Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (13)
M EC2017 - 00588 1111 GENERAL NOTES LEGEND _ AIR HANDLER UNIT SEQUENCE OF OPERATION r • SYMBOL&ABBREVIATION DESCRIPTION L- THIS SECTION DESCRIBES THE1. THEN I ES MANNER THE AIR CONDITIONING SYSTEM SHALL OPERATE TO MAINTAIN SETPOINT INSTALLATION SHALL COMPLY WITH THE FOLLOWING CODES ANY AND/OR SA/SUP SUPPLY AIR(RISE/DROP) - TEMPERATURE INSIDE THE CONDITIONED SPACE. UNIT CONTROLLER SHALL BE ABLE TO CONTROL COOLING AND ALL REQUIREMENTS OF THE LEGALLY CONSTITUTED AUTHORITIES HAVING p, N rT RETURN AIR DUCT(RISE/DROP) L �l -- HEATING INSIDE THE UNIT IN ORDER TO MAINTAIN THE OCCUPIED/UNOCCUPIED, COOLING/HEATING SET POINTS JURISDICTION. _ AS INDICATED ON PLANS. OPERATING SCHEDULES AS PER TENANT BASED ON BUSINESS HOURS. T,N( EA/EXH EXHAUST AIR DUCT(RISE/DROP) 2. CONSTRUCTION TO CONFORM: �., ._� _. .. .... r _.... .._ .._ _ _. _ OCCUPIED: CEILING DIFFUSER/SUPPLY REGISTER _ _ -2014 OREGON STRUCTURAL SPECIALTY CODE ( >] -- CD/SR (ARROWHEAD REPRESENTS NUMBER OF THROW) - SUPPLY FAN ON. -SUPPLY FAN SHALL BE ON ALL TIMES DURING OCCUPIED MODE.THE OUTDOOR AND RETURN -- _ -�-- -- AIR DAMPERS ARE OPENED. -2014 OREGON FIRE CODE (4 WAY TYPICAL IF NO ARROWS) _ = _ _ - -2014 OREGON MECHANICAL SPECIALTY CODE - - - __ _ - _ COOLING MODE -2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE --+- RR/RG RETURN REGISTER/GRILLE -- _- - AS SPACE TEMPERATURE RISES ABOVE TEMPERATURE SET POINT AS SENSED BY ROOM THERMOSTAT, THE 3 ® --r-- ER/EG EXHAUST REGISTER/GRILLE - - ___ PROV D - E ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR CONTROLLER SHALL ACTIVATE THE COMPRESSOR TO MAINTAIN ROOM TEMPERATURE. "` REQUIRED TO INSTALL COMPLETE AN OPERABLE MECHANICAL SYSTEMS AS RECTANGULAR DUCT ELBOW WITH TURNING VANES -T - S L. _T INDICATED ON THE DRAWINGS. = __._ HEATING MODE FC FLEXIBLE CONNECTION == _ AS SPACE TEMPERATURE DROPS BELOW TEMPERATURE SET POINT AS SENSED BY THE ROOM THERMOSTAT, 4. UNLESS OTHERWISE SHOWN LOCATE ALL ROOM THERMOSTATS 40 ABOVE - MVD MANUAL VOLUME DAMPER.--.. -.._-, . .:x..,.. .... ._.._.,_ - . - THE CONTROLLER SHALL ACTIVATE THE HEATING SYSTEM TO MAINTAIN SPACE TEMPERATURE FINISH FLOOR. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE - _,.. ...._ _ ..._ ._._,..._..___.._._.______...._.�..._ .___._._.._LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON FD R UNOCCUPIED: LOCATION. I (L) DUCT LINING(1"THICKUNLESSOTHERWISE NOTED) SUPPLY FAN OFF.-THE OUTSIDE AIR DAMPER IS CLOSED AND RETURN AIR DAMPER IS FULL OPEN. _.5. ALL INDICATED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE .. ... SINGLE LINE DUCT BRANCH TAKE-OFF = -=-- ____ PURPOSES - COOLING MODE _ _ _w ONLY. BEFORE PROCEEDING WITH THE WORK,THIS CONTRACTOR - DUCT TRANSITION(RECTANGULAR TO ROUND) _ COOLING SYSTEM IS OFF. SHALL CAREFULLY CHECK AND VERIFY ALL DIMENSIONS, SIZES, REQUIRED - ~ ~ w~~~~ - _ - CLEARANCES,AND SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF = = FLEX FLEXIBLE DUCT - HEATING MODE ALL EQUIPMENT AND MATERIALS HEREIN REQUIRED TO OTHER PARTS OF THE T T STAT PROGRAMMABLE THERMOSTAT m WHEN SPACE TEMPERATURE DROPS BELOW NIGHT SETBACK SET POINT, THE UNIT WILL BE ACTIVATED INTO WORK AND TO THE WORK OF OTHER TRADES. �-.-...--�-- --.- �--"--"-.__ HEATING MODE AND RUN UNTIL SET POINT IS ACHIEVED.AT THIS TIME THE UNIT WILL SHUT BACK OFF. T - 6, CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING .. SD SD DUCT SMOKE DETECTOR s_ - _ MORNING WARM-UP CYCLE: OUT HIS WORK AND EQUIPMENT OR SPECIALTIES REQUIRING READING, SUPPLY FAN ON.-THE OUTSIDE AIR DAMPER IS CLOSED AND RETURN AIR DAMPER IS FULL OPEN. HEATING IS ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE © FD FIRE DAMPER ACTIVATED. UNIT IS TO RUN IN THIS MODE UNTIL RETURN AIR TEMPERATURE OF 68°F IS SATISFIED. SYSTEM WILL CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED 960 Atlantic Ave. THEN SWITCH TO OCCUPIED MODE BUILDING. T FSD COMBINATION FIRE/SMOKE DAMPER _._ ..w..... _..___... Alameda, CA 94501 Q ZD ...ZONE DAMPER 510 . 58663 OCCUPIED SET POINTS: 7, DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH COOLING: 74°F, HEATING: 68°F CHAPTER 6 OF THE IMC,2012 EDITION AND SMACNA, 2005 EDITION. -CD C� ,CONDENSATE DRAIN mbh CrrEIVEDX X X DEMOLITION UNOCCUPIED SET POINTS: 8. ALL BRACING OF DUCTS AND PIPING SHALL INSTALLED IN ACCORDANCE WITH - - COOLING: 85°F, HEATING: 55°F "SMACNA"GUIDELINES AS FOR SEISMIC RESTRAINTS OF MECHANICAL AND DIA DIAMETER_•.._ ..w_. __ .__ .. A�G 7 201 PLUMBING SYSTEMS.WHERE BRACING DETAILS ARE NOT SHOWN ON -DL DL DOOR LOUVER CITYOFTIIg, D DRAWINGS OR" IN THE GUIDELINES,THE FIELD INSTALLATION SHALL BE TO THE - APPROVAL OF THE ARCHITECT AND THE STRUCTURAL ENGINEER. UC ......UC DOOR UNDERCUT(3/4"MINIMUM) _ BUILDING Dwyer, FURNISHED AND INSTALLED BY MECHANICALk31o P�'OFF 9. ALL FRESH AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10'-0"FROM ANY �::a Acyrs �� `sS,. CONTRACTOR. NGINEREQUIRED OUTSIDE AIR VENTILATION RATES (ASHRAE 62.1-2007) SANITARY VENT, EXHAUST FAN DISCHARGE AND FLUE OF OTHER FURNACES. _ ._. w _._..__ ._____ .w _ _ _.._ . .. . ____.. __._:.. w� 86687PER '24. WHEN NECESSARY EXTEND VENT OR PROVIDE ADDITIONAL FRESH AIR INTAKE /� FURNISHED AND INSTALLED BY ELECTRICAL 4 r Tesla-Washington Square Mall,Portland. OR DUCTWORK AS DIRECTED BY THE ENGINEER. �e`_„J CONTRACTOR ENGINEERING CODE Occupant CODE FURNISHED BY MECHANICAL CONTRACTOR AND 3371 Olcott Street Re NET AREA PEOPLE Vbz Ez Vdz Vpz Vpsd Vou Zd Xs Ev Vat Vot 1p, ME CA 950541 REO'D Density READ WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS,THE FIELD INSTALLED BY ELECTRICAL CONTRACTOR Santa Clara, �, OREGON ,1, INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL _•.__.____._... .. ..._ . _.......__.... _._._ ph:(408)522-5255 -T 0\ Outdoor Outdoor Y 0$ 2 OCCUPANCY intake flow per intake flow ENGINEER. POINT OF CONNECTION fx:(408)522-5260 fy , ZONE &AREA CATEGORY AREA OUTDOOR BASED ON #` Per ASHRAE OUTDOOR BASED ON - --Total OA Zone air System Uncorrected OA fraction System System ASHRAE design •-. ►..__._.._.__. ._ _ ._...._,....__. info@acies.net 7�SON 4LF' J' y y y g 11. THE CONTRACTOR SHALL COORDINATE HIS WORK 1MTH ALL TRADES AT THE SD-1 - (SD-SUPPLY DIFFUSER RD-RETURN DIFFUSER E-EXHAUST) Copyright 02017 Air Rate Ra Floor area People Standard Air Rate Rp people Required by distribution Supply Supply primary outdoor air required average ventilation Standard (CFM) � � � CFM/SF CFM 62.1-2007 CFM/Person CFM code(CFM) effectiveness (CFM) (CFM) airflow intake of minimum outdoor efficiency 62,1-2007 SITE.ANY COST TO INSTALL WORK TO ACCOMPLISH SAID COORDINATION 100 - AIR QUANTITY IN CFM EXPIRATION DATE: 12/31/18 Az Ra Pz Rp {CFM} zone airflow air fraction WHICH DIFFERS FROM THE WORK AS SHOWN ON THE PLANS SHALL BE Showroom Retail 2523 0.12 303 + 16 6 7.5, 120 :_: - 423 0.8 3200 3200 3200 423 0.133 0.133 1 423 - 550 INCURRED BY THE CONTRACTOR.ANY DISCREPANCIES,AMBIGUITIES OR CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AC + MECHANICAL EQUIPMENT DESIGNATION -. AHU-1 Subtotal 2523 303 + 16 120 = 423 0.8 3200 3200 3200 423 0.133 0.133 1 423 550 DURING BID TIME FOR CLARIFICATION.ANY SUCH CONFLICTS NOT CLARIFIED 1 DESIGNATED NUMBER Owners Lounge Retail 186 0.12 22 + 2 107. 15 _ 37 0.8 300 300 300 38 0.125 0.127 1.002 38 60 PRIOR TO BID SHALL BE SUBJECT TO THE INTERPRETATION OF THE ARCHITECT - _-__... ... . ,._......__. ._•._..______._ _.. .. .._._.. _..,...._.._. .:-...W.._........_....-.......w_~_�...._ .m.........-....._ ...•..w_ ._._._.M... ._:..._.._ Office Office Space 324 0.06 = -19 + - 7 20 0.� 35 = 54 0.8 900 900 : 900 55 0.061 0.062 1.001 55 80 AT NO ADDITIONAL COST TO THE OWNER. Restrooms Office Space 93 0.06 6 + 1 5 5.0 5 = 11 0.8 100 100 100 11 0.106 0.11 1.004 11 20 A/C AC' AIR CONDITIONING WASHINGTON AHU-2 Subtotal 603 47 + 10 55 = 102 0.8 1300 1300 1300 104 0.125. 0.08 0.955 109 150 12. AFTER ALL REQUIREMENTS OF THE SPECIFICATIONS AND/OR THE DRAWINGS BD(7` BACK DRAFT DAMPER SQUARE MALL HAVE BEEN FULLY COMPLETED, REPRESENTATIVES OF THE OWNER WILL BOD BOTTOM OF DUCT p INSPECT THE WORK.THE CONTRACTOR SHALL PROVIDE COMPETENT 9585 SW WASHINGTON PERSONNEL TO DEMONSTRATE THE OPERATION OF ANY ITEM OR SYSTEM,TO CLG. CEILING THE FULL SATISFACTION OF EACH REPRESENTATIVE. FINAL ACCEPTANCE OF w.... CONN. _ CONNECT/CONNECTION-- SQUAREµ pµ SUARE ROAD THE WORK WILL BE MADE BY THE OWNER AFTER RECEIPT OF APPROVAL AND RECOMMENDATION OF ACCEPTANCE FROM EACH REPRESENTATIVE. CONT. CONTINUATION SPACE #T05 13. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DO ALL CORING, SAW CONT'R CONTRACTOR TIGARD, OR 97223 CUTTING, PATCHING AND REFINISHING OF EXISTING WALLS AND SURFACES CFM CUBIC FEET PER MINUTE WHEREVER IT IS NECESSARY FOR HIM TO PENETRATE FOR HIS WORK.ALL .-..,..._...__._M._.-,_.._...._.__,m_._.,._.____ ,.............__ ___ ......._... . .._....... .........._.._. .,w......w...._...............__. . .,...0*. OPENING SHALL BE SEALED TO MEET THE FIRE RATING OF THE PARTICULARDEL DETAIL WALL, FLOOR OR CEILING PENETRATED. DISC. DISCONNECT 14. WHEREVER A DISCREPANCY IN QUANTITY OR SIZE OF MECHANICAL EQUIPMENT EF EXHAUST FAN ISSUE / REVISION w....__.._ ......,.-._..- T____._.._ _..__.....__.,._ MATERIAL ARISES ON THE DRAWINGS AND/OR SPECIFICATIONS,THE (E) EXISTING 05.19.17 SD ISSUE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL --• ---•--- - - _-~ MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED E.S.P. EXTERNAL STATIC PRESSURE 06.23.17 75%CD ISSUE ON DRAWINGS AND/OR IN THE SPECIFICATION TO ENSURE COMPLETE AND OPERABLE SYSTEMS AS REQUIRED BY THE OWNER AND ENGINEER. FD FIRE DAMPER 07.31.17 PERMIT ISSUE GA. GAGE/GAUGE 15. PENETRATION OF PIPES.CONDUITS, ETC., IN WALLS REQUIRING PROTECTED --..-_µ._..... .__.._... . __:.._.._w....... .r. _... __._., . _ ...~......._.___ _...._.w OPENING SHALL BE FIRE STOPPED. FIRE STOP MATERIAL SHALL BE A U.L. GC GENERAL CONTRACTOR TESTED AND APPROVED ASSEMBLY APPROVED BY THE STATE FIRE MARSHALL. QAC HEATING,VENTILATING,AND AIR CONDITIONING 16. INSTALLATION INSTRUCTIONS FOR ALL LISTED EQUIPMENT SHALL BE MADE MCA MINIMUM CIRCUIT AMPACITY ' AVAILABLE TO THE BUILDING INSPECTOR AT THE TIME OF INSPECTION. _ MFR. _ MANUFACTURER cay Or TIGA 17. PROVIDE MANUAL BALANCE DAMPERS AT EVERY DUCT BRANCH WHETHER MECH. MECHAN 1E ED OR CODE CUl1 C :� �ti , SHOWN OR NOT. MOCPMAXIMUIdIIREIt OTECTION ("i1 1 � 18. ALL WIRING SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR COORDINATE QT, _ (N) NEW . FOR PROVISION OF INFORMATION AND ANY DEVICES TO ELECTRICAL .__._ _ ,_... _ r-• x7ar--•.._* CONTRACTOR. OA/OSA OUTSID4 19. PROVIDE SMOKE DETECTORS AND AUTOMATIC SHUTOFF FOR HVAC UNITS OR OBD OPPOSE AI s -. COMBINATION THEREOF SUPPLYING AIR IN EXCESS OF 2000 CFM.WHERE FIRE ` ' DETECTION OR ALARM SYSTEMS ARE PROVIDED FOR THE BUILDING,THE _.^ ~_,• _,_PH.._. _•, , PHASE D . SIL.Al&. Data-ii'' DRAWING TITLE SMOKE DETECTORS SHALL BE SUPERVISED BY SUCH SYSTEMS AND SHALL (R) RELOCATE r ACTIVATE THE FIRE ALARM SYSTEMS.COORDINATE DUCT DETECTORS AND - , ___,.......__...__.__ ... . ...• __., . _ .._.__. ..._.w _. ;,. _ a..... _....,_,. AUTO SHUT OFF WITH THE FIRE ALARM SYSTEM, IF APPLICABLES/S STAINLESS STEEL 20. AIR CONDITIONING EQUIPMENT SHALL BE LABELED AS TO THE SPACE IT SENS. SENSIBLE SERVES. TEMPERATURE SENSORS SHALL BE LABELED AS TO UNITS AND/OR TEMP TEMPERATURE OFFICE COPY ZONES CONTROLLED. - TYP. TYPICAL __ MECHANICAL GENERAL UON UNLESS OTHERWISE NOTED NOTES, & SYMBOLS UTR UP THRU ROOF DRAWING SCHEDULE V VOLTS SHEET DESCRIPTION M100 MECHANICAL GENERAL NOTES&SYMBOLS DESIGN CONDITIONS M101 MECHANICAL NOTES&SCHEDULES SCALE: N.T.S. M200 MECHANICAL FLOOR PLAN BASED ON LOCATION AND ASHRAE HANDBOOK.PORTLAND,OREGON PROJECT NUMBER: 51909 M300 MECHANICAL SPECIFICATIONS OUTSIDE:A. SUMMER: DB:91.8°F,WB:70.5°F M400 COMCHECK COMPLIANCE FORMS-ENVELOPE B. WINTER: 16.9°F SHEET NUMBER M401 COMCHECK COMPLIANCE FORMS-MECHANICAL INSIDE: C. SUMMER: 74°F(MAXIMUM)50%RH. B. WINTER 68°F M402 COMCHECK COMPLIANCE FORMS-MECHANICAL M500 MECHANICAL DETAILS M 1 0 0 M501 MECHANICAL DETAILS DUCT HEATER SCHEDULE AIR HANDLER UNIT SCHEDULE __ I ► EQUIP. MANUFACTURER& INSIDE DUCT ELECTRICAL SUPPLY FAN COOLING COIUSYSTEM ELECTRICAL - T_ _-T-__ TAG MODEL SERVICE kW DIMENSIONS SERVICE STAGE REMARKS - - (V/ph/Hz) _ _AR _ MARK MANUFACTURE MODEL SERVED SUPPLY DESIGN TOTAL SENSIBLE ENTER LEAVING HEATING ELECTRICAL MAX. WEIGHT(lbs) REMARKS -_ _ - OUTSIDE COOLING COOLING WATER WATER MCA = =-_ (R)DH-1 INDECCO QUA (R)AHU-1 18 26"x18" 208/3/60 2 1,2 AIR AIR HP CAPACITY CAPACITY TEMP, TEMP. GPM SERVICE (A) FUSE - _ _ -__ (cfm) (cfm) (MBH) (MBH) (°F) (°F) (v/ph/Hz) SIZE _ _ DH-2 INDECCO QUA AHU-2 4 14"x14" 208/3160 2 1,2 _ _.-. _ _- - _- ____- -_ EXISTING4_, __ _- _ (R)AHU-1 CARRIERS 39LAO6KA-AD-ALEAA7 SHOWROOM 3200 550 3 85.67 64.33 44 56 12.2 18kW DUCT 208/3/60 - - 625 1-6 4 - _- 1. INTERLOCKED WITH AIR HANDLER HEATING MODE. HEATER - 2. INSTALL PER MANUFACTURE RECOMMENDATION. OFFICE, EXTERNAL AHU-2 CARRIERS 42BHEO8BD4L60808DE BATHROOM& 800 150 3/4 22.36 17.74 44 56 3.7 4kW DUCT 208/3/60 3.3 FLA 15 250 3,5-9 - _- - _ LOUNGE HEATER -- - _.-- - ---_ - NOTES: 7. RETURN AIR&OUTSIDE AIR MIXING BOX 1. RELOCATE EXISTING AIR HANDLER UNIT. 8. NEW AIR HANDLER UNIT SUSPEND FROM STRUCTURE. PROVIDE 2. PERFORM MAINTENANCE CHECKLIST. VIBRATION ISOLATORS. -- - -__ 3. PROVIDE NEW 2"MERV 8 FILTER. 9. LOW AMBIENT CONTROL TO 0°F. - --iii 4. RE-USE EXISTING VIBRATION ISOLATORS FOR SUSPENDED _ ---- -- MOUNTING. __ 5. PROVIDE MOTORIZED DAMPER FOR MIXING BOX. -- 6. PROVIDE FLEXIBLE CONNECTIONin . _ __-_-_-H _ ___ - DUCTLESS SPLIT SYSTEM - AIR CONDITIONING UNIT SCHEDULE 960 Atlantic Ave. Alameda, CA 94501 MANUFACTURER: MITSUBISHI -HYPE SUPPLY FAN COOLING ELECTRICAL WEIGHT(Ibs) 510 865 8663 SECTION mbharch.com NOMINAL MARK AREA CAPACITY TOTAL SENSIBLE REMARKS SERVED SUPPLY ELECTRICAL MAX. INDOOR UNIT OUTDOOR UNIT INDOOR OUTDOOR (TONS) AIR FLA COOLING COOLING SEER SERVICE MCA FUSE INDOOR OUTDOOR UNIT UNIT (cfm) (A) CAPACITY CAPACITY (v/ph/Hz) (A) SIZE UNIT UNIT (MBH) (MBH) IT/ELECT. WALL c�FtttGNR�FF`rs'/pFC 1/CU-1 PKA-A24KA6 PUY-A24NHA6 ROOMMOUNT FAN CONDENSER 2.0 775 0.36 24.0 18.0 17.0 208-230/1/60 18 30 46 163 1-11 AC1ES � E,Q y COIL 4w 86687PE 9! NOTES: 6. COOLING ONLY UNIT 337ENG1NEERING Olcott Street 04,„ 1. R-41OA REFRIGERANT. 7. PROVIDE WITH MINI CONDENSATE PUMP ACCESSORY. Santa Clara,CA 95054 OREGON �, 2. SINGLE POINT POWER CONNECTION TO OUTDOOR UNIT. INDOOR 8. PROVIDE VIBRATION ISOLATORS FOR OUTDOOR UNIT-3/4"THICK ph:(408)522-5255 UNIT POWERED BY OUTDOOR UNIT. RUBBER IN SHEAR. fx:(408)522-5260 , ' 08, 201 3. OUTDOOR DISCONNECT BY ELECTRICAL. 9. FACTORY PROVIDED WIRED,WALL MOUNTED THERMOSTAT. info@acies.net �74SON 1-0- 4. INSULATE BOTH REFRIGERANT LINES AND SIZE PER 10. LABEL ROOFTOP UNIT WITH STORE NAME AND SPACE NUMBER. Copyright©2017 MANUFACTURER'S RECOMMENDATIONS. 11. FACTORY PROVIDED WIND BAFFLE FOR LOW AMBIENT EXPIRATION DATE: 12/31/18 5. OUTDOOR UNIT MOUNTED ON CONCRETE PER MALL STANDARDS. OPERATION. EXHAUST FAN SCHEDULE AIR DEVICE SCHEDULE WASHINGTON _ - SQUARE MALL MOTOR ELECTRICAL MOUNT DUTY 9585 SW WASHINGTON MANUFACTURER& AIR FLOW TOTAL STATIC FAN SPEED OPERATING EQUIP.TAG SERVICE TYPE SIZE BHP/ SERVICE REMARKS * (WATTS) (V/ph/Hz) WEIGHT(lbs) DIFFUSER FACELii MARK NECK SIZE OR CEILING GRID CFM RANGE Z U I- _1 tt to MFR. MODEL NO. REMARKS SQUARE ROAD SIZE(in) >- 0 D Z Q SPACE #T05 - PENNBARRY w = d H Z = EF-1 Z6H RESTROOM CEILING 80 0.48 1550 .03 BHP 115/1/60 20 1,2,3,4,5,6,7,8 Cl) D W 1- - TIGARD, OR 97223 1. CEILING EXHAUST FAN. 4. INTERLOCKED WITH AHU-2. 7. FLEXIBLE DUCT CONNECTIONS. SD-1 SEE PLANS 24"x24" 125-150 X - - X - - PRICE SPD 2 2. BACKDRAFT DAMPER. 5. DISCONNECT SWITCH. 8. PROVIDE WITH VIBRATION ISOLATION. 3. SPEED CONTROLLER. 6. TIE IN TO MAIN BUILDING EXHAUST DUCT. SD-2 SEE PLANS 14"x14" 25-175 - X - X - - PRICE SPD 2 ISSUE 1 REVISION 05.19.17 SD ISSUE SG-1 14"X8" 15"x1O" 175-250 - - X X - - PRICE SDGE 1,2 06.23.17 75%CD ISSUE HVAC MAINTENANCE CHECKLIST FOR 07.31.17 PERMIT ISSUE EXISTING SYSTEM RG-1 SEE PLANS 36"x28" - - X - - X - PRICE 530 2 1. CHEMICALLY CLEAN CONDENSER COILS RG-2 SEE PLANS 24"X24" 335 X - - - X - PRICE PDR 2 2.LUBE ALL BEARINGS AND LINKAGES AS REQUIRED ! 3.CHECK ALL MOTORS AND DRIVES RG-3 SEE PLANS 14"X14" 145 - X - - X - PRICE PDR 2,3 4.REPLACE ALL FAN BELTS 5.CHECK OIL LEVELS WHERE POSSIBLE , 6.CHECK REFRIGERANT CHARGES RG-4 SEE PLANS 18"x12" - - X - - X - PRICE 530 2 7.VISUALLY INSPECT ALL SYSTEMS FOR REFRIGERANT, OIL OR WATER LEAKS 8.CHECK OPERATING PRESSURES AND TEMPERATURES ON COOLING EQUIPMENT 9.CHECK CONTROL SETTINGS 10. CHECK OPERATION OF SAFETY CONTROLS 11. CHECK GENERAL OPERATION OF EQUIPMENT 1. DIFFUSERS IN THE SHOWROOM CEILING SHALL BE PAINTED 12. CHECK AIR COOLED CONDENSERS FOR DIRT BLACK TO MATCH CEILING.-SEE BID ALTERNATE. 13. CHECK ALL SEALS AND PACKING 2. COLOR OF DIFFUSERS TO MATCH CEILING/WALL. REFER TO DRAWING TITLE 14. CHECK STARTER CONTACT POINTS ARCHITECTURAL DRAWINGS. 15. CHECK AND TIGHTEN ELECTRICAL CONNECTIONS 3. OPPOSED BLADE DAMPER. BID ALTERNATE: 16. CHECK OPERATION OF CYLINDER UNLOADERS -CONTRACTOR SHALL PROVIDE ALTERNATE BID FOR FACTORY 17. CHECK SOLENOID AND EXPANSION VALVES FOR CORRECT OPERATION PAINTED DIFFUSERS IN THE SHOWROOM. 18. CHECK ALL DAMPERS FOR PROPER POSITION AND OPERATION 19. CALIBRATE CONTROLS AS REQUIRED I ' 20. CHECK VOLTAGE AND AMPERAGE OF MAIN EQUIPMENT 21. CHECK HOT GAS BYPASS WHERE REQUIRED MECHANICAL 22. CHECK LOW AMBIENT COOLS AND 23. CHECK MOTOR SPEED CONTROLLERS OLLERS OPERATIONS NOTES & 24. CHECK FANS AND BLOWERS FOR PROPER POSITION AND SET SCREW TIGHTNESS 25. CHECK CRANKCASE HEATERSSCHEDULES 26. CHECK ALL EXHAUST FANS 27. CHECK GAS PRESSURE AND SHUTOFF VALVES 28. VISUALLY INSPECT BURNER OPERATION AND ADJUST AS NECESSARY 29. VISUALLY CHECK HEAT EXCHANGER FOR LEAKS OR CRACK 30. CHECK HEATER SEQUENCE OF OPERATION 31. PROGRAM T-STATS WITH NEW HOUR OF OPERATION PER TENANT. DAMPER CONTROL SCALE: N.T.S. j PROJECT NUMBER: 51909 ***NOTE:NO REPAIR SHALL BE MADE WITHOUT OWNER APPROVAL DAMPERS FOR OUTDOOR AIR SUPPLY AND EXHAUST SHALL AUTOMATICALLY SHUT WHEN THE SYSTEM OR SPACES SERVED ARE NOT IN USE OR DURING BUILDING WARM-UP,COOL-DOWN,AND SETBACK. SHEET NUMBER 1 OPERATION OF DAMPERS SHALL BE ALLOWED DURING VENTILATION PREPURGE ONE HOUR BEFORE EXPECTED OCCUPANCY AND FOR - UNOCCUPIED PERIOD PRE-COOLING DURING THE COOLING SEASON M 1 0 1 QQ PP MM ' rimp tadI I I I I4111r I ADJACENT_TENANT(NIG.) I I AHU-1 . ! AHU-24 1 -— ( I _ � � ... - ' ilio S . - sass -- Saar a o oiiiavisiii� - o --- .��T® -- --- -TZ'--- i -._- ,� --. ./ 7"Tl-/ I / ! 1 / / t / /-7 I �.��i�.a�.�r.�i �► i i iiwsiii ii�ii �".7_:1?.._� is ' LEASE LINE 38.7 •♦ ,a♦♦♦cam♦♦♦0i♦♦ I SD.1 IliEF n ;r. / L1� .� i♦i:ti� Area.Q.♦.6D.�.� A 125-- - --i-I 12" I! i ®� ® . , RS i / iQr.♦e�V���.� IT/ELEJ ' ! m - _ - 8 0 / 1 Z Et �r� , Mil w a���-� O 4 OWNERS iX0)1 L1 LOUNGE i r- r j 1 ��� € co (R DH JJJ 1 Ea LOUNGE IVJ >> w O i m ` -' ( / a s a o a— ---__---s a a ® a a (; n o _ .n 18 .. I RDH T 2 , 2`;. ��\ SD-II `, 12 12 L4 •L4 l4 L4 L4 O I 1 _ L1A ( © ' r (ma% i �t& 150 ca 10 / SG-1 �'� SG-1 '' - - L1A�L1�A n © ,�� - * 17 0 * 175 * L4 * - - 5 I * / • e e \ of AHU 1 - ®I 'y NISEX TOILET i / 1 Q: 72 SD-1 _ / ti j • / iIJ I _!Jj;;: / 150 �`' 01L 1L1 Eica . 7I, 10 010"0 A�sRG-2 / (I! SG- IO It>.G1 335 ( 8'00A V 41 t21 ' I 0 / 2001 , 250 L1�11AE I I 111 - I I ��° Hi !I RG-1 17 N ® 3 RG-4 17 H ! i —;ice 15 - 0 I I I f L4 YYYfff Lr _ L4 Q `_ _ 'Ld L4 L4 L4 L4 el 1 a--- _o p� r- _- :/ `- — -- ° cd. - F ® a a a a ® a a a S® el 1 �___ r (� ® N { 1 II _I ( --,—� GI I I sG 1 SG-1 ��I Itl0, p * f 250 �® Ire b i zoo MI 200 20 j (¢� 200 4 (¢jI t} UI I o Alameda, CA 94501 SG- , 960 Atlantic Ave. SG-1 rL1AE I 12 • I i i ( ' II 12 I 12 12 .' ® 12 I 510 865 8663 O I I ® I I I 4�I ji L1A•LIA o mbharch.com pI �x W 12"0 III�I ` t? � �j^IsFR2 ¢f )`^ i<) 20^0 18^0 (�I 16"0 h ( 14"0 ial X �. L.....--f II ( 2 ta II ti; L, r9 I I I ® ¢ , II I f' i �� ® (a I I SG 1L 12 la' O I I C. ' 12 ,r 0 , 12 C�j I n< SG-1 I SG-1 I- SG-1 SG-� `• I� 200 H SALES O ( I t PROF�cs250 200 I 200 �I 200 " 20q y�y I GINeIw (�I <� ACIESEi687PE 9 L1A 3 n ® a---- --t b ® d—�:` --- h a a ® e--- a a 9 ® a _� �_� ©, i L4 L4 L4 L4 ( L4 L4 L4 L4 L4 I I ® m 'l I ENGINEERING Olcott Street /s��_ I O I - - LIN QA ( I Santa Clara,CA 95054 OREGON L_ ©1I 0 SII ph:(408)522-5255 ' + OS 20` . xx a I a1 { ®AHU-1® i!i �iicC- •i�� ii.°i :---- ��►r��r `a' ,. ..=r.� info@acies.net ON l L-- me ...�.�..♦. ;♦�, aI/ / / l/// // / / / j i .////// I - - ( - - c 408)522-5260 �i'i� - - - - �=___-..-.._ . � Copyright C)2017 ♦ ------ - - - _- — — — 12 - 37 / EXPIRATION DATE 12/31/18 •}♦♦♦ / e s 200 (� ® p O 250 I I II� . I ...„,o ADJACENT TENANT(N.L )C. / / IL4 ©Io 1 L1AILIA WASHINGTON j a1 ca)) z[ SQUARE MALL - i ' a--- h o h a -a d� a ) I�-I I L4 ® L4 L4 L4 ® L4 I 1/ ♦♦.� .�...♦#•, 9585 SW WASHINGTON I/ J x3 — Q* I .At J SQUARE ROAD !/-/--- — - f=/ / / /-//T yr / '+ SPACE #T05 LEASE LINE TIGARD, OR 97223 FLOOR PLAN - HVAC SCALE J 3/16"=1'-0" I MECHANICAL KEYED NOTES GENERAL NOTES ISSUE / REVISION 05.19.17 SD ISSUE 06.23.17 75% CD ISSUE ® NEW AIR HANDLER UNIT ABOVE CEILING HUNG FROM STRUCTURE. PROVIDE 16 MOTORIZED DAMPER. 1. DEMOLISH&REMOVE ALL EXISTING UNUSED DUCTWORK&PIPING UNLESS 07.31.17 PERMIT ISSUE FLEXIBLE CONNECTION. OTHERWISE NOTED. ® RELOCATE EXISTING AIR HANDLER UNIT TO ABOVE OFFICE CEILING. RE-USE 17 MOUNT AS HIGH AS POSSIBLE. 2. ALL BRANCH DUCT CONNECTIONS TO OUTLETS SHALL INCLUDE A MANUAL EXISTING DRAIN PAN. PROVIDE FLEXIBLE CONNECTION. BALANCE DAMPER WITH LOCKING QUADRANT LOCATED AT THE BRANCH 18 EXTEND& RE-CONNECT CONDENSING WATER SUPPLY& RETURN TO EXISTING. DUCT CONNECTION TO THE HEADER DUCT. O3 RELOCATE EXISTING 18kW DUCT HEATER AS SHOWN. MATCH EXISTING SIZE. FIELD VERIFY EXACT ROUTING. 3. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS. ® NEW 4kW DUCT HEATER. 19 EXTEND&CONNECT TO MAIN CONDENSING WATER SUPPLY&RETURN. REFER TO MANUFACTURE INSTALLATION GUIDE FOR SIZING. FIELD VERIFY EXACT ROUTING. 4. CONTRACTOR MUST VERIFY ALL CLEARANCES AND DIMENSIONS IN FIELD. ® NEW SMOKE DETECTOR IN RETURN AIR DUCT. ©0 24"x24"ACCESS PANEL. COORDINATE WITH ARCHITECT. 5. ALL OUTSIDE AIR INTAKES SHALL BE MINIMUM 10'-0"AWAY FROM EXHAUST © NEW WALL MOUNTED FAN COIL, MOUNTED BELOW T-BAR CEILING. ROUTE DISCHARGES. REFRIGERANT PIPING TO CU-3 ON ROOF. COORDINATE ROUTING IN THE FIELD, SIZE 5. CONTRACTOR TO PROVIDE AS REQUIRED: PER MANUFACTURERS RECOMMENDATIONS. SMOKE DETECTORS AND AUTOMATIC SHUTOFF FOR HVAC UNITS OR COMBINATION THEREOF SUPPLYING AIR IN EXCESS OF 2000 CFM.THE AIR O PROVIDE NEW REMOTE TEMPERATURE SENSOR, STAINLESS STEEL BUTTON TYPE- HANDLING UNITS SHALL BE CAPABLE OF AUTOMATIC/GLOBAL SHUT-OFF. DRAWING TITLE HONEYWELL#C7041 P. COORDINATE FINAL LOCATION WITH TESLA PM. AUTOMATIC/GLOBAL SHUT-OFF SHALL BE ACCOMPLISHED UPON DETECTION OF SMOKE IN ANY ONE UNIT.WHERE FIRE DETECTION OR ALARM SYSTEMS ® PROVIDE NEW PROGRAMMABLE ELECTRONIC THERMOSTAT, SET WITH 5° ARE PROVIDED FOR THE BUILDING,THE SMOKE DETECTORS SHALL BE DEADBAND-HONEYWELL#THX9421-PRESTIGE-IAQ. COORDINATE FINAL LOCATION SUPERVISED BY SUCH SYSTEMS AND SHALL ACTIVATE THE FIRE ALARM WITH TESLA PM. SYSTEMS. ® CEILING MOUNTED EXHAUST FAN. PROVIDE FLEXIBLE CONNECTION. 6. COORDINATE DUCT ROUTING WITH EXISTING PIPING, CONDUITS, LIGHTS AND STRUCTURAL MEMBERS. OFFSET AS REQUIRED. 10 EXTEND&CONNECT TO MALL MAIN EXHAUST DUCT. FIELD VERIFY ROUTING & LOCATION. MECHANICAL 11 P.O.C. CONNECT TO EXISTING OUTSIDE AIR DUCT. FIELD VERIFY SIZE&LOCATION. FLOOR PLAN 12 DUCT MOUNTED SUPPLY AIR GRILLE-SEE DETAIL 2/M500 FOR MOUNTING DETAILS. 13 EXPOSED SPIRAL DUCTING TO BE MOUNTED AS HIGH AS POSSIBLE ABOVE LIGHT SCALE: PROJECT NUMBER: 51909 FIXTURES. COORDINATE DUCT ROUTING WITH FIXTURES, PIPING, CONDUITS AND STRUCTURAL MEMBERS. OFFSET AS REQUIRED. 14 OUTLINE OF CONDENSING UNIT ON ROOF. COORDINATE FINAL LOCATION IN FIELD SHEET NUMBER WITH BUILDING ENGINEER. 15 REFRIGERANT PIPING TO FAN COIL UNIT/CONDENSING UNIT. FIELD VERIFY Pvl 2 0 0 ROUTING. SECTION 1500 - HEATING. VENTILATION AND AIR CONDMONING 1.00 - GENERAL F.SUPPLY AND RETURN AIR DUCTWORK SHALL BE EXTERNALLY INSULATED WITH 1 W THICK, 1 1/2 PCF DENSITY OR 2.07 INSULATION (INSTALLED PER MANUFACTURER'S RECOMMENDATIONS) 3.02 TESTING AND BALANCING (SEE ALSO, SECTION 15990 BELOW.) 1 filliw AS REQUIRED BY LOCAL ENERGY CODE. INSULATION SHALL BE OWENS-CORNING SOFT DUCT WRAP OR EQUAL TO FRK VAPOR RETARDER FACING. A HEATING AND COOLING DUCTWORK LOCATED IN INTERIOR LOCATIONS BALANCING OF NE AIR CONDITIONING SYSTEM WILL BE PERFORMED BY AN INDEPENDENT TEST AND _ 1.01 DESCRIPTION OF WORK IINCOSNUSLATION SHALL MEET THE REQUIREMENTS OF NFPA 90A AND 90 ISTING OF A BLANKET OF GLASS ABER INSULATION LAND OTHER MECHANICAL ENERGY CODES. 1. INSULATE WITH OWENS-CORNING FIBERGLASS ALL SERVICE FACED DUCT WRAP BALANCING AGENCY. NE MECHANICAL CONTRACTOR SHALL COOPERATE WITH THE SELECTED ILaI -_ FURNISH AND INSTALL COMPLETE AND OPERATIVE HVAC SYSTEM AS SHOWN ON THE DRAWING AND AND BALANCE AGENCY IN NE FOLLOWING MANNER: ._ = _ SPECIFIED HEREIN. WORK SHALL INCLUDE, BUT NOT BE UMITED TO NE FOLLOWING: G.ACOUSTICAL FLEXIBLE DUCT SHALL BE UL 181 USTED, CLASS 1, 2-PLY VINYL FILM SUPPORTED BY HELICALLY TYPE 150 WITH FACTORY APPUED FLAME RETARDANT FOIL REINFORCED KRAFT FACING _ WOUND SPRING-STEEL WIRE. FIBROUS-GLASS INSULATION TO MEET LOCAL CODE R-VALUES, AND FINISHED WAN A (FRK-25 UL LABELSD), OR APPROVED EQUAL. INSTALLED THERMAL RESISTANCE SHALL BE A. PROVIDE SUFFICENT TIME BEFORE FINAL COMPLETION DATE SO THAT TEST AND BALANCING CAN _ A. AC UNR. SEE SCHEDULES. POLYETHYLENE VAPOR-BARRIER FILM. INTERIOR VINYL FILM SHALL BE PERFORATED FOR SOUND BE ACCOMPLISHED. =_ ATTENUATION. FLEXIBLE DUCT SHALL BE RATED TO +1D"/-1" W.G., 4000 FPM, AND -20 TO 210 DEC. F B. PROVIDE IMMEDIATE LABOR AND TOOLS TO MAKE CORRECTIONS WHEN REQUIRED WITHOUT UNDUE _ B. TOILET EXHAUST FAN. TEMPERATURE RANGE. FUMBLE DUCT CLAMP CONNECTORS SHALL BE STAINLESS-STEEL BAND WITH CADMIUM HEX B. ACOUSTICAL DUCTWORK AND PLENUM AND CASING UNER DELAY, INSTALL BALANCING DAMPERS AS REQUIRED BY TEST AND BALANCE AGENCY. -- -_- C. AUTOMATIC TEMPERATURE CONTROLS SYSTEM INCLUDING TIME CLOCK, BY-PASS TIMER, SCREW TO TIGHTEN BAND WITH A WORM-GEAR ACTION. FLEXIBLE DUCTS SHALL BE ALLOWED ONLY AT THE FINAL THERMOSTATS, CONTROL LOW-VOLTAGE INTERLOCK WIRING AND OTHER ASSOCIATED DEVICES. CONNECTION TO AIR OUTLETS/INLETS AT A LENGTH OF 5 FEET MAXIMUM. 1. PROVIDE INTERNALLY LINED DUCTWORK WHERE INDICATED ON DRAWINGS. ACOUSTICAL DUCT C. THE CONTRACTOR SHALL PUT ALL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS AND _ _ - - LINER SHALL BE TRALI E DUCT UNER, OR EQUAL MATTE FACE, EQUIPMENT INTO FULL OPERATION AND SHALL CONTINUE NE OPERATION OF SAME DURING EACH = - _ - ---- _D. DUCTWORK AND AIR DISTRIBUTION SYSTEMS. 2.01.2 FACTORY-MADE AIR DUCTS SUITABLE FOR VELOCITIES FROM 1500 TO 4000 FPM, IN COMPLIANCE W/ UL723 AND WORKING DAY OF TESTING AND BALANCING. E. HANGERS AND SUPPORTS FOR DUCTWORK, PIPING AND HVAC EQUIPMENT UL181. SECURE UNER TO DUCTWORK WITH ADHERSIVE AND MECHANICAL FANSTENERS PER D. TESTING AND BALANCING AGENCY SHALL BE KEPT INFORMED OF ANY MAJOR CHANGES MADE TO .���� F. FLASHING OF DUCT AND PIPE PENETRATIONS THROUGH EXTERIOR OPENINGS. A FACTORY-MADE AIR DUCTS SHALL BE APPROVED FOR THE USE INTENDED. EACH SECTION OFA SMACNA DUCT LINER APPLICATION STANDARD. SYSTEM DURING CONSTRUCTION AND SHALL BE PROVIDED WITH COMPLETE AS-BUILT DRAWINGS. FACTORY-MADE AIR DUCT SHALL BE IDENTIFIED BY THE MANUFACTURER WITH A LABEL INDICATING CLASS AND BELT 1 _ _-- _ G. ROOF CURB AND ROOF SLEEPER SUPPORTS. DESIGNATION. THESE DUCTS SHALL BE USTED AND SHALL BE INSTALLED IN ACCORDANCE WITH THE 2. WHERE INTERNAL INSULATION IS APPLIED, DUCT AND PLENUM SIZES AS SHOWN ON THE E. THE MECHANCIAL CONTRACTOR SHALL INCLUDE THE COSTS OF DAMPERS, PULLEY _ _ _ __ -- TERMS OF THEIR LISTING. DRAWINGS SHALL BE INSIDE CLEAR DIMENSIONS. CHANGES IN HIS CONTRACT. - = _ _ H. DUCT THERMAL AND ACOUSTIC INSULATION. __ = -- -_---- -- --- _-_ I. LICENSE, PERMITS AND ASSOCIATED FEES. B.INSULATED ALUMINUM FLEXIBLE DUCT SHALL BE UL 181 LISTED, CLASS 0, INTERLOCKING SPIRAL OF 3. FIBERGLAS DUCT AND PLENUM INSULATION ARE TO BE APPLIED ONLY WITH MANUFACTURER'S 3.04 SPECIAL CONDITIONS J. DEMOLITION AND REMOVAL OF EXISTING HVAC EQUIPMENT AS REQUIRED. ALUMINUM FOIL FIBROUS-GLASS INSULATION SHALL MEET LOCAL CODE R-VALUE, AND SHALL BE APPROVED ADHESIVES, MASTICS AND MECHANICAL FASTENING DEVICES. FINISHED WITH A POLYETHYLENE VAPOR-BARRIER FILM. ALUMINUM FLEXIBLE DUCT SHALL BE RATED A. AIR CONDITIONING EQUIPMENT ON ROOF: NE EXACT EQUIPMENT LOCATIONS ON K. SEISMIC RESTRAINTS AND BRACING. TO +/- 8" W.G., 5000 FPM VELOCITY, AND -20 TO 250 DEC. F TEMPERATURE RANGE. C. HEATING AND COOUNG DUCTWORK LOCATED ON THE ROOF. NE ROOF SHALL BE FIELD VERIFIED BY CONTRACTOR. THE INTENT OF NE DESIGN IS TO UTILIZE C.INSULATED WIRE FLEXIBLE DUCT SHALL BE UL 181 LISTED, CLASS 1, 2-PLY VINYL FILM SUPPORTED BY 1. INSULATE WITH RIGID BOARD INSULATION WITH A MINIMUM R VALUE OF R-6 OR R-8. A MANUFACTURER SUPPUED ROOF CURB THAT WOULD SUPPORT THE NEW EQUIPMENT. 1.02 RELATED WORK INCLUDED UNDER OTHER SECTIONS HELICALLY WOUND SPRING-STEEL WIRE, FIBROUS-GLASS INSULATION SHALL MEET LOCAL CODE R-VALUES, AS REQUIRED PER CODED. COAT EXTERIOR OF INSULATION WITH PERFORATED SHEET METAL LINER. CONTRACTOR SHALL CONFORM TO MANUFACTURER'S PUBLISHED INSTALLATION AND ASSEMBLY GUIDE. -- _--_ _-_ _ AND SHALL BE FINISHED WITH A POLYETHYLENE VAPOR-BARRIER FILM. FLEXIBLE DUCTS SHALL BE RATED SUITABLE FOR VELOCTTfES FROM 1500 TO 4000 FPM, IN COMPLIANCE W/ UL723 AND INSTALLATION SHALL CONFORM TO STRUCTURAL ENGINEERS'S REQUIREMENTS. --_ --_--- -_ A. FIRE PROTECTION, SECTION 15300. TO +10/-111.G., 4000 FPM VELOCITY, AND -20 TO 210 DEG. F TEMPERATURE RANGE. FLEXIBLE DUCT ULT 81. BSTRUCTURAL SUPPORT FOR THE AIR CONDITIONING UNIT: THE OWNER SHALL ENGAGE ALICENSED -_ --_- -_- B. B. PLUMBING, SECTION 15400. CLAMP CONNECTORS SHALL BE STAINLESS-STEEL BAND WITH CADMIUM HEX SCREW TO TIGHTEN BAND 2. WHERE INTERNAL INSULATION IS APPLIED, DUCT AND PLENUM SIZES AS SHOWN ON THE STRUCTURAL ENGINEER TO DESIGN THE STRUCTURAL SUPPORT FOR THE AIR CONDITIONING UNIT ON - C UNE VOLTAGE AND POWER WIRING, ELECTRICAL SECTION 16000. WITH A WORM-GEAR ACTION. DRAWINGS SHALL BE INSIDE CLEAR DIMENSIONS. _,_ THE ROOF. THE MECHANICAL CONTRACTOR IS TO COORDINATE ALL WORK WITH THE STRUCTURAL El D.INSTALLATION OF FACTORY-MADE AIR DUCT JOINTS AND ATTACHMENTS SHALL BE IN STRICT ACCORDANCE ENGINEER. - 1.03 EXAMINATION OF SITE WITH LATEST EDITION OF SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE". D. SOFT FLEXIBLE DUCT. - - ViSTT SITE BEFORE SUBMITTING BID AND CHECK LOCATION OF ALL EXISTING COND(t10NS WHICH E.SELECT TRANSITIONS, BRANCH CONNECTIONS, TEES AND LATERALS, AND OTHER FITTING TYPES, AND 1. GENFLEX NIL(S). 7-0" MAXIMUM LENGTH UNLESS NOTED OTHERWISE. CLASS 1 RATING C. All REQUIRED PENETRATIONS OF EXISTING ROOFING SYSTEM SHALL BE MADE BY LANDLORD'S ---_ -- -_ WILL AFFECT THIS WORK, VERIFY DIMENSIONS AND LOCATIONS SHOWN ON DRAWINGS AND COVER ALL FABRICATE ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" WITH A MINIMUM R-6 INSULATION. ROOFING CONTRACTOR AT OWNER'S EXPENSE AFTER NOTIFICATION TO LANDLORD FOR APPROVAL COSTS. CONTRACTOR SHALL ASSUME REASONABLE VARIATIONS OR MINOR OMISSIONS AND SHALL BASED ON INDICATED STATIC-PRESSURE CLASS. E. INSULATION. END OF SECTION 960 Atlantic Ave. COMPLETE PROPOSED WORK WITHOUT ADDITIONAL COST. FAILURE TO VISIT SITE WILL NOT LESSEN F.SELECT SIZING PRACTICES IN ACCORDANCE TO THE AIR CONDITIONING CONTRACTORS OF AMERICA (ACOA),ENT1. FOIL FACED FIBERGLASS, OWENS CORNING TYPE 75 OR EQUAL, FLAME SPREAD RATING OF Alameda, CA 94501 RESPONSIBILITY OR ITLE ADDITIONAL COMPENSATION FOR WORK NOT INCLUDED IN PROPOSAL MANUALS D & Q. IN PRACTICE UMIT VELOCITIES TO 700 PM MAX. FOR SUPPLY AND RETURN AIR OF NOT MORE THAN 25 AND A SMOKE DEVELOPMENT RATING OF NOT MORE THAN 50 SECTION 15990 - TESTING. ADJUSTING AND BALANCING 510 865 8663 DUCTS, AND INCREASE DUCT SIZES BY ONE SIZE (EVEN NUMBER) LARGER THAN METAL AIR DUCTS. UNLESS SHOWN OTHERWISE, ALL INSULATION SHALL BE EXTERNAL TO DUCTWORK. 1.04 DRAWINGS 1.00 - GENERAL mbharch.com G.FACTORY-MADE DUCTS SHALL NOT BE USED FOR VERTICAL RISERS IN AIR DISTRIBUTION DUCT SYSTEMS. F. DUCT LINER. THE ACCOMPANYING DRAWINGS SHALL BE CONSIDERED PART OF THESE SPECIFICATIONS. WORK AND SUCH A DUCT SHALL NOT PENETRATE CONSTRUCTION WHERE FIRE DAMPERS ARE REQUIRED. 1.01 DESCRIPTION MATERIALS SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS AND VICE VERSA 1. FOR EXTERIOR DUCTS: FIBERGLASS WITH FIRE RATED BLACK COATING, OWENS CORNING THE TESTING AND BALANCING WORK WILL BE PERFORMED UNDER A SEPARATE CONTRACT FROM THE SHALL BE EXECUTED AS IF SPECIFICALLY MENTIONED OR SHOWN IN BOTH. THE DRAWINGS SHALL BE AEROFLEX TYPE 150. HVAC WORK. THE WORK DESCRIBED IN THIS SECTION SHALL BE PERFORMED BY AN INDEPENDENT CONSIDERED AS SCHEMATIC IN NATURE AND MINOR MODIFICATIONS OF THE WORK TO COMPLY WITH 2.02 PIPING 2. FOR OTHER LOCATIONS SHOWN ON DRAWINGS: AEROFLEX TYPE 150, AS ABOVE, EXCEPT TEST AND BALANCE AGENCY, SPECIALIZING 1N TESTING AND BALANCING OF HVAC SYSTEMS AND A THE STRUCTURE AS FOUND SHALL BE MADE. A. CHILLED WATER, HOT WATER AND CONDENSER WATER SERVICE PIPING SHALL BE BLACK 1 INCH THICK. FLAME SPREAD RATING OF NOT MORE THAN 25 AND SMOKE DEVELOPED NUMBER OF THE MBC OR APPROVED EQUAL ORGANIZATION. STEEL SCHEDULE 40. PER ASTM A-120 WITH PLAIN WELDED JOINTS AND SEAMLESS SCHEDULE RATING OF NOT MORE THAN 50. 1.05 RULES AND REGULATIONS vO PROF 40 FITTINGS GALVANIZED FOR EXTERIOR LOCATIONS. ,�4,R £s A. ALL WORK AND MATERIAL SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES AND REGULATIONS 3. AN EPA-APPROVED BIOCIDE IN THE AIRSTREAM COATING ENABLES OWENS-CORNING DUCT si 1.02 SCOPE OF WORK ACIES ��`� t�NGINE£,Q Dy OF THE STATE FIRE MARSHAL AND OTHER APPLICABLE STATE AND LOCAL RULES AND REGULATIONS. B. ALL STEEL PIPING SHALL HAVE THREADED CONNECTIONS AND ALL COPPER PIPING SHALL HAVE LINERS TO RESIST FUNGAL OR BACTERIAL GROWTH WHEN SUBJECTED TO MICROBIAL ATTACK A. HVAC SYSTEM TEST AND BALANCE IN ACCORDANCE WITH PROCEDURES ESTABLISHED BY MBC 4�v lit7T.. NOTHING IN THESE DRAWINGS OR SPECIFICATIONS SHALL BE CONSTRUED TO PERMIT WORK NOT SOLDERED JOINTS OF 300 LB. PRESSURE RATING. DESCRIBED IN ASTM C 665 AND STANDARD PRACTICES ASTM G 21 (FUNGUS TEST) ANDOR NEBB. ENGINEERING CONFORMING TO THESE CODES. G 22 (BACTERIA TEST). B. MEASUREMENT OF FINAL OPERATING CONDITIONS OF HVAC EQUIPMENT. C. PIPE HANGERS SHALL BE SUPERSTRUT OR KIN-UNE, SPACED 0 6 FT. O.C., WITH CLEVIS OR 3371 Olcott Street B. FURNISH WITHOUT ANY EXTRA CHARGE ANY ADDITIONAL MATERIAL AND LABOR WHEN REQUIRED TO TRAPEZE TYPE HANGERS. SECURE PIPE HANGER RODS TO STRUCTURE PER UPC C. TEST AND BALANCE REPORTS. Santa Clara,CA 95054 OREGON �, COMPLY WITH THESE LAWS, ORDINANCES AND CODES REGARDLESS OF WHETHER SHOWN OR PROVIDE ISOLATION SHIELDS WHERE PIPE RESTS ON HANGER ASSEMBLY. D. EACH PIECE OF AIR CONDITIONING AND HEATING EQUIPMENT AND NE AIR DISTRIBUTIONS ph:(408)522-5255 2.08 TEMPERATURE CONTROL SYSTEM SYSTEMS SHALL BE TESTED AND ADJUSTED TO INSURE PROPER FUNCTIONING OF ALL CONTROL, fx:(408)522-5260 /y Y 08, 2 t MENTIONED IN THESE SPECIFICATIONS OF DRAWINGS. D. INSULATE ALL WATER PIPING WITH DENSITY FIBROUS GLASS INSULATION WITH WHITE KRAFT BONDED /�S E TO ALUMINUM FOIL THICKNESS AND R VALUE AS PER TABLE 120.3-A OF CEC STANDARDS. PROPER DISTRIBUTION OF AIR, MAINTENANCE OF TEMPERATURE, ELIMINATION OF DRAFTS, info@acies.net ON L - 1.06 SUBMITTALS FITTINGS SHALL BE INSULATED PREMOLDFJ? FIBERGLASS INSULATION. THE INTEGRITY A ALL UNITARY HEATING OR COOLING SYSTEMS, INCLUDING HEAT PUMPS, NOT CONTROLLED BY A NOISE AND VIBRATION, AND LEFT IN FIRST CLASS OPERATING CONDITION. THE AIR SYSTEM Copyright c©2017 CENTRAL ENERGY MANAGEMENT CONTROL SYSTEM (EMCS) SHALL HAVE A SETBACK THERMOSTAT. EXPIRATION DATE: 12/31/18 A. SUBMIT FOR REVIEW TO THE OWNER A COMPLETE AND ALL-INCLUSIVE LIST OF' EQUIPMENT AND OF NE VAPOR BARRIER SHALL BE MAINTAINED THROUGHOUT THE INSTALLATION. 1. SETBACK CAPABILITIES. ALL THERMOSTATS SHALL HAVE A CLOCK MECHANISM THAT ALLOWS SHALL BE READJUSTED IF REQUIRED FOR COMFORT OF EACH ROOM. MATERIALS PROPOSED FOR USE (1) HARD & (1) SOFT COPY, ACCOMPANIED BY MANUFACTURER'S DATA TAPE AND SEAL ALL JOINTS WITH VAPOR BARRIER TAPE. THE BUILDING OCCUPANT TO PROGRAM THE TEMPERATURE SETPOINTS FOR AT LEAST FOUR E. THE MECHANICAL CONTRACTOR WILL MAKE ANY CHANGES IN THE PULLEYS, BELTS, DAMPERS, SHEETS. DATA SHALL BE FORWARDED IN A SINGLE PACKAGE WITHIN 15 DAYS AFTER AWARD OF E. ALL CONNECTIONS BETWEEN DISSIMILAR METALS SHALL UTILIZE DIELECTRIC INSULATING FITTINGS, PERIODS WITHIN 24 HOURS. VANES, BAFFLES AND THE LIKE REQUIRED FOR CORRECT BALANCE OF CONTRACT. SUBMIT PORTABLE DOCUMENT FORMAT(PDF) AND ONE REPRODUCIBLE SHOP DRAWING COUPLINGS AND UNIONS. SYSTEM AS RECOMMENDED BT T&B AGENCY AND TO THE SATISFACTION OF THE OWNER. SHOWING PROPOSED DUCTWORK INSTALLATION. INCLUDE SIZES, LOCATIONS AND OTHER REQUIRED F. ALL SHUT-OFF VALVES AND DRAIN VALVES SHALL BE BALL-COCK TYPE, 300 LB. RATING WITH B. HEAT PUMPS WITH SUPPLEMENTARY ELECTRIC RESISTANCE HEATERS SHALL HAVE CONTROLS: INFORMATION TO COORDINATE INSTAUATION WITH OTHER TRADES. PLUGS INSTALLED ON DRAIN VALVES. NIBCO OR EQUAL BY THE HEAT 1. THAT PREVENT EEVE MSUP ALONEE TA HEATER OPERATION WHEN THE HEATING LOAD CAN BE MET 1.03 SUBMITTALS WASHINGTON BWWITHIN 5SDAYS AFTER T TR ARD HESTOSUBSTITUTE,AWARD OF CONTRACT, SUBMIT DTHE PDF COPY PRFOR APPROVAL. ALLUDE SUCH OF A LETTER STATING ANY &2. IN WHICH THE CUT-ON TEMPERATURE FOR COMPRESSION HEATING IS HIGHER THAN THE A. PROVIDE (1) HARD COPY (1) SOFT COPY OF TEST AND BALANCE REPORT TO THE OWNER FOR NIA 2.03 DUCTWORK ACCESSORIES CUT-ON TEMPERATURE FOR SUPPLEMENTARY HEATING, AND THE CUT-OFF TEMPERATURE FOR REVIEW AND APPROVAL IN SOFT COVER, LETTER SIZE, 3-RING BINDER MANUAL COMPLETE WITH SQUARE MALL INFORMATION AS MANUFACTURER'S NAME, TYPE OF MATERIAL, CERTIFIED RATINGS, OVERALL COMPRESSION HEATING IS HIGHER THAN THE CUT-OFF TEMPERATURE FOR SUPPLEMENTARY INDEX PAGE AND INDEXING TABS. THE REPORT SHALL INCLUDE A SET OF REDUCED DRAWINGS WITH APPEARANCE, AND NECESSARY INFORMATION TO EXPLAIN FUNCTION AND OPERATION OF MATERIAL ALL A. DAMPER OPERATORS HEATING. AIR OUTLETS AND EQUIPMENT IDENTIFIED TO CORRESPOND WITH DATA SHEETS AND INDICATING 9585 SW WASHINGTON MATERIAL,- PROPOSED EQUIPMENT OR METHOD BE EQUAL IN QUALITY, DESIGN, UTILITY AND APPEARANCE TO 1. DUCTS WITH EXTERNAL INSULATION: VENTLOCK 1637, DURADYNE, YOUNG, OR APPROVED EQUAL C. CONTRACTOR SHALL POST IN THE OFFICE TYPEWRITTEN INSTRUCTIONS ON OPERATION OF All CONTROLS. HERMOSTAT LOCATIONS, 2. DUCTS WIN INTERNAL INSULATION AND/OR NO INSULATION: VENTLOCK 1635, DURADYNE, B. THE TEST AND BALANCE REPORT SHALL INCLUDE, AS A MINIMUM, BUT NOT BE UMITED TO: SQUARE ROAD 1.07 AS-BUILT DRAWINGS YOUNG, OR APPROVED EQUAL B. FLEXIBLE CONNECTIONS: VENTFABRICS "VENTGLAS", DURADYNE, OR APPROVED EQUAL, U.L 181 1. EACH EQUIPMENT SHALL BE IDENTIFIED BY EQUIPMENT SERVICE NUMBER, MANUFACTURER, SPACE #T05 MODEL NUMBER, AND SERIAL NUMBER, MOTOR HORSEPOWER, MOTOR NAMEPLATE VOLTAGE, TIGARD, OR 97223 A SET OF HVAC PRINTS OR ACCESS TO A PRINT SHOP/POPS WILL BE FURNISHED TO THE CONTRACTOR ON APPROVED WITH METAL ATTACHMENT. MOTOR RPM, ACTUAL AND DESIGN STATIC PRESSURE, ACTUAL OUTLET VELOCITY, ACTUAL CFM, WHICH HE/SHE SHALL INDICATE THE INSTALLATION "AS-BUILT' AS THE WORK PROGRESSES. UPON C. AIR EXTRACTOR: TITUS AG-225, KRUEGER EX-88C, OR APPROVED EQUAL 2.09 DX PIPING DESIGN CFM. COMPLETION OF THE WORK, A SET OR REPRODUCIBLE DRAWINGS SHALL BE OBTAINED FROM THE OWNER AT COST, AND ALL CHANGES AS NOTED ON THE RECORD SET OF PRINTS SHALL BE INCORPORATED D. TURNING VANES SHALL COMPLY WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS REFRIGERANT PIPING SHALL BE TYPE L HARD COPPER ACR TUBING WITH WROUGHT COPPER, SOLDER 2. EACH COIL SHALL BE IDENTIFIED BY EQUIPMENT SERVICE NUMBER, MANUFACTURER. MODEL THEREON. THIS SET OF REPRODUCIBLES, ALONG WITH ONE SET OF PDF'S, SHALL BE DELIVERED TO THE ALL RECTANGULAR DUCT WITH MITERED ELBOWS SHALL BE FITTED WITH TURNING VANES. JOINT FITTINGS, SILVER SOLDERED. ALL REFRIGERANT PIPING SHALL BE INSULATED EXCEPT WHERE THE NUMBER AND SIZE, NUMBER OF ROWS, TOTAL CFM, AIR INLET AND OUTLET DRY BULB AND OWNER UPON COMPLETATION AND BEFORE FINAL ACCEPTANCE OF THE PROJECT. E. SPIN-IN-FITTINGS ARE NOT ALLOWED. USE UNITED MCGILL BELLMOUTH FITTING FOR ROUND DUCT UNINSULATED AREA DOES NOT RESULT IN AN ENERGY LOSS TO THE SYSTEM OR AN ADVERSE EFFECT WET BULB TEMPERATURES. TAPS. TO THE SYSTEM FROM STRAY HEAT. PIPE INSULATION SHALL BE ARMSTRONG ARMAFLEX, 3. EACH AIR OUTLET SHALL BE IDENTIFIED WITH MANUFACTURE, MODEL NUMBER, SIZE, VELOCITY, F. SUPPORT DUCTWORK ACCORDING TO THE SMACNA DUCT CONSTRUCTION STANDARDS AND THE OWENS-CORNING FLEXIBLE TUBING, RUBICON OR APPROVED EQUAL THICKNESS SHALL BE 3/4" ON CORRECTION FACTOR, ACTUAL CFM, DESIGN CFM. ISSUE / REVISION 1.08 GUARANTEE DRAWINGS. INTERIOR PIPING AND 1" ON EXTERIOR PIPING. INSULATED PIPING EXPOSED TO WEATHER SHALL BE 4. TRAVERSE READING OF MAIN SUPPLY. RETURN AND OUTSIDE AIR DUCTS TO ESTABLISH AIR 05.19.17 SD ISSUE THE CONTRACTOR SHALL LEAVE THE ENTIRE INSTAUATION IN COMPLETE WORKING ORDER FREE FROM G. ACCESS DOORS IN DUCTWORK: SHALL BE VENTLOCK, DUCTMATE OR APPROVED EQUAL, STAMPED PROVIDED WITH ARMSTRONG ARMAFLEX FINISH AND ALL-WEATHER SERVICE JACKET FOR OUTDOOR QUANTITIES. 06.23.17 75% CD ISSUE ANY DEFECTIVE MATERIAL, WORKMANSHIP OR FINISH. HE SHALL GUARANTEE TO REPAIR OR REPLACE, OR FORMED INSULATED ACCESS DOORS COMPLETE WITH ALL HARDWARE AND SEALANT. APPLICATIONS VALVES, STRAINERS, SIGHT GLASS, FILTER DRIERS, OIL SEPARATORS, ETC. SHALL BE 5. TEST AND RECORD TEMPERATURES FROM TEMPERATURE CONTROLLERS SUCH AS DAY WITHOUT CHARGE, DEFECTS DUE TO FAULTY WORKMANSHIP OR MATERIAL FOR A PERIOD OF ONE YEAR MANUFACTURED BY SPORLAN VALVE CO. THERMOSTAT, NIGHT THERMOSTAT. 07.31.17 PERMIT ISSUE FROM NE DATE OF FIUNG OF THE NOTICE OF COMPLETION. H. JOINT SEALING: 1. THE FOLLOWING ITEMS ARE TO BE SEALED WITH HARDCAST DT TAPE AND ADHESIVE: 2.10 SEISMIC RESTRAINTS AND BRACING 6. TEST AND RECORD TEMPERATURES FROM MAIN SUPPLY AIR TRUNK, MIXED AIR DURING THE 1.09 OPERATION MANUALS AND OWNER INSTRUCTIONS FULL HEATING AND FULL COOLING CYCLE AND ECONOMIZER CYCLE. A. LONGITUDINAL AND TRANSVERSE SEAMS OF RECTANGULAR DUCTWORK. A. ALL HVAC EQUIPMENT, DUCTWORK, PIPING AND WIRING CONDUITS SHALL BE INSTALLED TO MEET A. PROVIDE COMPLETE OPERATION AND MAINTENANCE MANUALS COVERING ALL MECHANICAL SYSTEMS B. ALL ROUND FITTINGS AND JOINT CONNECTORS USE FIA-20 FOR INDOOR USE AND NE LATERAL BRACING REQUIREMENTS FOR THE APPLICABLE SEISMIC ZONE. PROVIDE SEISMIC 7. TEST AND BALANCE ECONOMIZER. AND EQUIPMENT TWAT HAVE BEEN INSTALLED. A HARD COPY & SOFT COPY OF THE MANUAL SHALL BE RTA-20 FOR OUTDOOR USE. RESTRAINTS IN ACCORDANCE WITH SEISMIC HAZARD LEVEL (SHL) A OF THE 8. WATER BALANCE INFORMATION PROVIDED TO AN OWNER. "SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS' 9. EXHAUST SYSTEM BALANCE. 2. FLEXIBLE DUCT AT DIFFUSERS SHALL USE INTEGRAL STAINLESS STEEL DRAW BAND AND DATED 2009, AS PUBLISHED BY S.MAC.NA AND ALSO IN ACCORDANCE 2.00 - PRODUCTS (NOT APPLICABLE) PROVIDE INSTRUCTIONS TO STORE PERSONEL AS TO OPERATION OF ALL HVAC EQUIPMENT AND PRESSURE SENSITIVE TAPE, HARDCAST P-301 OR EQUAL THERMOSTATS. INSTRUCTION PERIOD TO COMMENCE FOR MINIMUM OF (2) HOURS AND SHALL BE WITH APPLICABLE LOCAL BUILDING CODES. I. BRACINGS, HANGERS NUTS, ETC. SHALL BE GALVANIZED. 3.00 - EXECUTION SCHEDULED AT OWNER'S CONVENIENCE. ALSO, PROVIDE STORE MANAGER WITH OPERATION MANUAL. B. ALL ROOFTOP EQUIPMENT SHALL HAVE PROPER ANCHORING AND RESTRAINT SYSTEMS, AND SHALL 1.10 CUTTING AND PATCHING J. CURVED ELBOWS SHALL HAVE CENTERUNE RADIUS EQUAL TO ONE AND ONE-HALF TIMES DUCT BE SECURED TO A ROOF CURB, EQUIPMENT PAD OR OTHER STRUCTURAL MEMBER TO PREVENT 3.01 DEFICIENCIES IN SYSTEM WIDTH IN PLANE OF TURN. LATERAL, VERTICAL OR OVERTURNING MOVEMENT WITHOUT SACRIFICING ANY RESILIENT VIBRATION A THE CONTRACTOR SHALL DO ALL CUTTING, DRILLING AND PATCHING WHICH MAY BE REQUIRED FOR K. SQUARE ELBOWS SHALL HAVE TURNING VANES. MITER ELBOWS (NOT SQUARE) SHALL HAVE SPLITTER ISOLATIONREQUIREMENTS. BALANCING CONTRACTOR SHALL REPORT IN WRITING TO NE OWNER ANY DISCREPANCIES ON ITEMS THE INSTALLATION OF THE WORK UNDER THIS SECTION OF THE SPECIFICATIONS. VANES 3 INCHES O.C. NOT INSTALLED IN ACCORDANCE WITH CONTRACT DOCUMENTS. ALL DEFICIENCIES IN HVAC SYSTEM, AND OTHER DEFICIENCIES. THE OWNER WILL REIMBURSE THE BALANCING CONTRACTOR IF ADDITIONAL B. PATCHING SHALL BE OF THE SAME WORKMANSHIP, MATERIAL, AND FINISH AND SHALL MATCH L VOLUME DAMPERS SHALL BE CONSTRUCTED TO SMACNA STANDARDS AND SHALL BE YOUNG WORK IS REQUIRED FOR HIS/HER PHASE OF WORK. ACCURATELY ALL SURROUNDING CONSTRUCTION IN A MANNER SATISFACTORY TO NE OWNER. REGULATOR MODEL 4040 FOR ROUND DUCTS AND SERIES 820 FOR RECTANGULAR DUCTS 3.00 INSTALLATION AND EXECUTION 3.02 WARRANTY NO CUTING OF THE STRUCTURE SHALL BE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNER. 2.00 - PRODUCTS 2.04 AIR DEVICES THE TEST AND BALANCE AGENCY SHALL INCLUDE AN EXTENDED WARRANTY OF 90 DAYS, AFTER DRAWING TITLE DIFFUSERS, GRILLES AND REGIS ILRS: TITUS, KRUEGER, METAL*AIRE, OR THERMAFUSER WHERE SHOWN. 3.01 INSTALLATION REQUIREMENTS COMPLETION OF WORK, DURING WHICH TIME THE OWNER, AT THEIR DISCRETION, MAY REQUEST A 2.01 DUCTWORK: FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR. PROVIDE VOLUME DAMPERS AND PAINT A. DUCTWORK: RECHECK OR RESETTING OF ANY OUTLET, SUPPLY AIR FAN, OR EXHAUST FAN AS USTED IN TEST INTERIOR FLAT BLACK. SIZE, FINISH, FRAME TYPES AND ACCESSORIES AS SHOWN ON THE DRAWINGS. REPORT. 2.01.1 METAL AIR DUCTS 1. DUCT BRANCHES SHALL BE HIIILD WITH VOLUME OR SPUTTER DAMPER AND WHERE REQUIRED, EXTRACTION DAMPER. ALL ACCESSIBLE VOLUME CONTROLS SHALL HAVE LOCKING END OF SECTION A.SHEET METAL RECTANGULAR AND ROUND DUCTWORK, PLENUMS, AND CASINGS SHALL BE FABRICATED IN 2.05 FIRE DAMPERS & SMOKE FIRE DAMPERS QUADRANTS. ALL INACCESSIBLE CONTROLS (DAMPERS, ETC.) SHALL BE PROVIDED WITH STRICT METAL AND ACCORDANCE FLEXIBLE' BASED ON INDICATED STATICITION OF -PRESSURE PRESS RENA'S C CLASS CONSTRUCTION STANDARDS - ADDIPERTIONNT TO EXTENSIONS CONTROLS AT ACCESSIBLE THE REGISTERS AND DIFFUSERS.CONTROLS ARE IN MECHANICAL A. PROVIDE FIRE DAMPERS WITH ACCESS DOORS INSTALLED WHERE REQUIRED BY ALL LOCAL B.MATERIALS FOR DUCTWORK SHALL BE HOT DIPPED GALVANIZED (G60) STEEL OF GAUGES SHOWN IN CODES. IN GENERAL, FIRE DAMPERS ARE REQUIRED WHERE DUCTS PIERCE FIRE-RATED 2. AIR INLETS, OUTLETS SHALL BE PROPERLY SET IN PLACE. REGISTERS AND GRILLES SHALL BE SPECIFICATIONS THE SMACNA HVAC DUCT CONSTRUCTION STANDARDS. ALL DUCTWORK SHALL BE CONSTRUCTED IN FLOORS, CEILINGS, WALLS AND SHAFTS. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS TIGHTLY SEALED. ACCORDANCE WITH PRESSURE CLASSIFICATION SCHEDULES OF NO LESS THAN CLASS +/- 2" W.G., AND OF ALL FIRE RATED ASSEMBLIES. SHALL BE SEALED TO THE DUCT SEALING REQUIREMENTS OF CLASS "C" MINIMUM. B. FIRE DAMPERS SHALL BE EQUAL TO AIR BALANCE INC., MODEL NO. 119BLX, OR 3. TRANSITIONS IN SIZE OF DUCTS SHALL BE MADE BY UNIFORMLY TAPERING SECTIONS C.SELECT TRANSVERSE JOINT AND LONGITUDINAL SEAM TYPES, FIGURES 1-4 AND 1-5 RESPECTIVELY, 119CL, OR AS APPROVED, FOR RECTANGULAR AND ROUND DUCTS. DAMPERS SHALL HAVING 1 INCH INCREASE IN WIDTH FOR EACH 7 INCHES OF RUN UNLESS CONSTRUCTION AND FABRICATE RECTANGULAR DUCTWORK ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION MEET THE REQUIREMENTS FOR NEPA BULLETIN NO, 90A, AND SHALL BE TESTED IN LIMITATIONS REQUIRE A MORE ABRUPT TRANSITION. STANDARDS - METAL AND FLEXIBLE'. ACCORDANCE WITH UL 555 TEST CRITERIA, FIRE DAMPERS SHALL BE LABELED AND 4. DIFFUSERS, GRILLES AND REGISTERS: EACH REGISTER AND DIFFUSER SHALL BE EQUIPPED LISTED BY UL D.SELECT ELBOWS, TRANSITIONS, OFFSETS, BRANCH CONNECTIONS, TEES AND LATERALS, AND OTHER WITH A VOLUME DAMPER OR AIR EXTRACTOR. PAINT INTERIOR SURFACE OF ALL UNITS FLAT SCALE: FITTING TYPES, AND FABRICATE ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - C. IF APPUCABLE, FIRE DAMPERS SHALL COMPLY WITH UL-555-2006, 7TH EDITION BLACK. FACE AND TRIM OF ALL UNITS SHALL BE FINISHED. SIZE, FINISH, FRAMES, PROJECT NUMBER: 51909 METAL AND FLEXIBLE". AND SHALL BE MARKED "FOR USE IN DYNAMIC SYSTEMS' OR "FOR USE IN ACCESORIES, CAPACITY AND PATTERN AS SHOWN ON DRAWINGS. E.COMPLY WITH SMACNA'S 'HVAC DUCT CONSTRUCTION STANDARDS - METAL AND STATIC SYSTEMS" AS REQUIRED. 5. CONTRACTOR SHALL PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTWORK IN FLDOBLE% CHAPTER 4, "HANGERS AND SUPPORTS FOR UPPER AND LOWER D. COMBINATION SMOKE FIRE DAMPERS SHALL BE INSTALLED WHERE DUCTWORK SUPPLY AIR, RETURN AIR AND OUTSIDE AIR SYSTEMS (WHETHER SHOWN ON PLANS OR ATTACHMENTS. FIGURES 4.2 AND 4.4 RESPECTIVELY. REFER TO TABLES 4.1 AND 4.2 FOR RECTANGULAR AND PENETRATES FIRE RATED WALLS SURROUNDING AN EXIT CORRIDOR. NOT) WHERE REQUIRED FOR AIR BALANCING OF HVAC SYSTEMS. SHEET NUMBER ROUND MINIMUM HANGER SIZE AND SPACING. F.SHEET METAL ROUND DUCT SHALL BE UNITED MCGILL, SEMCO INC., UNX IND., OR EQUAL SPIRAL SEAM DUCTS 2.06 AIR CONDITIONING EQUIPMENT WITH GASKET "UNISEAL" CONNECTION FOR EXPOSED INSTALLATIONS, AND SPIRAL OR LONGITUDINAL SEAM WITH A. FURNISH AND INSTALL AIR CONDITIONING EQUIPMENT AS SPECIFIED ON THE BEADED SLEEVE JOINT CONNECTIONS FOR CONCEALED INSTALLATIONS. FITTINGS SHALL BE "UNIFORM' MACHINE M300 FORMED WITH CONTINUOUS WELDS. DRAWINGS AND IN EQUIPMENT SCHEDULES. Air Leakage, insulation,and Component Certification: to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.6.1 and to comply with the mandatory v 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with requirements in the Requirements Checklist. _ _ _ - gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped - __ r. COMcheck Software Version 4.0.6.1 or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow WILSON LEE, P.E. iaL07/2$/2017 - - -- - - for expansion and contraction of the construction materials. Name-Title Signature Date - -- - Envelope C a m I i a n c e Certificate Plans reference page/section: See Architectural Plans i/ 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope -_- _ are determined in accordance with AAMANVDMA/CSA 101/1.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and = - - =- labeled and certified by the manufacturer. _- - - Section 1: Project information ,/ Exception applies:Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. _- __ Energy Code:2014 Oregon Energy Efficiency Specialty Code Plans reference page/section: See_Architectural Plans =__ _ _ Project Title:Tesla Showroom-Washingston Square Mall `/ 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swingingja_- Project Type:Alteration entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, Envelope Compliance Method: Prescriptive the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging 9..nmal - _ Construction Site: Owner/Agent: Designer/Contractor: entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. • • Washingston Square Mall Wilson Lee Requirement is not applicable. ' -_- ----_ _- 9321 SW Washington Square Rd.#T-05 ACIES Engineering Tigard,OR 97223 3371 Olcott Street Plans reference page/section: Santa Clara,CA 95054 408.522.5255 4/ 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 infoQacies.net inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, l Building Location(for weather data): Tigard,Oregonmanufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths andClimate Zone: 4cmarker requirements. Vertical Glazing/Wall Area Pct.: 30% t/ 7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable uponinspection.• Building Use;_Area_type Floor Area `/ 8. insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value 1-Retail;Nonresidential 3130 rule. r/ 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the Section 2: Envelope Assemblies and Requirements Checklist International Building Code. i/ 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral '--4,:•:64,1,F#0 . to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate � � per footat1.0 inchwaterwhen testedaccordance with MCA shaft ventdampersshallbe "� '' of 4 cfm square gauge in a rdan t A 500D.Stair and d per 960 Atlantic Ave. Envelope Assemblies: capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Alameda, CA 94501 R-Value __ Proposed Max.Allowed Post-Alteration Assembly Cavity_ Cont. U-Factor SHGC U-Factor SHGC Plans reference page/section: 510 865 8663 Storefront glazing:Metal Frame Curtain Wall/Storefront,Clear, - - -- 0.450 0.250 0.450 0.400 mbharch.com y/ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles [Bldg.Use 1-Retail] are parked in the doorway. (a)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Requirement is not applicable. in the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks Plans reference page/section: identify requirements that the applicant acknowledges are met or excepted from compliance, 'Plans reference pagelsection'identifies where in the plans/specs the requirement can be verified as being satisfied. 6/ 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned Fenestration Product Rating: and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are - 4E0 PROF, sealed with a gasket or caulk between the housing and interior wall or ceiling covering. 'k. SJ. v 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, AC!ES �,s �t1GiNFF� ,{}y independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values Plans reference page/section: �� 86687PE 9f listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label affixed to the fenestration products must not be removed prior to inspection. v 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the ENGINEERING l vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. 3371 Olcott Street y f Exception applies:Site-built fenestration products shall have a single certificate specifying glazing type,special coatings, spacers,gas fills,center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These f Exception applies:Doors that open directly from a space less than 3000 sq.ft.in area. Santa Clara,CA 95054 if OREGON certificates shall be maintained on the jobsite and made available to the inspector. ph:(408)522-5255 '9Y d8, 24\ Plans reference page/section: - fx:(408)522-5260 fy Plans reference page/section:See Architectural Plans info@acies.net 'SON FrEE- I/ 14'Other components have supporting documentation for proposed U-Factors. Copyright c 2017 v 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in pmg accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined Requirement is not applicable. EXPIRATION DATE: 12/31/18 using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Plans reference page/section: ,/ Exception applies:Site-built fenestration products shall have a single certificate specifying glazing type,special coatings, spacers,gas fills,center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These Section 3: Compliance Statement certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: See Architectural Plans Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, WASHINGTON specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed SQUARE MALL Project Title:Tesla Showroom-Washingston Square Mall Report date:07/28/17 Project Title:Testa Showroom-Washingston Square Mall Report date:07/28/17 Project Title:Tesla Showroom-Washingston Square Mall Report date:07/28/17 9585 SW WASHINGTON Data filename:P;\MBH\Tesla1Showroom\20171170257 Washington Square Mall,Portland,ORWMechanical\Comcheck\Tesla-Washingston Data filename:P:\MBH1Tesla\Showroom\2017\170257 Washington Square Mall,Portland,OR\Mechanical\Comcheck\Tesla-Washingston Data filename:P:1MBH\TeslatShowroom\20171170257 Washington Square Mall,Portland,OR\Mechanical\Comcheck\Tesla-Washingston SQUARE ROAD Square Comcheck.cck Page 1 of 7 Square Comcheck.cck Page 2 of 7 Square Comcheck.cck Page 3 of 7 SPACE #T05 TIGARD, OR 97223 ISSUE / REVISION • 05.19.17 SD ISSUE • 06.23.17 75% CD ISSUE 07.31.17 PERMIT ISSUE DRAWING TITLE COMCHECK COMPLIANCE FORMS - ENVELOPE SCALE: N.T.S. PROJECT NUMBER: 51909 SHEET NUMBER Plans reference page/section: 6/ 18.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. 6/ 3. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance Plans reference page/section: -=IT- Tie COMCheek Software Version 4.0.6.1 with Section 503.2.1. `/ 19.Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handling automobiles employs __automatic carbon monoxide sensing devices.f �.} Plans reference page/section: Mechanical Compliance Certificate icate Plans reference page/section: v 4. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test = _ procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program 6/ 20.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When -- _ - _ - exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt _ _ --_ - - y/ 5. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 - _ _ - - _ - - respond to temperature within the zone. of the International Mechanical Code. Section 1: Project Information ✓ P systems. longitudinaljoints, low-pressuresupply Plans reference page/section: 21.Low- ressure duct All and transverse seams and connections of and return ducts are T `�� -A -n = securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in Energy Code:2014 Oregon Energy Efficiency Specialty Code y/ 6. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, accordance with the manufacturer's installation instructions. --- -- =- Project Title:Testa Showroom-Washingston Square Mall prevent supplementary heat operation when the heat pump can meet the heating load. =--- -_ _-= - =_ _= -- Project Type:Alteration Plans reference page/section: Envelope Compliance Method:Prescriptive Plans reference page/section: , 22.Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance Construction Site: Owner/Agent: Designer/Contractor: f/ 7. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Washingston Square Mall Wilson Lee or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or Plans reference page/section: 9321 SW Washington Square Rd.#T-05 ACIES Engineering reduced to a minimum. - --- --- Tigard,OR 97223 3371 Olcott Street 6/ 23.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. -_- - -_ - Santa Clara,CA 95054 Plans reference page/section: In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. _ - 408.522.5255 8. Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set --- - - - info@acies.net v Plans reference page/section: - - - point at time of occupancy. -1--_-_---_- v 24.Piping Insulation.All pipes serving space-conditioning systems(hot water piping for heat systems,chilled water,refrigerant,and brine IJ Section 2: General Information Plans reference page/section: piping systems,and steam piping)are insulated as specified by this section. 1----- -_ y/ 9. Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or �/ 25Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the Building Location(for weather data): Tigard,Oregon programmable control system. requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable --- _ _ _ _ -- Climate Zone: 4c volume fans with motors 10 horsepower. Plans reference page/section; Plans reference page/section: 960 Atlantic Ave. Section 3: Mechanical Systems List V 10.Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. y 6/ 26.Hydronic system balancing.Individual hydropic heating and cooling coils are equipped with means for balancing and pressure test Alameda, CA 94501 Quantity ,System Type_8‘Description Plans reference page/section: connections. 510 865 8663 r/ 11.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat Plans reference page/section: mbharch.com 1 HVAC System 1 (Single Zone): exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air Heating:1 each-Other,Electric,Capacity=14 kBtu/h temperatures meet code criteria. v27.Manuals,The construction documents require that an operating and maintenance manual be provided to the building owner by the No minimum efficiency requirement applies mechanical contractor.See long description for specifications. Cooling:1 each-Hydronic Coil,Capacity=22 kBtu/h,No Economizer,Economizer exception:None Plans reference page/section: No minimum efficiency requirement applies Plans reference page/section: Fan System: FAN SYSTEM 1 -Compliance(Motor nameplate HP method):Passes «/ 12.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by ✓ 28Air System Design and Control.Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control of Sections 503.2.10.1 through 503.2.10.2. Fans: provisions so that the primary systems may be specifically controlled for comfort purposes only. FAN 1 Supply,Constant Volume,800 CFM,0.8 motor nameplate hp P Plans reference page/section: Plans reference page/section: ,5��'�NGINeF�s/O� 29Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motorAC!E" Ca ti Section 4: Requirements Checklist `/ 13.Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. 4w 86687PE it zones,a humidity control device is provided. In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. CheckmarksPlans reference page/section: ENGINEERING X identify requirements that theapplicant acknowledges are met or excepted from compliance. 'Plans reference a e/section'identites where in Plans reference page/section: 3371 Olcott Street ... the laps/secs the requirement can be verified as beingsatisfied. 30.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake p p q 14.Humidity control,Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative Santa Clara,CA 95054 ✓ horsepower(bhp). -4. OREGON n. Requirements Specific To: HVAC System 1 : humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel ph:(408)522-5255 .qy 01 6/ 1. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a or electricity to reduce relative humidity below 60 percent. Plans reference page/section: fx:(408)522-5260 y, 0$. 2 minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Plans reference page/section: 31.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce info Q@acies.net 74 SON 1.E ✓ Copyright Q 2017 Plans reference page/section: airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a y/ 15.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where namaximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical EXPIRATION DATE: 12/31/18 ✓ 2. Hydronic system controls.Hydronic systems of at least 300,000 Btu/h design output capacity supplying heated and chilled water to active humidification or dehumidification takes place. Code,whichever is greater. comfort conditioning systems include controls that meet the requirements of Section 503.4.3. Plans reference page/section: Plans reference page/section: Plans reference page/section: 16.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code. ✓ V 32All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. Generic Requirements: Must be met by all systems to which the requirement is applicable: Chapter 4 of the International Mechanical Code. r/ 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the Plans reference page/section: WASHINGTON ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. Plans reference page/section: y/ 33.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors SQUARE MALL 2. Cooling equipment economizers:The total capacity of all cooling equipment without economizers must be less than 240 kBtu/h.This �/' 17.Demand controlled ventilation(DCV).DCV is required far spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating cQ ✓ project lists 22 kBtu/h capacity without economizers.Thatportion of the equipment dwellingunits and guest rooms is not for multiple zone systems. conditions. 95 V 5 SW WASHINGTON P j P nY serving included in determining the total capacity of units without economizers. Plans reference page/section: Plans reference page/section: SQUARE ROAD Project Title:Tesla Showroom-Washingston Square Mall Report date;07128/17 Project Title:Tesla Showroom-Washingston Square Mall Report date:07/28/17 Project Title:Tesla Showroom-Washingston Square Mall - Report date:07/28/17 SPACE #T05 Data filename:PAMBH1TestalShowroom12017\170257 Washington Square Mall,Portland,OR1Mechanical\Comcheck1Tesla-Washingston Data filename:P:1MBH\Teslal5howroom120171170257 Washington Square Mall,Portland,OR1MechanicallComcheckqesia-Washingston Data filename:P:\MBH\TeslalShowroom120171170257 Washington Square Mall,Portland,OR1MechanicallComcheckgesla-Washingston T1 GAR D C}R 97223 Square Comcheck.cck Page 4 of 7 Square Comcheck.cck Page 5 of 7 Square Comcheck.cck Page 6 of 7 ! ISSUE 1 REVISION 05.19.17 SD ISSUE 06.23.17 75%CD ISSUE 07.31.17 PERMIT ISSUE DRAWING TiTLE COMCHECK COMPLIANCE FORMS - • MECHANICAL SCALE: N.T.S. PROJECT NUMBER: 51909 SHEET NUMBER v 34.Heating outside a building.Systems installed to provide heat outside a building are radiant systems.Such heating systems are __ = - _--_ _=_- controlled by an occupancy sensing device or a timer switch,so that the system is automatically deenergized when no occupants are - - __- - -- present. _- Plans reference page/section: -- Section 5: Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, - _ -_--- specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed - _ _ - - - __ to meet the 2014 Oregon Energy Efficiency Specialty Code,Chapter 8,requirements in COMcheck Version 4.0.6.1 and to comply with the - _ -- mandatory requirements in the Requirements Checklist. ,�� WO't'� WILSON LEE, P.E. ---- 07128/2017 Name-Title Signature Date Section 6: Post Construction Compliance Statement -- -- • HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment v= — provided to the owner. • HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. - La Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date 960 Atlantic Ave. Alameda, CA 94501 510 865 8663 mbharch.com ! CTES g%P% ENGINEERING 3371 Olcott Street Santa Clara,CA 95054 �, OREGON I, ph:(408)522-5255 q fx:(408)522-5260 Y 08, 20 ifo@cies. net �7�SON LEE Copyright©2017 EXPIRATION DATE: 12/31/18 WASHINGTON SQUARE MALL 9585 SW WASHINGTON SQUARE ROAD SPACE #T05 TIGARD, OR 97223 Project Title:Testa Showroom-Washingston Square Mall Report date:07/28/17 Data filename:P:\MSH\Tesla\Showroom\2017\170257 Washington Square Mall,Portland,OR\Mechanical1Comcheck\Tesla-Washingston Square Comcheck.cck Page 7 of 7 ISSUE / REVISION 05.19.17 SD ISSUE 06.23.17 75% CD ISSUE 07.31.17 PERMIT ISSUE DRAWING TITLE COMCHECK COMPLIANCE FORMS - MECHANICAL SCALE: N.T.S. PROJECT NUMBER: 51909 SHEET NUMBER rr� RECTANGULAR DUCTS ACOUSTICAL FLEXIBLE DUCT MAXIMUM SIZE STEEL ALUMINUM — -�__ 2"WIDE METAL STRAPS MAX. 3'-6"LONG (INCHES) (MINIMUM THICKNESS, NOMINAL) (MINIMUM THICKNESS, NOMINAL) _ -- THROUGH 12 0.022 INCH(26 GAGE,GALV.) 0.020 INCH(NO.24 B&S GAGE) 13 THROUGH 30 0.028 INCH(24 GAGE,GALV.) 0.025 INCH(NO.22 B&S GAGE) _ _ -T — --= __ SECURE TO SUPPLY AIR DUCT 31 THROUGH 54 0.034 INCH(22 GAGE,GALV.) 0.032 INCH(NO.20 B&S GAGE) ID H __ .___,_,_ ___ ___ ___ —_-_-- 960 Atlantic Ave. Alameda, CA 94501 510 865 8663 mbharch.com NOT USED NTS 10 NOT USED NTS 7 NOT USED NTS 3 NOTES: -REGISTER CONTAINS CONTROL AT GRILLE �,,EO PROFESS -GRILLE FLANGES MUST COVER DUCT AC'E �`5 �r1GINfF� goy FLANGES 41 86687PE -9` -SEE FLOOR PLAN DRAWINGS FOR DUCT ENGINEERING SIZE AND LOCATION OF REGISTERS (j! 337101cott Street .m Santa Clara,CA 95054 OREGON ev ph:(408)522-5255 fx:(408)522-5260 '9y 08, 20 1 ino@cies. net */ SON LE? Copyright 02017 SUPPLY REGISTER EXPIRATION DATE: 12/31/18 ROUND SPIRAL AIR DUCT WASHINGTON SQUARE MALL -- Ail 9585 SW WASHINGTON NINIT , SQUARE ROAD - SPACE #T05 TIGARD, OR 97223 SUPPLY REGISTER SIDE INSTALLATION NOT USED I NTS 1 9 NOT USED NTS 6 DUCT MOUNTED GRILLE NTS 2 ISSUE / REVISION 05.19.17 SD ISSUE 06.23.17 75% CD ISSUE 07.31.17 PERMIT ISSUE THREADED HANGER ROD 1/2" MIN. DIA. THREADED HANGER ROD 1/2" MIN. DIA. TYPICAL PIPE HANGERS (TYP) ATTACH TO STRUCTURE. SEE DETAIL (TYP) ATTACH TO STRUCTURE. SEE DETAIL 6 & 7/M500 FOR ATTACHMENT TO6 & 7/M500 FOR ATTACHMENT TO MAXIMUM PIPE/TUBING SUPPORT SPACING, FEET STRUCTURE METHODS STIFFENERS STRUCTURE METHODS NOM. THRU 1 11/4 11/2 2 21/2 3 4 FOR OVER 12" SIZE 1' HANGER ROD SEISMIC BRACING ANGLES PIPE 7 FT 7 7 9 10 11 12 14 1-1/2X 1-1/2X3/16OR 12 II GA. CHANNEL. EXTEND & (NJCONNECT BRACING TO STRUC. TUBING 5 FT 6 7 8 8 9 10 12 ABOVE UNISTRUT OR APPROVED NOTE: FOR TRAPEZE HANGER TAKE SPACING OF EQUAL PIPE CLAMP LONGITUDINAL A II SMALLEST SIZE ON TRAPEZE. BEYOND ^n ,__, 011- Il AlihNUT & 1 2" DIA. HANGER RODS LOCKNUT �J WITH 36" MAX. SPACING .� (TYP.) I, ON EACH CHANNEL DRAWING TITLE PIPE HANGER . - *---i v. F:31 [�IIIII�111 MECHANICAL PLATE UNISTRUT P100T mo_orDETAILS CHANNEL OR EQUAL (i.i RUT tt PIPE HANGER 1 1/2" 12 GAGE LICHANNEL OR 2"x2"x1/2" THERMAL HANGER PLATED D HEX THERMAL SHIELD P.S.I. MODEL CS 1" MAX ANGLE SHIELD P.S.I. OR EQUAL MODEL CS OR SCALE: N.T.S. EQUAL NEOPRENE MOUNT SIDE VIEW PROJECT NUMBER: 51909 TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD SHEET NUMBER NOT USED NTS 8 PIPE SUPPORT DETAIL NTS 1 M 50 1