 Title Page private property r R " 1.2 Descriptions and Specifications 0' 40' 80' 120' 180' SCALE:1"=80' ,orf 2.1 - 2.2 Route Design 100018273: Oregon State Start 3.1 - 3.4 Traffic Control Plans Treasury � I jl•. CITY:Tigard f Washington TOWNSHIP 2S Range:1W Section:13 08 i40001 LLJ TITLE PAGE A End- 16290 SW Upper z Boones Ferry Rd AV IT 40000) PLOT DATE: SHEET: 06/22/2018 �.� so (ound y waue WAVEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 REV DESCRIPTION DATE BY 1 ORIGINAL ISSUE 07-18-18 JK 2 3 4 I 6 FCA243630-00006 GENERAL CONSTRUCTION FIBERGLASS / POLYMER CONCRETE I NOTES i I - - --ASSEMBLY - 2-- x 36"x 30°° 1 -ALL WORK AREAS TO BE (For actual dimensions see drawing) j RESTORED TO LIKE OR BETTER DESCRIPTIONS/SYMBOLOGY � CONDITION. Fiberglass/Polymer Concrete Assembly, r Straigth Sides, Floor, WUC 3.6, ® 2-ALL OTHER UTILITIES ARE ANSI/SCTE-715/20K," ; EXISTING AERIAL BASED OFF EXISTING LOCATES 3/8" Hex Bolts, Standard Nameplate t 24 1/4" OR UTILITY STRUCTURES. (BLANK) Installed 35 3/4" 1 EXISTING ANCHOR 3-IT IS THE CONSTRUCTION O OVERBUILD EXISTING CONTRACTORS RESPONSIBILITY LOA® RATINGS UNDERGROUND TO CALL FOR LOCATES PRIOR Incidental Traffic- Parking Lot, Sidewalk I OVERLASH EXISTING AERIAL TO DIGGING. Conforms to: •WUC 3.6 NEW AERIAL STRAND 4-ALL POLE ATTACHMENTS E •ASTM C 857O j AND UNDERGROUND WORK •ANSI/SCTE 77 NEW AERIAL FIBER OR COAX MUST COMPLY WITH NESC 1 STANDARDS AND LOCAL, STATE, NEW ANCHOR AND FEDERAL REGULATIONS AS ! FEATURES: j 37 7/8" APPLICABLE. • USDA/RUS Approved NEW UNDERGROUND • Drop-In nameplate 26 1/4 • Shipped assembled �� SLACK SPAN i • Skid resistant cover •Stainless steel bolts 30" •Cast-in floating nut box ( ® UTILITY POLE N -Integral drain holes UTILITY VAULT Additional product information I l OO AERIAL STORAGE continued on the reverse I J AERIAL SPLICE CASE ■ POSSIBLE TREE TRIM #ibAND SQUIRREL GUARD ne% � I 0' 40' 80' 120' 160' # Composites for Infrastructure SCALE:I"=80', i ! i 2626 Kansas Avenue ! Riverside,California 92507 100018273: Oregon State 951.787.0600 _ Inside Dimensions Treasury � 951.787.0632(fax) Length ---�---- Width f -- Depth info@newbasis.com 33 1/8' 221/2" I CITY.,Tigard 27 ! REV: A 1 COUNTY.,Washington rr TOWNSHIP.2S Range:IW Section:13 newbasis.com -2$ 1/16 1 16 1/2rr -------- DESCRIPTIONS AND SPECIFICATIONS PLOT DATE: SHEET.• 06/22/2018 1.2 astound by wave WAVEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 { REV DESCRIPTION DATE BY 0 ORIGINAL ISSUE 07-18-18 JK 1 2 3 O 4 5 Construction Notes O Trench 10'of 2"conduit and 48ct fiber southeast from pole 7321 starting in City of Tigard ROW and continuing onto tb private property. Minimum depth 36". Set Stop Sign- c Existing Utility Vault ' k a bore pit for next shot northeast. 2O Bore 130'of 2"conduit and 48ct fiber, 20' °s �� behind Upper Boones Ferry` rY Rd curb on private property.Minimum depth 36". Set a 24"x36"x30"utility vault 19'behind eC s Upper Boones Ferry Rd curb,in line with ° f a the existing utility vault at corner of o° parking lot and planter. Leave 100' ' 4 storage in vault ej ` Intercept existing conduit path to Building U� 16290 and add 750'of 48ct fiber with 100' jj7 tail for termination point in building communications room. Existing conduit to ° Building 16290 O� (approx. 