Permit (94) CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT
: s• COMMUNITY DEVELOPMENT Permit#: FPS2018-00046
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/06/2018
T t 4 Ix C� g Parcel: 1 S 135BA00100
Jurisdiction: Tigard
Site address: 10125 SW WASHINGTON SQUARE RD
Project: Jaguar/Land Rover Subdivision: None Lot: None
Project Description: Fire sprinkler supply line for a new car dealership building and service facility.
Contractor: VARIN CONSTRUCTION INC Owner: PPR SQUARE TOO LLC
PO BOX 1623 PO BOX 847
SHERWOOD, OR 97140 CARLSBAD, CA 92018
PHONE: 503-570-1192 PHONE:
FAX:
FEES
Description Date Amount
Specifics: Permit Fee-COM 08/06/2018 $831.87
12%State Surcharge-Building 08/06/2018 $99.82
Type of Use: COM Plan Review-Fire Life Safety-COM 08/06/2018 $332.75
Class of Work: NEW Type of Const: VA Info Process/Archiving-Lg$2.00(over 08/06/2018 $42.00
Occupancy Grp: M Height: ft 11x17)
Stories:
Commercial Sprinkler System:
Sprinkler Required: Sprinkler Type:
Standpipe Required: Yes Hazard:
Density: 0 Design Area: 0
K Factor: 0
Commercial Fire Alarm System:
Fire Alarm Required: Alarm Type:
Pull Station Required: Smoke Detectors Req:
Battery Calcs Provided: Cut Sheets Required:
Total $1,306.44
Valuations: Required Items and Reports(Conditions)
Sprinkler Valuation: $105,000.00
Residential Square Footage: 0
Fire Alarm Valuation: $0.00
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-009 You may obtain a copy of the rules
or direct questions to OUNC by c ' g 503.232.1987 or 1.800.332.2344.
Issued By: / ` Permittee Signature: t �_
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
City of Tigard: Fire Protection Permit Checklist
Page 2- Supplemental Information
Describe work to be done:
1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices:
® New system Number of sprinkler heads: Number of alarm devices:
❑ Addition or ❑ 1-10 heads: Affidavit required and ❑ 1-5 devices: Affidavit required and
Alteration (3) copies of sketch showing area (3) copies of sketch showing area
to existing of work within building structure of work within building structure
system
❑ 11+ heads: Plan review required and ❑ 6+ devices: Plan review required and
(3) sets of plans. (3) sets of plans.
Additional description of work: See above
Type of System (Complete A, B,C or D as applicable):
A.) Commercial Sprinkler
Sprinkler Type ❑ Wet ❑ Dry
Additional Standpipes
Information: Sprinkler Supply Line Yes ❑ No
Hazard Group
Density
Design Area
K. Factor
Sprinkler Project Valuation: $ /Jr)",
B.) Type I - Hood Fire Suppression System
Hood Project Valuation: $
C.) Fire Alarm
Submittal shall Battery Calculations ❑ Yes
include: Individual Component ❑ Yes
Cut Sheets
Fire Alarm Project Valuation: $
D.) Residential Sprinkler(Stand Alone System)
Square Footage: Permit Fee:
0 to 2,000 $198.75
2,001 to 3,600 $246.45
3,601 to 7,200 $310.05
7,201 and greater $404.39
Sprinkler Project Square Footage: sq. ft.
Fire Protection Permit Fees
Project valuation subtotal (see A,B & C above): $
Permit fee based on project valuation (see fee schedule): $
Permit fee based on square footage (see D above): $
State Surcharge (12% of permit fee): $
FLS Plan Review(40% of permit fee): $
TOTAL: $
P:\116139 Land Rover-Jaguar Washington Square\consultants\TM Rippey-Civil\2018025 Permit Applications\2018-4-25 FPS Permit Application Partially Complete.doc