Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (183)
CITY OF TIGARD BUILDING PERMIT 1111 •' COMMUNITY DEVELOPMENT Permit#: BUP2018-00165 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/19/2018 T I� �l+ Dg Parcel: 1S135DA00100 Jurisdiction: Tigard Site address: 11070 SW HALL BLVD Project: Summit View Crossing Subdivision: METZGER ACRE TRACTS Lot: 9 Project Description: Demolition of(1)1,990 sq.ft.house on sewer,(1)615 sq.ft.accessory structure,and(1)646 sq.ft.accessory structure in preparation for a new subdivision development. UPON FINAL INSPECTION,DEMO CREDITS FOR SDC FEES MAY APPLY. Contractor: D&T EXCAVATION INC Owner: PECK,WALTER D&ELIZABETH M PO BOX 3767 PO BOX 23789 WILSONVILLE, OR 97070 PORTLAND, OR 97223 PHONE: 503-263-2607 PHONE: FAX: 503-263-2648 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 07/18/2018 $377.90 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development 07/18/2018 $80.70 Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 07/18/2018 $0.50 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Value: $20,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $459.10 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Ersn Cntrl 503-639-4175 Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-s.1-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: % /— Permittee Signature: t �, i(LL w�II U� -i► `.i N�.. - r Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ` Building Permit Application Residential BELE t,ola<iiltc l t \l (IN 1.v City of Tigard MAY ?0�8 freemen �/ . I \ C Q0.: ;�P 1 ,11 ai ' 13125 SW Hall Blvd.,Tigard,OR 97223 _I Mu Review Other Der r Phone: 503.718.2439 Fax: 503.598.19-Ty c)F i U GAR D I Date/By: a j 2 for Internet: wwwxigard or75.govB J I LD I NG D iV I*I a ''400ti5 ethoJulied: I Sappier tal l■farmation TYPE OF WfDRK REQUIRED DATA:1-&ND2-FAMILY DWELLING Q New construction 0 Demolition Permit fees*are based on the value of the work performed. Q Addition/alteration/replacement 0 Other: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ° CATEGORY OF CONSTRUCTION - work indicated on this application. Q I-and 2-family dwelling 0 Commercial/industrial , Valuation: S 2 (, ,.trC~a 0 Accessory building Q Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: iTotal number of floors: '-` JOB SYTE INFORMATION A143)LOCATIOPt Iob site address: 11070 SW Hall Blvd I New dwelling area: square feet City/State/ZIP: Tigard,OR 97223 Garage/carport area: square feet Suite/bldg.lapt.no.: Project name: Summit View Crossing i Covered porch area: square feet Cross street/directions to job site: I Deck area: square feet East side of SW Hall Blvd,north of SW Pfaffle Street,and south of SW Spruce Street Other structure area: square feet RE•QUIREDDATA:CO RCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 151350A00100 1 Indicate the value(rounded to the nearest dollar)of all I equipment,materials,labor,overhead,and the profit for the 1. DESCRIPTION OF WORK • .. • work indicated on this application. Demolish homes/structures/trees on site in preparation of subdivision development. Valuation. $ lop See attached plans Existing building area: square feet i New building area: square feet ca PROPERTY OWNER In TENANT • Number of stories: Name: Ettro Capital Management,Peter Ettro Type of construction: Address: 340 Oswego Pointe Drive,Ste 208 Occupy groups: City/State/ZlP: Lake Oswego,OR 97034 I Existing: Phone:( 503) 866-9681 Fax:( ) S New: , , ® APPLICANT ® CONTACT PERSON BUILDING PERMt!`FEES' ' (Plane"der to frig witedel Business name: Ettro Capital Management (t Structural plan review fee(or deposit): Contact name: Brianna Perdue i Address: 340 Oswego Pointe Drive,Ste 208 FLS plan review fee(if applicable): Total fees due upon application , City/State/7AP: Lake Oswego,OR 97034 s 3 Phone:( 503 ) 871-5227 Fax::( ) i Amount received: E-mail: ettrtocapital.com PHOTOVOLTAIC SOLAR PANEL SYSTEM yam* CONTI ICT'OR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: D&T Excavation Submit two(2)sets of roof plan with connection details I and fire department access,along with the 2010 Oregon Address: PO Box 3767 ' Solar Installation Specialty Code checklist. City/State/ZIP: Wilsonville,OR 97070 Permit Fee(includes plan review i $180.00 Phone:( 503)612-9284 ( ) and administrative fees}: t I Fax: State surcharge(12%of } permit fee): $21.60 CCB lie.: 151668 1 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a perm&is not obtained _ within 180 days after It has been accepted as complete. Print name: Peter Ettro Date: 0—L��` ,,, tt *Fee methodology set by Tri Comity Building Industry 2� i Service Board. 