750) N A. 2 _a Pole 7321 4 ��• _ 0' 10' 20 30' 40' - ;.• SCALE.I"=20 M 100018273: Oregon State } Treasury ° ; CITY.Tigard COUNTY:Washington TOWNSHIP.'2S Range:1 W Section:13 ROUTE DESIGN PLOT DATE: SHEET. 06/22/2018 2.2 as- tou by wave �f WAVEDIVISION HOLDINGS LLCD W v. - ,: _. _- � .• � -_-: 401 KIRKIAND PARKPLACE SUITE 500 KIRKLAN A 98033 '� f C '9'� REV DESCRIPTION DATE BY � - �e` ORIGINAL ISSUE 07-18-18 JK 1 ip, eS s + GjV "PI.��p r o� 0& osa •, 0<, ;6 > ;6 5 �° e�� Construction Notes `��`s VQC closure _ " T ° 1O Splice new 48ct fiber at existing enclosure SP-00749. Leave 100'tail in span. �: -t• & 0 5 - O2 Overlash 48ct fiber to existing facilities. Attach new 48ct fiber and 114"ehs strand. �� 6 O4 Leave 150'storage in span. Install 140'of 2"conduit and 48ct fiber betweenp ole 7321 and new utility vault. See Sheet 2.2 for additional details. a �`O 3 { ©Existing conduit path to communications - r' room,approximately 750'in length. # O00 �� Ct, CP 4 �� ° f°�° .9., ...__ 3 _ 1� Q• � °co eco ' p r 0 '� Q '9 5'� cO i�0 6 C4� P. C0 O C j r r A o - �0 30 u .. ° ,f , _ 6r o r0 dL o� 6 ,— C10 CW Orp dO��iP € 0 40' 80' 120' 160' ,O° TOA SCALE.1"=80' �.. '� '°� ,• t4 5 100018273: Oregon State IJ k",Y d� J !, �, � d "cam '' CITY:Tigard COUNTY:Washington Ae ! TOWNSHIP:2S Range:1W Section:13 era ° Communications Room _ . '- r ooh o Q� 16290 SW Upper Boones Ferry Rd �` -, ROUTE DESIGN nx w. Pp `� 10� k a y , _ r PLOT DATE: SHEET: 0612212018 2.1 go (ound by waue WAVEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 Page 64 2011 Edition 2011 Edition Page 6-0 REV DESCRIPTION DATE BY 0 ORIGINAL ISSUE 07-18-18 JK an, wo ar Vb "Twi, �T. 3pe atio.0- t on, .'W A" h 7 W 2 0" h4M b Roads 3 Use this detail for continuous slow-moving operations in the travel lane of 3 two-lane, 4 two-wayroad. It does not include a layout for every possible work situation,but 5 Construction Notes shows the minimum requirements for this type of operation. For Striping Operations,use this detail,then move on to the next detail-Striping on Work Vehicle Two-Lane,Two-Way Roads: Diagram 120—for additional information. wl TMA(Opdonao 4 1. Use truck mounted flashing warning lights on work and shadow vehicles. I t 2. For added visibility,truck-mounted arrow boards or PCMS incaution mode may be used. MW 3. A shadow vehicle should be used when: fes, WORK a. Sight distance is less than 750 feet;or, AHEAD 1). Dust created by the operation,fog or other low visibility conditions reduces z the sight distance to less than 500,feet;or, 1 ($gn optknW c. 'Speed is 45 mph or higher with the work vehicle operating within the lane- moil USINg 4. The shadow vehicle is optional when the traffic volume is-:400 ADT. SMdow 1d9) 5. When a shadow vehicle is used: ,a. Signs onwo*.vehicle are optional. b. The shadow vehicle may replace the advance warning signs. ,6. The shadow vehicle should: a. Adjust the space beteieen the work vehicle and each additional shadow _ Diftnoe A vehicle cle to maintain traveli ng distances found in Table 24. See TaNe 2.4 1). Slow down before vertical or horizontal curves that restrict sight distance- c. Maintain a position on the right side of the highway as far as practical. 7. If a shadow vehicle is not used: (OpMona a. Advance warning signs or PCIAS should be used. o 1). Signs may cover up to five miles and Should include the distance on the sign. N 8. When the work vehicle is traveling alone,a TIVIA should be considered. The initial vehicle,either work or shadow-vehicle.which will be exposed to traffic in the travel lane maybe equipped with an attenuator- ROAD 000000 9. Where practical and when needed,the work and shadow vehicles should pull over 00 130001313 periodically to allow motor vehicle traffic to pass. WORK OR 000000 AHEAD PCM8 10.Use ROAD WORK AE "ROAD MACHINERY(AHEAD)*-(W21-3)or other appropriate rear-mounted!signs with a minimum dimension of 36". If there are 61 40' io, 120, 1s0- limited 01limited opportunities to pass,the sign may be substituted with a combination SCALE:1°=80' • "YIELD"(R1-2)sign and"TO ONCOMING TRAFFIC(R1-2a}dder:or,a"DO ShadowVehide NOT PASS'(134-1)sign. w/TMA(bcb Opdoinao 100018273: Oregon State 11.A PC IVIS may be pl a ced at the beginning of the se cti on of road to warn traffic of Sm ChapWr 4 Treasury the work ahead- The sign should state the type of woreon panel one.and NEXT X MILES on panel two. The distance between the worlk and the PCIVIS should be I t CITY:Tigard limited to five miles or less. COUNTY.Washington TOWNSHIP:2S Range:1W Section:13 12,For unpaved roads,refer to the guidance given in Section 1.13 in Chapter 1 Chapters December 2011 December'2011 Chapter-5 TRAFFIC CONTROL PLAN PLOT DATE: SHEET. 0612212018 1 3.1 by wave WAVEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 Page K 2011 Edition 2011 EdifiGn Page 83 REV DESCRIPTION DATE BY 0 ORIGINAL ISSUE 07-18-18 JK 2 a 3 sing'i,, "Wo I Ag.ran _ ti v 1, rW3 n Mill ffi' IdO s!, 4 Diagram 310 covers shifting traffic.lanes on a Mo-lane, two-way roadway 5 around the work site with one lane partially or fully on the ShGU[der- RM Construction Notes 1. Use truck-mounted flashing warning lights on work and protection WORK AHM vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. �t. A 2. For added visibility, a truck-mounted arrow board PCMS in caution OP&W*V epee& mode may be used. • 40 mph w km 3. All travel lanes should have a minimum 10 toot lane width. IQ2 0 4. Shoulder shall be adequate in width and surfacing to carry traffic. min. 5. Two advance warning signs are required- 6. Place cones as stiovm. Cones along the far edge of travel lane, farthest from the work space, are optional and may be added to clearly mark the travel path. Sign Spacing and BUffer Lengths(feet) 3Postetl S6-6—cin MOW P PM18011M Vdd* A 20 50 GWMdMWMkW 0 0 wl MA ftM Opla* am 0011", Sm ChOpUff 4 25 1100 100 100 75 9 0 30 1010 35 350 350 31150 125 40 1510 45 180 • it N E-0 500 5,00 500 �5 25fl �� • � I# 61 410' 8 120' 700 SCALE:1 80' A 100018273: Oregon State Treasury CITY:Tigard WIM COUNTY,Washington AMM TOWNSHIP:2S Range:I W Section:13 Chapter 5 Decenil,--r 2011 December 2011 Chapter 5 TRAFFIC CONTROL PLAN PLOT DATE.- 0612-912018 1 SHEET.• 3.:2�j by wave WAVEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 Page 78 2011 Edition 2011 Edition Page 79 REV DESCRIPTION DATE BY 0 ORIGINAL ISSUE 07-18-18 A D 2 Werk � -f !NT "I'd 6 r 6 n-.,�Zh' k- 4 S 2 3 Diagram 210 covers stationary work with work or parked equipment on the 4 shoulder. This diagram does not cover work on a freeway shoulder. See Construction Notes Diagram 710 for Freeway Shoulder work. 1. Vehicles should be parked as far off the roadway as practical. 2. Use truck-mounted flashing warning lights on work and protection vehicles- See Section 4.3-Lights and Lighted Signs for exceptions. 3. For added visibility,truck-mounted arrow boards or PCMS in caution roode may be used. 4- Arrow panels in caution mode are recommended for work on roads with posted speeds of 45 mph or greater and high traffic volumes, greater than 2000 average daily traffic(ADT). 5. Requirements for signing and devices are sholun in Table 5-2,below. PaXecdon Vehicle (C"klngo n Ide wjTMA MoM W Table 5-2: Deviceand SosLnage Guldelines oxlrnllty� 6 r f s- 1a ave e N,I �v iy-, r Buft MoreIN 6�fiftii- 4-5 b, -4.�Les;sAnafi1f6, ard -Q- One advance warning sign is required and two signs are ke Advance warning W-"Sol "J' '-P-laceg, signs,devices, and recommended. • Mare"&,t flashing warning Cone taper is required. Cones 77 - lights are optional along the edge of traveled way N are{optional. Advance warning signs and devices are optional. A Sign Spacing and Buffer Lengths(feet) B WORK OR 61 4b' 8,0, 1�0, 160, Soe' - '- "` V VKM a 20 14 �,N 1-31-4-- 50 AHEAD AHMO SCALE I r'=80' 25 100 100 100 75 4 30 100 Initial Wamlng Sign 100018273: Oregon State 35 350 35G 3.50 125 Treasury 40 150 Use as appropilleft-we TaWe 5-2 45 180 CITY.Tigard COUNTY.,Washington 50 500 500 5,00 210 TOWNSHIP:2S Range:I W Section:13 55 1 1 250 Chapter5 Dectniber2011 December 2011 Chapter 5 TRAFFIC CONTROL PLAN PLOT DATE: 0612212018 77�7 3.3 Be (n)URd by wave WA VEDIVISION HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 Page 118 2011 Edition 2011 Edition Page 119 REV DESCRIPTION DATE BY 0 1 ORIGINAL ISSUE 07-18-18 JK L 2 20. a p-�Ine!i 1psuf "k a .1 cirlam, a9919; �Af* C 'u` ......."`610 M-1 td(o' - tW,- go. D' T 1 9 t1h'­F1`­"" 3 4 Diagram 620 covers%rork within an intersection when normal traffic control 5 must be interrupted. Iiiiii'Vork vehicles mayor may not be in the work space. Construction Notes 1. During flagging,traffic signals shall be turned off. Contact tile road jurisdiction for approval and assistance (seeChapter 3). WW 2. For multi-lane facilities,traffic approaching the intersection shall be C reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one Dagger for each approach. One Dagger mav cont,Tol two adjacent approaches if sight distance, law volumes on side roads,and flagger position allows for safe operation and clear direction A to motorists. For low traffic volume intersections(fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD",(VV204)sign is optional and should • < < ME be considered on high volume or high speed roads, or when extended queues may be expected- A B B C Sign Spacing and BLIffer Lengths(feet) 4M i® BAUff 6(,-r "Rd ,, ,�`" �V,-�- 04050611, a qw, 20 50 25 100 100 100 75 30 1 100 loot. 35 350 350 350 125 C B 13 A 40 1510 WM N 45 IN "OIL"M 1 <64 1 — 500 210 1% 5,0 500 500 a 55 1 250 A t B B IC A 0 410' 80' lk 160' B mow" SCALE:1 80' 4 t C 100018273: Oregon State *M Treasury CITY:Tigard COUNTY.,Washington TOWNSHIP:2S Range:1W Section:13 Ch apter 5 December 2011 December 2011 Chapterc., TRAFFIC CONTROL PLAN PLOT DATE: SHEET. 0612212018 3.