Plans (2)
M EC2017 - 00405 2.1 COMMISSIONING OVERVIEW 7. FUNCTIONAL AND INSTALLATION ISSUES SHALL BE 1. CXA NOTES EACH SATISFACTORILY DEMONSTRATED WHITNEY A. SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS A. THE FOLLOWING PROVIDES A BRIEF OVERVIEW OF TYPICAL ADDED TO THE PUNCH LIST AND CORRECTION FUNCTION ON TEST FORM. CXA, GC, AND OWNER ARCHITECTS, INC. COMMISSIONING TASKS DURING CONSTRUCTION AND SHALL FOLLOW PROTOCOL AS DESCRIBED IN THE REPRESENTATIVE PROVIDE FORMAL APPROVAL OF 700 Commerce Drive I Suite 350 PART 1 - GENERAL GENERAL ORDER IN WHICH THEY OCCUR. GENERAL CONDITIONS. FPT AFTER REVIEW. (� j�]�1 OakBrook,IL60523 I USA 1. CXA PROVIDES A COMMISSIONING PLAN TO C. TEST STRATEGY � 'l.�a ` '"� T : 630.571.1118 I F : 630.571.0518 OUTLINE THE COMMISSIONING PROCESS INCLUDING 2.3 DEFERRED TESTING whltney-archltects.com 1.1 DESCRIPTION 1. EACH CONTRACTOR SHALL COMPREHENSIVELY 'IV 7 20 7 THE ROLES AND RESPONSIBILITIES OF THE A. UNFORESEEN DEFERRED TESTS: �`" A. THIS SECTION DELINEATES THE REQUIREMENTS OF THE OWNER, DESIGN PROFESSIONAL, AND TEST ALL SYSTEMS FOR WHICH THEY ARE +j�•) IL. CORPORATE LIC. 184-001 580 CONTRACRESPONSIBLE TO PROVIDE TO THE PROJECT. �� ��C'' PROCESS TOFOR THE FOLLOWINGR IN THE NACTIVTES:OF THE COMMISSIONING DCOENTIIFYITTHE LOGISTICSNING AGENT. TSCHEDULES HE PLAN HANDALL ALSO 2. SYSTEMS THAT CONTAIN MANY REPEATED IDENTICAL 1 BUILDING STRUCTURE, REQUIREDP CCU DP SING LI°i1511N MANAGEMENT PROTOCOLS ASSOCIATED WITH THE DEVICES MAY BE SELECTED AND DEMONSTRATED CONDITION, OR OTHER DEFICIENCY, MAY BE 1. PARTICIPATION IN COMMISSIONING MEETINGS COMMISSIONING PROCESS. TO THE PROJECT TEAM BASED ON A SAMPLING DELAYED UPON APPROVAL OF OWNER. HESE �S 2. COMMISSIONING SUBMITTAL REQUIREMENTS 2. CONTRACTORS SUBMIT NORMAL COMPREHENSIVE STRATEGY AT THE OPTION OF THE CXA. TESTS SHALL BE CONDUCTED AS SOON AS \ 3. EQUIPMENT INSTALLATION AND START-UP FOR PRODUCT AND EXECUTION SUBMITTALS AS HOWEVER, NO FEWER THAN THE GREATER OF 10 POSSIBLE. SYSTEM COMPONENTS SPECIFIED. DEVICES OR 10 PERCENT OF ANY GROUP OF Environmental Systems Design,Inc. 4. SYSTEM TESTING AND BALANCING 3. DESIGN TEAM REVIEWS SUBMITTALS AND RETURNS IDENTICAL DEVICES SHALL UNDERGO FUNCTIONAL B. OPPOSITE SEASON TESTING: TESTING PROCEDURES SHALL 175 West Jackson Blvd.Suite 1400 5. FUNCTIONAL OPERATIONAL DEMONSTRATION OF TESTING. BE REPEATED AND/OR CONDUCTED AS NECESSARY Chicago,Illinois 60604 TO CONTRACTORS. CXA REVIEWS SUBMITTALS FOR / 312 372 1200 fax 312 372 1222 SYSTEM PERFORMANCE EQUIPMENT SYSTEMS IN THE COMMISSIONING DURING APPROPRIATE SEASONS. "OPPOSITE SEASON" DPRLicenseNol a4-000892 1L 6. COMMISSIONING DEFICIENCIES SI D. NON-CONFORMANCE: TESTING IS PRIMARILY FOR ENVIRONMENTAL SYSTEMS AND PROGRAM SIMULTANEOUSLY WITH DESIGN TEAM B. THE CONTRACTOR SHALL: AND SUBMITS COMMENTS TO DESIGN TEAM. 1. CXA SHALL DOCUMENT RESULTS OF FUNCTIONAL SHALL BE REQUIRED WHERE SCHEDULING PROHIBITS g.,‘, PPOf ;, 1. PROVIDE SCHEDULING AND COORDINATION OF 4. DESIGN PROFESSIONAL RECEIVES AND REVIEWS PERFORMANCE TEST ON FPT FORMS. DEFICIENCY THOROUGH TESTING IN ALL MODES OF OPERATION. AIR wesCOMMISSIONING ACTIVITIES WITH SUBCONTRACTORS O&M SYSTEMS MANUALS AS PART OF NORMAL OR NON-CONFORMANCE ISSUES SHALL BE NOTED HANDLER AND CENTRAL HEATING SYSTEM TESTING FOR 64336 PE AND CXA (COMMISSIONING AGENT) SUBMITTALS. CXA ALSO REVIEWS SUBMITTAL FOR AND REPORTED TO COMMISSIONING TEAM AS A HEATING RELATED MODES OF OPERATION AND CONTROL CONFORMANCE TO PROJECT INTENT. PUNCH LIST ITEM WITH SPECIFIC RESPONSIBILITY LOOPS SHALL BE TESTED WHEN THERE IS AN ADEQUATE OREGON 2. PERFORM EQUIPMENT INSTALLATION AND START UP 5. CXA COMPLETES DEVELOPMENT OF FUNCTIONAL INDICATED. DIFFERENTIAL TEMPERATURE BETWEEN THE OUTSIDE AIR PERFORMANCE TESTS BASED ON SUBMITTED 2. CORRECTIONS OF MINOR DEFICIENCIES IDENTIFIED AND THE CONDITIONED AIR WITHIN THE FACILITY TO PLACE , G�R11,'' 3. VERIFY THE FUNCTIONAL READINESS OF SYSTEMS TO BE TESTED PRIOR TO SCHEDULING AND DOCUMENTATION AND SUBMITS TO COMMISSIONING MAY BE MADE DURING TESTING AT DISCRETION OF A DEMAND ON THE OPERATIONAL SYSTEMS. THE CXA DEMONSTRATING THE FUNCTIONAL OPERATIONAL TEAM FOR REVIEW AND COMMENT, APPROXIMATELY CXA. IN SUCH CASE, DEFICIENCY AND SHALL SCHEDULE THE OPPOSITE SEASON TESTING DURING I , a PERFORMANCE ONE WEEK PRIOR TO FUNCTIONAL PERFORMANCE RESOLUTION SHALL BE DOCUMENTED ON THE WARRANTY PERIOD TO COINCIDE WITH A DESIGN DAY . ITVN Alt: 1 4. CONDUCT FUNCTIONAL PERFORMANCE TESTING IN TESTING. FINAL FORMAT OF TESTING PROTOCOLS, PROCEDURE FORM AS A RESOLVED ISSUE. CONDITION WHEN POSSIBLE. THE PRESENCE OF THE CXA BASED ON REVIEW COMMENTS, ARE PREPARED BY 3. EVERY EFFORT SHALL BE MADE TO EXPEDITE 5. CORRECT DEFICIENCIES CXA AND DISTRIBUTED. TESTING AND MINIMIZE UNNECESSARY DELAYS, 6. PERFORM FUNCTIONAL PERFORMANCE RETEST 6. THE CONTRACTOR COORDINATES PROPER WHILE NOT COMPROMISING INTEGRITY OF INSTALLATION OF EQUIPMENT. THE CONTRACTOR PROCEDURES. 1.2 EQUIPMENT AND SYSTEMS INCLUDED IN THE COMMISSIONING COORDINATES PROPER TESTING AND BALANCING 4. DEFICIENCIES ARE HANDLED IN THE FOLLOWING PROGRAM OF THE SYSTEMS. MANNER: V--i A. THE FOLLOWING SYSTEMS/EQUIPMENT ARE INCLUDED IN 7. FUNCTIONAL PERFORMANCE TESTING FOR A SYSTEM a. WHEN THERE IS NO DISPUTE ON w THE COMMISSIONING PROGRAM: SHALL BE SCHEDULED UPON COMPLETION OF DEFICIENCY AND SUB-CONTRACTOR EQUIPMENT INSTALLATION, EQUIPMENT STARTUP, 1. EXHAUST FANSACCEPTS RESPONSIBILITY FOR REMEDIAL AND SYSTEM TESTING AND BALANCING. THE w . ROOF TOP UNITS CONTRACTOR WITH RESPONSIBILITY FOR THE ACTION: \ 3. AIR CONDITIONING (AC) UNITS FUNCTIONALITY OF A SYSTEM DEMONSTRATES 1) CXA DOCUMENTS DEFICIENCY AND Q I..L 4. SENSORS (TEMPERATURE SENSORS, THERMOSTATS, SYSTEM FUNCTIONALITY TO CXA. CONTRACTOR'S RESPONSE AND ETC.) 8. CXA COMPILES FINAL COMMISSIONING REPORT INTENTION. CXA POSTS ISSUE TO RECOMMENDING ACCEPTANCE OF PERFORMANCE 0 5. LIGHTING CONTROLS (OCCUPANCY SENSORS, TIME � LIST. CONTRACTOR AND FUNCTIONALITY OR RECOMMENDS REMEDIAL CORRECTS DEFICIENCY AND CD N CLOCK CONTROLS, DAYLIGHTING CONTROLS, ETC.) ACTION AND RE-TESTING. THEN FINAL ` CORRECTS RESUBMITS TO CXA. CONTRACTOR L Q COMMISSIONING REPORT OUTLINES THE ( ADDRESSES ALL ISSUES NOTED ON 1.3 COORDINATION FUNCTIONAL TESTING PROCEDURES, SUMMARIZES ACTION LIST BY CORRECTING O THE RESULTS OF THE FUNCTIONAL PERFORMANCE DEFICIENCIES OR BY POSTING I; CD< A. THE CXA (COMMISSIONING AGENT) MAY WITNESS TEST TESTING, AND IDENTIFIES ANY OUTSTANDING DATE FOR COMPLETION OF ACTIVITIES SPECIFIED IN THE TECHNICAL SPECIFICATIONS DEFICIENCIES. RESOLUTION OF DEFICIENCY. H. C]) I- , AND DESIGN DOCUMENTS AS WELL AS SELECT 9. CONTRACTOR TO PROVIDE A COPY OF 2) THE GC RESCHEDULES TEST WITH CONSTRUCTION TESTS (E.G. PIPING PRESSURE TESTS, CONSTRUCTION DOCUMENTS, ALL O&M MANUALS, Q_ LC)AND CONTRACTOR. NEW DUCT LEAKAGE TEST, ETC.) AND EQUIPMENT START-UP SYSTEM BALANCING REPORT, AND FINAL TEST TIME IS POSTED TO PROJECT d7 TESTS. THE OWNERS REPRESENTATIVE MAY WITNESS COMMISSIONING REPORT TO THE BUILDING OWNER SCHEDULE. O r COMMISSIONING ACTIVITIES AS APPROPRIATE. OR OWNER'S AUTHORIZED AGENT WITHIN 90 DAYS CO OF THE DATE OF RECEIPT OF THE CERTIFICATE b. WHEN THERE IS A DISPUTE ABOUT A B. CONTRACTOR SHALL PROVIDE A MINIMUM OF 48 HOURS OF OCCUPANCY. DEFICIENCY, REGARDING WHETHER IT IS A r NOTICE TO THE OWNERS REPRESENTATIVE OF ANY DEFICIENCY OR WHO IS RESPONSIBLE: CHANGES IN DATE, TIME, AND LOCATION OR ANTICIPATED 2.2 FUNCTIONAL PERFORMANCE TESTING DURATION OF START-UP AND TEST ACTIVITIES. 1) CXA DOCUMENTS DEFICIENCY AND C. TESTS THAT ARE NOT PERFORMED AS SCHEDULED SHALL A. OBJECTIVES AND SCOPE: CONTRACTOR'S RESPONSE AND ON BE CONSIDERED A FAILED TEST UNLESS A MINIMUM 48 1. EACH SYSTEM SHALL BE OPERATED THROUGH ALL TESTINGSUBSPROCEEDSTSTOR HOURS NOTIFICATION OF CANCELLATION OR RESCHEDULING CXA POSTS ISSUE TESTTOPUNCH LIST. WAS RECEIVED BY ALL PARTIES. CONTRACTOR SHALL MODES OF OPERATION (SEASONAL, OCCUPIED, CXA POSTS PUNCH UNOCCUPIED, WARM-UP, COOL-DOWN, PART- AND DISTRIBUTES TO TEAM. REIMBURSE THE OWNER FOR COSTS INCURRED BY THE OWNER AS THE RESULT OF FAILURE TO PROVIDE TIMELY AND FULL-LOAD, ETC.) WHERE THERE IS A 2) THE GC FACILITATES RESOLUTION NOTICE OF CHANGES IN DATE, TIME, LOCATION, OR SPECIFIED SYSTEM RESPONSE. VERIFYING EACH OF DEFICIENCY. OTHER PARTIES ANTICIPATED DURATION OF START-UP AND TEST SEQUENCE IN THE SPECIFIED SEQUENCE OF ARE BROUGHT INTO DISCUSSIONS ACTIVITIES, INCLUDING COSTS ASSOCIATED WITH THE CXA OPERATION IS REQUIRED INCLUDING RESPONSES AS NEEDED. FINAL INTERPRETIVE INVOLVEMENT. TO CONDITIONS SUCH AS POWER FAILURE, FREEZE AUTHORITY IS WITH A/E. FINAL CONDITION, LOW OIL PRESSURE, NO FLOW, ACCEPTANCE AUTHORITY IS WITH D. MEETINGS: EQUIPMENT FAILURE, ETC. THE OWNER. 1. COMMISSIONING MEETING(S) SHALL BE HELD 2. THE CONTRACTOR RESPONSIBLE FOR THE DYNAMIC 3) CXA DOCUMENTS RESOLUTION 1 ISSUED FOR BID/PERMIT 05.19.17 PERIODICALLY BEFORE AND DURING THE OPERATION OF A SYSTEM SHALL DEMONSTRATE PROCESS. REV. DESCRIPTION DATE FUNCTIONAL PERFORMANCE TESTING PHASE TO COMPREHENSIVE FUNCTIONALITY OF THAT SYSTEM. CITY OF TIGARD REVIEW STATUS OF TESTING DISCREPANCIES AND ALL CONTRACTORS THAT HAVE CONTRIBUTED TO 4) ONCE INTERPRETATION AND RESOLUTION HAS BEEN DECIDED, REVIEWED FOR COD COMPLIANCE ISSUES SCHEDULING OF TESTS, RETESTS, AND THE INSTALLATION OF THE SAME SYSTEM SHALL APPROPRIATE PARTY CORRECTS Approved: f c.Xco } u1k.Sukt. VERIFICATIONS. NOT BE REQUIRED TO DIRECTLY PARTICIPATE IN DEFICIENCY, AND CXA IS GIVEN OTC: [ ] PHASE: THE FUNCTIONAL TESTING ACTIVITY BUT SHALL BE NOTICE TO PROCEED FOR RETEST. CONSTRUCTION E. SCHEDULING: REQUIRED TO BE IMMEDIATELY AVAILABLE FOR Permit#: M I a 1;3 1. IN COOPERATION WITH THE CXA, THE RESOLUTION OF ISSUES THAT FALL WITHIN HEIR THE GC AND CXA RESCHEDULE Address: L( le{'j Z CONTRACTOR SHALL INTEGRATE COMMISSIONING SCOPE AND RESPONSIBILITY DURING TESTING. TEST. NEW TEST TIME IS POSTED Suite#: DOCUMENTS ACTIVITIES INTO THE MASTER CONSTRUCTION TO PROJECT SCHEDULE. SCHEDULE. B. COORDINATION AND SCHEDULING: By: ,r�!;!' Dates ell if E. COST OF RETESTING: , rfl�1J ILLI A SE 1.4 SUBMITTALS 1. FUNCTIONAL PERFORMANCE TESTING IS 1. COST TO CONTRACTOR TO RE EXECUTE FPT, IF A. 48 HOURS PRIOR TO FUNCTIONAL PERFORMANCE CONDUCTED FOLLOWING EQUIPMENT INSTALLATION, THEY ARE RESPONSIBLE FOR DEFICIENCY OR OFFICE COPY TESTING, CONTRACTOR SHALL PROVIDE CXA WITH EQUIPMENT START-UP, AND SYSTEM TESTING AND FAILURE, SHALL BE THEIRS. IF CONTRACTOR IS 2. V'RAERNANNGCONTRACTOR COMPLETES A SYSTEM SHEET DESCRIPTION: DOCUMENTATION REQUIRED FOR COMMISSIONINGPRIOR TO THE COMPLETION DATE AS SHOWN ON NOT RESPONSIBLE, COST RECOVERY FOR COMMISSIONING ACTIVITIES. AT MINIMUM, DOCUMENTATION SHALL INCLUDE RE-VISITATION SHALL BE NEGOTIATED WITH THE MANUFACTURER AND MODEL NUMBER, MANUFACTURER'S THE PROJECT SCHEDULE, THE CONTRACTOR MAY GC. REQUEST INITIATION OF FPT. SPECIFICATIONS PRINTED INSTALLATION AND DETAILED START-UP 2. TIME FOR CXA AND THE GC TO DIRECT ANY SPECIFICATIONS lr/1 IV PROCEDURES, FULL SEQUENCES OF OPERATION, O&M 3. COORDINATION AND FINAL SCHEDULING RETESTING REQUIRED BECAUSE A SPECIFIC DATA, PERFORMANCE DATA, ANY PERFORMANCE TEST CONFIRMATION OF FUNCTIONAL PERFORMANCE INSTALLATION OR START-UP TEST ITEM REPORTED PROCEDURES, CONTROL DRAWINGS, AND DETAILS OF TESTING SHALL OCCUR DURING REGULARLY TO HAVE BEEN SUCCESSFULLY COMPLETED, BUT OWNER CONTRACTED TESTS. IN ADDITION, INSTALLATION SCHEDULED COMMISSIONING MEETINGS. DETERMINED DURING FUNCTIONAL PERFORMANCE AND CHECKOUT MATERIALS ACTUALLY SHIPPED INSIDE 4. ALL COMMISSIONING ACTIVITIES SHALL BE FULLY TESTING TO BE FAULTY, SHALL BE BACKCHARGED FLOOR NO.: EQUIPMENT AND FIELD CHECKOUT SHEET FORMS USED BY INTEGRATED INTO THE CONSTRUCTION ACTIVITY TO THE CONTRACTOR. FACTORY�gOR FIELD TECHNICIANS SHALL BE SUBMITTED TO SCHEDULE. THIS INCLUDES MILESTONE DEADLINES 3. CONTRACTORS SHALL BE HELD RESPONSIBLE FOR 1ST FB. CXA WILL REVIEW SUBMITTALS FOR CRITERIA AS SYYSTEM R COMPONENTS COMPLETION OFIN AND HEIS DURATIONSOF OFOR RDUE TO TOES INCURRED TO O 'SS OWNER FOR R EPOOR CaE D RELATED TO COMMISSIONING. REVIEW IS PRIMARILY FUNCTIONAL TESTING OF A SYSTEM. READINESS OR LACK THEREOF. EXPENSES COULD FLOOR INTENDED TO AID IN DEVELOPMENT OF FUNCTIONAL 5. THE GC SHALL PROVIDE 48 HOURS NOTICE TO INCLUDE, BUT NOT BE LIMITED TO, RETESTING TESTING PROCEDURES AND SECONDARILY TO VERIFY CXA REGARDING CHANGES TO THE COORDINATED LABOR COSTS, TRAVEL EXPENSES, AND COMPLIANCE WITH EQUIPMENT SPECIFICATIONS. THE CXA COMPLETION SCHEDULE FOR SYSTEMS TESTING. REMOBILIZATION FOR OWNER AND CONSULTING Scale: Job Number WILL NOTIFY THE CONTRACTOR, OWNERS REPRESENTATIVE, 6. CXA SHALL WITNESS AND DOCUMENT FUNCTIONAL TEAMS. NONE 52322 AND DESIGN PROFESSIONAL OF MISSING ITEMS OR WHERE PERFORMANCE TESTING OF SYSTEMS. DESIGNATED ISSUES MAY EXIST. SUB-CONTRACTOR OR VENDOR RESPONSIBLE FOR F. APPROVAL: North: Drawn: DYNAMIC OPERATION OF A SYSTEM OR DEVICE BJC PART 2 - EXECUTION SHALL DEMONSTRATE SYSTEM FUNCTIONALITY TO cnk'd: Mn 0 . 0 1 CXA. TH nm mu:3/9/2017 ills Namc m9.01.Py I:\option care - portland or\option care - portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright 0 2017 by Environmental Systems Design, Inc. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL SECTION 230900 - TEMPERATURE CONTROLS 2) IN ALL CASES WHERE COPPER PIPE 8e A MINIMUM OF 25% OF THE DUCTWORK CONSTRUCTED WHITNEY SECTION 011000 - GENERAL CONDITIONS AND REQUIREMENTS LABOR AND TOOLS TO MAKE ANY CORRECTIONS TO THE CONNECTIONS ARE MADE TO PIPING OR AN FOR +4.0" W.G. SHALL BE LEAK TESTED IN ACCORDANCE ARCHITECTS, INC. SYSTEM WHEN REQUIRED TO BALANCE THE SYSTEM 1,1 GENERAL REQUIREMENTS ITEM OF EQUIPMENT OF A DISSIMILAR METAL, WITH SMACNA LEAK TESTING MANUAL, LEAKAGE CLASS 6. 700 CommerceDrive I Suite 350 1, THE WORK UNDER THESE SPECIFICATIONS SHALL INCLUDE WITHOUT UNDUE DELAY TO THE TESTING AND BALANCING PROVIDE DIELECTRIC FITTINGS AS HEREIN 9. PROTECT DUCTWORK FROM THE ELEMENTS AND FOREIGN Oak Brook,IL 605231 USA ALL LABOR, SERVICES, MATERIALS AND EQUIPMENT, AND CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL PUT 1. MECHANICAL CONTRACTOR SHALL PROVIDE CONTROL SPECIFIED. MATERIAL, AND COMPLY WITH INTERMEDIATE DUCT T : 630.571.1118 I F : 630.571.0518 PERFORMANCE OF ALL WORK REQUIRED FOR THE ALL EQUIPMENT INTO FULL OPERATION AND CONTINUE ITS WIRING FOR ALL MECHANICAL EQUIPMENT. CLEANLINESS LEVEL IN ACCORDANCE WITH SMACNA'S b. ALL PIPE FOR THE FOLLOWING SERVICES SHALL BE Whitney-archltects.com INSTALLATION OF ALL MECHANICAL WORK AS SHOWN ON OPERATION DURING EACH WORKING DAY OF TESTING AND 2. THERMOSTATS AND SPACE TEMPERATURE SENSORS SHALL "DUCT CLEANLINESS FOR NEW CONSTRUCTION THE DRAWINGS AND HEREIN SPECIFIED. BALANCING. NO TESTING AND BALANCING WORK SHALL MATCH EXISTING. TYPE "L" COPPER: 2. SHOULD THERE BE ANY DISCREPANCIES OR A QUESTION START UNTIL ALL OF THE AIR HANDLING EQUIPMENT HAS 3. THERMOSTATS AND OTHER ENVIRONMENTAL CONTROLS CONDENSATE DRAIN LINES GUIDELINES". IL. CORPORATE LIC. 184-001580 OF INTENT, REFER THE MATTER TO THE ARCHITECT FOR A NEW FILTERS INSTALLED AND COILS HAVE BEEN CLEANED ACCESSIBLE TO THE OCCUPANT, SHALL BE MOUNTED AT DECISION BEFORE ORDERING ANY EQUIPMENT OR BY THE MECHANICAL CONTRACTOR. THE TESTING AND BUILDING STANDARD HEIGHT OR AS OTHERWISE INDICATED, c. ALL REFRIGERATION PIPING SHALL BE COPPER 1.2 DUCTWORK FITTINGS MATERIALS OR BEFORE STARTING ANY RELATED WORK. BALANCING CONTRACTOR SHALL BE KEPT INFORMED AND IN ALL CASES BETWEEN 34 AND 44 INCHES ABOVE TUBING TYPE ACR, OR K BASED ON PRESSURE 1. ALL NEW DUCT TURNS, ELBOWS, ETC., SHALL BE ESD 3. WHERE WORK CONNECTS TO THAT OF ANOTHER TRADE, DURING THE CONSTRUCTION OF THE PROJECT OF ANY FINISHED FLOOR. DO NOT INSTALL SENSORS OR T-STATS REQUIREMENTS. INSTALLED WITH TURNING VANES OR MINIMUM 1134 RADIUS OR TO PIPING OR EQUIPMENT IN PLACE, TAKE MAJOR CHANGES MADE TO THE HVAC SYSTEM. TESTING ABOVE DIMMER SWITCHES. ELBOWS. MEASUREMENTS IN THE FIELD TO MAKE CONNECTING AND BALANCING CONTRACTOR SHALL BE PROVIDED WITH 4. PROVIDE INSULATED BASES FOR THERMOSTATS AND 1 2 VALVES18" Environmental Systems Design,Inc. WORK COME TRUE AND LINE UP WITH THE ITEM BEING ONE (1) SET OF SHOP DRAWINGS ON ALL EQUIPMENT SENSORS MOUNTED ON EXTERIOR WALLS AND COLUMNS. 2. RADIUS ELBOWS, AND LARGER, SHALL BE PROVIDED 3 AND WITH TURNING BLADES AT 1 THE WIDTH OF 175 wChicago,Illinois 60604Blvd Suite 1400 CONNECTED. WHICH THEY WILL BE REQUIRED TO WORK ON WHEN 1. CHECK VALVES IN LINES DISCHARGING AGAINST / 4. MINOR ITEMS AND ACCESSORIES OR DEVICES REASONABLY BALANCING THE HVAC SYSTEM. THE DUCT FROM THE INSIDE RADIUS. TURNING VANES 312 372 1200 fax 312 372 1222 1.2 BASE BUILDING BAS - NOT USED PRESSURES LESS THAN 100 PSIG SHALL HAVE 125-LB. www.esdglobal.com INFERABLE AS NECESSARY, TO THE COMPLETE AND 2. THE FINAL TEST RESULTS SHALL BE TABULATED AND FOUR SEMI-STEEL BODIES, AND FOR PRESSURE 100 PSIG OR SHALL BE PROVIDED WITH HEMMED ENDS. DPR License No.184-0008921L PROPER INSTALLATION AND OPERATION OF ANY SYSTEM, (4) CERTIFIED COPIES SHALL BE SUBMITTED TO THE GREATER SHALL HAVE 250 PSIG SEMI-STEEL BODIES. 3. SQUARE ELBOWS SHALL BE USED ONLY WHERE INDICATED SHALL BE PROVIDED BY THE TRADE CONTRACTOR FOR 1,3 TENANT STANDALONE CONTROLS OR WHERE REQUIRED TO FIT CONSTRUCTION AND ONLY 0PRDf ARCHITECT FOR REVIEW. TWO (2) CERTIFIED COPIES ALL SHALL BE COMPLETE WITH BRONZE TRIM AND GINF SUCH SYSTEM WHETHER OR NOT THEY ARE SPECIFICALLY SHALL BE SUBMITTED TO THE BUILDING OWNER'S 1. GENERAL STAINLESS STEEL SPRINGS. ON LOW PRESSURE SYSTEMS. PROVIDE ALL SQUARE F3' 4 p 'ly CALLED FOR BY THE SPECIFICATIONS OR DRAWINGS. 2. IN THE DISCHARGE OF BASE-MOUNTED PUMPS, PROVIDE ELBOWS WITH TURNING VANES. 64336 PE REPRESENTATIVE NO LATER THAN THIRTY (30) DAYS a. ALL TENANT EQUIPMENT SHALL BE STANDALONE AND 4. AT EACH ROUND DUCT CONNECTION TO RECTANGULAR AFTER TENANT MOVE IN. ALL EQUIPMENT SHOWN INA SPRING LOADED CHECK VALVE. oaEG. dr SECTION 200170 - SERVICES EXECUTION REQUIREMENTS WILL NOT TIE INTO THE BASE BUILDING BAS, 3. ALL VALVES LOCATED IN NATURAL GAS LINES SHALL BE DUCT, FURNISH AND INSTALL A MODEL BMD BUCKLEY .�1. BALANCING REPORT SHALL HAVE AN EQUIPMENT ID TAG4v 11 AIR-TITS TAKE-OFF AS MANUFACTURED BY BUCKLEY AIR WHICH SHALL CORRESPOND TO TAG SHOWN ON 2. AUTO-DIALER BALL VALVES AS FOLLOWS: 1r PRODUCTS, INC„ HANOVER, MAINE. MATERIAL SHALL BE fir ��, 1.1 QUALITY ASSURANCE MECHANICAL AS BUILT DRAWING. a. PROVIDE THE SENSAPHONE WEB600 (PART#: a. 2" AND SMALLER - MILWAUKEE # BA475B GALVANIZED STEEL G-90, 24 GAUGE FOR THE BELLMOUTH Ill-1. EACH MAJOR COMPONENT OF EQUIPMENT SHALL HAVE FGD-W600) WITH 2 HOUR BATTERY BACKUP AND b. 2 " AND LARGER - MILWAUKEE # F90CS150R-02WITH A 26 GAUGE BODY. BELLMOUTH TO INCLUDE F. „. 1.2 AIR SYSTEMS STANDALONE TEMPERATURE SENSOR (PART#: AIR-TITE NEOPRENE GASKET AND SHALL INCLUDE THE MANUFACTURER'S NAME, ADDRESS, MODEL NUMBER FGD-0103) IN EACH MDF/IDF ROOM. ALL PRE-DRILLED HOLES FOR QUICK MOUNTING. EACH UNIT AND RATING ON A PLATE SECURELY AFFIXED IN A 1. BALANCE EACH AIR SUPPLY AND EXHAUST SYSTEM TO MONITORING POINTS, TCP/IP SETTINGS, EMAIL/SMS 1.3 PIPING SPECIALTIES - NOT USED SHALL BE COMPLETE WITH 26 GAUGE BLADE DAMPER CONSPICUOUS PLACE. WITHIN 10% OF QUANTITY SHOWN ON DRAWINGS. ADDRESSES, AND PRE-CONFIGURED MESSAGES TO WITH TWO WING NUTS. 2. CODE RATINGS, LABELS OR OTHER DATA WHICH ARE 2. BALANCING REPORT MUST SHOW INLET STATIC PRESSURE, BE COORDINATE/VERIFIED WITH THE OWNER. 1.4 PIPING INSTALLATION DIE-STAMPED OR OTHERWISE AFFIXED TO THE SURFACE MAXIMUM SETPOINT CFM AND MINIMUM SHUT-OFF CFM AT 1.3 FLEXIBLE DUCTWORK OF THE EQUIPMENT SHALL BE IN A VISIBLE LOCATION. EACH TERMINAL UNIT. 3. CONTROL OF EXHAUST FANS 1. THE PIPING SYSTEM SHALL BE SUPPORTED IN w 3. ALL EQUIPMENT PROVIDED UNDER THESE SPECIFICATIONS 3. BALANCING CONTRACTOR SHALL VERIFY THAT RETURNS, ACCORDANCE WITH MANUFACTURER'S STANDARDIZATION 1. FLEXIBLE DUCTWORK SHALL BE FACTORY FABRICATED SHALL PERFORM WITH THE LEAST POSSIBLE NOISE AND SPECIFICALLY LIGHTING FIXTURE SLOTS, ARE OPEN AND a. THERMOSTATICALLY CONTROLLED EXHAUST FANS SOCIETY (MSS) GUIDES SP-58, 69, AND 89. ASSEMBLY OF CORROSION RESISTANT REINFORCING WIRE in D VIBRATION CONSISTENT WITH ITS DUTY. QUIETNESS OF SHALL NOTIFY MECHANICAL CONTRACTOR IF THEY ARE 1) EXHAUST FAN SHALL BE HARDWIRED TO 2. SUPPORT SHALL NOT BE FROM DUCTWORK, CONDUIT, OR HELIX PERMANENTLY BONDED AND ENCLOSED IN HEAVY OPERATION OF ALL EQUIPMENT IS A REQUIREMENT. ANY NOT. EQUIPMENT, AS DETERMINED BY THE BUILDING OWNER'S 4. BALANCING CONTRACTOR SHALL ADJUST PATTERNS OF REVERSE ACTING THERMOSTAT. FAN SHALL OTHER PIPING BUT FROM THE PERMANENT BUILDING COATED FIBERGLASS FABRIC. DUCT SHALL BE UL LISTEDW REPRESENTATIVE, OR ENGINEER TO BE PRODUCING ADJUSTABLE OUTLETS FOR PROPER DISTRIBUTION. CYCLE ON WHEN SPACE TEMPERATURE RISES STRUCTURE OR EQUIPMENT SUPPORTS. 181 CLASS I AND SHALL COMPLY WITH NFPA 90AH AND { 90B AND ALL OTHER GOVERNMENTAL AUTHORITIES HAVING ��// OBJECTIONABLE NOISE OR TRANSMITTING NOISE OR 5. BELTS AND SHEAVE CHANGES REQUIRED TO MEET ABOVE SETPOINT (76 DEG F. ADJ.) 3. ALL PIPE SHALL BE CUT TO EXACT MEASURE. FULL JURISDICTION. � Q f: VIBRATION TO THE BUILDING SHALL BE REPAIRED OR SPECIFIED AIR VOLUMES SHALL BE DONE AT NO LENGTHS OF PIPE SHALL BE USED. SHORT LENGTHS OF 2. DUCT MATERIAL SHALL BE FACTORY WRAPPED WITH REMOVED AND REPLACED. ADDITIONAL COST. PIPE WITH COUPLINGS WILL NOT BE ACCEPTED. O 4. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES. 6. RECORD AMP DRAW FOR AC UNITS AND VERIFY UNIT SECTION 232100 - PIPING 4. PROVIDE DRAIN, VENT AND TEST FITTINGS TO FACILITATE FIBERGLASS INSULATION WITH A C FACTOR OF .23 OR THESE CODES SHALL BE FOLLOWED AS A MINIMUM. CAPACITY. PIPE LEAK TESTING. SUBJECT PIPING SYSTEM TO LESS. THE INSULATION SHALL BE ENCASED IN A FIRE z 0 CONTRACTOR SHALL PROVIDE HIGHER GRADES OF 7. RECORD DISCHARGE AIR TEMPERATURE AT BOX, AND 1.1 PIPE AND FITTINGS HYDROSTATIC TEST PRESSURE THAT IS NOT LESS THAN RETARDANT VAPOR BARRIER JACKET. MATERIAL AND WORKMANSHIP WHERE SPECIFIED OR DIFFUSER. 1.5 TIMES THE SYSTEM'S WORKING PRESSURE. TEST 3. FLEXIBLE DUCTS SHALL NOT BE LONGER THAN 5'-0" 1. BLACK STEEL 4. FLEXIBLE DUCTWORK SHALL BE SUPPORTED. SHARP N REQUIRED. PROVIDE ALL TESTS REQUIRED BY LOCAL PRESSURE SHALL NOT EXCEED MAXIMUM PRESSURE FOR BENDS, KINKS, AND CONDITIONS THAT RESTRICT AIR FLOW O CODES. 1.3 WATER SYSTEMS - NOT USED a. PIPE SHALL BE BLACK CARBON STEEL. EXCEPT AS ANY VESSEL, PUMP, VALVE, OR OTHER COMPONENT IN IN ANY WAY WILL NOT BE ACCEPTED. 11 cl HEREINAFTER SPECIFIED, PIPE 2-INCH AND SYSTEM UNDER TEST. 5. AFTER HYDROSTATIC TEST PRESSURE HAS BEEN APPLIED 5. FLEXIBLE DUCT SHALL BE FLEXMASTER 4M OR APPROVED 1.2 SHOP DRAWINGS AND AS-BUILTS 1.4 REFRIGERATION SYSTEMS SMALLER SHALL BE ANSI/ASTM A-53 GRADE B, EQUAL. WELDED WITH MILL-ATTACHED EXTRA HEAVY FOR AT LEAST 10 MINUTES, EXAMINE PIPING, JOINTS, AND (f) 1. SHOP DRAWINGS, PRODUCT DATA AND/OR SAMPLES SHALL 1. RECORD SUCTION AND DISCHARGE PRESSURES IN ALL TAPERED RECESSED COUPLINGS AND PIPE 21 INCH CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY BE SUBMITTED FOR ALL EQUIPMENT AS SPECIFIED OR SYSTEMS IN OPERATION AT AMBIENT TEMPERATURES AND LARGER SHALL BE ANSI/ASTM A-53 GRADE B, TIGHTENING, REPAIRING, OR REPLACING COMPONENTS, AND 1.4 DUCT LINING ill. Lid SCHEDULED. SHOP DRAWING PLANS SHALL BE )4" SCALE ABOVE 80 DEG. F. WITH BEVELED ENDS FOR WELDING. EACH LENGTH REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS FOR A PERIOD OF 4 HOURS, CERTIFICATION OF THE 1. ALL ACOUSTICAL DUCT LINING MATERIALS SHALL HAVE FIRE O r- AND SHALL INDICATE LAYOUT OF ALL EQUIPMENT, DUCTS, 2. RECORD ALL MECHANICAL PERFORMANCE DATA FOR OF PIPE SHALL BE LEGIBLY IDENTIFIED AT THE MILL TEST SHALL BE SUBMITTED TO THE BUILDING ENGINEER. AND FUEL CONTRIBUTED AND SMOKE HAZARD RATINGS, DIFFUSERS, BOXES, PIPING, THERMOSTATS, AS WELL AS CONDENSING UNITS. BY PAINT, STENCILING, OR RAISED SYMBOLS AS TESTED BY PROCEDURE ASTM E-84, NOT GREATER C� 6. DRAIN LEAK TEST FLUID, ISOLATE EQUIPMENT FROM ASSOCIATED SIZES AND CFMS. 3. RECORD RUNNING CURRENT OF CONDENSING UNITS. IDENTIFYING THE MANUFACTURER AND CLASS OF THAN: 2. CONTRACTOR SHALL PROVIDE ONE SET OF AUTOCAD FILES PIPE. PIPING. INSTALL PIPING CROSS-CONNECTIONS TO AND TWO SETS OF PRINTS TO BUILDING OWNER'S ASSURE FLOW THROUGH ALL NEW PIPING, FLUSH NEW a. FLAME SPREAD - 25 SECTION 230700 - HVAC INSULATION 1) ALL PIPE FOR THE FOLLOWING SERVICES PIPING WITH WATER UNTIL DISCHARGE RUNS CLEAN. b. FUEL CONTRIBUTED & SMOKE DEVELOPED - 50 REPRESENTATIVE AND ONE SET OF PRINTS TO ENGINEER SHALL BE SCHEDULE 40 BLACK STEEL FOR DRAIN PIPING; REFILL WITH FRESH WATER AND AD LIQUID SHOWING AS-BUILT CONDITIONS OF ALL CONTRACT WORK. 1.1 DUCT INSULATION PIPING 10 INCHES AND SMALLER AND SHALL ALKALINE COMPOUND WITH EMULSIFYING AGENTS AND 2. DUCT LINING, WHERE INDICATED, AND/OR AS HEREINAFTER CONTRACTOR SHALL FURNISH OWNER WITH THREE HAVE A MINIMUM WALL THICKNESS OF 0.375 DETERGENTS TO REMOVE GREASE AND PETROLEUM SPECIFIED SHALL BE JOHNS MANVILLE OR APPROVED INSTRUCTION MANUALS IN BOUND FORM CONTAINING DATA 1. ALL LOW PRESSURE SUPPLY DUCTWORK SHALL HAVE 1 R" COVERING CAPACITIES, MAINTENANCE, AND OPERATION OF FLEXIBLE DUCTWORK INSULATION (UNLESS THE DUCTWORK INCHES FOR PIPING 12 INCHES AND LARGER. PRODUCTS FROM PIPING; CIRCULATE 24 HOURS; DRAIN EQUAL WITH MAXIMUM CONDUCTIVITY AS FOLLOWS: PIPING AND CLEAN STRAINERS. COORDINATE WITH ALL EQUIPMENT AND APPARATUS. MANUALS SHALL BE a) GAS EDITED TO BE PRODUCT SPECIFIC FOR PRODUCTS IS LINED) WITH VAPOR BARRIER: JOHNS MANVILLE TYPE BUILDING AND REFILL PIPING WITH WATER FROM BUILDING a. TYPEI, FLEXIBLE: 0.27 BTU X IN./H X SQ. FT. X _ ACTUALLY INSTALLED ON THE PROJECT. 75 MICROLITE, 3/4" LB. PER CUBIC FOOT DENSITY, b. ALL FITTINGS IN BLACK CARBON STEEL PIPING 21 SYSTEM. DEGF AT 75 DEGF MEAN TEMPERATURE. MAXIMUM LABELED THERMAL CONDUCTIVITY OF 0.28 INCH AND LARGER SHALL BE SHORT OR LONG 7. ALL GAS PIPING SHALL BE CLEANED AND PRESSURE b. TYPED, RIGID: 0.23 BTU X IN./H X SQ. FT. X , BTU/HR./SQ.FT./DEG. AT 75 DEGREE F MEAN PATTERN WELDED FITTINGS OF THE SAME WALL TESTED WITH AIR, CERTIFICATION OF THE TEST SHALL BE DEGF AT 75 DEGF MEAN TEMPERATURE 1.3 DEMOLITION AND DISPOSITION OF REMOVED EQUIPMENT TEMPERATURE PER INCH OF THICKNESS SPECIFIED FACED THICKNESS AND OF THE SAME MATERIAL AS THE SUBMITTED TO THE BUILDING ENGINEER. c. TYPE I LINER SHALL BE USED WITH RECTANGULAR WITH RATED ALUMINUM FOIL, FIBERGLASS REINFORCED PIPE TO WHICH THEY ARE ATTACHED. THEY SHALL 8. PRESSURE TESTING SHALL BE DONE UNDER THE DUCTS AND TYPE II WITH ROUND DUCTS. 1. MECHANICAL CONTRACTOR SHALL REMOVE EXISTING MECHANICAL EQUIPMENT AND MATERIALS AS SPECIFIED OR SCRIM WITH KRAFT PAPER BACKING (FSK). BE IDENTIFIED BY THE MANUFACTURER BY SUPERVISION OF THE BUILDING ENGINEER.9 PROVIDE DRAIN PANS UNDER ALL AC UNITS, CONDENSER 3, SHOP APPLICATION OF DUCT LINER FOR RECTANGULAR AS REQUIRED, WHETHER SHOWN ON THE DRAWINGS OR a. DUCTWORK IN EXPOSED CEILING AREAS SHALL NOT PERMANENTLY ATTACHED TAGS, IMPRINTS, OR OTHER 1 ISSUED FOR BID/PERMIT 05.19.17 APPROVED MEANS, INDICATING THE CLASS OF WALL AND CHILLED WATER PUMPS. DUCTS SHALL COMPLY WITH SMACNA'S "HVAC DUCT NOT TO PREPARE FOR THE NEW WORK. MECHANICAL HAVE INSULATION. THICKNESS AND MATERIAL. 10. PROVIDE DIELECTRIC UNIONS AT DISSIMILAR PIPING CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," REV. DESCRIPTION DATE CONTRACTOR SHALL TAKE POSSESSION OF REMOVED CONNECTIONS. FIGURE 2-19, "FLEXIBLE DUCT LINER INSTALLATION." EQUIPMENT AND MATERIALS AND REMOVE THEM FROM THE 1.2 PIPING INSULATION c. LOW PRESSURE MALLEABLE IRON FITTINGS AND 11. PROVIDE "SETON" OR SIMILAR PIPE MARKERS, OVER THE 4. SHOP APPLICATION OF DUCT LINER FOR ROUND DUCTS ISSUES SITE PROMPTLY, EXCEPT AS SPECIFIED BELOW OR UNLESS 1. INSULATE REFRIGERANT SUCTION PIPING AND FITTINGS UNIONS SHALL BE USED FOR THE FOLLOWING PIPING INSULATION, AT EACH SHUTOFF VALVE AND BOTH SHALL COMPLY WITH INSULATION MANUFACTURER'S OTHERWISE NOTED ON THE DRAWINGS, SERVICES: PHASE: 2. ALL SALVAGEABLE MATERIAL AND EQUIPMENT, INCLUDING WITH FOAMED ELASTOMERIC PLASTIC PIPE INSULATION, SIDES OF EACH FULL HEIGHT WALL PENETRATION AND INSTALLATION INSTRUCTIONS. BUT NOT NECESSARILY LIMITED TO HEATING UNITS, AC THICKNESS SHALL BE 1" ON PIPING SMALLER THAN GAS EVERY 20'0" OF RUN OR CHANGE IN DIRECTION. 5. ALL TRANSFER DUCTS AND EXHAUST FAN DUCTWORK UNITS, N LARGER. SHALL VE T MAINTAINEDMINAL AS UNITS, GOOD�CONDITIONC., SHALL BE REMOVED AND AS POSSIBLE AND 2. INSULATEAND CONDENSATED RAININNES WITH 1"AND THICK, ASTM 1) FITTINGS SHALL BE STANDARD CLASS 150 SECTION 233100 - HVAC DUCTS AND ACCESSORIES 6. PROVIDE A1" 1DUCT CLINING GFOR FIRST 10'-0" OF LOW CONSTRUCTION S TURNED OVER TO THE BUILDING OWNER'S C 547, TYPE I, GRADE A FIBERGLASS PIPE INSULATION BLACK MALLEABLE IRON BANDED SCREWED PRESSURE DUCTWORK DOWNSTREAM FROM TERMINAL DOCUMENTS REPRESENTATIVE. HOWEVER, IF THE BUILDING OWNER'S WITH ASJ. FITTINGS, CONFORMING TO ANSI/ASME 816.3. 1.1 DUCT CONSTRUCTION UNITS. PHASE REPRESENTATIVE DECIDES ANY SUCH MATERIALS ARE OF 3. PIPE INSULATION SHALL BE APPLIED WITH ALL ADJOINING 2) UNIONS SHALL BE CLASS 150 MALLEABLE 1. ALL DUCTWORK SHALL BE GALVANIZED SHEET METAL AND NO VALUE TO THE BUILDING THEN THEY SHALL BECOME SECTIONS FIRMLY BUTTED TOGETHER AND THE IRON, BRASS TO IRON SEAT GROUND JOINT 1.5 ACCESS PANELS THE PROPERTY OF THE MECHANICAL CONTRACTOR WHO LONGITUDINAL SEAM OF THE VAPOR BARRIER LAP UNIONS. MEET THE REQUIREMENTS OF "HVAC DUCT CONSTRUCTION SHALL REMOVE SUCH DISCARDED WORK FROM THE CEMENTED WITH FOSTER NO. 85-75. END JOINTS SHALL STANDARDS" PUBLISHED BY "SHEET METAL AND AIR 1. PROVIDE ACCESS PANELS IN ALL DUCTS ADJACENT TO SHEET DESCRIPTION: PREMISES AND DISPOSE OF SAME. BE SEALED WITH MINIMUM 3" WIDE FACTORY FURNISHED 2. COPPER PIPE AND FITTINGS CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC„" AUTOMATDAMPERS,ICA DAATERS, AT REHEAT COIRE S DAMPERS, AT SMOKE MECHANICAL 3. EXISTING EQUIPMENT OR SYSTEMS WHICH ARE SPECIFIED VAPOR BARRIER STRIPS APPLIED WITH FOSTER NO. 85-75 a. PIPE SHALL BE HARD TEMPERED, SEAMLESS LATEST EDITION. DUCTS DOWNSTREAM OF VAV BOXES TO BE REPLACED BY NEW EQUIPMENT OR SYSTEMS LAP CEMENT. COPPER TUBING, CONFORMING TO ASTM SHALL BE CONSTRUCTED FOR +1.0" W.G. TRANSFER 2. ACCESS PANELS IN DUCTWORK SHALL BE OF 22 GAUGE SHALL NOT BE REMOVED FROM SERVICE UNTIL THE NEW 4. ALL FITTINGS, VALVES, STRAINERS, ETC., IN PIPING 3" ANDDUCTS AND EXHAUST DUCTS SHALL BE CONSTRUCTED GALVANIZED SHEET METAL WITH NEOPRENE GASKETS. SPECIFICATIONS SPECIFICATION B-88. MANUFACTURER'S NAME OR EQUIPMENT OR SYSTEMS HAVE ACTUALLY ARRIVED AT THE LARGER AND ALL FLANGES IN ANY SIZE PIPE SHALL BE TRADEMARK AND TYPE OF TUBING SHALL BE FOR -1.0" W.G. DUCTS UPSTREAM OF TERMINAL UNITS PANELS IN INSULATED DUCTWORK, SHALL HAVE 1" THICKFIBERGLASS INSULATION BETWEEN TWO THICKNESS OF PROJECT SITE. INSULATED WITH FABRICATED MITERED OR MOULDED INDENTED OR OTHERWISE IDENTIFIED AT 3 FOOT SHALL BE CONSTRUCTED FOR +4.0" W.G. UNLESS NOTED SEGMENTS OF FIBERGLASS PIPE INSULATION. SEGMENTS INTERVALS. OTHERWISE. ALL SUPPLY AND RETURN DUCTWORK SHALL SHEET METAL. THE AIRSIDE SHEET METAL ON INSULATED SHALL BE FIRMLY BUTTED AND SECURELY WIRED IN "A". SECTION 230579 - TESTING, ADJUSTING AND BALANCING BE CONSTRUCTED TO SMACNA SEAL CLASS PANELS SHALL BE WELDED OR MECHANICALLY LOCKED IN FLOOR NO.: PLACE WITH 16 GAUGE SOFT ANNEALED COPPER CLAD 1) FITTINGS IN COPPER TUBING 21 " AND POSITION, PANELS UP TO 15" SHALL BE PROVIDED WITH � 2. ALL DUCT SIZES SHOWN ON PLAN SHALL BE INSIDE WIRE WRAPS. APPLY A %" THICK COAT OF INSULATION SMALLER SHALL BE WROUGHT SWEAT TYPE TWO CAM LATCHES, ONE ON EACH SIDE. PANELS OVER 1ST 1.1 GENERAL REQUIREMENTSCLEAR DIMENSIONS. 