Loading...
Report (60) zilFORTE ' JOB SUMMARY REPORT Job.4te • •• •• •• •• • •• • • • • • • •• •• • • • • • • • 01:Patio Structure - ; ; - Member Name Results Current Solution Comments Rafters Passed 1 Piece(s)2 x 12 Douglas Fir-Larch No.2 @ 24"OC Roof Beam Passed 1 Piece(s)5 1 2a (lf.3%2•4F-V4 a Giulio, ..• • Roof Lower Cantilevered Beam Passed 1 Piece(s)3 1/2:x 6:24!-\0•4 DF:Glulam•• •• •• Floor Beam Passed 1 Piece(s)3 1414(11 4/4"24F;V,pFnulam • • ••• Floor Joists Passed 1 Piece(s)2 x 12 Douglas Fir-Larch No.2 @ 16"OC 02:Front Deck Member Name Results Current Solutiefi• ••• • • •• •• Comments • - O Deck Beams Passed 1 Piece(s)4 x 10:iem-Fit,No.:2•• ••• •• • • 03:Existing Building Member Name Results Current Solution Comments New I-leader,East Side Passed 1 Piece(s)3 1/2"x 9"24F-V4 DF Glulam RECEWE SEP 9 2016 CflY Forte Software Operator Job Notes 9/15/2016 8.3905 AM Forte v5.0, Design Engine:V6 4.0.40 Job,4te (503)701 8213 Page 1 of 8