Loading...
Plans (4) MC2O1 6 - 00274 \,0v cwR�7-2"cws �� 11 o I i a - - �, . _ - - - - - - - y - - - - - - - - - -� DATE: 03/11/16 -1 -. ._.. mF �® �- k-- k A II n r- - r -- .. I,., [1 0 Il _ 327 �,�,- 1 --n - n -I - 0 0 - \ - - - - - - - - - -- JOB N0: 20245 SD-3 ---.1 - JL __ JI_ ._.. JL .-_ __II i �- DRAWN: DP/BH • i 10"0 _ 24"x18" 24"x18" I / \ _� u - ��- ll t_� - II300_ - I 0 / \ \ � -'I_, / / \ � / I \ •. r I 0 ) 0 / \ \ I r j £� jx1 ECKED: AR/CF I 10"m S , SD-3 \ \ �tI - �'SD-2 -i� 100 ?, / / / 12"x12„ 8„x8, � � milk 1s°m 250 \ / N / I AP 200 _ - 1 yr"� 8 RG-2 �j / \ \ / / I + �I R 1 B Za16 IcwR t �� 0 L ' zz°xzr' X i� / �/ / �. v I �� TYOFTf �` r GE 1 1 1Le ,1 780 ` _ / ��:% / /1/ ,. / 1 v ti I) t BUIL��,�D.1E S�N CWS p Th RG-2 / / \ ...; � r / / c - `�l / f - 3 _I,_1'i l i 22"x22" / <\ / \ . ' }: ...„ `,� /I tf - SD-4 ._ ��_%� 7g5 \� \ MEP En ineerof Record 6.,m EF / 1 -_ m �L ,s°m • • o / sD 1 ' \ \ L Randall A. Nelson 100 �. . � . .18°x8°�� - / -_ J RYp) 275 / \ SD-1 1 14817 West 95th Street cu_1 ® / 1a°xs° l irt_r Q / o i + Lenexa, Kansas 66215 13 _-I _f 4 1D© Fcu-z q, F 10� N / I \ / 1 if Phone 913 322 5150 ri v 275 TG-1 20"x18" / 1 \. I 20"x18" 20"m \ 16"m / I 12"x12" - • r 200 \ I RG-1 �� a /l� / T__I f roTG-1 I I 12'x12" 12"x12"O 1 _ I m m ,_ - -m - -a r1=r SD-1-p J I 1 ( 100 1 1 - I o o ( Iiil - - 18„x8„ I 11 TG-1 r l) SD_1 275 I 1 1 ._ 12"x12" 11/ N Y:- 18'X8" I / 1111 200 © (TYP) 1 1/4 FCU-2 I ) 275 / I I I 0 �1 1/4" CWS 1CWS o I \ / I k I L !'RCIf SD-1 �I- 1 1/4" , T 18"x8" , 71- CWR I ---- I i.i' I I I i-- I G\ Fd'- 1 1/4"�� �� I p Mi �1� l J I li ��C�1(OP�� �i /' 330 ( CWR !t ' I Tr I �1' 11 J( 'Tit_IL ( Itp 2 7 IEEE-2,I _ It 1 I Q 7RSG1Pc 1a°m - 28"x12" �- Mi.r I II I C-, I 1 1 rprC+w..l rit / - kli r/ �__ -� �� C SD-1 SD 1, I I fes 1. - 18"x8"p 0 18"x8"- I • II 551 AN . \ PH � . - - - - - - - - II 330 340 0� ® l SD-3 SD-3 1 - A �, o � no r CoQ I I , - I I I I ya EXPIRATION DATE: �1 hIl b 1 \ _ }� 250 250 -! 0 U -1 I _ I �n 1 a I r I / CITY OF TIGARD 1- M I i, I I; I, 1 Q Q -C2.....) 6 I I; I� \ FCU-1 (0 O� REVIEWED FOR CODE COMPLIANCE W N i 1-� T l� �) �J "'ll i 11� ;III 1 ILII i l �: -- _ -� t n - i til u i j ii _ • ` if- - -li 1 I / Pet#a v �, -Oa f- Z cn 3 9 I • Addreaat ' • ' b. ea. O CL i ` I I I Sults -4 -(c3 z 1- O S S PP CD (MM) • BY: �3L' Dates z z n- - W- -c/l 0 0 = o MECHANICAL SYMBOLS OFFICE COPY NOTE: THIS ISA MASTER LEGEND AND NOT ALL SYMBOLS, ETC.ARE NECESSARILY HVAC EQUIPMENT&DUCTWORK 0 1/4" - 1 �"MECHANICAL FLOOR PLAN W _n z (- USED ON THE DRAWINGS NOTE:ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE / PIPING DIMENSIONS. SEE SECTION 15250 OF THE SPECIFICATION D v / FOR DUCTWORK TO RECEIVE INSULATION OR LINER. NOTE : NOTE : J Q - 0_ CD CONDENSATE DRAIN (CD) DUCTWORK OR EQUIPMENT TO REMAIN REFER TO SHEET A122 FOR DUCT MOUTING HEIGHTS. THE OWNER RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS CD- AUXILIARY CONDENSATE DRAIN(ACD) AND SPECIFICATIONS.SHOULD THE OWNER FIND CORRECTIVE WORK NECESSARY, HE WILL D in RL REFRIGERANT LIQUID (RL) + + EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED J WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COS CO RD REFRIGERANT DISCHARGE(HOT GAS) (RD) BRANCH DUCT WITH 45°RECTANGLE-ROUND BRANCH VERIFY ALL CONDITIONS IN FILED: OF REINSPECTIONS WILL BE BORNE BY THE CONTRACTOR. in RS REFRIGERANT SUCTION (RS) FITTING AND MANUAL VOLUME DAMPER IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO VISIT THE JOB SITE 11JTO FAMILIARIZE HIMSELF WITH MAJOR ITEMS SUCH AS STRUCTURAL ELEMENTS, WIF WORK IS REQUIRED BY OWNER IN ORDER TO IMPROVE,CHANGE OR CORRECT AIR , S HEATING HOT WATER SUPPLY(HWS) CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION,WARRANTY OR ELBOW WITH TURNING VANES PLUMBING LOCATIONS, ELECTRICAL RUNS AND POINTS OF CONNECTION TO OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, IWR HEATING HOT WATER RETURN (HWR) EXISTING DUCT SYSTEMS. ADDITIONALLY, MECHANICAL CONTRACTOR SHALL VERIFY CONTRACTOR SHALL 3E DIRECTED BY OWNER TO ADDRESS THIS WORK IN A TIMELY CWS CHILLED WATER SUPPLY(CWS) EXACT LOCATIONS AND DIMENSIONS OF SUCH ITEMS AS HVAC EQUIPMENT, MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CAN NOT ACCOMPLISH THE SWR CHILLED WATER RETURN(CWR) j(\ N RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP DUCTWORK, ETC. PRIOR TO COMMENCING ANY WORK. TASK,THEN AFTER 72 HOURS OF WRITTEN NOTICE,THE OWNER MAY AT HIS DISCRETION HS HEAT PUMP SUPPLY(HS) ALL HVAC WORK TO BE PERFORMED IN COMPLIANCE WITH LOCAL CODES AND TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE N N RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN LANDLORD CRITERIA. WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE,WORKMANSHIP AND/OR HR HEAT PUMP RETURN (HR) ADHERENCE TO PLANS AND SPECIFICATIONS. NII�� SUPPLY AIR DUCT UP �1 LPS LOW PRESSURE STEAM SUPPLY(LPS) W ISSUE FOR SD 12/15/15 LPC LOW PRESSURE STEAM CONDENSATE(LPC) 4. ✓`J SUPPLY AIR DUCT DOWN ISSUE FOR DD-LLL 01/08/16 EXISTING PIPING TO BE REMOVED 1 2 3 EXISTING PIPING TO REMAIN + I EQUIPMENT WITH FLEXIBLE DUCT CONNECTION GENERAL NOTES : PLAN KEYNOTES: (OO O) ISSUE FOR DD-LLD 01/08/16 DIRECTION OF FLOW ISSUE FOR CD-LLL 03/11/16 10"CSD-1 300 CFM 1. PRIOR TO SUBMITTING BID,VISIT THE JOB SITE AND BECOME FULLY 1. ROUTE TO EXISTING LANDLORD EXHAUST DUCT. FIELD VERIFY EXACT BALL VALVE >�� NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER ACQUAINTED WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE LOCATION. ISSUE FOR CD-LLD 03/11/16 cpa CONTROL VALVEGENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL 2. PROVIDE HONEYWELL THERMOSTAT, MODEL VISIONPRO TB8220. ALL ISSUE FOR PERMIT XX/XX/XX MANUAL VOLUME DAMPER REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS WIRING, ETC. SHALL BE COORDINATED WITH ELECTRICAL CONTRACTOR * THREE-WAY CONTROL VALVE PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. FINAL CONNECTION SHALL BE ISSUE FOR BID XX/XX/XX Da SHUTOFF VALVE "1121=3 SQUARE TO ROUND TRANSITION AND/OR OWNER OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF MADE BY THE G.C. -COORDINATE WITH MALL OPERATIONS DIRECTOR. BID. 3. PROVIDE REMOTE SENSOR. MOUNT OUT OF DIRECT LIGHT AT 48"ABOVE CHECK VALVE SD DUCT MOUNTED SMOKE DETECTOR 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE FINISHED FLOOR. ALL WIRING, ETC. SHALL BE COORDINATED WITH 85 BALANCING VALVE WITH PRESSURE PORTS VISITS AND MAY NOT REFLECT EXACT"AS-BUILT"CONDITIONS. FIELD VERIFY ELECTRICAL CONTRACTOR AND ARCHITECT PRIOR TO INSTALLATION. TRIPLE DUTY VALVE WITH PRESSURE PORTS FD FIRE DAMPER EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW FINAL CONNECTION SHALL BE MADE BY THE G.C.-COORDINATE WITH WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS MALL OPERATIONS DIRECTOR. WATER METER ®i FIRE SMOKE DAMPER PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL UNDERCUT DOOR 1"FOR AIR FLOW TO EXHAUST 1 STRAINER 3. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER FANS. 1 VD VOLUME DAMPER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. COORDINATE 5. COORDINATE INSTALLATION OF EQUIPMENT, DUCTWORK AND PIPING WITH IiIIIID ca SOLENOID VALVE INSTALLATION OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ALL TRADES. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL cF PRESSURE GAUGE MD MOTORIZED DAMPER ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. PANELS. 44. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW 6. INSTALL SMOKE DETECTOR IN RETURN AIR DUCT. SMOKE DETECTOR THERMOMETER S TEMPERATURE SENSOR INSTALLATION DURING WORK. REPAIR DAMAGE CAUSED DURING SHALL SHUT DOWN ROOFTOP UNIT UPON DETECTION OF SMOKE. VERIFY T PRESSURE AND TEMPERATURE TEST PLUG O CONSTRUCTION AT NO EXTRA COST TO THE OWNER. LOCATION AND OPERATION PRIOR TO SUBMITTING BID. �I UNION © THERMOSTAT 5. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE 7. PAINT NEW EXPOSED DUCTWORK TO MATCH FINISHED CEILING. PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 8. PROVIDE NEW FAN COIL UNIT AND INSTALL PER MANUFACTURER'S I FLANGE CONNECTION 6. NEW MECHANICAL EQUIPMENT AND DUCTWORK ARE SHOWN AT APPROXIMATE RECOMMENDATION. MAINTAIN ALL MANUFACTURER'S RECOMMENDED o ELBOW UP AIR DISTRIBUTION DEVICE SCHEDULE LOCATIONS. FIELD MEASURE FINAL DUCTWORK LOCATIONS PRIOR TO SERVICE CLEARANCES. REVISIONS FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK 9. MOUNT TRANSFER GRILLE AS HIGH AS POSSIBLE. '3 ELBOW DOWN WITHIN THE AVAILABLE SPACE.VERIFY THAT FINAL EQUIPMENT LOCATIONS 10. ROUTE 2"CHILLED WATER SUPPLY AND RETURN LINES TO EXISTING o TEE UP (BASED ON TITUS) MEET MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE LANDLORD'S MAIN. FIELD VERIFY EXACT LOCATION. NOTES: CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. 11. CONNECT OUTDOOR AIR DUCT TO EXISTING OUTDOOR AIR DUCT. FIELD TEE DOWN 7. INSTALL DUCTWORK PARALLEL TO BUILDING COLUMN LINES UNLESS VERIFY EXACT LOCATION. o REDUCER 1. SYMBOL KEY-FIRST LETTER: S-SUPPLY R-RETURN E-EXHAUST T-TRANSFER. SECOND LETTER: D-DIFFUSER R-REGISTER G-GRILLE OTHERWISE SHOWN OR NOTED. 12. ROUTE 28"x12"RETURN DUCT INTO SPACE AS SHOWN. PROVIDE 24"x22" 2. BORDER STYLE- REFER TO REFLECTED CEILING PLAN 8. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT AND DUCTWORK OPENING IN TOP OF DUCT AND COVER OPENING WITH 1/2"x1/2" 3. DAMPERS- OPERABLE FROM FACE-OB: OPPOSED BLADE ROB: RADIAL OPPOSED BLADE B: BUTTERFLY SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH GALVANIZED HARDWARE CLOTH. MOUNT TOP OF DUCT MINIMUM 7 INCHES ABBREVIATIONS 4. REFER ARCHITECTURAL PLANS FOR FINISH HANGERS AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF. BELOW BOTTOM OF STUCTURE. AFF ABOVE FINISHED FLOOR MC MECHANICAL CONTRACTOR SIZE MOUNTING MATERIAL ACCESSORIES 9. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF 13. MOUNT TRANSFER GRILLE AS HIGH AS POSSIBLE ABOVE BREAKROOM TAG MODEL SIDE- EQUAL FIRE REMARKS EQUIPMENT ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT CEILING AND BELOW SHOW WINDOW CEILING. BAS BUILDING AUTOMATION SYSTEM MIN MINIMUM FACE NECK CEILING DUCT FLOOR STEEL ALUM. DPR. AND/OR FILTER REPLACEMENT. BD BACKDRAFT DAMPER NC NOISE CRITERIA WALL GRID DPR. 10. SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE CFM CUBIC FEET PER MINUTE OA OUTSIDE AIR GRILLES TO BE ROTATED WITH THE CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH DDC DIRECT DIGITAL CONTROL RA RETURN AIR SD-1 TITUS S300FS 18"x8" - 0 0 OB 30 DEGREES ON DUCT, FIRE RATED COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS. NO. DATE DESCRIPTION DX DIRECT EXPANSION SA SUPPLY AIR AIMED TOWARD FLOOR. 11. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, EA EXHAUST AIR SD SMOKE DUCT DETECTOR REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING,WALL AND FFA FROM FLOOR ABOVE TFA TO FLOOR ABOVE SD-2 TITUS 250 12"x12" 8"0 0 0 ROB 2-WAY FLOW. OPPOSED DUCT INSTALLATION REQUIREMENTS. FFB FROM FLOOR BELOW TFB TO FLOOR BELOW -SIDEWALL BLADE DAMPER 12. ADJUST LOCATIN OF CEILING REQUIRED TO AOCCOMMODATE DINAL CERLING GRID AND L GHTMG LIFFUSES, REGISTERS AND GLLEOSCATIDNS . NOTE: MECHANICAL GPM GALLONS PER MINUTE TYP TYPICAL IN WC INCHES OF WATER COLUMN UNO UNLESS NOTED OTHERWISE CONTRACTOR TO PROVIDE BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK INFORMATION ON THIS SHEET PERTAINING TO THE EXISTING MECHANICAL SYSTEMS IS FLOOR PLAN MAX MAXIMUM W/ WITH SD-3 TITUS TDC 24"x24" 10"0 0 0 ROB ANY ROUND DUCT NECK SIZE UNLESS OTHERWISE NOTED. BASED ON RECORD DRAWINGS AVAILABLE AT THE TIME OF DESIGN. FIELD VERIFY ALL MBH 1000 BTU PER HOUR W/O WITHOUT TRANSITIONS. 13. PROVIDE A NEW SET OF AIR FILTERS IN UNITS PRIOR TO TESTING,ADJUSTING EXISTING CONDITIONS AND NOTIFY ARCHITECT AND ENGINEER IMMEDIATELY IF ANY AND BALANCING AND BEFORE TURNING SYSTEM(S) OVER TO OWNER. DISCREPANCIES ARE FOUND. STANDARD MOUNTING HEIGHTSSD 4 TITUS TDC 14"x14" 6"0 0 0 ROB 14. ALL ROOF PENETRATIONS SHALL BE PERFORMED BY A LANDLORD APPROVED CONTRACTOR TO MAINTAIN WARRANTIES. MECHANICAL (AFF,AFG, UNLESS NOTED OTHERWISE) 15. TENANT SHALL LOCATE ANY ROOF TOP VENTS A MINIMUM OF 10'AWAY DUCTWORK NOTE: NINIRINS THERMOSTATS (USER ADJUSTABLE)(TOP OF DEVICE) 48" CONTRACTOR TO PROVIDE FROM ANY ADJACENT ROOFTOP UNIT. CONTROLS(TOPS DEVICE) 48" SD-5 TITUS 300FL 10"x8" 8"X6" o o ROB ANY ROUND DUCT NECK 16. FIELD VERIFY EXISTING CONDITIONS AND THAT SPACE CONFORMS TO INFORMATION ON THIS SHEET PERTAINING TO THE EXISTING MECHANICAL SYSTEMS IS SHEET NUMBER TRANSITIONS. APPROVED LEASE OUTLINE DRAWING,AS APPROVED WITH LEASE BASED ON RECORD DRAWINGS AVAILABLE AT THE TIME OF DESIGN. FIELD VERIFY ALL AGREEMENT. EXISTING CONDITIONS AND NOTIFY ARCHITECT AND ENGINEER IMMEDIATELY IF ANY ANNOTATION TG-1 TITUS 355RL 14"x14" 12"x12" 0 0 - 17. TENANT SHALL BE RESPONSIBLE FOR MEETING ALL APPLICABLE CODES AND DISCREPANCIES ARE FOUND. OBTAINING ALL JURISDICTIONAL APPROVALS. O 18. ANY EXISTING HVAC UNITS NOT TO BE REUSED BY TENANT SHALL BE MIlO MECHANICAL PLAN CALLOUT REMOVED AND DISCARDED BY TENANT G.C.AND ROOF PATCHED IF REQUIRED. ROOF NOTE: m MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED AND TG-2 TITUS 355RL 26"x22" 24"x20" 0 0 - W INSTALLED UNLESS NOTED OTHERWISE) DO NOT ATTACH ANYTHING DIRECTLY TO THE UNDERSIDE OF THE DECK.VERIFY ALL CONDITIONS IN THE FIELD PRIOR TO BIDDING.VERIFY IF THE EXISTING STRUCTURE CAN CONNECTION POINT OF NEW WORK TO EXISTING RG-1 TITUS 355RL 14"x14" 12"x12" 0 0 SUPPORT THE NEW RTUS.VERIFY EXACT REQUIREMENTS PRIOR TO COMMENCING ANY IMIIIIIIa WORK. 0 DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER LOWER ® NUMBER INDICATES SHEET NUMBER RG-2 TITUS 355RL 24"x24" 22"x22" o o - ® SECTION CUT DESIGNATION DATE: 03/11/16 AIR HANDLING UNIT SCHEDULE (CHILLED WATER) FAN SCHEDULE JOB NO: 20245 SUPPLY FAN COOLING COIL CONDENSER HEATING MIN SERVICE ESP MIN. ELECTRICAL DRAWN: DP/BH NOMINAL ESP MIN. TH SH EAT EWT/LWT P.D 0/A WEIGHT MARK (EA, RA, SA) MANUFACTURER MOUNTING MODEL CFM (IN) HP VOLTS/PH DISC.TYPE NOTE MARK MANUFACTURER MODEL TONNAGE CFM (IN) HP (MBH_) (MBH) (DB/WB) GPM FT. MBH KW CFM V/PH/HZ MCA MOCP (LBS) NOTE EF-1 EXHAUST BROAN CEILING QTRE080FLT 125 0.25 FRAC 120/1 SWITCH A,B,C CHECKED: AR/CF FCU-1 TRANE BCHD090 6 2400 0.8 1.5 88.5 74.4 _ 80.2/64.5 47/57 17.65 8.06 75.1 22.0 835 480/3/60 38.7 40.0 350 A-F EF-2 EXHAUST BROAN CEILING QTRE 080FLT 80 0.25 FRAC 120/1 SWITCH A,B,C FCU-2 TRANE BCHD054 4 1600 0.8 1.0 46.8 40.8 76.4/63.1 47/57 9.32 3.58 34.1 _ 10.0 150 480/3/60 18.8 20.0 250 A-F _ NOTES: NOTES: A. PROVIDE WITH BACK DRAFT DAMPER. A. EQUIPMENT SIZED FOR AMBIENT TEMPERATURE OF 95.0°F, SUMMER DB= 90.0°F,WB=75.0°F,WINTER DB=21.0°F. B. PROVIDE TIME SWITCH AND INTERLOCK FAN TO OPERATE DURING OCCUPIED HOURS. B. PROVIDE WITH TWO SETS OF 2"THICK THROW-AWAY FILTERS. - C. UNIT IS COMBINATION FAN/LIGHT. FURNISH 42 WATT FLUORESCENT LAMP. C. PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT. D. PROVIDE SECONDARY DRAIN PAN WITH FLOAT SWITCH, UNIT SHALL SHUT DOWN UPON ALARM FROM FLOAT SWITCH. MEP Engineer of Record E. SUSPEND UNIT FROM STRUCTURE, PROVIDE SPRING VIBRATION ISOLATORS. F. PROVIDE WITH 3 WAY CONTROL VALVE. REFER TO FCU DETAIL 10 FOR MORE INFORMATION. MECHANICAL RESPONSIBILITY SCHEDULE Randall Nelson 14817 West 95th Street FURNISHED BY INSTALLED BY REUSE Lenexa, Kansas 66215 ITEM TENANT LANDLORD CONTR. LANDLORD CONTR. EXISTING N/A REMARKS Phone 913 322 5150 ALL DUCT LINER FLANGED AND GASKETED JOINT OR TRANSVERSE EDGES TO DUCT CONNECTION AND RE-INFORCEMENT INalk AIR HANDLING UNITS 0 0 0 BE ACCORDANCE W/SMACNA 2"W.G. CLASS, SEAL EXHAUST DUCT SUPPLY AIR DUCT COATED W/ADHESIVE IN NON-GASKETED TRANS-VERSE JOINTS BY MECH.CONTR. STRUCTURAL SUPPORTS FOR AHU o 0 0 0 ACCORD: CE W/SMACNA IN ACCORDANCE W/SMACNA CLASS AS REQUIRED STANDARD•. (TYP.) "C". (TYP.) AND SIZES INTFNELD) CONDENSING UNITS o 4 AIR FLOWIII 40 AIR FLOW CURB AND/OR STRUCTURAL SUPPORTS RUBBERVIBRATI-IN-SHEAR ISOLATORS FOR COND. UNITS AS REQUIRED �✓o � QI ��s ?� ROOF TOP UNITS 0 jr. il MAIN DUCTJ...r OVERSIZE DUCT COLLAR 79504�� ' y IR EXHAUST FAN _■:HMO TO FIT REGISTER FLANGE 45° ENTRY COLLARo 0FLOWi. ' FOR RTU AS REQUIRED STRUCTURAL CURB ADAPTER ORCGD d MAR13 ,,... ` BACKDRAFT t STRUCTURAL SUPPORTS FOR RTU t t'7< j Q DAMPER SUPPLY AIR REGISTER AS REQUIRED. // / Jr a WITH INTEGRAL VOLUME �, �>t�. 1 TYP. DAMPER o 0 U.O.N. + � - 4s CL CONICAL OR BELLMOUTH EXHAUST DIFFUSERS AND GRILLESEXPIRK1Ioi TATE: 4 I L1J ' TAPE DOWN SPIN-IN FITTING, SEAL AIRTIGHT - EXTERNAL W/MASTIC. 0 INSULATION. DIFFUSERS/GRILLES FIRE DAMPERS FASTEN W/MIN. (3)SHT. F— Q Q M MTL. SCREWS, SEAL W/ WALL FIRE DAMPERS AND/OR LI.o D (NI DUCT TAPE AND MASTIC. 0 TOILET EXHAUST FAN DETAIL 0 DUCT MOUNTED REGISTER DETAIL COMBINATION SMOKE/FIREDAMPERS T N.T.S. N.T.S. LOW PRESSURE DUCTWORK o o U.O.N. 1 I 11 ROUND RIGID DUCT. v / z 1-1/2"WRAPPED HIGH/MEDIUM PRESSURE DUCTWORK 0 O INSULATION. Z ~ O TEMPERATURE CONTROL SYSTEM 0 (D RELIEF AIR/MAKE UP AIR 0 z O z Q MOTOR OPERATED DAMPERS Q 0 I z RELIEF AIR/MAKE UP AIR o z Q Q TO S.A. MAIN INSULATED ROUND DUCT MOTOR OPERATED DAMPER ACTUATORS > ® TYPICAL ROUND DUCT TAKE-OFF DETAIL AND/OROKE SUPPLY CTOR(S) IN URN W — > ~ AND/OR SUPPLY AIR DUCT o o J N.T.S. ZONE DAMPERS o 0_ EMI% STRAP CLAMP J - d (TYPICAL) UNIT/BASEBOARD HEATER(S) 0 D J Lo RETURN/SUPPLY 00 OUTSIDE AIR INTAKE LOUVER 0 o LI) AIR DUCT 0) RELIEF AIR FAN OR HOOD o FLEXIBLE CONNECTION (MAX. 5 FT.) TOILET EXHAUST FAN(S) 0 0 RETURN TUBE THERMAL INSULATING TOILET EXHAUST DUCTWORK BLANKET WHERE I WALL OR ROOF CAP 0 SMOKE DETECTORla REQUIRED. I I 1 I I AIR BALANCE REPORT o AABC OR NEBB CERTIFIED ALSO MAY BE LOCATED ISSUE FOR SD 12/15/15 WITHIN UNIT - / I AS-BUILT DRAWINGS o f/ �� I ISSUE FOR DD-LLLD 01/08/16 SUPPLY AIR **... *,>'•... T FINISHED SPRINKLER PIPING AND HEADS 0 0 ISSUE FOR DD-LLD 01/06/16 DIFFUSER DRYWALL CEILING — ISSUE FOR CD-LLL 03/11/16 GENERAL NOTE THIS SCHEDULE IS INTENDED AS A"QUICK"REFERENCE. ALL ITEMS LISTED HERE ARE SPECIFIED AND DETAILED ISSUE FOR CD-LLD 03/11/16 ON THESE DRAWINGS. IF THE CONTRACTOR ENCOUNTERS ITEMS THAT ARE CONTRADICTORY THEN IT IS HIS ISSUE FOR PERMIT XX/XX/XX RESPONSIBILITY TO INFORM TENANT'S CONSTRUCTION MANAGER SO THAT THESE ITEMS CAN BE CLARIFIED FOR THE CONTRACTOR. NOTE: LEASE PROVISIONS CONTROL OVER ALL OTHER INFO. ISSUE FOR BID XX/XX/XX SAMPLING TUBE 0 DIFFUSER MOUNTING DETAIL N.T.S. 4D 6 SMOKE DETECTOR DETAIL N.T.S. METAL GAUGE FOR DUCTWORK TO BE AS FOLLOWS: ROUND DUCT 3 TO 19 INCHES TO BE 26 GAUGE RECTANGULAR 1/4", 21 1/4", 19 1/4" OR 13)/4"1NOTE: ROUGH-IN OPENING SIZES: DUCT UP TO 12 INCHES WIDE TO BE 26 GAUGE RECTANGULAR NOMINAL 12"x 12" = 12 1/2"x 12 1/2" REVISIONS DUCT 13 TO 30 INCHES WIDE TO BE 24 GAUGE. RECTANGULAR OUTSIDE DIMENSION DUCT ABOVE 30 INCHES WIDE TO BE 22 GAUGE. NOMINAL 24"x 24" = 24 1/2"x 24 1/2" NOMINAL 24"x 12" = 24 1/2"x 12 1/2" GRISWOLD FLOW CONTROL VALVE STEEL STRAP HANGER ! I \ NOMINAL 18"x 18" = 18 1/2"x 18 1/2" SHUT-OFF VALVE Chp SET 0 REQUIRED GPM FLOWNOMINAL 20"x 20" = 20 1/2"x 20 1/2" DUCTWORK . . --.. 3-WAY MODULATING SELF-TAPPING, CONTROL VALVE SHEET METAL 23", 19", 17" OR 11" L� RISTANCE PER MANUFACTURER'S SCREW (TYP.)-r". EaINSIDE DIMENSION NINN" HANGER SPACING: "C" CHANNEL 7-MANUAL AIR VENT AT .x'--25 1/4 , 21 1/4", REINFORCING BY MIGH POINT DUCT FACE AREA FROM 0 TO 4 SQ. FT. HANGERS 98" O.C. MAX 19 1/4" OR 13 1 f4 G.C. AROUND DUCT FACE AREA FROM 4 TO 10 SQ. FT. HANGERS 72" 0.C. MAX OPENING. NO. DATE DESCRIPTION DUCT FACE AREA FROM 10 AND GREATER HANGERS 48" O.C. MAX SHUT-OFF VALVE // WHERE DUCTS ARE LESS THAN 2 SQ. FT. IN FACE AREA, HANGERS mss' 4 SHALL BE NOT LESS THAN 1"x1/16" STRAP STEEL MOUNTING SCREW BYPASS W/ BALANCING 1114 �' WHERE DUCT ARE GREATER THAN 2 SQ. FT. IN FACE AREA. MECHANICAL , kil HANGERS SHALL BE NOT LESS THAN 1"x1/8" STRAP STEEL \ ' FIELD