15" MANUFACTURER'S INSULATING CEMENT OVER INSULATION FITTINGS MANUFACTURED OF SEAMLESS 3. MECHANICAL CONTRACTOR SHALL PROVIDE (AT NO EXTRA SHALL BE PROVIDED WITH FOUR CAM LATCHES, TWO 1. TESTING AND BALANCING CONTRACTOR SHALL BE AND FINISH WITH A GLASS CLOTH JACKET OR A SPIRAL TUBING FORGED BRONZE OR BRASS ROD TO COST) ALL NECESSARY RISES, DROPS, AND OFFSETS IN ON EACH SIDE. ALL PANELS SHALL BE OF SUFFICIENT FLOOR INDEPENDENT OF THE MECHANICAL CONTRACTOR AND WRAP OF STRETCHABLE GLASS TAPE BETWEEN TWO COATS MEET THE STANDARDS OF ANSI/ASME B16.22. SIZE FOR EASY ACCESS TO AND THE SERVICING OF CERTIFIED MEMBER OF EITHER MBC, TAB OR TABB. THE OF FOSTER NO. 30-36 AFTER CEMENT IS DRY. ALL FITTINGS IN COPPER TUBING 3-INCH DUCTWORKOL IONSATISFY THEFIHED CONDITIONS. DAMPERS, DAMPER MOTORS, COILS, ETC. MECHANICAL CONTRACTOR SHALL COOPERATE WITH THE 5. ALL FITTINGS, VALVES, STRAINERS, TRAPS, ETC., IN PIPING AND LARGER MAY BE CAST RED BRONZE 4. UPON COMPLETION SYSTEMOF INSTALLATION OF DUCTWORK, TC. " SOLDER TYPE FITTINGS, MEETING THE CLEANR ENTIREA OF RUBBISH, PLASTER, DIRT, ETC. TESTING AND BALANCING CONTRACTOR AND SHALL 2� AND SMALLER SHALL BE INSULATED WITH THE BEFORE INSTALLING GRILLES OR DIFFUSERS. 1.6 FIRE DAMPERS - NOT USED Scale: Job Number: PROVIDE SUFFICIENT TIME BEFORE FINAL COMPLETION OF INSULATION MANUFACTURER'S INSULATING CEMENT APPLIED STANDARDS OF ANSI B16.18 AND ASTM 5. PROVIDE VOLUME DAMPERS AT ALL BRANCH TAKE-OFFS. NONE 52322 HIS WORK SO THAT TESTING AND BALANCING CAN BE IN SEVERAL LAYERS TO THE EQUAL THICKNESS OF B-62. FITTINGS OF EITHER TYPE SHALL 6. DUCTWORK SHALL BE SUPPORTED FROM STRUCTURE WITH SECTION 238000 - DECENTRALIZED HVAC EQUIPMENT - NOT USED ACCOMPLISHED. ADJOINING PIPE INSULATION AND FINISHED WITH A GLASS HAVE TUBING STOPS. STANDARD GALVANIZED BAND STEEL HANGERS. North: Drawn: CLOTH JACKET OR A SPIRAL WRAP OF STRETCHABLE 7. FLEXIBLE CONNECTIONS AND TAKE-OFF TO DIFFUSERS BJC A O . O 2^ GLASS TAPE BETWEEN TWO COATS OF FOSTER NO. SHALL BE THE SIZE OF THE DIFFUSER INLET. Chk'd: I\v/I 30-36. TH floc Date:3/9/2017 me Name m9.01 av I:\option care - portland or\option care - portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9O AM kmchone Copyright 0 2017 by Environmental Systems Design, Inc. HVAC SYMBOLS AND LEGEND WHITNEY ,GENERAL NOTES ARCHITECTS, INC. 1. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR 20. MECHANICAL CONTRACTOR SHALL COMPLY WITH BASE EXISTING DUCTWORK, PIPING OR EQUIPMENT 700 Commerce Drive I Suite350 VISITING THE SITE AND VERIFYING ALL EXISTING FIELD BUILDING SPECIFICATIONS FOR ALL STANDARDS OF Oak Brook,IL 605231 USA CONDITIONS PRIOR TO SUBMISSION OF HIS BID. THE WORKMANSHIP REQUIRED, METHODS OF CONTROL SAFETY T : 630.571.1118 I F : 630.571.0518 CONTRACT DOCUMENTS INDICATE APPROXIMATE LOCATION DEVICES, ETC., FOR ALL NEW EQUIPMENT AND MATERIALS x•-•>(-)44(-4( DUCTWORK, PIPING OR EQUIPMENT TO BE REMOVED whitney-architects.com OF EXISTING DUCTWORK AND SYSTEM COMPONENTS AND BEING INSTALLED. ARE DIAGRAMMATIC IN NATURE. THE MECHANICAL 21. DURING CONSTRUCTION, PROVIDE FILTER MEDIA ON NEW DUCTWORK, PIPING OR EQUIPMENT IL. CORPORATE LIC. 1 84-001 580 CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING RETURN AIR RISER, BRANCHES AND ALL FAN POWERED THE ACTUAL LOCATION, ROUTING AND SIZE OF THE BOX RECIRCULATION INLETS (NEW AND EXISTING) USED DUCTWORK AND COMPONENTS. NO EXTRA CHARGES WILL FOR TEMPORARY HEAT. FILTER MEDIA SHALL BE REMOVED C -4 FLEXIBLE DUCT BE ACCEPTED BY THE BUILDING OWNER'S REPRESENTATIVE PRIOR TO CEILING INSTALLATION. Wil:i. FOR WORK THAT HAS TO BE PERFORMED DUE TO THE 22. ALL SYSTEMS SHALL BE INDEPENDENTLY SUPPORTED. MECHANICAL CONTRACTOR'S FAILURE TO ADEQUATELY 23. VOLTAGE FOR ALL EQUIPMENT SHALL BE VERIFIED BY THE I- CAPPED DUCTWORK OR PIPING VERIFY EXISTING CONDITIONS. MECHANICAL CONTRACTOR PRIOR TO ORDERING. Environmental Systems Design,Inc. 2. THE MECHANICAL CONTRACTOR SHALL INCLUDE ALL LABOR, 24. ALL FINAL POWER (LINE VOLTAGE) WIRING OF ALL - CAPPED DUCTWORK OR PIPING 175 West Jackson Blvd.Suite 1400 MATERIALS, AND COSTS REQUIRED TO FACILITATE EQUIPMENT SHALL BE DONE BY THE ELECTRICAL 31237212001 fllinois ax 31237241222 CONSTRUCTION OF THE NEW WORK AND REMODELING OF CONTRACTOR. www.esdglobal.mm ® THE EXISTING SYSTEMS. 25. THE MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE NEW SUPPLY AIR DIFFUSER DPR License No.184-000892 IL 3. ALL PERMITS, LICENSES, APPROVALS, AND OTHER ANY FIREPROOFING REMOVED OFF OF BEAMS IN ORDER PROF or, FOR WORK SHALL BE OBTAINED BY THE TO INSTALL REPAIR, OR REMOVE ANY ITEMS INCLUDED IN rX� EXISTING SUPPLY AIR DIFFUSER Sp\���,GINEFo`r�O�_ MECHANICAL CONTRACTOR AT OWN EXPENSE. THE MECHANICAL CONTRACTOR'S SCOPE OF WORK. `�. 4. MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR AND 26. FINAL INSPECTION AND TESTS SHALL BE MADE IN THE 64336 PE MATERIALS NECESSARY FOR THE INSTALLATION OF A PRESENCE OF THE BUILDING OWNER'S REPRESENTATIVE I SUPPLY AIR DIFFUSER W/ BLANK OFFS i OREGON COMPLETE AND PROPER FUNCTIONING SYSTEM. BY THE CONTRACTOR RESPONSIBLE FOR THE rii 5. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION. ALL NEW EQUIPMENT SHALL BE CLEANED Jay" IDENTIFYING AND INCLUDING ANY ITEMS NOT INDICATED ON AND ADJUSTED AS REQUIRED TO OPERATE SATISFACTORILY NEW RETURN/EXHAUST AIR DIFFUSER � �,� _ -_ THE DRAWINGS BUT NECESSARY FOR THE PROPER AND WITNESSED BY BUILDING PERSONNEL EACH ,, OPERATION OF THE MECHANICAL SYSTEMS. CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, V�J EXISTING RETURN/EXHAUST AIR DIFFUSER PIRATIO DATE: 6. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR INSTRUMENTS, AND MISCELLANEOUS EQUIPMENT REQUIRED COOTS. ALL RDINATING OTHER MECHANICALTRADES, WORK MAKING WITH ANY THE WORK OF FOR NECESSARY 27. PROVIDE COMPETENT OPERATING TECHNICIAN TO INSTRUCT CABINET UNIT HEATER SCHEDULE 1 NEW LINEAR SLOT DIFFUSER MODIFICATIONS INCLUDING OFFSETS TO MECHANICAL WORK THE BUILDING OWNER'S REPRESENTATIVE IN THE AT NO ADDITIONAL COST. OPERATION AND MAINTENANCE OF THE INSTALLED ± Etas EXISTING LINEAR SLOT DIFFUSER 7. REFER TO ARCHITECTURAL ELECTRICAL, PLUMBING, AND EQUIPMENT. U Z SPRINKLER DRAWINGS FOR ADDITIONAL DETAILS. 28. CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIAL Q o W B. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION FOR ONE YEAR AFTER FINAL ACCEPTANCE AGAINST ALL OZQ 0• U Z XXX-S CFM SUPPLY AIR Ili D OF EQUIPMENT, PARTITIONS, WALLS, AND GENERAL DEFECTS OF MATERIAL, EQUIPMENT, AND WORKMANSHIP. P U ~ W >= MANUFACTURER MODEL REMARKS CONSTRUCTION. ANY DEFECTIVE MATERIALS OR WORKMANSHIP AS WELL AS Q SERVICE Z 0 w n Z w 9. SUBMIT DRAWINGS T HES INDICATING RICA ANY FROM MRTHE HE DAMAGE TO THE WORK OF ALL TRADES RESULTING FROM Z D ^ Z a w Q OZ U XXX-E CFM EXHAUST AIR SAME SHALL BE REPLACED OR REPAIRED AS DIRECTED 0 P J c/) O 2 a 1- INSTALLATION. cn Q Q 10. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND FOR THE DURATION OF THE STIPULATED GUARANTEE w U W Y O = z cn XXX-R CFM RETURN AIR SHALL BE FOLLOWED AS CLOSELY AS ACTUAL PERIOD. a Q i .� > d in p cn ♦ 1 O CONSTRUCTION OF THE BUILDING AND THE WORK OF 29. ALL DUCTWORK SHALL BE GALVANIZED SHEET METAL OF CUH-1 .01 VESTIBULE 135 200 6 277 1 YES QMARK EFQ6007 SEE NOTES NG NATURAL GAS v Q _, OTHER TRADE CONTRACTORS WILL PERMIT. ALL CHANGES GAUGES AND CONSTRUCTION IN ACCORDANCE WITH FRHM DRAWINGS CONENTRACTORS TO MAKE THE WORK OF SMACNA AND ASHRAE STANDARDS. CUH-1 .02 CORRIDOR 137 200 6 277 1 YES QMARK EFQ6007 SEE NOTES z 0 FLEXIBLE DUCTS SHALL NOT BE LONGER THAN 5'-0" 30. . 00 NEW ROOF TOP UNIT EACH CONTRACTOR CONFORM TO THE BUILDING CUH-1 .03 VESTIBULE 101 200 6 277 1 YES QMARK EFQ6007 SEE NOTES CV 31. THE CONTRACTOR SHALL GUARANTEE THAT THE PLENUM CONSTRUCTION AND THE WORK OF OTHER TRADE O Q CHAMBER USED FOR RECIRCULATION OF AIR WILL BE OF CUH-1 .04 OPEN OFFICE 110 200 6 277 1 YES QMARK EFQ6007 SEE NOTES r----1 CONTRACTORS SHALL BE DONE AT THE APPROPRIATE I IN m I EXISTING ROOF TOP UNIT TRADE CONTRACTOR'S EXPENSE. TIGHT CONSTRUCTION AND THAT ALL SOURCES OF AIR L___J O 11. IN GENERAL, ALL PIPING, DUCTWORK AND SIMILAR ITEMS CONTAMINATION FROM TRAPS, SOIL STACKS, DOWNSPOUTS, VENTS, BE ENCLOSED SO THAT NO CONTAMINATED AIR NOTES: NEW EXHAUST FAN Cl) SHALL BE INSTALLED CONCEALED FROM VIEW ABOVE THE WILL BE RECIRCULATED. CEILING, IN PARTITIONS, SHAFTS, OR CHASES, UNLESS 32. ALL EQUIPMENT INSTALLED IN A PLENUM CEILING SHALL 1 . UNIT SHALL BE MOUNTED RECESSED COORDINATE FINAL MOUNTING WITH ARCHITECT. � �� OTHERWISE INDICATED. HAVE A U.L., CSA, OR ETL LABEL 2. PROVIDE REMOTE MOUNTED THERMOSTAT. REFER TO DRAWINGS FOR MOUNTING LOCATION. %/V4 NEW MECHANICAL EQUIPMENT 0, 12. LOCATION OF ITEMS NOT DEFINITELY FIXED BY DIMENSIONS 33. EQUIPMENT NOISE LEVEL SHALL NOT EXCEED 55 DB AT ARE APPROXIMATE ONLY AND EXACT LOCATIONS THE LOT LINE. r -_i 0 r NECESSARY TO SECURE THE BEST CONDITIONS AND L___J EXISTING MECHANICAL EQUIPMENT CO RESULTS SHALL BE DETERMINED AT THE SITE, SUBJECT 34. ALL FRESH AIR INTAKE OPENINGS SHALL BE A MINIMUM TO REVIEW. OF 15'-0" AWAY FROM ANY EXHAUST OR POINT OF NECK SIZING SCHEDULE Mk 13. ALL WALLS SHALL STOP (MINIMUM) 6" BELOW SLAB. CONTAMINATED DISCHARGE AND MINIMUM 10'-0" ABOVE ® EQUIPMENT TAG GRADE OR HAVE ADEQUATE MEANS TO REMOVE DUST. AIR INLET &/OR AIR QUANTITY NECK SIZE REMARKS (U.N.O. - SEE ARCHITECTURAL). SPACES THAT ARE OUTLET TYPE RANGE (CFM) (IN.) © KEY NOTE TAG SEPARATED FROM THE RETURN AIR PLENUM WITH SLAB 35. CONTRACTOR SHALL REMOVE ALL REFRIGERATION DEVICES, TO SLAB PARTITIONS WILL REQUIRE TRANSFER AIR EXPANSION VALVES AND CONNECTORS FROM THE AIR 0-250 8" OPENINGS TO ALLOW SPACE EXHAUST AIR TO RETURN TO STREAM. xx EQUIPMENT TAG THE RISER. TRANSFER AIR OPENINGS SHALL BE SIZED 36. INSTALL PRESSURE RELIEF VALVE ON HIGH PRESSURE 251-350 10" - NOT TO EXCEED 300 FPM. SIDE OF SYSTEM, UPSTREAM FROM ANY LIQUID LINE OMNI 351-450 12" 14. THE MECHANICAL CONTRACTOR SHALL PROTECT ALL SHUT-OFF VALVES. - OT NEW THERMOSTAT EXISTING BUILDING SURFACES, EQUIPMENT, AND FIXTURES 37. ALL REFRIGERATION PIPING SHALL BE COPPER TUBING 451-600 14" - FROM DAMAGE FROM THE CONSTRUCTION WORK FOR THIS TYPE ACR, OR K BASED ON PRESSURE REQUIREMENTS. PROJECT. ANY DAMAGE CAUSED BY THE MECHANICAL 38. ALL REFRIGERATION JOINTS SHALL BE BRAZED. 0-600 15" RETURN APP. 0 NEW CONNECTION CONTRACTOR SHALL BE REPAIRED AT THE MECHANICAL 0-180 6" - CONTRACTOR'S EXPENSE. 181-320 8" - - --® MOTOR OPERATED DAMPER 15. THE MECHANICAL CONTRACTOR SHALL MAKE ALL - ARRANGEMENTS WITH THE BUILDING OWNER'S R-OMNI 321-440 10" - 1 ISSUED FOR BID/PERMIT 05.19.17 -- - CD CONDENSATE DRAIN REV. DESCRIPTION DATE REPRESENTATIVE REGARDING BUILDING RULES AND 441-550 12" REGULATIONS INCLUDING WORKING HOURS, REFUSE - DISPOSAL, SECURITY, INTERRUPTIONS OF BUILDING 551-750 14" - 5--D4-4 SHUT-OFF VALVE ISSUES UTILITIES OR FUNCTIONS, OWNERSHIP OF SALVAGED 0-150 6" MATERIALS AND ANY OTHER ITEM DEEMED TO BE OF PHASE: 16. ITSHALLINLEREST.SE THE MECHANICAL CONTRACTORS TBD-80 2 SLOTS 151-200 8" FLOW ARROW RESPONSIBILITY TO STORE HIS MATERIALSNICACIA MANNER @ 1 201-230 10 4' PLENUM CONSTRUCTION THAT WILL MAINTAIN AN ORDERLY CLEAN APPEARANCE. IF 231-300 12" CAP DOCUMENTS STORED ON-SITE IN OPEN OR UNPROTECTED AREAS, ALL EQUIPMENT AND MATERIAL SHALL BE KEPT OFF THE PHASE GROUND BY MEANS OF PALLETS OR RACKS, AND COVERED WITH TARPAULINS. EQUIPMENT AND MATERIAL IF LEFT OUT IN THE OPEN AND DAMAGED, SHALL BE AIR OUTLETS AND INLETS SHEET DESCRIPTION: REPAINTED OR OTHERWISE REFURBISHED AT THE DISCRETION OF THE BUILDING OWNER'S REPRESENTATIVE. MECHANICAL EQUIPMENT AND MATERIAL IS SUBJECT TO REJECTION AND REPLACEMENT IF, IN THE OPINION OF THE ENGINEER OR Z z Z OH SPECS & MANUFACTURER, THE EQUIPMENT HAS DETERIORATED OR TAG TYPE SERVICE N N w MANUFACTURER z REMARKS BEEN DAMAGED TO THE EXTENT THAT ITS IMMEDIATE USE SCHEDULES IS QUESTIONABLE, OR THAT ITS NORMAL LIFE EXPECTANCY ( ( w W HAS BEEN CURTAILED. W U ~O 0 p 17. PROVIDE ALL HOLES, SLEEVES, CUTTING, PATCHING AND Q w O O FLOOR NO.: CAULKING FOR INSTALLATION OF THIS WORK. CAULKING LL. Z u) Z 2 SHALL CONFORM TO THE FIRE RATING OF THE WALLS. DA SUPPLY SQUARE - ARCHITECTURAL 24"x24" NOTE 1 N/A N/A TITUS OMNI NOTE(S) 2,3 1ST SEAL ALL PENETRATIONS THROUGH BLOCK WALLS. 18. RECHANICAL COCONTRACTORNY NOSHALL ERRESPSBE ONSIBLE FOR EUDIOR © SUPPLY ROUND - ARCHITECTURAL N/A NOTE 1 N/A N/A TITUS R-OMNI NOTE(S) 3 FLOOR CONDUIT, HANGERS, ETC., AT NO ADDITIONAL COST TO ION © SUPPLY LINEAR - PERFORMANCE N/A 8" 1" 2 ACUTHERM TL-C NOTE(S) 3,4,5 OWNER. © SUPPLY LINEAR -LAY-IN N/A NOTE 1 1" 2 TITUS TBD-80 NOTE(S) 3,4,5 19. WHERE PIPES ARE LOCATED INSIDE PARTITIONS, OR Scale: Job Number: FURRED OUT SPACES AND CHASES, OBTAIN INFORMATION NONE 52322 AS TO THEIR EXACT LOCATION AND SIZE AND INSTALL NOTE(S): WORK SO AS TO BE ENTIRELY CONCEALED IN THE 1 . SEE NECK SIZING SCHEDULE. North: Drawn: ALLOTTED SPACE. IF CONFLICTS ARISE MAKING THIS BJC ■ . O . O ^ IMPOSSIBLE, OBTAIN INSTRUCTIONS FROMMTHE ARCHITECT 2. PROVIDE LIGHT SHIELD FOR ALL NON-DUCTED RETURN DIFFUSERS. M0 . 03 BEFORE PROCEEDING WITH THE WORK. Chia:3. CONFIRM BORDER TYPE AND FINISH WITH ARCHITECT. TH 4. PROVIDE ASSOCIATED LINEAR PLENUM BOOT FOR EACH DUCTED DIFFUSER OF SIZE SHOWN ON PLAN. 5. PROVIDE REMOTE BALANCING DAMPER FOR ALL DIFFUSERS LOCATED ABOVE HARD CEILINGS. °°io3roa0" me wme:m,o“., I:\option care - portland or\option care - portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright 0 2017 by Environmental Systems Design, Inc. VENTILATION SCHEDULE WHITNEY ROOM # ROOM NAME OCCUPANCY FLOOR AREA # OF ORDINANCE REQUIREMENTS ACTUAL REMARKS ARCHITECTS, INC. CLASSIFICATION (SOFT.) PEOPLE CFM/PERSON CFM/SQFT. SUPPLY EXHAUST SUPPLY EXHAUST 700Commerce Drive I Sotto 350 Broo101 VESTIBULE MAIN ENTRY LOBBY 46 1 5 0.06 8 - 140 140 - T : 630.5771.1111.111oa8l8 I60523 USA � F : 630.571.0518 102 RECEPTION RECEPTION AREA 254 8 5 0.06 55 - 325 325 - whltney-archltects.com 103 CLOSET STORAGE ROOM 17 0 0 0 0 - 0 0 UNOCCUPIED ROOM IL. CORPORATE LIC. 184-001 580 104 AIS OFFICE SPACE 182 4 5 0.06 31 - 210 175 T-35 TO UNISEX 105 105 UNISEX TOILET ROOM - PUBLIC 50 1 0 0 0 70 65 100 T-35 FROM UNISEX 105 106 TREATMENT PATIENT ROOM 132 2 25 0 50 - 300 300 - OESD 107 TREATMENT PATIENT ROOM 125 2 25 0 50 - 295 295 - Environmental Systems Design,Inc. 109 CONFERENCE ROOM CONFERENCE ROOM 111 6 5 0.06 37 - 335 335 - 175 west Jackson Blvd.Suite 1400 120-T TO MEN'S RESTROOM 140Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 110 OPEN OFFICE OFFICE SPACE 2811 28 5 0.06 309 - 3010 2750 & 140-T TO WOMENS RESTROOMDPR License wnv.e No. 18484-00000892 IL 141 FD PROF 111 CONFERENCE ROOM CONFERENCE ROOM 96 5 5 0.06 31 - 290 290 - 44- S� aGINE-C9 112 CONFERENCE ROOM CONFERENCE ROOM 97 5 5 0.06 31 - 290 290 - 64336 PE 113 CONFERENCE ROOM CONFERENCE ROOM 96 5 5 0.06 31 - 290 290 - OREG• 114 CONFERENCE ROOM CONFERENCE ROOM 96 5 5 0.06 31 - 290 290 - G`Y - i 115 CONFERENCE ROOM CONFERENCE ROOM 101 5 5 0.06 31 - 320 320 - , N� 11`1a� ------ 116 PRIVATE OFFICE OFFICE SPACE 126 3 5 0.06 23 - 275 275 - % INDATC. 117 LOCKERS OFFICE SPACE 161 4 5 0.06 30 - 170 170 - 118 CHANGE OFFICE SPACE 32 1 5 0.06 7 - 50 50 - 119 CHANGE OFFICE SPACE 33 1 5 0.06 7 - 50 50 - 120 PHARMACY PREP PHARMACY (PREP. AREA) 1292 13 5 0.18 298 - 6000 6000 - w 121 ANTE ROOM #1 PHARMACY (PREP. AREA) 113 1 5 0.18 25 - 1000 1000 - in D 122 CLEAN ROOM #1 PHARMACY (PREP. AREA) 296 5 5 0.18 78 - 3000 3000 - 123 PASS-THRU/STORAGE STORAGE ROOM 164 0 0 0.12 20 - 50 50 - w 124 CLEAN ROOM #2 PHARMACY (PREP. AREA) 282 5 5 0.18 76 - 3000 3000 - 125 ANTE ROOM #2 PHARMACY (PREP. AREA) 131 2 5 0.18 34 - 1000 1000 - Q 126 NPR PHARMACY (PREP. AREA) 69 1 5 0.18 17 - 500 1083 - U 0 0 127 VESTIBULE MAIN ENTRY LOBBY 262 3 5 0.06 31 - 440 440 - CN 0 128 STORAGE STORAGE ROOM 83 0 0 0.12 10 - 125 125 - CC 129 WAREHOUSE SHIPPING AND RECEIVING 1905 5 0 0.12 229 - 2160 2110 50-T TO JANITORS 132 ti Q 130 MDF STORAGE ROOM 87 0 0 0 0 - 0 0 UNOCCUPIED ROOM O CD 131 ELEC STORAGE ROOM 58 0 0 0 0 - 0 0 UNOCCUPIED ROOM I"' U) I- 132 JANITORS TOILET ROOM - PUBLIC 53 0 0 0 0 0 0 50 50-T FROM WAREHOUSE 129 0. in 133 VESTIBULE MAIN ENTRY LOBBY 457 5 5 0.06 52 - 775 775 - 134 ELEC STORAGE ROOM 121 0 0 0 0 - 70 70 UNOCCUPIED ROOM cD r 135 VESTIBULE MAIN ENTRY LOBBY 106 1 5 0.06 11 - 175 175 - Cfl 136 STORAGE STORAGE ROOM 122 0 0 0.12 15 - 255 255 - 137 CORRIDOR CORRIDOR - PUBLIC 251 0 0 0.06 15 - 200 200 - 138 CORRIDOR CORRIDOR - PUBLIC 153 0 0 0.06 9 - 120 120 - 139 WELLNESS OFFICE SPACE 105 1 5 0.06 11 - 115 115 - 140 MEN'S RESTROOM TOILET ROOM - PUBLIC 164 3 0 0 0 210 210 330 120-T FROM OPEN OFFICE 110 141 WOMEN'S RESTROOM TOILET ROOM - PUBLIC 191 4 0 0 0 280 245 385 140-T FROM OPEN OFFICE 110 142 CORRIDOR CORRIDOR - PUBLIC 286 0 0 0.06 17 - 310 310 - . 143 PHONE ROOM OFFICE SPACE 54 2 5 0.06 13 - 75 75 - 144 PHONE ROOM OFFICE SPACE 52 2 5 0.06 13 - 75 75 - 145 PHONE ROOM OFFICE SPACE 74 2 5 0.06 14 - 85 85 - 1 ISSUED FOR BID/PERMIT 05.19.17 146 STORAGE STORAGE ROOM 110 0 0 0.12 13 - 85 85 - 147 BREAK ROOM DINING ROOM 482 34 7.5 0.18 342 - 1920 1920 - REV. DESCRIPTION DATE 148 CONFERENCE ROOM CONFERENCE ROOM 335 _ 17 5 0.06 105 - 840 840 - ISSUES 149 UPS ROOM STORAGE ROOM _ 74 _ 0 0 0 0 - 0 0 UNOCCUPIED ROOM PHASE: CONSTRUCTION TOTAL SYSTEM 12498 175 2103 560 29535 30118 DOCUMENTS PHASE FAN SCHEDULE SHEET DESCRIPTION: FAN MOTOR DATA MECHANICAL o Q v P w ,- a w Z = >- } SCHEDULES I- - W m N o_ H U z SERVICE LOCATION TYPE D E r W Ce Q CD w O 0 I-- Cl) zLii _ W c� MANUFACTURER MODEL NO. REMARKS LLJ Q Q X a 0 O Q N W Q J W W CL CK FLOOR NO.: o 2D zu. - o Q 2 > 1 Q Q Q 2W -- � me Wo 1ST K EF-1 .01 NPR - 126 ROOF UPBLAST 600 0.5 1050.0 1 .00 120 1 23 C NO GREENHECK CUE 095 SEE NOTES FLOOR N EF-1 .04 PHARMACY PREP - 120 ROOF UPBLAST 250 0.5 1550.0 1 .00 120 1 23 C NO GREENHECK G 080 SEE NOTES O EF-1 .05 ELEC 131 & 134 ROOF UPBLAST 360 0.75 1541 .0 0.13 120 1 23 C NO GREENHECK CUBE-101 HP-4 SEE NOTES Scale: Job Number: NONE 52322 NOTES: North: Drawn: 1 . PROVIDE SPRING VIBRATION ISOLATION. BJC N10 . 04 2. EF-1 .01 & 1 .04 SHALL BE CONTINOUS OPERATION. EF-1 .05 SHALL BE CONTROLLED VIA THERMOSTAT. chk'd: TH 3. SPEED CONTROLLER TO BE MOUNTED ON FAN UNDER DOME. Mot Oat.:3/9/2017 File Name:ma 414x9 I:\option care - portland or\option care - portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright 0 2017 by Environmental Systems Design. Inc. ROOFTOP PACKAGED AIR HANDLING UNIT WHITNEY REFRIGERATION GAS HEATING SUPPLY FAN TOTAL UNIT ARCHITECTS, INC. COMPRESSORS ELECTRIC DATA 700 Commerce Drive I Sone 350 Oak Brook,IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 whltney-a rchltects.com IL. CORPORATE LIC. 184-001 580 ENT. TEMP. LVG. TEMP CC____ ___So) Environmental Systems Design,Inc. UJ w 175 West Jackson Blvd.Suite 1400 DC lJ CD Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 r�rr�� '1wvrv.esdglobalcom Q V r, = 5 Q LU DPR License No.184-000892 IL W Z = W H Z 0 I LL 0 g L7 = J -- Cn m , cc CD D Z a 12 0 D `p�PROf Z Li_ H Li_ Z CO p 02 CC 2 I- D Z 0 O C) W H H ��V` GINE /0 p SERVICE LOCATION o o CC Li Ii COD O z U z z ., O m Q 0 MODEL NO. REMARKS e`y� 64336 ER 1= C >- O >- p >- w >- co U) co Cn co co co Cn O % D H w U Q = U >- w W > z > n z z - LL Q Q H 2 H U H _1 H _1 1±1 -I w _I W -1 W fY W a D g z a p 2 } Et W D W D W W D W Za W Ur Z = _ D F- al Z OREGO if CDZ J f- F- J U 1J7 U 0_ - 0 U W U U `� o Q Z 2 Z Q Q U Q °3 [� f n m COIb r n pp W W I- I- I- O p O 2 Q Q I-- w O FU- W IU_ IY ( U W a - < • ?1 t ' ' w oDzDoQwQEWwwCCwww Do } a w w H X z 0 z2U o = z co oQ � Q 5WpcLw z wm � 1* Ilia 0 H 0 2 O H U cn U o o o 0 0 o z U H H I I C W c 2 2 < > a D o cn cn 5 cn 2 w CC O 5 D CC (EN E , RTU-1 .01 1ST FLOOR ROOF 2,520 310 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 16.4 - - - - 25 - - - - _ - - t+A1IaN .AI E: RTU-1 .02 1ST FLOOR ROOF 1 ,435 165 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 10.8 - - - - 15 - - - - - - - RTU-1 .03 1ST FLOOR ROOF 1 ,440 185 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 10.8 - - - - 15 - - - - - - - RTU-1 .04 1ST FLOOR ROOF 1 ,920 345 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. _ 11 .9 - - - - 15 - - - - - - - RTU-1 .05 1ST FLOOR ROOF 2,545 245 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 16.4 - - - - 25 - - - - - - - W RTU-1 .06 1ST FLOOR ROOF 840 105 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 18.1 - - - - 25 - - - - - - - LLI D RTU-1 .07 1ST FLOOR ROOF 2,645 230 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 16.4 - - - - 25 - - - _ - - - - RTU-1 .08 1ST FLOOR ROOF 1 ,540 130 EXISTING RTU TO REMAIN. REBALANCE TO CFM'S INDICATED. 11 .7 - - - - 15 - - - - - - - I W RTU-1 .09 1ST FLOOR ROOF 1 ,200 700 40.9 37.1 86.7 _ 65.3 52.3 51 .2 _ 1 _ SCROLL STAGED 50 40 0.75 2.50 14.4 460 3 YES YES 20 YES 1500 11 .8 12 TRANE OABD036A4 NOTES 1-14 < > CC RTU-1 .10 1ST FLOOR ROOF 1 ,400 450 44.9 38.2 81 .4 64.3 _ 48.2 47.0 1 SCROLL _ STAGED 50 40 0.75 2.50 16.5 460 3 YES _ YES 20 YES 1500 _ 10.5 12 TRANE _ OABD048A4 NOTES 1-14 ` Q O vo NOTES: Z N Q 1 . UNIT TO BE PROVIDED WITH HAIL GUARDS ON CONDENSING COIL AND CONVENIENCE OUTLET. 