Loading...
Permit CITY OF TIGARD BUILDING PERMIT 1111-i • COMMUNITY DEVELOPMENT Permit#: BUP2018-00169 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/19/2018 TIGARD g Parcel: 1 S 135DA00200 Jurisdiction: Tigard Site address: 11120 SW HALL BLVD Project: Summit View Crossing Subdivision: METZGER ACRE TRACTS Lot: PTS 9& Project Description: Demolition of(1)1,350 sq.ft.house on sewer,(1)345 sq.ft.accessory structure,and(1)881 sq.ft.accessory structure in preparation for a new subdivision development. UPON FINAL INSPECTION,DEMO CREDITS FOR SDC FEES MAY APPLY. Contractor: D&T EXCAVATION INC Owner: PECK, CHRISTOPHER D& PO BOX 3767 PECK RHONDA L WILSONVILLE,OR 97070 11120 SW HALL BLVD TIGARD, OR 97223 PHONE: 503-263-2607 PHONE: FAX: 503-263-2648 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 07/18/2018 $377.90 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development 07/18/2018 $80.70 Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 07/18/2018 $0.50 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Value: $20,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $459.10 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: a, " A.,✓/ Permittee Signature: // ,�y B e3 �r 1 •L1 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Residential 6 iV 1,w All i tt I s wi rt�1 w City of Tigard �dY` ' Penne 13125 SW Hall Blvd.,Tigard,OR 97223JN 3r 1 �� � ") (,:� Phone: 503.718.2439 Fax 503.598.1960 MAY 2 L O Plan Review / Other Penne: w 503.639.4175Insswetion Line: �� CITY C liGAHD Not it, , { s�appleSeemeataii�af�eaastua BUILDING DIVISION' `' ' TYPE OF WORK i REQUIRED DATA 1-AND 2-Y'AMII Y DWELLING Q Demolition 0 New construction i Permit fees*are based on the value of the work performed. i Indicate the value(rounded to the nearest dollar)of all 0 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 0 1-and 2-family dwelling 0 Commercial/industrial i Valuation: S7"..%1 l'�)L 0 Accessory building 0 Multi-family I! Number of bedrooms: ❑Master builder 0 Other: J Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11120 SW Hall Blvd New dwelling area: square feet City/State/ZIP: Tigard,OR 97223 Garage/carport area: square feet. Suite/bldg./apt.no.: Project name: Summit View Crossing Covered porch area: square feet Cross street/directions to job site: Deck area: square feet East side of SW Hai!Blvd,north of SW Pfeifle Street,and south of SW Spruce Street Other structure area: square feet ' REQUIRED DATA.COMMERCIAL-USE C'SEC.KLISI Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 1 S 135t?A00 ,00 IIndicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demolish homes/structures/trees on in preparation of subdivision development. Valuation $ See attached plansExisting building area: square feet i New building area: square feet Ed PROPERTY OWNER Ei TEN AN' Number of stories: Name: Euro Capital Management,Peter Ettro Type of construction: Address: 340 Oswego Pointe Drive,Ste 208 Occupancy groom: City/State/ZIP: Lake Oswego,OR 97034 Existing: I Phone:( 503 ) 866-9681 Fax:( ) New: i - Qj APPIJCANT 0 ' iii CONTACT PERSON MAIMING PERMIT FEES* , ;; fee Business name: Ettro Capita!Management ftp" a' Structural plan review fee(or deposit): Contact name: Brianna Perdue FLS plan review fee(if applicable): I Address: 340 Oswego Pointe Drive,Ste 208 Total fees due upon application: { City/State/ZIP: Lake Oswego,OR 97034 Phone: i Amount received: ( 503) 871-5227 I Fax::( ) E-mail: briannaGettrucapital.com P'IIOIOVOLLAIC SOLAR PANEL SYSIEMFEES" Commercial and residential prescriptive installation of CONTRACTOR . roof-top mounted Photo Voltaic Solar Panel System. jBusiness name: D&T Excavation Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon $ Address: PO Box 3767 i Solar Installation Specialty Code checklist { City/State/ZIP: Wilsonville,OR 97070 Permit Fee(includes pian review i $180.00 ? and administrative fees): Phone:( 503)612-9284 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 151668 Total fee due upon application: $207.60 Authorized xi:. This permit application expires If a permit is not obtained within 180 day,after It has been accepted as complete. Print name: Peter Ettro Date: Z *Fee methodology set by Tri-County Building Industry .� Service Board 1:1Bui1dingiPermits'BUP-RESPermitApp.doc 02/24/2011 440.4613T(1 I/02/COM/WEB) Branden Taggart From: Jill Bentley Sent: Tuesday, July 17, 2018 4:41 PM To: Branden Taggart Subject: RE: Summit View Crossing Demo Permits Branden, Both addresses are getting billed for sewer though neither owner/customer has paid their bill since January 2013. Kind Regards, Jill Jill City of Tigard-Utility Billing Senior Accounting Asst 'uu W88)826-7211 Pay=ments (503)718-2460 UB Main j . rid-or-gov 1543)718-2494 13125 SW Hall Blvd, Tigard,OR 97223 From: Branden Taggart Sent: Monday,July 16, 2018 7:34 AM To:Jill Bentley<JILLB@tigard-or.gov> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject:Summit View Crossing Demo Permits Jill, I was wondering if the following addresses are being billed for sewer: 11070 SW Hall Blvd 11120 SW Hall Blvd Thanks, Branden Taggart w City of Tigard s ■ Senior Permit Technician 1Y Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 bra nderitz4,tigard-o r,gov 1 Agnes Lindor From: Monica Bilodeau Sent: Wednesday, June 6, 2018 7:47 AM To: 'brianna@ettrocapital.com' Cc: Agnes Lindor Subject: Summit View Subdivision Demo Permits Attachments: SUB2017-00004.pdf Hello, I have building permits BUP2018-00165 and BUP2018-00169 for demolition on hold due to an outstanding tree protection fencing condition. Condition one states that "Prior to commencing any site work, the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the Urban Forestry Plan, and send written verification with a signature of approval directly to the project planner within one week of the site inspection." Please send us a letter from the arborist once the tree protection fencing has been installed in accordance with the urban forestry manual. I have also attached a copy of the condition report for your reference. Thanks, Monica Bilodeau Associate Planner City of Tigard I COMMUNITY DEVELOPMENT 13125 SW Hall Boulevard Tigard, Oregon 97223 www.tigard-or.gov Phone 503.718.2427 Email MonicaB@tigard-or.gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 1 City of Tigard IIIa COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A R D Building Permit Review — Residential Building Permit #: e4', /f Ci i ' Site Address: 1142 ° .,„,, (vii 1 vd. Project Name: Svrv-k;F \J',t4, C1—lit' Lot #: (New dwelling=subdivision name;Addition or Alteration=last name of owner) Planning Review Proposal: o t eNt)/S rut(i�S/rtes c. s;) t',, rye, 11n v S,,,bJ1'vi'ii ' e evt.(orrtn1. �z� of IJ riaq Xerify site address/suite# exists and actio"ipermit system. ll4 River Terrace Neighborhood: LJ No ❑ Yes,See River Terrace Review Addendum Attached Sit lan Elements: ee(3)copies of site plan L1 Existing structures on site e plan must be on 8 1/2"x 11"or 11 x 17"paper ootprint of new structure(including decks)with finished • awn to scale(standard architect or engineer scale) floor elevations i Worth arrow 1i . 'ty locations&easements(required for new and additions) gilS).teaddress,project or subdivision name and lot number MI Sidewalk/driveway approach UX" pplicant information(name and phone number) ation of wells/septic systems � WO pdimensions and building setback dimensions " xisting trees to be retained with drip line,and tree Kr quare footage of buildings to be demolished protection measures y 1IC .ot area,building coverage area,percentage of coverage and Itr et tree size,type and location impervious area(applicable if R-7,R-12,R-25&R-40) IM,Srtreet names 'roperty corner elevations(2 foot contour lines if more than >1,000 sf of impervious area created or replaced? LI Yes 0 N 4 foot differential) If es,is a storm water .uali facility shown? ❑ es No FA Clean Water Services—Service Provider Letter (lot platted prior to 9/10/1995): J quired: Yes,applicant was notified ❑ No Received: ❑ Yes Nom �ct LIQ Public Facilities,�,�Improvement(PFI) Permit: V y2 ' =quired: LIQ'Yes,applicant was notified I -7❑ No Applied For: LTJ Yes ❑ No,stop intake L� i7 0/Land SU(2, L 6(10'1 frI2d11—o 2M LTJ Zoning: k-12- (1.4 -1Z Required Setbacks: Front Rear Side Street Side Garage (4 Landscape Requirement: [d*Lot Coverage Maximum: 0/0 14 Building Height: Maximum Height Actual Height Visual Clearance � � [IV [ ,Sensitive Lands: Ed/Yes ❑ No Type G c,t1 S xj,n; t 41.) Art„,. (,,,, [' rban Forestry Plan Conditions "Met"prior to issuance of building permit Notes: Pr-Approved By Planning: .2„./ („,,�,t. Date: S- Lt-i r Revisions (after Building Submittal only) / Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw RES_061417.docx Building Permit Submittal Original Submittal Date: 5-frill r Site Plans: # BuildingPlans: # f✓ 4 `^ , Building Permit#: ZLX,rrter building permit#� above. Workflow Routing: ,,.._ /arming {LYEngtneering L_ e.:Mit Coordinator ❑ Building Workflow Sign-off: i=1. -off for Planning(include notes from planning review) 1 Route Application Documents: L��Engineering: (1) copy of permit application, (1) site plan, (1) building plan and ori al plan review routing form. uilding: original permit application, site plans,building plans,engineer and 3 beam calculations and trust details,if applicable,etc. t. Notes: A'‘.14) dj / By Permit Technician: tY7 9--- Date: 374374 En 'neering Review b 1 ope at building pad: /1 �onditions "Met"prior to issuance of building permit asements (encroachments) per engineering conditions of approval and plat Ir Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ Final Plat Recorded: *IA ❑ NOT Approved by Engineering: Date: Notes: LJ' Approved by Engineering: d ' �W Date: 6/40( Revisions (after Building Submittal . ly) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved ` Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review cb 4,. Conditions "Met"prior to issuance of building permit Yom- Approved,NOT Released: A I v I/1 Lo IA pDate: Notes: W 0 11) !M'M'- C GC/ profr vv io � 1�s.I 61 lie -ye G(.Gt-ed —) 110 �'-- Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 'N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes 2 /A LIDA ❑ Yes U N/A .OK to Issue Permit Approved by Permit Coordinator: Date: 1 `�O\0,'L I:\Building\Fonns\BldgPennitRvw_RES_010118.docx