1:1Buildmg1Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Branden Taggart From: Jill Bentley Sent: Tuesday, July 17, 2018 4:41 PM To: Branden Taggart Subject: RE: Summit View Crossing Demo Permits Branden, Both addresses are getting billed for sewer though neither owner/customer has paid their bill since January 2013. Kind Regards, Jill Jun 1,11N„, ** City of Tigard-Utility Billing Senior Accounting Asst 1OA (888)826-1211 Payments (503)718-2460 UB Main jilibd Fgar -or gov (503)718-2494 13125 SW Hall Blvd, Tigard,OR 97223 From: Branden Taggart Sent: Monday,July 16, 2018 7:34 AM To:Jill Bentley<JILLB@tigard-or.gov> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Summit View Crossing Demo Permits Jill, I was wondering if the following addresses are being billed for sewer: 11070 SW Hall Blvd 11120 SW Hall Blvd Thanks, Branden Taggart City of Tigard : �1 roi Senior Permit Technician Community Development 'MAR n p1; 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent tigard-or,gov 1 Agnes Lindor From: Monica Bilodeau Sent: Wednesday,June 6, 2018 7:47 AM To: 'brianna@ettrocapital.com' Cc: Agnes Lindor Subject: Summit View Subdivision Demo Permits Attachments: SUB2017-00004.pdf Hello, I have building permits BUP2018-00165 and BUP2018-00169 for demolition on hold due to an outstanding tree protection fencing condition. Condition one states that "Prior to commencing any site work,the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the Urban Forestry Plan, and send written verification with a signature of approval directly to the project planner within one week of the site inspection." Please send us a letter from the arborist once the tree protection fencing has been installed in accordance with the urban forestry manual. I have also attached a copy of the condition report for your reference. Thanks, Monica Bilodeau Associate Planner City of Tigard I COMMUNITY DEVELOPMENT 13125 SW Hall Boulevard Tigard, Oregon 97223 www.tigard-or.gov Phone I 503.718.2427 Email I MonicaB(a)tigard-or.gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law, E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 1 Dianna Howse From: Agnes Lindor Sent: Wednesday,June 6, 2018 7:59 AM To: #Building Permit Technicians Subject: FW: Summit View Subdivision Demo Permits Attachments: SU B2017-00004.pdf These two permits are on hold until conditions are met.Thanks, Agnes From: Monica Bilodeau Sent:Wednesday,June 6, 2018 7:47 AM To: 'brianna@ettrocapital.com' <brianna@ettrocapital.com> Cc:Agnes Lindor<agnesl@tigard-or.gov> Subject:Summit View Subdivision Demo Permits Hello, I have building permits BUP2018-00165 and BUP2018-00169 for demolition on hold due to an outstanding tree protection fencing condition. Condition one states that"Prior to commencing any site work,the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the Urban Forestry Plan, and send written verification with a signature of approval directly to the project planner within one week of the site inspection." Please send us a letter from the arborist once the tree protection fencing has been installed in accordance with the urban forestry manual. I have also attached a copy of the condition report for your reference. Thanks, Monica Bilodeau Associate Planner City of Tigard I COMMUNITY DEVELOPMENT 13125 SW Hall Boulevard Tigard,Oregon 97223 www.tigard-or.gov Phone I 503.718.2427 Email I MonicaB@tigard-or.gov DISCLAIMER: E--mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule,:' 1 City of Tigard 1111 p COMMUNITY DEVELOPMENT DEPARTMENT 0 T 1 c A R D Building Permit Review — Residential Building Permit #: gi,,PA-y i F._cc) i 6— Site Address: 110-7-0 cL/ lixij 1r,(1. Project Name: S,i th Ali. V i SA tl i,/,',(7G,\. Lot #: (New dwelling=subdivision name;Addition or Alteration=last name of owner) Planning Review ni Proposal: )e.