Permit TBUG PERMIT
�' COCIMYMUNITYOFTIGARD DEVELOPMENT mit#: BUP2018-00089
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 DatePerIssued:ILDIN07/19/2018
T t[;A IL 1) g Parcel: 2S114AA00100
Jurisdiction: Tigard
Site address: 9000 SW DURHAM RD
Project: Tigard High School Subdivision: None Lot: None
Project Description: Foundation only for modernization project:foundation for new classrooms,commons,kitchen,auxiliary gym,locker
rooms,and weight room.
Contractor: LCG PENCE CONSTRUCTION LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT
2720 SW CORBETT AVENUE 6960 SW SANDBURG ST
PORTLAND, OR 97201 TIGARD, OR 97223
PHONE: 503-252-3802 PHONE:
FAX: 503-256-3684
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Permit Fee-COM-New Construction 07/19/2018 $17,566.10
Occupancy Grp: E Occupancy Load: 0 12%State Surcharge-Building 07/19/2018 $2,107.93
Dwelling Units: 0 Plan Review 03/29/2018 $11,417.97
DC Provision Review,COM New-Bldg 07/19/2018 $180.50
Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 07/19/2018 $48.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $3,831,004 Info Process/Archiving-Sm$0.50(up to 07/19/2018 $300.00
11x17)
Metro Const.Excise Tax 07/19/2018 $4,597.20
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $36,217.70
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet: 1 Foundation Only
2 Special Inspection(see plans)
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 o11.800.332.2344.
Issued By: Permittee Signature: _Ad�
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Agnes Lindor
From: Agnes Lindor
Sent: Wednesday, June 6, 2018 2:19 PM
To: Deepa Bharatkumar
Cc: #Building Permit Technicians;Jonny Gish;Agnes Lindor; Matthew Lewis; Kevin Brady
Subject: BU P2018-00089
Attachments: 6-6-18 HS Conditions.pdf; RE: THS Land Use Compliance to Cs of A
Good afternoon-
Yourpermit8UPZU18'00U89isonhn|d. There are pending planning and engineering conditions(See attached report). I
have also attached a previous email pertaining to the planning conditions.Thanks,
Agnes Lindor I Associate Planner
City of Tigard I Community Development
13125 SW Hall Boulevard
Tigard, Oregon 97223
Phone: 503.718.2429
Enoai|: AgnesL@0dAard'or.guv
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If nequested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Low. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules -City General Records Retention Schedule."
1
Cu, /d - O o O/y
ROGERS v6e7-77Of.,/ 0// 4-7
ENGINEERING
Structural Engineering•Building Design•Code Consulting■Inspection Services
558 S.E.Jackson St.
Roseburg,Oregon 97470
Ph: (541)672-0315
Fax: (541)672-1787
rogerst(h),ros en et.n et
June 18,2018
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Mark VanDomelen
Building Official
Rogers Engineering: Structural Review
Project: Tigard High School Modernization
Rogers Engineering has completed a structural plan review of the submittal for the Tigard High
School Modernization, building underground phase on behalf of the City of Tigard. Rogers
Engineering recommends approval of the associated construction documents.
Following are documents reviewed for this phase.
Drawings as identified on sheet G0.01 prepared by Basset Architecture, dated March 28,2018
Project manual by Basset Architects dated March 28, 2018.
Structural drawings by Catena Consulting Engineers dated March 3,2018
Structural calculations by Catena Consulting Engineers dated March 22, 2018
Supplemental structural calculations by Catena Engineers dated June 4,2018
Revised drawings dated June 4,2018: S2.11, S2,12, S2.41, S2.42, S2.51, S3.02, S5.01,and
85.06 (revised).
Supplemental calculations dated 6/13/18—Moment frame strip footing
Supplemental calculations dated 6/14/18—Retaining wall—5/S5.06
Revised drawings dated June 15,2018: S5.01 and S5.06
Should you have questions or need additional information, contact me at your convenience.
Respectfully Submitted,
r1f�
Tom Rogers, .E.,CBO
City of Tigard
711 I COMMUNITY DEVELOPMENT DEPARTMENT
1 c�n u l) Building Permit Review — Commercial - With Land Use
Building Permit #: ii,) a-- ut0;
Site Address: I WO SW D1,1nnuryl 2 Suite/Bldg#:
Project Name: Tl r� 410,Schon I
(Name f commercial Bess occupying the space. If vacant,enter Spec Space.)
Planning Review l,�
Proposal: f lcc 11 1fi Sci coI f2efDUG lo�/1 �k1 '- OV1 1
Verify site address/suite# exists and active in permit system.
River Terrace Neighborhood: ❑ Yes No
l Land Use Case#: PDR -D11 - r)000 3
'Plans Match Approved Land Use: ,_,knee 'mss s'hvw
aw! ii uv. tx✓P1pin J
ZrSite Plan EiLandscape Plan ❑ Other: 11 WA Ct2., 4. /
Urban Forestry Plan qiElevation Plan
1Building Height: Maximum Height Actual Height
Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance
Business License:
Exists: 14 Yes ❑ No,applicant notified to obtain business license
0, Public Facilities Improvement(PFI)Permit:
Required: tELYes,applicant was notified 0 No Applied For: 0. Yes ❑ No,stop intake
Notes: Do h t Sae . Cv+i .3( S hD+ (rune,+.
Approved by Planning: Date: 312- 1 IB
Revisions (after Building Submittal only)
Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 3p,�/3
Site Plans: #
Building Plans: #
Building Permit#: nter building permit#above.
Workflow Routing: 0-nning eering ®- P rrmit Coordinator EL4itlllding
Workflow Sign-off: ' -off for Planning(include notes from planning review)
Route Application Documents: ler'Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: _�
By Permit Technician: y Date: '_"_ '
I:\Building\Forms\BldgPemiitRvw_COM_WithLandUse 060116.docx
En�;ineerir�g Review o
giS_lope at building pad: 2. 4,
PFI Permit#: p /020/r- 00075—
❑ conditions "Met"prior to issuance of building permit
®/Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP)N/i4
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: 2/Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes: Do A1UT 1SSt(E ct n riL_ Pf t 2'sscf•��'�C—
Approved by Engineering: Date: 6,‘h-
-7 _
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
°Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: �� ig /--- Date: (o l le f 1 0
Notes: C rh(A Ino1 . rnn nD+ tsS,-421. NDhh-ruat a.ppLect.
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A
Tigard Trans SDC: ❑ Yes 0 N/A
Parks SDC: 0 Yes ❑ N/A
to Issue Permit
rIC
Approved by Permit Coordinator: 4Date: -712
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
_ " Transmittal Letter
r r ci n E.n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: a DATE RECEIVED:
DEPT: BUILDING DIVISION
RErmED
FROM: 1A` L�� � J U L 1 7 2018
COMPANY• _jET--‘l 1 V CITY Of- TIG
ARD BUILDING DIVISION
PHONE: .03 -224- 6\\e,2 By: (
RE: (A000 5vJ K.\- ?-0) - 00 0%G\ ,
(Site Address) (Permit Number)
30 fa
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
\,, ' Additional set(s) of plans. Revisions:
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain): 1
REMARKS: EVE WO 1 `� 1
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Initials:
Fees Due: ❑ Yes ❑No Fee Description: Amount Due:
$
$
$
$
Special
Instructions:
Reprint Permit(per PE): ❑Yes ❑No ❑ Done
Applicant Notified: Date: Initials: