Loading...
Plans (117) 'MSS i4Z — u.).7iLkILA REVISION r G p) c.-G c_ Bulletin MILBRANDT AR(HITE(TS Bulletin#: MA-21 Date: 10-23-17 ATTACHMENTS: MA-21.1-MA21.3 Job Name: Polygon at River Terrace East(Area 3)-Plan 7A,Lot 206 Job No: 1503 Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.At Lot 206,the building was placed too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into the living area on the attached bulletin page:MA-21.1-MA21.3 and any accompanying structural documents. Distribution Job Site Paul McColm Client Chris Walther Angela Grajewski Nichole Thorpe Struct.Eng. Arne Solomon City of Tigard Tom Hochstatter • 25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM • Ci y -j-,w UL APPROVID 36" WIDE FLUSH BEAM /' LAY= FACTORY-BUILT DIRECT ABOVE) .r VENT GAS FIREPLACE 1 2' 6x6 POST (' I W/ GWB FINISH Entry 52/ N rn . II 1'� a Living 2x6 39" HIGH l� I I WALL W/ FINISH10 4 TRIM AT TOP SAFETY (--- AFETY L._ GLAZING ? 1'-11 12" TILE �� IL 1 00 } —� 20 o HEARTH m 1-6 I-10 1 M N A10 v '-03/4",I 2'-8/2" 4. 2� I „1 N 1- ♦ \ ♦ ♦ _� 6 5,0 SH 2.-6,5-0.r 2 5-0 F 2,-6 57,09y/ 3'-9/4" , 3'-0 k 3-0" k 3'-0" 3 ' Porc 16'-61/2 9'-53/2" /--h I 20 A11 Oil 9 D 10'-7y' PLAN 7A FIRST FLOOR 1/4"=i'-0" (� ENGLISH REVIVAL • l%1 LJJ 1 I i I 1 I _11 __ 13'a" x 2y2" LV_L____41 Imo- 3°,30,,,,,^ I , I FOOTING W/ — 18"x18"x10" FTG. 01 _.,_j (3) #4 EA. W' W/ (2) #4 EW \ TYP. U.N.O. T-I ,1•::,,r. L____ 6x6 P.T. PO I F- I1 L4_1 10 Allgli 13/4" x 9yz" LVL I SIM.S6.0 MrSIM. —1"-_—__—__—__—__ ^ 2x4I PONY 7 i WALL 1 I 6,1 START FRMG. J I-11Y4." 7�I S6.0 SIM) 6 `n �I 1 I �1 S6.0 qS 31 " CON \\_ • .ST10 - �`-STHD14 S6.0 16'-61/2 "' i 9'-5)/2" 'N -� 7 I THICKENED D1 I rSLAB EDG d- *I--'1/4---- iKi- 00 % %--- a, % ABU447 Io TOP OF SLAB -61/2" 6'-0" • 83/4 10'-73/2" PLAN 7A FOUNDATION PLAN 1/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 10-23-17 SCALE: 1/4" = 1'-0" PAGE: PREPARED BY: Alexia Fukui REF. SHEETS: A3, A6 MA-21,1 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. RJ RJ RJ RJ I , 11 /A10 11��/ 2Iy rel►ol ii�� tc L▪J 20 All PLAN 7A ROOF PLAN 1/4"=1.-0" ENGLISH REVIVAL x U --r toeJ 6X6 POST I ix j r — 2 I 9 I Il l S9.0 GT ABOVE GT ABOVE "°,p STHD14 STHD14 w 4x8 HDR 4x8 HDR 4x8 HDR 4x8 HDR N o 1 �N S9.0 o a cc 2P3 Q I -- NEP 6x6 POST L ---- --- W/ ACE4 m law LOWER LEVEL SHEARWALLS PLAN 7A UPPER LEVEL FLOOR FRAMING 1/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 10-23-17 SCALE: 1/4" = l'-0" PAGE: PREPARED BY: Alexia Fukui REF. SHEETS: A7, A8 MA-21.2 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. Ak A Ur IMF / 12 7 11 .,TOP OF PLATE _—_—_— A10 FIBER—CEMENT LAP SIDING 5" EXPOSURE = Ca } 1 2ND FIN. FLOOR_ ,\ — \ IS GARAGE _ 4�12 u TOP PLATE + -) - _ _ M — O \\` I �i 20 All 1ST FIN. FLOOR I 7 D7 PLAN 7A LIVING SIDE ELEVATION 1/8' I'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 10-23-17 SCALE: 1/8" = 1'-0" PAGE' PREPARED BY: Alexia Fukui REF. SHEETS: A9 MA-213 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.