2. UNIT TO BE PROVIDED WITH DOWNFLOW SUPPLY AND RETURN OPTION. O I� Q 3. PROVIDE RAIN HOOD WITH BIRD SCREEN FOR OUTSIDE AIR INTAKE. _ 4. PROVIDE UNIT WITH FREEZESTAT 5. PROVIDE ROOF CURBS AND CURB ADAPTERS AS REQUIRED. ~ 6. PROVIDE UNIT WITH CONDENSATE TRAP. 3 in 7. UNIT TO BE TIED TO EMERGENCY GENERATOR POWER. REFER TO ELECTRICAL PLANS. r 8. PROVIDE WALL MOUNTED THERMOSTAT. REFER TO SHEET M4.01 FOR LOCATION. CO 9. PROVIDE PRICING FOR RTU-1 .09 & 1 .10 FROM TRANE, CARRIER, YORK, AND DAIKIN. COORDINATE WITH ANGSTROM TECHNOLOGY SHEETS. r A) BASED ON "TRANE" WITH REFRIGERANT R410A VARIABLE CAPACITY COMPRESSOR WITH 10-100% CAPACITY CONTROL (5 YR COMP. WARRANTY.) B) PROVIDE UNIT WITH INSULATED CURB, DOUBLE WALL CABINET W/ R-13 INSULATION, STAINLESS STEEL DRAIN PANS, HINGED ACCESS DOORSM AND SINGLE POINT POWER CONNECTION. C) UNIT TO INCLUDE OA INTAKE HOOD, 2" PRE FILTERS, 4" 95% MERV 14 UNIT FILTERS, MODULATING HOT GAS REHEAT, AIR TO AIR MODULATING HEAT PUMP, CONDENSOR FAN WITH VFD, ECM BLOWER MOTOR, AIR FLOW MONITORING.PROVIDE SPACE TEMP. / HUMIDITY CONTROLS WITH BACNET / MSTP COMMUNICATION CARD FACTORY INSTALLED. EVAPORATOR UNIT SCHEDULE EVAPORATOR TOTAL UNIT CD -- FAN DATA ELECTRIC DATA H F z -- f O Z co J m 0 W U j d U Z ' C� 1- __I m 1 ISSUED FOR BID/PERMIT 05.19.17 _= cc .< 2 Z W Q 0 -- O ' > QD f¢- 2 Z W pZz W Z a W z SERVICE LOCATION p >- U } ~ (� LL U U Q Q U W U Z } 0 IY U REV. DESCRIPTION DATE p p r O cn w MANUFACTURER MODEL NO. REMARKS U � w � z zrd -Iz L, W Q : C a F01 a7- zm 0 < ISSUES o I-- 0 (7) 0_ D W ao Z � 0 0 O " 0 a JpH Cep F- `' u_ 0 PHASE: O� v z < CC Zuj ww O z > Z � � WL Lt LU co a W X a Z �' W o CONSTRUCTION W AC-1 .1 UPS ROOM # 149 CEILING OF #149 12.4 10.4 600 75 0.3 1 0.2 1 .4 208 1 YES NO 220 3.2 LIEBERT MMD12E7P000A SEE NOTES DOCUMENTS NOTES: PHASE 1 . PROVIDE SENSAPHONE WEB600. 2. PROVIDE PROGRAMMABLE THERMOSTAT. SHEET DESCRIPTION: 3. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. MECHANICAL 4. PROVIDE 1" ACOUSTICAL DUCT LINING FOR ALL SUPPLY AND RETURN DUCTWORK. SCHEDULES 5. PROVIDE CONDENSATE PUMP. 6. UNIT TO BE PROVIDED WITH WEB INTERFACE CARD. FLOOR NO.: 1ST FLOOR Scale: Job Number: NONE 52322 North: Drawn: k d: ChM 0 a 05 TH Not Date:3/9/301; He Nan„mg-al.tlwg I:\option care - portland or\option care - portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright© 2017 by Environmental Systems Design, Inc. WHITNEY ARCHITECTS, UNIT HEATER SCHEDULE 7oocomercINC. Commerce ISu350 ELECTRICAL Oak Brook.IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 zZ Z z whltney-archltects.com OImo- Q Z Q Z 0 H z IL. CORPORATE LIC. 184-001580 P SERVICE z w = H z 0 J O w a z MANUFACTURER MODEL REMARKS Cz7 ? ^ 1=- v ^ ? U ^ az DZ 0 Q w _i 0O ° �, ° � � _00 � � = al CO D � z i OUt ESD H o Q 0 z02 OO � O z ° u_ ° a � � ou) Environmental Systems Design,Inc. F UH-1 .02 VESTIBULE 127 960 75.0 62.2 4 0.5 0.06 120 1 YES REZNOR UDAP75 SEE NOTES 175 West Jackson Blvd.Suite 1400 . Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 DPR vrww.esdglobaI.ccm NOTES. License No.184-000892 IL 1 . UNIT TO BE CONTROLLED VIA REMOTE WALL MOUNTED THERMOSTAT. vS��R9?NQt 2. UNITS 1 .01 SHALL BE MOUNTED AT SAME HEIGHT AS LOADING DOCK DOOR. e`ti64336 pE f 4. UNIT SHALL BE PROVIDED WITH MANUAL SHUT OFF VALVES. 5. TWO-STAGE NATURAL GAS VALVE "o<OREGO 1 - 6. SHALL BE PROVIDED WITH TOTALLY ENCLOSED FAN MOTORAtittlye,a an'-o 1 IO J nnra. AIR COOLED CONDENSING UNIT SCHEDULE REFRIGERATION TOTAL UNIT CONDENSER COMPRESSORS ELECTRIC DATA i- 0 H i I Z ZCO - D Q ZU CD c/) Z F- a: W W P -LI- >- Q1LL 1d z D L.L. a w ° � 0 � z w D z SERVICE LOCATION U Q Q 0 _ w Q O w v cn O w O O u� MANUFACTURER MODEL NO. REMARKS JF- ~ ZQ W � 0 LL CCd W W d Q C lic: � U °- `; Zm W ( ) QU p W W W' ,., LL O = mcK 0 H = 0 Zy D � � J .� Q 0 CL .� 2 w � 0 Q Q LL � Q QWo Zw zp H O zO Q � LU w z ° I- gH Z 0 � � w Ui Q Q 0U- Uo Jr. CU-1 .1 AC-1 .1 ROOF 1 950 95 29.5 1 0.2 1 RECIPROCAL 9 208 1 YES 15 NO 200 LIEBERT PFH014A-PL7 SEE NOTES Z N 10 NOTES: O N Q 1 . PROVIDE CONVENIENCE OUTLET. CD 2. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. I (n H 3. PROVIDE WITH DISCONNECT SWITCH. 4. PROVIDE UNIT WITH HOT GAS BYPASS Lf Or CD OUTSIDE INSIDE FLEX CONNECTION (n(P) MANUAL ISOLATION CONDENSING VALVE (TYP.) UNIT A oil RS i>.< VOLUME DAMPER U •• RL (OVER ACCESSIBLE ROOF CEILING OR ACCESS = = CHARGING1 ISSUED FOR BID/PERMIT 05.19.17 PANEL) AIMEMIN=Mia .-VALVEREFRIGERANT LIQUID LOW VELOCITY REFRIGERANT SUCTION REV. DESCRIPTION DATE ROUND METAL SUPPLY AIR DUCT -- L f ROOF CURB ISSUES FITTING QUADRANT (SEE PLAN) W/OUTSIDE OPER. PHASE: PROVIDE INSULATION SUPPLY ' GUARD WHERE SUPPLY AIR FLOW FILTER-DRIER CONSTRUCTION NECESSARY0--) Al AIR FLOW lit 1-> A T GLASS DOCUMENTS VOLUME DAMPER s '/R � (OVER ACCESSIBLE 407 ‘On, 6Y a EXPANSIONVALVE (TYP.) PHASE CEILING) It/ - Q '5. AIR RETURN/ EXHAUSTFLODX COIL i' CONICAL SPIN IN LI; CONNECTION RETURN/ • I •• •• SHEET DESCRIPTION: `�r/ AIR EXHAUST FLOW L = W/4, (4" MIN.) OIL TRAP -� T � ;�, �'�•• MECHANICAL `' • • SEAL JOINT WITH ,�., I DETAILS DUCT SEALER HOLD TO MIN. -I I- (WITHDIFFU /VO (WITH VOLUME DAMPER IF J/ INSTALLED IN INACCESSIBLE CEILING) FINISHED FLOOR TO OPEN HUB DRAIN FLOOR NO.: RECTANGULAR AIR OUTLET/INLET TAKE-OFF FOR 1ST ROUND DIFFUSER TAKE-OFF LOW PRESSURE SUPPLY/RETURN-EXHAUST DUCTS FLOOR NOTES: 1 . PROVIDE A HOT GAS BYPASS OR HEAD PRESSURE CONTROL OF CONDENSING UNIT FAN(S) TO Scale: Job Number: PROVIDE LOW AMBIENT OPERATION OF THE CONDENSING UNIT. NONE 52322 2. INSTALL CONDENSING UNIT ON ROOF EQUIPMENT BASE. North: Drawn: 8d: MO 06 Chk'd: ® LOW PRESSURE AIR OUTLET/ TAKE-OFF DETAIL 7 �"\ DX COOLING PIPING SCHEMATIC TH SCALE: NOT TO SCALE \ / SCALE:NOT TO SCALE "ao„ 9 I:\option care — portland or\option care — portland or\DwaS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright© 2017 by Environmental Systems Design. Inc. WHITNEY ARCHITECTS, INC. 700 Commerce Drive I Suite 350 Oak Brook,IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 wh I t n ey-a rc h i to c ts.co m IL. CORPORATE LIC. 184-001580 CIS) HANGER STRAP 1" x 16 GA. Environmental Systeme Design,lnc. ® 10' MAX. SPACING 175 West Jackson Blvd.Suite 1400 Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 vrvw.esdglobal.com DPR License No.164-000892 IL HANGER RODS 3/8" BOLT (MIN.) rxof�t�._ IGIN�Ft,tr,_ FORGED STEEL CLEVIS HANGER CPE .II. BAND SAME SIZE 4011,1 AIL . I . AS HANGER STRAP OREGON �/ INSULATION y„ Z� / PIPE ,__Oilier ___ MINIMUM THROAT • ,/ /�� ``;, 12" LONG X 16 GAUGE SHIELD ="" +'' • 1C RADIUS EQUAL TO — % ONE DUCT DIAMETER �,` i 18" MAX � PROVIDE DAMPER 12" LONG HALF SECTION OF HIGH AT EACH DIFFUSER ' DENSITY INSULATION OR HARDWOOD 1111111111 TAKE OFF BLOCKS WITH VAPOR BARRIER EXTENDED 2" OVER EACH END ' 1.1.1 WD COORDINATED DIFFUSER I.Z MOUNTING HEIGHT WITH LIGHTS. Q Q • 0 0 CI N � NOTE: 1. REFER TO ROUND DUCT HANGING DETAIL FOR ADDITIONAL INFORMATION O in am L0 (8) OPEN CEILING DIFFUSER INSTALL 6 PIPE SUPPORT-DETAIL (TYPICAL HANGERS) C4 ) ROUND DUCT HANGING DETAIL O SCALE: SCALE SCALE: NOT TO SCALE SCALE: NOT TO SCALE CO r SECURE UNIT TO FACTORY CURB W/BOLTS. A 1111 FAN HOUSING P • FACTORY CURB. FLASH FAN MOTOR IIS & COUNTER— FLASH • 1 ISSUED FOR BID/PERMIT 05.19.17 1 I CANT REV. DESCRIPTION DATE STRIP FAN r-n Cr" COUNTER FLASHING ISSUES �" PIPE OR TUBE DUCT �� COLLAR PHASE: /1ROOF FLEX CONNECTION P7 INSTALL UNIT LEVEL FLASHING SLEEVE �— COLLAR CLAMP CONSTRUCTION ON MOUNTING FRAME DOCUMENTS VIBRATION CURB (REQUIRED _ FOR UNITS LARGER THAN I ��.�� PHASE t-...:,.._ 15 TONS) PREFABRICATED I-y I f ROOFINGROOFING FEATHERED 6" , " I NAILING STRIP FAN CURB BY FAN {, 20" MIN. 1/2" MIN. f EDGE OF FLANGE pi" MANUFACTURER ° a 1I\\ i SHEET DESCRIPTION: ROOF MOUNTING FRAME 7- BEYOND SEE NOTE 3 MECHANICAL INSULATION °. ° . a a METAL FLANGE CANT STRIP PLENUM SIZE AS PER PLAN PLASTIC CEMENT DETAILS NAIL AT 3 O.C.\••• .:.: GRAVITY DAMPER OR MAXIMUM ...40Kr7 �:O MOTORIZIED DAMPER at (REFER TOROOF SLAB ROOF CURB DETAIL SPECIFICATIONS AND FLOOR NO.: EQUIPMENT SCHEDULE) 1ST ACCESS DOOR FLOOR NOTES: DUCT CONNECTION 1. PROVIDE TYPE "L" COPPER CONDENSATE DRAIN, P—TRAP ROUTED TO THE ROOF DRAIN. 2. COORDINATE FLASHING REQUIREMENTS WITH THE ROOFING CONTRACTOR. PROVIDE COUNTER FLASHING IF REQUIRED. NOTES: Scale: Job Number: 1. COORDINATE FLASHING REQUIREMENTS WITH THE ROOFING CONTRACTOR. PROVIDE COUNTER NONE 52322 FLASHING IF REQUIRED. North: Drawn: 8 M0 , 07 PIPE ROOF Chk'd: (7) ROOFTOP UNIT INSTALLATION DETAIL ROOF UPBLAST FAN DETAIL 3PENETRATION COLLAR FLASHING TH SCALE:NOT TO SCALE ® SCALE: NOT TO SCALE \\ / SCALE: NOT TO SCALE Ro.,9,20” rue Name ma-oi.a„ I:\option care — portland or\option care — portland or\MOS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright 0 2017 by Environmental Systems Design, Inc. WHITNEY ARCHITECTS, INC. 700 Commerce Drive I Sutte 350 FLEXIBLE SPRING WIRE SHEATH Oak Brook IL 60523 I USA /WITH .050 STAINLESS WIRE INSIDE T whltn y- rchltects.com 630.571.1118 I F 630.571.0518 e a STRUCTURAL o ��'O h 1/��//�����I���� uiiiiiti��.1......•� IL. CORPORATE LIC. 184-001580 .• BEAM STRUCTURAL CEILING ••. • ♦♦♦♦♦ MACHINE BOLT SHIELD • +:•:•:,..„---- • � ESD ,, STRUCTURE 1"x16 GAUGE GAIN. BAND ON 10'-0" ..a : CENTERS FOR DUCT W/ MAX. DIMENSION "'` ` EYE SCREW Environmental Systems Design,Inc. OF 18", WHERE MAX. DIMENSION EXCEEDS / / 175 West Jackson Blvd.Suite 1400 4 / Chicago,Illinois 60604 18" HANGERS SHALL BE SPACED ON 8'-0" NO. 5020-CC ROUND BUTTERFLY RACK AND PINION // 312 fax 312 CENTERS. #12 WIRE % DPR License No.184-0008921L FLEXIBLE DUCT, SEE 1"x22 GAUGE BAND DAMPER-SINGLE BLADE-90 ' OPERATOR CONVERTS 1 PLANS FOR SIZE OPEN/CLOSED OPERATION ROTARY MOTION OF SHAFT �pgpf DUCT SELF TAPPING SCREWS PUSH/PULL `Q TO j �StGINFF o?, (SEAL TO PREVENT AIR LEAKAGE) CONNECT FLEXIBLE DUCT MOTION OF WIRE ' Q, 6036 PE '� DECK INSERTS OR TO COLLAR WITH 22 DIE CAST ' GAUGE CLAMP AND FOUR OREGON EXPANSION BOLTS SHEET METAL SCREWS AND MOUNTING CLIP i 'ton ,,//• SEAL WITH DUCT TAPE '�FINISHED CEILING iiii � 3/8"� THREADED ROD UI ]IIOHIOIIIfr , CEILING DIFFUSER SEE PANELSW/ NO ACCESS I E 7- ION DATE: L MINIMUM THROAT PLANS AND SCHEDULE u Li • - 2"x2"x1/4" ANGLE © MIDPOINT RADIUS EQUAL TO NO MOR E N DTHAN 8'-0" 0 C.UCT JOINTS OR ONE DUCT DIAMETER CEILING _ (6'-O" O.C. IF DUCT WIDTH 3" DIA. PLATED COVER _ IS 60" OR GREATER) ON CEILING (REMOVE V..I TO ADJUST DAMPER) lail BOLTS ON BOTH SIDESI.Z rm BEAM CLAMP OR SOCKET WRENCH USED TO EXPANSION BOLT ENGAGE OPERATOR SHAFT Q FOR DAMPER ADJUSTMENT ' ` Q O v Q ,. ZNQ REMOTE, GEAR OPERATED O ti Q 12 RECTANGULAR DUCT HANGING DETAIL T CEILING DIFFUSER INSTALLS BALANCING DAMPER SCALE: NOT TO SCALE \, y SCALE: NOT TO SCALE SCALE: NOT TO SCALE a. d SINGLE ZONE AIR HANDLING UNITS O CO A. SYSTEM DESCRIPTION: 4 1. ROOFTOP UNIT WILL BE A HEAT PUMP CONFIGURATION, MULTISTAGE OR MODULATING AIR-COOLED DX COOLING, SUPPLY FAN, AND POWERED EXHAUST FAN. 2. ROOFTOP UNIT IS A CONSTANT VOLUME SYSTEM, SERVING SPACES DIRECTLY THROUGH DUCTWORK. 