Loading...
Permit TBUG PERMIT �' COCIMYMUNITYOFTIGARD DEVELOPMENT mit#: BUP2018-00089 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 DatePerIssued:ILDIN07/19/2018 T t[;A IL 1) g Parcel: 2S114AA00100 Jurisdiction: Tigard Site address: 9000 SW DURHAM RD Project: Tigard High School Subdivision: None Lot: None Project Description: Foundation only for modernization project:foundation for new classrooms,commons,kitchen,auxiliary gym,locker rooms,and weight room. Contractor: LCG PENCE CONSTRUCTION LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT 2720 SW CORBETT AVENUE 6960 SW SANDBURG ST PORTLAND, OR 97201 TIGARD, OR 97223 PHONE: 503-252-3802 PHONE: FAX: 503-256-3684 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-COM-New Construction 07/19/2018 $17,566.10 Occupancy Grp: E Occupancy Load: 0 12%State Surcharge-Building 07/19/2018 $2,107.93 Dwelling Units: 0 Plan Review 03/29/2018 $11,417.97 DC Provision Review,COM New-Bldg 07/19/2018 $180.50 Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 07/19/2018 $48.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $3,831,004 Info Process/Archiving-Sm$0.50(up to 07/19/2018 $300.00 11x17) Metro Const.Excise Tax 07/19/2018 $4,597.20 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $36,217.70 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Foundation Only 2 Special Inspection(see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 o11.800.332.2344. Issued By: Permittee Signature: _Ad� Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Agnes Lindor From: Agnes Lindor Sent: Wednesday, June 6, 2018 2:19 PM To: Deepa Bharatkumar Cc: #Building Permit Technicians;Jonny Gish;Agnes Lindor; Matthew Lewis; Kevin Brady Subject: BU P2018-00089 Attachments: 6-6-18 HS Conditions.pdf; RE: THS Land Use Compliance to Cs of A Good afternoon- Yourpermit8UPZU18'00U89isonhn|d. There are pending planning and engineering conditions(See attached report). I have also attached a previous email pertaining to the planning conditions.Thanks, Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Enoai|: AgnesL@0dAard'or.guv DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If nequested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Low. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules -City General Records Retention Schedule." 1 Cu, /d - O o O/y ROGERS v6e7-77Of.,/ 0// 4-7 ENGINEERING Structural Engineering•Building Design•Code Consulting■Inspection Services 558 S.E.Jackson St. Roseburg,Oregon 97470 Ph: (541)672-0315 Fax: (541)672-1787 rogerst(h),ros en et.n et June 18,2018 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Tigard High School Modernization Rogers Engineering has completed a structural plan review of the submittal for the Tigard High School Modernization, building underground phase on behalf of the City of Tigard. Rogers Engineering recommends approval of the associated construction documents. Following are documents reviewed for this phase. Drawings as identified on sheet G0.01 prepared by Basset Architecture, dated March 28,2018 Project manual by Basset Architects dated March 28, 2018. Structural drawings by Catena Consulting Engineers dated March 3,2018 Structural calculations by Catena Consulting Engineers dated March 22, 2018 Supplemental structural calculations by Catena Engineers dated June 4,2018 Revised drawings dated June 4,2018: S2.11, S2,12, S2.41, S2.42, S2.51, S3.02, S5.01,and 85.06 (revised). Supplemental calculations dated 6/13/18—Moment frame strip footing Supplemental calculations dated 6/14/18—Retaining wall—5/S5.06 Revised drawings dated June 15,2018: S5.01 and S5.06 Should you have questions or need additional information, contact me at your convenience. Respectfully Submitted, r1f� Tom Rogers, .E.,CBO City of Tigard 711 I COMMUNITY DEVELOPMENT DEPARTMENT 1 c�n u l) Building Permit Review — Commercial - With Land Use Building Permit #: ii,) a-- ut0; Site Address: I WO SW D1,1nnuryl 2 Suite/Bldg#: Project Name: Tl r� 410,Schon I (Name f commercial Bess occupying the space. If vacant,enter Spec Space.) Planning Review l,� Proposal: f lcc 11 1fi Sci coI f2efDUG lo�/1 �k1 '- OV1 1 Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes No l Land Use Case#: PDR -D11 - r)000 3 'Plans Match Approved Land Use: ,_,knee 'mss s'hvw aw! ii uv. tx✓P1pin J ZrSite Plan EiLandscape Plan ❑ Other: 11 WA Ct2., 4. / Urban Forestry Plan qiElevation Plan 1Building Height: Maximum Height Actual Height Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: 14 Yes ❑ No,applicant notified to obtain business license 0, Public Facilities Improvement(PFI)Permit: Required: tELYes,applicant was notified 0 No Applied For: 0. Yes ❑ No,stop intake Notes: Do h t Sae . Cv+i .3( S hD+ (rune,+. Approved by Planning: Date: 312- 1 IB Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3p,�/3 Site Plans: # Building Plans: # Building Permit#: nter building permit#above. Workflow Routing: 0-nning eering ®- P rrmit Coordinator EL4itlllding Workflow Sign-off: ' -off for Planning(include notes from planning review) Route Application Documents: ler'Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: _� By Permit Technician: y Date: '_"_ ' I:\Building\Forms\BldgPemiitRvw_COM_WithLandUse 060116.docx En�;ineerir�g Review o giS_lope at building pad: 2. 4, PFI Permit#: p /020/r- 00075— ❑ conditions "Met"prior to issuance of building permit ®/Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP)N/i4 ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: 2/Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Do A1UT 1SSt(E ct n riL_ Pf t 2'sscf•��'�C— Approved by Engineering: Date: 6,‘h- -7 _ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review °Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: �� ig /--- Date: (o l le f 1 0 Notes: C rh(A Ino1 . rnn nD+ tsS,-421. NDhh-ruat a.ppLect. Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A Tigard Trans SDC: ❑ Yes 0 N/A Parks SDC: 0 Yes ❑ N/A to Issue Permit rIC Approved by Permit Coordinator: 4Date: -712 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ " Transmittal Letter r r ci n E.n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: a DATE RECEIVED: DEPT: BUILDING DIVISION RErmED FROM: 1A` L�� � J U L 1 7 2018 COMPANY• _jET--‘l 1 V CITY Of- TIG ARD BUILDING DIVISION PHONE: .03 -224- 6\\e,2 By: ( RE: (A000 5vJ K.\- ?-0) - 00 0%G\ , (Site Address) (Permit Number) 30 fa (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: \,, ' Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): 1 REMARKS: EVE WO 1 `� 1 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑No Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit(per PE): ❑Yes ❑No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc