Plans (117) 'MSS i4Z — u.).7iLkILA
REVISION
r G p) c.-G c_
Bulletin MILBRANDT AR(HITE(TS
Bulletin#: MA-21 Date: 10-23-17 ATTACHMENTS: MA-21.1-MA21.3
Job Name: Polygon at River Terrace East(Area 3)-Plan 7A,Lot 206 Job No: 1503
Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.At Lot 206,the building
was placed too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original
drawings.A full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace
bumped into the living area on the attached bulletin page:MA-21.1-MA21.3 and any accompanying structural documents.
Distribution
Job Site Paul McColm
Client Chris Walther Angela Grajewski Nichole Thorpe
Struct.Eng. Arne Solomon
City of Tigard Tom Hochstatter
•
25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM
•
Ci
y
-j-,w UL APPROVID 36" WIDE FLUSH BEAM /' LAY=
FACTORY-BUILT DIRECT ABOVE)
.r
VENT GAS FIREPLACE 1 2'
6x6 POST
(' I W/ GWB FINISH Entry
52/
N
rn . II
1'� a Living 2x6 39" HIGH
l� I I WALL W/ FINISH10
4 TRIM AT TOP
SAFETY (---
AFETY
L._ GLAZING
? 1'-11 12" TILE ��
IL 1
00
} —� 20 o HEARTH m 1-6 I-10 1
M N A10 v '-03/4",I 2'-8/2" 4. 2�
I „1
N 1-
♦ \ ♦ ♦ _�
6 5,0 SH 2.-6,5-0.r 2 5-0 F 2,-6 57,09y/
3'-9/4" , 3'-0 k 3-0" k 3'-0" 3 ' Porc
16'-61/2 9'-53/2"
/--h
I
20
A11
Oil 9 D
10'-7y'
PLAN 7A FIRST FLOOR
1/4"=i'-0" (� ENGLISH REVIVAL
• l%1 LJJ 1
I
i I
1
I
_11
__ 13'a" x 2y2" LV_L____41 Imo- 3°,30,,,,,^ I , I FOOTING W/
—
18"x18"x10" FTG. 01 _.,_j (3) #4 EA. W'
W/ (2) #4 EW \
TYP. U.N.O. T-I ,1•::,,r. L____ 6x6 P.T. PO
I F- I1
L4_1 10 Allgli
13/4" x 9yz" LVL I SIM.S6.0 MrSIM.
—1"-_—__—__—__—__ ^ 2x4I PONY
7 i WALL
1
I 6,1
START FRMG. J I-11Y4." 7�I S6.0 SIM) 6
`n �I 1 I �1 S6.0 qS
31 " CON
\\_ •
.ST10 - �`-STHD14
S6.0 16'-61/2 "' i
9'-5)/2"
'N -� 7 I THICKENED
D1 I rSLAB EDG
d- *I--'1/4---- iKi-
00
% %---
a, %
ABU447 Io
TOP OF SLAB -61/2" 6'-0"
•
83/4
10'-73/2"
PLAN 7A FOUNDATION PLAN
1/4"=1'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 10-23-17 SCALE: 1/4" = 1'-0" PAGE:
PREPARED BY: Alexia Fukui REF. SHEETS: A3, A6 MA-21,1
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
RJ RJ
RJ RJ
I
,
11 /A10 11��/
2Iy rel►ol
ii��
tc
L▪J
20
All
PLAN 7A ROOF PLAN
1/4"=1.-0" ENGLISH REVIVAL
x U --r
toeJ 6X6 POST
I ix
j r —
2 I
9 I Il l
S9.0
GT ABOVE GT ABOVE "°,p
STHD14 STHD14 w
4x8 HDR 4x8 HDR 4x8 HDR 4x8 HDR N o
1 �N
S9.0 o a
cc
2P3 Q I
--
NEP
6x6 POST L ---- ---
W/ ACE4 m
law
LOWER LEVEL SHEARWALLS
PLAN 7A UPPER LEVEL FLOOR FRAMING
1/4"=1'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 10-23-17 SCALE: 1/4" = l'-0" PAGE:
PREPARED BY: Alexia Fukui REF. SHEETS: A7, A8 MA-21.2
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
Ak
A Ur
IMF
/ 12
7
11
.,TOP OF PLATE _—_—_— A10
FIBER—CEMENT LAP SIDING
5" EXPOSURE
=
Ca
} 1 2ND FIN. FLOOR_ ,\ —
\
IS
GARAGE _ 4�12 u
TOP PLATE + -) - _ _
M
— O \\`
I �i 20
All
1ST FIN. FLOOR
I
7
D7
PLAN 7A LIVING SIDE ELEVATION
1/8' I'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 10-23-17 SCALE: 1/8" = 1'-0" PAGE'
PREPARED BY: Alexia Fukui REF. SHEETS: A9 MA-213
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.