-P-10 �c ke,�,� c�nr��v✓'q�`�`rti;� ON 5�,�. �h w��,r,,-„ -rr, AS-.�ti� .�(� ����tnt k-kk S. ti'. �erify site address/suite#exists and activin permit system. L' River Terrace Neighborhood: L'� No ❑ Yes,See River Terrace Review Addendum Attached Sit lan Elements: ee(3) copies of site plan [ Existing structures on site to plan must be on 8-1/2”x 11"or 11 x 17"paper l, 00tprint of new structure(including decks)with finished yawn to scale(standard architect or engineer scale) floor elevations Orth arrow !1 ity locations&easements(required for new and additions) F;Site address,project or subdivision name and lot number OSidewalk/driveway approach plicant information(name and phone number) cl.OLocation of wells/septic systems LLyL7 dimensions and building setback dimensions Li 1• ;lusting trees to be retained with drip line,and tree [ quare footage of buildings to be demolished protection measures --Otos area,building coverage area,percentage of coverage and pr.AStet tree size,type and location impervious area(applicable if R-7,R-12,R-25&R-40) []'Street names ,�__// Property corner elevations(2 foot contour lines if more than >1,000 sf of impervious area created or replaced? ❑Yes E�N�o ff 4 of differential) If yes,is a storm water quality facility shown? ❑Yes LPNo L1 Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): _ Pe t �Required: �(i Yes,applicant was notified I=1 No Received: E Yes [1 ' No E Public Facilities mprovement (PFI) Permit: l `� /Required: Yes,applicant was notified I=1 No Applied For: Yes ID No,stop intake L and Use Case#: Std 8 2O 17—od od d1 L PF l r 1-c,;L-19p E Zoning: (.17—. Required Setbacks: Front Rear Side Street Side Garage F2' Landscape Requirement: El Lot Coverage Maximum: kav Building Height: Maximum Height Actual Height tr isual Clearance T�ensitive Lands: Yes ❑ No Type t ,9.,;�"t., L� rban Forestry Plan Li,/ Lid' Conditions "Met"prior to issuance of building permit Notes: Approved By Planning: i -a,i i ° v q,,-- Date: S-Z'1-1 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved El Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw RES_061417.docx Building Permit Submittal Original Submittal Date: 5/36/1 Site Plans: # Building Plans: � ' Building Permit#: n er building permitabove. Workflow Routing: M � anning I�Engineering ermit Coordinator ❑ Building Workflow Sign-off: le"-§11.p_, off for Planning(include notes from planning review) Route Application Documents: 4�Engineering: (1) copy of permit application, (1) site plan, (1) building plan and o4inal plan review routing form. Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. il Notes: ,� D -7 , By Permit Technician: Date: 5 30 ftp Engineering Review ,,Slope at building pad: ,/(ifl e1 31onditions "Met"prior to issuance of building LEr'igsements (encroachments)per engineering conditions of approval and plat © Water Quality/Quantity Facility: /V/- Assess Water Quality Fee in-lieu: ❑ Yes CI No Assess Water Quantity Fee in lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes CI No Final Plat Recorded: Ai/A. 111 NOT Approved by Engineering: Date: VNotes: "g i/ Approved by Engineering: %� Date: 6-/G/Ar Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved 1 Revision 2: ❑ Approved ID Not Approved Revision 3: CI Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit R Approved,NOT Released: ity-it 1°f i ,/ Date: Notes: \j 1 AA. `1 pc ,,,.c, (oL l hS 1(201, r C FL (I a I[l Ai Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: .SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes M N/A Tigard Trans SDC: ❑ Yes 'I N/A Parks SDC: ❑ Yes .1 N/A LIDA ❑ Yes le N/A 0 OK to Issue Permit Approved by Permit Coordinator: -ki*OANVDo Date: 1 ( V f + Cg, I:\Building\Forms\BldgPermitRvw_RES_010118.docx