3. ROOFTOP UNIT WILL BE ENABLED TO OPERATE BASED ON A TIME OF DAY SCHEDULE WITH OCCUPANCY OVERRIDES. INITIAL CONFIGURATION: ifi a) CENTRAL SERVICES RTU-1.1-1.10: TYPICAL BUSINESS HOURS. M 4. EACH ROOFTOP UNIT WILL BE PROVIDED WITH PACKAGED FACTORY f \ / FURNISHED CONTROLS WITH PROGRAMMABLE THERMOSTAT LOCATED IN ) SPACE BEING SEREVED. REFER TO SHEET M4.01. EXHAUST 5. ALL LOOSE-SHIPPED CONTROL DEVICES, INCLUDING SPACE AIR 'r - ��+ 0 A R URN TEMPERATURE SENSORS, OTHER SENSORS, AND ACTUATORS, SHALL BE FURNISHED BY THE UNIT MANUFACTURER AND INSTALLED BY THE CONTRACTOR. B. SEQUENCE OF OPERATION: 1 ISSUED FOR BID/PERMIT 05.19.17 1. THE AHU IS A PACKAGED UNIT AND SHALL OPERATE USING THE SEQUENCE OF OPERATIONS PROVIDED BY THE MANUFACTURER. THE UMC REV. DESCRIPTION DATE FOLLOWING SUMMARY IS FOR REFERENCE ONLY. REFER TO THE APPROVED AHU SUBMITTAL FOR ACTUAL SEQUENCE OF OPERATIONS. DATA CONNECT ISSUES 2. EACH AHU UNIT SHALL BE SET TO THE HEATING AND COOLING MODE \\\\\\\\-ISI PHASE: SPACE TEMPERATURE SETPOINTS (OCC HEAT SET: 72T, OCC COOL SET: 75'F, ADJ.). THE AHU SHALL OPERATE USING THE OCCUPIED CONSTRUCTION MODE DEFAULT SETPOINTS. 3. 4. SHU AF TIES SHALL SHUTDOWN AHU UPON ALARM DOCUMENTS STAa) TENANT DEFINED TIME SCHEDULE. M - �� \ ' / \ ' / Z PHASE b) THE AHU SHALL BE DISABLED WHEN IN UNOCCUPIED MODE. — \ ALL OUTPUTS SHALL GO TO THE NORMAL POSITIONS WHEN DX GAS SCHEDULED OFF OR IN ALARM (I.E. OUTSIDE AIR AND OUTSIDE _ _ + �f�* l SUPPLY SHEET DESCRIPTION: EXHAUST AIR DAMPERS CLOSED, RETURN AIR DAMPER OPEN, AIR r� Tr Os. 5 O `+ AIR & HEATING, COOLING, AND SUPPLY / EXHAUST FANS _ MECHANICAL DISABLED). 5. EXHAUST FAN AMS DETAILS a) EXHAUST FAN OPERATES TO RELIEVE EXCESS AIR DURING ECONOMIZER MODE. DB• 6. DISCHARGE AIR TEMPERATURE a) OCCUPIED MODE DAT SETPOINT RESETS BASED UPON FLOOR NO.: HEATING/COOLING DEMAND. b) THE AHU SHALL ENTER ECONOMIZER MODE WHEN OUTSIDE 1ST CONDITIONS ARE SUITABLE. FLOOR 7. OUTSIDE AIR CONTROL a) WHEN OCCUPIED, OUTSIDE AIR DAMPER MAINTAINS AIRFLOW EQUAL TO FIXED MINIMUM SETPOINT (SET: REFER TO SCHEDULE). Scale: Job Number: NONE 52322 North: Drawn: BJCM 0 08 Chk,d:d: ® PACKAGED AHU (W/ GAS HEAT & DX COOLING) TH • NOT TO SCALE v.. 3i.aov ei.N.-:..me.. 1:\option core - portland or\option care — portland or\DWGS\CAD\HVAC\mg_01.dwg 5/23/2017 9:20 AM kmchone Copyright©2017 by Environmental Systems Design. Inc. WHITNEY • ARCHITECTS, INC. 700 Commerce Drive I Suite 350 Oak Brook,IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 whitney-a rchitects.com IL. CORPORATE LIC. 1 84-001 580 III0 0 �4/ 0 0 (8) * Environmental Systems Design.Inc. ....... Chicago,Illinois 80604 312 372 1200 fax 312 372 1222 vi m.esdglobal.com - - - DPR License No.184-000892 IL ,��,�1 rrtUFex I I I I I I I I �1GINE� /�/��\ 64336 PE MIIMISIO • 11111 s, 14;;;;Ne r „., „ ,,, I Lt 6--i --I- -I 1 _ pp 11•I—_ I I "74 ! e' 1 I-111� �42_ 6_� II • 1 33 R a,� m • D E: r � _1 ! - "S R 1 a la7_ _ EFTt 1 11 II II II II 11 r 26) LT - tom''• ►c I-- I - -I- i -+- I- I„ .\ VI Imo, __I Ill $ Jr . __ -I- mo i-{ -1- �--I--I- - illuillisii r r---7� r----i r---- r----i •w 1 - --I--� _I. _• -I- I' - i I i I`�f��' J �37 I , L--AJ I L----.1120 I L- I /,/: /v//rrr//• t;�' 'a _ _ 1_i_L1 _ ■ - - • : =.�lz. .• -r 132 / - r W �.� � ��I.j� A ± yrs moi.• \ � -.. _ _ ___ �,e E e T�/ :" •��IYi, .'/�' , Ytilt' �It/ I"/.f ! E I IIS - `L > o 1 �S _ ;- --- ;_ .I 'Ohl ii7 ' e�ki 14öirlialI IF__ __J I I I Th=I I I I I I I h4-11 I /� 1rcLI � � I �YI I I I I0y, 1 :0 / 1 1 11111 T ter. I I 1 7-I- I IfT-171 1 I i- -1 I - 7-1-1 011 ‘,..... $ . , T i �_ T ■ + + a E I . ■■ ■ t 1 t- t -}” I- -I- + -I- 1- a - r H-/r -r-1 fi 1 _ _ r i - - i I ^,� - fir; .;.•►. yl`):._ �� .f.:r. r I L J _ k.-e ya ' �■ a ' ; II i&-�%;_i -I-=� 1 I /I I I I 1 1 IIJ-7-1- 3,--1 I I Hail:I I U X S II I I I T ; � a Tear d 111 I ,,,,t1 I I I I Il -I I I �I� I %I -T " I I j_ 1 1 -I- -I I- --�-- I + - �— �_�ti rtl�+ I -i-i- h-1t -I- r -i �— fi-i =I—T, --r-4 -I - O Q I �:,.__I__s i �11 +-��T ��� �d ' ___141_ _L i -1- !_41 .1_ � �_J_ -1---I- I 9 -u ri---pn i _I - 1/0 r I I I I l lr r c1 z cti I fi -I I I -I�- L i _I ■■■ — ■r �� ,� �� -1 - I _I IIII I i III 1 I _ /i I 11 I I�I�I r-�-+ I i I I .:� I _ 1 e a 1 fHiEEt+ 1 171 1 1 1 1 _ _LO F -r F—+ -I� fi - �I i I 1 I I H � -�- +-�i -,I_ - _ �46,�i , ' -_ t .rely ,y X I -C I I -I. 4,,,,,,,,/,Ad 0) s__l-►lam, r:J•rc T • ni. - _ _ _ _ _ �r..�.� _ saitt I .:vs��^IK O / II■ � ' ■■ [� 1I■■r ■` >, ■li■■ ■�lrl1��l� 'I�a ■■ ��II 1 auk ! toNiiili■ `� r r rc„, I1IIIl ■■► ■V.■■ fl■tlI ■■■SIIM ■:E _� � T � IT 'ilk ■ % ■rirl■rr1=rtes41 ■■1■■■■■ ill0 \� ■■■■U■■■ ■■ � __e1■ ■ _ ■!■■■■■■■■■■■SM■■S1I■■N110■11M1i■■■■■■ 1�nsmm ■ m■ z � m ® �E � ■nn ■ ■ N ■■ asommm na ■ U■ II■■NMr ■■■I/N■■■■■■■ITII■■N■I`*■■■■■■I■■■hI■■■■■■ MEM■■�■■■I■a■■■ lI1111■MITIENNU■/Ip■■■■■■■■■■111■1■■■1■■■■■EMIIIII■■■■■■ I■■H■■�■■■I■ff■■■ . ISI n■n E�■nnll■■■■o■■■nM■nn■.,� uMnn� ■ I■■n il■-■ti1■■r. ,MI■■■■` ■■■■■v■I■111■■■■■■rJ■■l1■■0�■= 1■■■LMS■■■I■ ■■■ II■ f:; �g e■iI■N /1311111111111111111.111, ■1 A0 IMI■■■■v■■11■■■■■■ I■■■■■■�■■■1■■■■■ IlliTalli ,�tii OS ■■■■l . ri ■I■ ■■■ ■■ ■® ■■■ ■■■ ■ ■■■ Ilr4+C■■■5aw!! I ' ° ■ ■1 `sn■�n. •■ ■■ ■ ■■ ■ ■■ IINaI ■■t<■:��'!; '�� * V IMMO I■■■ M■RIM■■■ ■■■■u■*i1■■■■■■ a■■■te■ ■■■a■■■■ 1 ISSUED FOR BID/PERMIT 05.19.17 IIc■ ■■Plc■Mr W `�i . ■■I I■■ .:+'r="+�="' � a a2ONIN�`!`III■■■■■■ - I■■■�■ ■p, ° • Illi ■ 11Ii! 1■ ►it &i i■■ IS■.Cv t ••••••. ,n■ —: I ■■� ■■ ■■■ I R . DESCRIPTION DATE IIMI�CN IN mr "f■■ ■■■■E■ C - ■■ ■I ■ ■■■ I��i ■�AIL ,;,,� ISSUES Il►iictg1■■�slg��l� z�L3L!a.trap ■ a■■N■■■■M EI■■■■■VI ■om■� ENE ___• UI illI PHASE: 111■■FIQi�i■ITI dIIMEBEI in/R i■■■ I!■■11 ■C !■■■■■I i■� �prl■■■�-c/ 1 iiia son i ,/ / II■ ■ G►.ii eat? Mea ■■ ■ .�.-E.J , Ns I■ ■I ■ t ■■■-■1■ CONSTRUCTION II■ IY ■�. �tl .■■ ■■ 1■II It_ ; F.i ■ i7 I■ ■I ii ■■■ DOCUMENTS II■■■■■■■ ■■■ �! :,:■■ ■P a. —.—, 9ii�i ii lair: ■i - liana — —,— IIUEc IIUUUmbamm innn; : : a � Win■+ ai Imam. Egos Im p sa s m111111// 1 /1'A ow PHASE . 1 I SHEET DESCRIPTION: MECHANICAL KEYNOTES: MECHANICAL GENERAL NOTES: MECHANICAL O DEMOLISH ALL DUCTWORK, CONTROLS, AND EQUIPMENT 1. DEMOLISH INDICATED. DEMO DUCTWORK, DIFFUSERS, AND TERMINAL UNITS AS DEMO ASSOCIATED WITH EXISTING RTU. Q AC UNIT IS EXISTING TO REMAIN NO CHANGE. PLAN ® EXHAUST FAN IS EXISTING TO REMAIN. NO CHANGE. FLOOR NO.: ® UNIT HEATER SHALL BE RELOCATED. DISCONNECT FLUE VENT AND 1ST NATURAL GAS LINE. NATURAL GAS LINE AND FLUE VENT SHALL BE EXTENDED TO NEW UNIT HEATER LOCATION. THERMOSTAT FOR UNIT FLOOR • HEATER SHALL BE RELOCATED PER LOCATION INDICATED ON a, M4.01. J,. DUCTWORK DROPS FROM RTU SHALL BE DEMOLISHED. ROOF scale: Job Number: ' O zl PENETRATION SHALL BE PATCHED AND SEALED BACK TO EXISTING 118"=1'-0" 52322 CONDITION. North: Drawn: 1 0 4' 8' 16' 0 Ch Bd: M 2 ■ 0 1 JS no,on.;3n,. ...Aid., m.d., I:\option care – portland or\option care – portland or\DWGS\CAD\HVAC\md_01.dwg 5/23/1017 9:20 AM kmchone copyright®2017 by Environmental Systems Design, Inc. WHITNEY ARCHITECTS, INC. 700 Commerce Drive I Suite 350 Oak Brook,IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 wh I t n ey-a rc h i t e c ts.co m IL. CORPORATE LIC. 184-001 580 IIII 0 0 \4/ 0 to r�+\ 9 Environmental Systems Design,Inc. 175 West Jackson Blvd.Suite 1400 Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 www.esdglobal.com DPR License No.184-000892 IL I I I I I I Fp PROP / 64336 PE CA) ......• _.alikanimn.m.. • i vG I I I I OREGO fr�s ;Jri ax, liFtett,h15nrc: I 7 0 , I I 1,x,, © a LJJ ® L- D I I I I w Z r1 , r---it �x� X X W i I I I��I /� < Q - � O 1 ©J 1 x 14 O L--J I I I I 0 Li ® Z N Q LJO ///' 1:4:Vril/ O rr1 `0 0_ i.), rBTh - - - - 1 - - r---I _ r-j�_ _ r--� - �_ - - _ ICA 1 I �� I-3 0 I 1 �y CO � I I I- I 14 I It I-e I � elet L__J L-_J O ®L__J /Jo® R I I I gO3 U O - 4 1 x7I l- I Fx� I i ISSUED FOR BID/PERMIT 05.19.17 1 I � ly � � I __J I t- I REV. DESCRIPTION DATE L--J / I I I I I ISSUES PHASE: CONSTRUCTION '"A11d • DOCUMENTS dr �`�ilk PHASE SHEET DESCRIPTION: MECHANICAL DEMOLITION KEYNOTES: MECHANICAL DEMOLITION GENERAL NOTES: ROOFTOP ® EXISTING ROOFTOP UNIT TO BE DEMOLISHED. 1. ALL RTU'S SHOWN TO BE DEMOLISHED SHALL ALSO INCLUDE MECHANICAL DEMOLITION OF CURBS, RAILS, PIPING SUPPORTS, ETC.. O EXISTING CONDENSING UNIT TO REMAIN. DEMO PLAN 2. PATCH ROOF STRUCTURE WHERE DUCTWORK, PIPING, EQUIPMENT O ROOFING CONTRACTOR TO DEMOLISH EXISTING VENT OR FLUE. OR ANY OTHER ITEMS HAVE BEEN REMOVED. CONTRACTOR SHALL FLOOR NO.: PATCH ROOF WEATHER TIGHT TO MATCH EXISTING. COORDINATE ALL ROOFING WORK AND ALL ROOFING AND INSULATION REQUIREMENTS WITH LANDLORD, ARCHITECT, AND O EXISTING RTU CHANGE. REFERNTO M4.01 FORD GAS RTU CONNECTION DUCTWORKOCHANGES.REMAIN. NO STRUCTURAL ENGINEER. ROOFTOP (ThO EXISTING EXHAUST FAN SHALL BE TESTED TO ENSURE IT IS IN PROPER WORKING ORDER. CONTRACTOR TO PROVIDE SEPARATE LINE ITEM TO REPLACE. Scale: Job Number: 1/8"=t-0" 52322 © EXHAUST FAN SHALL BE DEMOLISHED. North: Drawn: 07 EXISTING UNIT HEATER FLUE VENT TO REMAIN. UNIT HEATER BJC M 2 R F SHALL BE RELOCATED PER M2.01 & M4.01. DUCT SHALL BE 0 4' 8' 16' 0 Chk'd: EXTENDED TO EXISTING FLUE PENETRATION. leirll Js nmmo-.31912017 I:\option care — portland or\option care — portland or\UWGS\CAU\HVAC\mrtd_01.dwg 5/23/201 / 9:20 AM kmchone Copyright© 2017 by Environmental Systems Design, Inc. WHITNEY ARCHITECTS, INC. 700 Commerce Drive I Suite 350 Oak Brook.IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 whitney-a rchitects.com IL. CORPORATE LIC. 184-001580 ck---s----0 CI © © r4) © ® to \.) ® 175s Wes Enck Systems Design.I00. West Jackson Blvd.Suite 1400 Chicago,Illinois 60604 312 372 1200 tax 312 372 1222 www.esdglobal.com DPR License No.184-000892 IL I I I I I I I I o PROF 4, OGINE 3 84338 PE C. . EA) =i1- `('`f `I Prr, 1r OREGON i Mit c ,1 1 I / rNCp NG, 75 I ■ Thr • IENDA : II � I r L L - - J ----L-_4I� 5---1_1 . � � NG JP TO RTU I.10 I IIIII J w PUMPED CD DOWN I ___ ■ 1� 7 TO OPEN SITE DRAIN. I d w 1" NG, 75 MBH r -- - ■�i ri I I I I I w saf._ NG, 50 MBH - �I Q MI o E I Q�'' : E U 1 jr �p� . - — z N Ct 01 1.► E I 1 1 Sli 0 ~ ii■i �I�■- Ts !I � NG, 100 Mt�H�■ J■=Ilii �iii►� _ _ IMMI ■ F. co 1— . -- _ a E "sr TO RTU- .09 � ■■■iii■ R lr �. 0- a)B --- _ - - - - - - 11... _ _ ■ e■■ CO '111111�� I PI 1,1 1 1 1 �i�/ �, „ II, .,.,, •UMPE C) _ -1J [ 1 1 � . 1J MI I I I 11 t e '_■■■■■■■■ r 1 ISSUED FOR BID/PERA1fT 05.19.17 .;;■Ei�°i I■■■■II■■■■ �� ME '_■■■11■■■■ IS REV. DESCRIPTION DATE ISASA"MP - "4 I1—il ■a1MM■■■■E = 1 -- 1 1111r1i1.iEiinmgellin. IWANIIMIL11lll ISSUES PHASE: A / hlIalt■II11 1 CONSTRUCTION■1 - DOCUMENTS ■■\■■■IIIc in: ■ \II ,IN 1 ■ 11 ■ I ■ N PHASE OSHEET DESCRIPTION: MECHANICAL EQUIPMENT: MECHANICAL GENERAL NOTES: MECHANICAL O 1. SEE MECHANICAL DETAILS FOR ALL PIPE TRIM AND 1.01 ANAL CONNECTIONS TO MECHANICAL EQUIPMENT PIPING RELOCATED REQUIRED. PLAN ®75 MBH 2. PUMP AND PITCH ALL CONDENSATE DRAIN LINES TO ■ 1 02 LOCATION SHOWN ON PLAN. PROVIDE CLEANOUTS ON FLOOR NO.: CONDENSATE DRAIN LINES AT ALL 90 DEGREE NEW ELBOWS OR STRAIGHT PIPE OVER 30' IN LENGTH. IST FLOOR Scale: Job Number: 118'=1'.0' 52322 North: Drawn: 1 BJC 0 4' 8' 16' � Chk'd: M 3 ■ 0 1 1�\F!Idlailli JS MIX Date 3/9/2017 r iile Na,..:mp 014w9 I:\option care — portland or\option care — portland or\DWGS\CAU\HVAC\mp_01.dwg 5/23/201 / 9:20 AM kmchone Copyright® 2017 by Environmental Systems Design, Inc. MECHANICAL EQUIPMENT: MECHANICAL GENERAL NOTES: WHITNEY 5. CONTRACTOR SHALL PROVIDE LINE ITEM PRICING TO PROVIDE A NEW BACNET ®200 CFM ®200 CFM ®EXISTING EXISTING 1. ALL BRANCH DUCTWORK SHALL MATCH DIFFUSER NECK SIZE. ENABLED WEB-BASED BAS SYSTEM THAT SHALL ALLOW FOR REMOTE MONITORING A 1.01 6 KW © 1.03 6 KW O 1.01 RELOCATED © 1.01 2 TON AND CONTROL OF ALL ROOFTOP UNITS, EXHAUST FANS, AND AC UNITS. BAS SYSTEM ARCHITECTS, INC. 2. CONTRACTOR SHALL PROVIDE REMOTE BALANCING DAMPERS FOR ALL DAMPERS SHALL BE PROVIDED WITH AIR-GAP SECURITY FOR INSTALLATION ON OPTION CARE 700Commerce Drive I Suite350 LOCATED ABOVE INACCESSIBLE CEILINGS. NETWORK. PRICING SHALL INCLUDE PROVIDING ALL RTU'S WITH FACTORY INSTALLED Oak Brook,IL 605231 USA OB ®200 CFM O ®200 CFM x960 CFM O 4600 CFM BACNET CARDS AND TEMPERATURE SENSORS IN LIEU OF PROGRAMMABLE T : 630.571.1118 I F : 630.571.0518 1.02 6 KW D 1.04 6 KW F 1.02 H 1.02 1 TON 3. CONTRACTOR TO COORDINATE PAINTING REQUIREMENTS OF ALL MEP COMPONENTS IN THERMOSTATS AS WELL AS ALL NECESSARY CONTROLLERS AND DEVICES TO PROVIDE whitney-architects.com OPEN CEILING AREAS WITH ARCHITECT. PROVIDE PAINTABLE SHEET METAL AS A FULLY FUNCTIONAL SYSTEM. REQUIRED. IL. CORPORATE LIC. 184-001580 6. CONTRACTOR SHALL PROVIDE LINE ITEM PRICING FOR ALL DUCTWORK INDICATED AS 4. DIFFUSERS IN OPEN CEILING AREAS SHALL BE INSTALLED WITH FACE OF DIFFUSER RECTANGULAR TO BE PROVIDED AS ROUND OF REQUIRED EQUIVALENT SIZE. AT SAME HEIGHT AS LIGHT FIXTURES. COORDINATE FINAL MOUNTING HEIGHT WITH ARCHITECT as_ _____Or- IIII 0 0 r-Th K,/ © 6/ fill 6-8) 92 E75 West Chl Chicago,IllBlvd.Suite inois 604 1400 312 372 1200 fax 312 372 1222 www.esdgbbal.com DPR License No.184-000892 IL ‘03 "orfiN I I I I I I �vS �'64ER 10x6 12X12 • IP A / • - 135-T A - I yG OREGON 1 I - 1-1 I� 3' 0-R - - <r11 z STORAGE 390-: • _ ::__��_; 8x. E I cCT g l L N Al,° F 565-R � I f/�/��i 1 35 1 . �I��/ 10X10 6x6 1 33 \ r© ®O VESTIBU O Li " ' : --- �� I ISI X79 5 fT 190-S 1955-S 190St' 4 6x6 134, 135-E E 7 ,all 01 �/ O 195-S I - - 1 ::�r� 220-S 220 , 1r ull - 215-S _ 0----�� 360-S141 o 1360-S 16x20 - / 360-S I i ,� �`Sifi1!ifi! � iTo�iltt _!� 02 14x16 - 14x20 . © 1J'/�V G'3'31�3C�!!`it1! •' �j�ai■■ I I .� 8x6 - r�I♦l■l ��al_-r a.... ■■��1 . 14x16 WAREHOUSE 1 `x 6 5 -R • :BIZ-'•a ■iJraiSrurl■irx12 ■1■I■■I Iii 18X;i>imill■■1■■11t rsnrn■tt�■-■■1 No 360-S lirs1535-R I �.,, is e_, ��V ILI�' 1x14 14 535-R �7 I ,i �, I I jj �rlriiiirameri 120UI I I I I z Liar: ITOR� I 18 11-1 12x12 � � 14x1050 T 9 132 �• I •• 1 \ -- ' 50-: 1 A�__�� • I 535 ; ■t:.�■!='■'■■■■■®■■®Lill I / ' / 535-R 110 ■D�i e.ral_ / ■■�� �1 /'12x12 vi- 11 1 s5- I , c IIIIIIIIIMI }- '■■■ ■■■ ■t1■ 8X12 I I /,■I • 360-s 3foosE'� � 5111t..�+�. . ., , ■■LJ�� 171-, ■■■ ■■� ■■I 'I !J■■■ L"ROO #2 I 0 .. R TROOM ,OM 13ra11!1117°- ! in S■■■ ■■: ■■, ■■� � 125 -360-S lT W.�■. • ROOM 2 17• r ga 170-'� t�iQ �r ■�.E, ia ■�i ®M ■.,..,: �N M■■II Q �,�^�'�:i1m�■'11/ =moo■ ■L J I I I 0 v / ��r�11■■M ��iE®1.210-_ (' � "45-' EJi.: U^'�1� � E1��,■_■■i si �" -- -.'• �lial �� _ .1�_:IR I�iI IC:.:h\IIIL ,111■I ' 1 _Jy111�.7rYiliilii.11■ 121 tem ■■ ■■■ ItrZ?i 1'- F- --I Niel SEEM Pi111■E11111f r 1 I E Paim ■■.eP i lin' . Y , 6--��► Iroo- - 11 _ _ o E _- ..,s�,p�,•Ja.7�11ipnsX2o ■ iil�:ral ■■■ v■r I a). / I o ■ I �■■r■I!fl!!G■ t ,,/ 14x1 Ru r0 C. �U_+IIII� fl!I ���� � aI ���_ ■�■ 0 _ 10x10 Iii ►' -.' -N -- --� �• \ i I cil--- -, I .. Ilii 1co =- ``I i i1i� rr . . „IAlla I. II II 1 1421 ■ . rive :1vAi 9 lat mlu i 2x20 1 • Sp /••,3 �� 10 ; 11 s�3�� v='� ta>I-. I11! ��/�� 1 I�� -- ►►�>♦ t '' • 50�-R 14 , C• 1 � r, p,rj#00 r//rs Po, PSf 'r .---/#0,, 1 , • . N „ 14®210 •\ - g ..,.. / '1f►� • r / • ,: . ���I tt r�`�m�� M�/I ,:a.�►.:o���_ , ,,:, � � :1 � S '/ •01 1 'I A • • 1 W 1. F, at111II�-RIII■11Zi. • . • 85 �hW11TLIl!I■■■f■■■■1■■■■■■■■■■■ ■■�■■■a■11■I .M ENS 1 . 1 1 vlllel.��•• tr, ' �' .3.I,t,• � ,,'N�# 1�►�.li•�c -��� � = == = �� H. F/ r S ' P IF 'A � A. �I rx SIP , - I10x14 _., III� .i�A ■■� ■'11.i1V1 �j I�� iI � 1 491 �� Iii P1 tII f� 11!'sox L 1L •1 R RINI11 L'i - 1114x12 :1 : 1II II c ISI .�� `'w- _ _ -■1II k■111 �r_.J 05 ;!II1 ■ ■ �/ �'.16X14 ri:77!..._. : i ._'Hi •r'%Wim■■■I �r�•IIIR •5� Vy��� 1111111111111 D FOR BID/PERMIT 05.19.17 I�! !y \-�.t■�Il1 .r• •!•� , .. w REV.1 ISSUE,,,,,. DESCRIPTION DATE M MEN II In . :L J-MEAS1i !%:;MI1111t 1111111■ t '�" r 1280-s Mimi / 6©240- 11�'+ 911 1111 W � wJ ■ 1�■t y/111ti ®'�1giU©�IIrl- limmaPI.LtgMMEEMMMENSI PI ,i M� = 2 '5-R -■aEEI ' ISSUES Rp i 1 , 1 • 1 I'!fillig hIR■■i11ii111■_ 1 : 1 scam PHASE: -10 �I ITim► ' •s-aJl ii' tri IF LE.0 111Eg- • --� ..D iii--1 �, �' ���' r►.;i� I��LJ: CONSTRUCTION = II !111► jai/.l ILiain_e' l .i4III■.11■■� - ■. E . d Ng , , 1 li • , ; • 1 1 IS email IIG;;111ii sari I�N■-��P g� ��r���ri �La�M■1 iiia : a■ ii�'L i ii h IS ,n.,l•,', = DOCUMENTS ■■■_ ■■;11® as lel■flV w'- ‘l=“11■■11111110117;11■ � i7t■In 'MOM IIf '■ !•�F ■ 11 / N PHASE -��_,• � .� si•■■II� �I■�li•m+ 95-S - rll_ � � t• lily rsf--_-�7 1`' ,'.frl� �`\ WIIII 21)240-S 16x12 12x1212x 10 335-S 100-S 190-S 100-S 190-S 100-S 190-S 100-S 190-S 290-S SHEET DESCRIP11ON: MECHANICAL KEY NOTES: MECHANICAL O PROVIDE WALL GRILLE ON OPEN CEILING FACE OF SIZE 8x8 BASED ON © PROVIDE 24x24 LAY IN TYPE DIFFUSER BASED ON TITUS MODEL 250 0 EXISTING EXHAUST DUCTWORK ROUTED UP TO EF-1.03 LOCATED ON 0 PROVIDE MOTORIZED BYPASS DAMPER IN DUCTWORK AS INDICATED. PLAN TITUS MODEL NUMBER 300FL. WITH 2-WAY DISCHARGE PATTERN WITH A NECK SIZE OF 16x16. ROOF. REFER TO M4.RF FOR FURTHER DETAILS. DAMPER SHALL BE NORMALLY CLOSED AND TIED TO DUCT STATIC PRESSURE SENSOR AT LOCATION INDICATED. DAMPER SHALL OPEN WHEN O PROVIDE QTY (2) WALL GRILLES OF SIZE 10x6 BASED ON TITUS MODEL 07 PROVIDE DIFFUSER OF SIZE 24x24 BASED ON TITUS MODEL PAR. 0 INSTALL FLUE VENT UP THRU ROOF PER MANUFACTURES DUCT STATIC PRESSURE INCREASES ABOVE SET POINT. SET POINT SHALL FLOOR No.: NUMBER 350RL. WALL GRILLES SHALL BE PLACED ON BOTH SIDES OF SPECIFICATIONS. BE DETERMINED BY TEST AND BALANCE CONTRACTOR DURING BALANCING WALL. 3 PROVIDE WALL GRILLE ON OPEN CEILING FACE OF SIZE 10x6 BASED ON O ANGSTROM TEEXHAUST CHNOLOGY PRINTSORK OF SIZE 20 MITOEF-1.01 ON FOR CLEARANCE ROF. REFER TO EQUIREMENTS. ® 300FL.PROVIDE 22x6 DUCT MOUNTED GRILLE BASED ON TITUS MODEL NUMBER AND SHALL BE ADJUSTABLE. ,I ST TITUS MODEL NUMBER 350RL. ® EXHAUST DUCTWORK OF SIZE 80 TO EF-1.04 ON ROOF. REFER TO 18 PROVIDE " AND " LIQUID AND SUCTION UP TO CU-1.02. FLOOR ANGSTROM PRINTS FOR FURTHER DETAILS. Q PROVIDE DOOR GRILLE OF SIZE 18x10 BASED ON TITUS MODEL NUMBER 0 AC UNIT IS EXISTING TO REMAIN. NO CHANGE. T700L. t0 10x8 EXHAUST DUCTWORK ROUTED UP TO EF-1.05 LOCATED ON ROOF. Scale: Job Number: O VAV DIFFUSERS BASED ON ACUTHERM TL-C DIFFUSERS. SEE AIR OUTLET REFER TO M4.RF FOR FURTHER DETAILS. 16 PROVIDE WALL GRILLE OF SIZE 12x12 BASED ON TITUS MODEL NUMBER v8"=1-0" 52322 AND INLET SCHEDULE PROVIDE WITH 24 VOLT CONTROL TRANSFORMER. 350RL. COORDINATE WITH ELECTRICAL CONTRACTOR. DIFFUSER D1 SHALL BE THE EXISTING EXHAUST DUCTWORK ROUTED UP TO EF-1.02 LOCATED ON North: Drawn: MASTER AND D2-D3 SHALL BE THE SLAVES. ROOF. REFER TO M4.RF FOR FURTHER DETAILS. BJC M • 4 01 0 4' 8' 16' 0 Chk'd:Wiliiii JS Prat Date 3/9/2017 i!Name:m13.014.9 I:\Option Care - Portland OR\Option Care - Portland OR\DWCS\CAD\RVAC\mh_O1.dwg 5/2372017 7O7 PM jschutz Copyright 0 2017 by Environmental Systems Design. Inc. WHITNEY ARCHITECTS, INC. 700 Commerce Drive I Suite 350 Oak Brook,IL 60523 I USA T : 630.571.1118 I F : 630.571.0518 whitney-a rchltects.com IL. CORPORATE LIC. 1 84-001 580 cc..._sisr)) ill 0 0 r-___, 0 (6) O \ / \ / Environmental Systems Design Inc. 175 West Jackson Blvd.Suite 1400 Chicago,Illinois 60604 312 372 1200 fax 312 372 1222 www.esdglobal.com DPR License No.184-000892 IL 1 I I I I SV\ow FNOFef�D��//y e • 6PE T Cia9 f 7 O O / EXPIRATION DATE: ° r--, 1 1 ® w O I 1 LU D O Im ® � w i1 , OO N -7 I ® Q > � LA UQo L__J 0r,© 4 z N LJ 0 1% - cl `j0 lz — _ 0 moN 0 ea O0g6") 0) —— 1 ATL Ir 1 HT1 r 1 �� 7 :0/7. COr L �J L--J O O� r ®� 1 © PROVIDE " AND " LIQUID IAND SUCTION DOWN TO AC-1 .02 L. J REFRIGERANT PIPING SIZING FOR REFERENCE ONLY. CONTRACTOR ri LJ © RESPONSIBLE FOR SIZING BASED ON ACTUAL PIPE ROUTING. . I-__I I 1---, 0 I Fx7l I I IVx7l I B 1 ISSUED FOR BID/PERMIT 05.19.17 I ii I fr --J © I L REV. DESCRIPTION DATE L__J ISSUES PHASE: CONSTRUCTION DOCUMENTS II / PHASE 411) SHEET DESCRIPTION: ROOFTOP MECHANICAL EQUIPMENT: MECHANICAL GENERAL NOTES: MECHANICAL KEYNOTES: MECHANICAL (DK R 625 MBH TON 0 R.05TU 625 MBH TON 0 RTU U 303 TON BH /\ ®715 CFM ® aTO AC-1.02 1 . COORDINATE ALL NEW ROOF PENETRATIONS WITH STRUCTURAL O EF-1.05 SHALL BE CONTROLLED VIA THERMOSTATS IN ELEC 134 07 NEW FLUE VENT FOR UH-1.02 PLAN 1.02 ENGINEER, ROOFING CONTRACTOR, AND BUILDING ENGINEER. & 127. EF SHALL HAVE A MOTORIZED DAMPER. EXISTING EXISTING NEW EXISTING NEW FLOOR NO.: 2. MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES ON ALL 02 DETAILSETONAD NGSTROM NCE PRINTS FOR ORM EF-1.01 & 1 .04 OPERATION ®(RTU 3 TON OF 106TU 45 TON MBH /7\ (RTU 50 TON MBH ®250 CFM 1.02 50 MBH ROOFTOP 3. PROVIDE TRAP IN CONDENSATE PIPING CONNECTION TO RTU PER O CU-1 .02 SHALL BE INSTALLED PER MANUFACTURER'S EXISTING EXISTING NEW NEW MANUFACTURER'S REQUIREMENTS. SPECIFICATIONS. MANUFACTURER'S CLEARANCE FOR CONDENSER UNITS SHALL BE MAINTAINED. © RTU 3 TON _ © RTU 6 TON K ®600 CFM O ®360 CFM 4. ALL NATURAL GAS PIPING FOR EXISTING RTU'S IS EXISTING TO Scale: Job Number: 1.03 50 MBH 1.07 125 MBH 1.01 1.05 REMAIN. NO CHANGE. REFER TO M3.01 FOR NATURAL GAS PIPING ® REFER TO ANGSTROM TECHNOLOGY SHEETS FOR FURTHER 1/8'=1'-0° 52322 EXISTING EXISTING NEW NEW ROUTED INSIDE BUILDING AND UP TO RTU'S. INFORMATION REGARDING RTU. North: Drawn: O RTU 4 TON O RTU 4 TON © ®100 CFM © � O EXISTING FLUE VENT FOR UH-1.01. "c M4RF NO CHANGE 0 4' 8' I s' cnk'd: 1.04 75 MBH 1.08 115 MBH 1.02 1.01 © PROVIDE ROOF CURB FOR RELOCATED RTU AS REQUIRED. 0 JS RELOCATED EXISTING EXISTING EXISTING COORDINATE ALL FLASHING REQUIREMENTS WITH BASE BUILDING ROOFING CONTRACTOR AND STRUCTURAL ENGINEER. „o,o,,,,,g„o„ File Name;m,m of e.g I:\option care — portland or\option care — portland or\DWGS\CAD\HVAC\mrfh_O1.dwg 5/23/201 / 9:21 AM kmchone Copyright Q 2017 by Environmental Systems Design, Inc.