ELYVER ENGINEERING AND DESIGN
Ve 7950 SE 106th, Portland, Oregon 97266
Ph: 503.705.5283 Fax 503.482.7449 TroyL@Lyver-EAD.com www.Lyver-EAD.com
MEMO
TO: MR. MARK STEWART- DESIGNER
FROM: TROY D. LYVER, PE/SE " <r'" # � s .
SUBJECT: GREENSWARD LOT#15—SINGLE FAMILY HOME
TIGARD, OREGON 97224
LEAD PROJECT#18-177 t EGO
N #11111
DATE: JULY 24, 2018 ``-7..v9.a�'
°YD.LY'J- "
CC: GARY HENIN —H&H HOMES AND FILE
RENEWAL:DEC.31,20 1
The purpose of the memo is to address questions raised by the contractor and/or
inspector during the construction of the residence listed above.
Question 1: The shear wall adjacent to the stairs is to be a double-sided
shear wall, type F. The interior sheathing was not installed
before the stairs were installed. What is the solution?
ANSWER 1: The plywood may break at the location of the landing. 2x flat
blocking shall be installed above and below the location of
the stair landing ledger. The plywood shall be nailed off to
the blocking per the nailing schedule. The blocking shall be
nailed through to the lower blocking with 16d at 3" on center
across the full length of the wall. And, while the plan shows
the shear wall hatching on the garage wing wall side, the
wall is not required to be sheathed on this side. The wall is
just to be sheathed on the interior for the length of the
landing wall.
I trust the information provided is adequate for review and acceptance. If you
have any questions, please contact our office.
Thank you.