INS3ALLED. SCHEDULES AND VALVE (SAME SIZE AS CHILLED 11, I WATER CONTROL VALVE WHERE DUCT ARE 8 SQ. FT. IN FACE AREA. HANGERS SHALL BE lit DRYWALL CEILING DETAILS BRACED BY 1"x1"x1/8" STEEL ANGLES ALL AROUND, SPACED NO „ U STRAINER 4 MORE THAN FOUR FEET ON CENTERS. " „ " 1 1/2 24 , 20 , 18 OR 12" -'`• r�ii �j, WHERE DUCTS ARE OVER 48" WIDE. THE HANGERS SHALL BE BROUGHT �IE///� GRISWOLD BALANCING VALVE DOWN UNDER THE DUCT SIDES 4" AND FASTENED TO THE BOTTOM. SHEET NUMBER N1/41/4. COOLING COIL 1 STEEL MOUNTING BALANCING VALVEit f PETE'S PLUG -• /8FRAME 1 " FLOW FITTING (SEE SPEC. 4 I\i1 610 FOR REQ'T & TYPE) UNION (TYP) 1/2" HOSE VALVE FCU CW COIL PIPING W/3 WAY VALVE DUCT SUPPORT SCHEMATIC 0 DRYWALL MOUNTING FRAME SCHEMATIC 1 0 8 N.T.S. N.T.S. N.T.S. DIVISION 15-MECHANICAL I. SHOP DRAWINGS A. ROOFTOP UNITS,EQUIPMENT,AND APPURTENANCES. 13. FIRE DAMPERS 4. GENERAL INSTALLATION-LABEL ALL PIPING B. DUCTWORK,FITTINGS,DAMPERS,AND INSULATION. DIVISION 15-MECHANICAL SECTION 15000 1. SUBMIT SIX COPIES OF MATERIAL LISTS AND SHOP DRAWINGS FOR ALL C. HYDRONIC PIPING AND INSULATION(AS APPLICABLE,REFER TO PLANS). A PROVIDE PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY A. INSTALL WATER MAINS WITHOUT PITCH.USE ECCENTRIC REDUCING COUPLINGS MECHANICAL GENERAL PROVISIONS EQUIPMENT AND DUCT FABRICATION DRAWINGS TO THE TENANT'S CONSTRUCTION D. REFRIGERANT PIPING(AS APPLICABLE,REFER TO PLANS). CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. SECTION 15300 MANAGER FOR APPROVAL PRIOR TO ORDERING EQUIPMENT. SUBMISSIONS MUST E. DIFFUSERS,GRILLES,AND REGISTERS. OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED. FIRE PROTECTION DATE: 03/11/16 A. GENERAL CONDITIONS BE EARLY ENOUGH TO ALLOW THE TENANTS CONSTRUCTION MANAGER EIGHT F. CURBS AND STEEL FRAMING FOR SUPPORT(AS APPLICABLE,REFER TO B. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT,INCLUDING GENERAL AND WORKING DAYS FOR REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE PSS) 165°F FUSIBLE LINK,TYPE A,AS MINIMUM. A 45 DEGREE ANGLE,PITCH DOWNWARD TOWARD UNITS.BRANCHES TO UNITS A SCOPE OF WORK JOB NO: 20245 SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS ARE A JOB'S PROGRESS. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE GENERAL G. TESTING,ADJUSTING,AND BALANCING. C. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PART OF THIS CONTRACT AND APPLY TO THIS AND THE OTHER SECTIONS OF CONDITIONS USING THE MANUFACTURER'S LISTED ON THE DRAWINGS. SHOP H. OPERATIONS MANUALS. UL AND CODE REQUIREMENTS. PITCHED UPWARD TOWARDS UNITS.PITCH NOT LESS THAN 1"TO 10 FEET. 1. THE F.P.CONTRACTOR SHALL FURNISH ALL LABOR,MATERIALS,EQUIPMENT, DRAWN: DP/BH DIVISION 15. DRAWINGS SHALL INCLUDE ALL DATA THAT PERTAINS TO THE REQUIREMENTS SET I. TEMPERATURE CONTROLS AND RELATED DIAGRAMS. D. PROVIDE DUCT ACCESS DOORS IN AN ACCESSIBLE LOCATION FOR ALL FIRE SERVICES,TOOLS,TRANSPORTATION AND FACILITIES NECESSARY FOR, FORTH ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE SUBMITTAL SHALL J. SEQUENCES OF OPERATION. DAMPERS. DOOR IS TO BE 20 GA GALVANIZED DOOR WITH QUICK-OPENING C. SEE MECHANICAL DETAIL DRAWINGS FOR APPLICABLE DETAILS. REASONABLY IMPLIED AND INCIDENTAL TO,THE FURNISHING,INSTALLATION, CHECKED: AR/CF 2. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO READ THE ENTIRE INCLUDE BUT NOT LIMITED TO CUTS OR CATALOGS INCLUDING DESCRIPTIVE K CONNECTION TO ANY LANDLORD ENERGY MANAGEMENT SYSTEM. LATCH AND PIANO HINGE. COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS AS SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL OTHER TRADES. LITERATURE AND CHARACTERISTICS OF EQUIPMENT SHALL SHOW MAJOR D. PROVIDE UL LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS SHOWN ON THE DRAWINGS,CALLED FOR IN THE SPECIFICATIONS,AND AS DIMENSIONS,ROUGHING-IN DATA, 14.COMBINATION FIREISMOKE DAMPERS: REQUIRED BY JOB CONDITIONS,TO INCLUDE,BUT NOT BE LIMITED TO THE CAPACITY,CURVES,PRESSURE DROP,CODE 3. BEFORE STARTING WORK,THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, THROUGH RATED WALLS.PENETRATIONS SHALL MEET THE REQUIREMENTS OF UL FOLLOWING:(REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING HIS SUBCONTRACTORS WITH COMPLIANCE,MOTOR AND DRIVE DATA AND ELECTRICAL DATA OBSERVE SPECIAL STRUCTURAL,MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO DETAILS WL1001(UNINSULATED WALL)AND WL5039(INSULATED WALL). A FULL SET OF BID SET DOCUMENTS(INCLUDING SPECIFICATIONS)AND THE INSTRUCTIONS WHEN REQUIRED. SUBMITTALS SHALL BEAR THE STAMP OF THE SEQUENCE,COORDINATE,AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC A. PROVIDE COMBINATION FIRE/SMOKE DAMPERS WHERE SHOWN ON DRAWINGS A. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE COORDINATION OF HIS WORKAND INSPECTIONS AND THE WORK AND INSPECTIONS GENERAL AND SUB-CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED SYSTEM,MATERIALS,AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID AND AS REQUIRED BY CODE ENFORCING AUTHORITY WITH FIRE/SMOKE OF HIS SUBCONTRACTORS WITH ALL OTHER TRADES ON SITE CONFORMING TO THE THAT THEY ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND INTERFERENCES AND CONFRONTATIONS. RATINGS AS REQUIRED TO MAINTAIN THE FIRE RATING NOTED ON THE E. REFRIGERANT PIPING COVERAGE IN ACCORDANCE WITH NFPA-13,LOCAL CODES,LANDLORD'S GENERAL CONTRACTOR'S TIME SCHEDULE. SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS TAKE PLACE. LACK OF SUCH ARCHITECTURAL DRAWINGS. DAMPERS SHALL MEET UL 555 CLASSIFICATION CRITERIA,AND INSURANCE CARRIERS FOR THE MALL AND TENANT. CONTRACTOR'S REVIEW AND APPROVAL WILL BE CAUSE FOR REJECTION WITHOUT B. HVAC EQUIPMENT FOR FIRE RATING AND UL 555S CLASSIFICATION OF LEAKAGE CLASS II SMOKE B. TAPS,RISERS,LATERALS,BRANCHES,VALVES,ALARMS,SPRINKLER HEADS 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING HIS BID TO REVIEW BY TENANT'S CONSTRUCTION MANAGER. ALL SHOP DRAWINGS MUST DAMPER;DAMPER SHALL BEAR A UL LABEL ATTESTING TO THESE 1. THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. DETERMINE CONDITIONS AFFECTING THE WORK. BIDS SHALL SERVE AS EVIDENCE APPEAR IN THE OPERATION AND MAINTENANCE MANUALS LEFT ON SITE AT JOB 1. PRIMARY HEATING,VENTILATION AND AIR CONDITIONING UNITS. CLASSIFICATIONS.PROVIDE FIRE DAMPER WITH A 165°F RESETTABLE PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR CONDENSING C. DESIGN DRAWINGS,CALCULATIONS,SUBMITTALS AND APPROVALS. OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE COMPLETION. TEMPERATURE DEVICE.RATE FIRE/SMOKE DAMPERS FOR A MINIMUM VELOCITY UNITS.REFER TO PLANS TO DETERMINE IF A REFRIGERANT SYSTEM IS REQUIRED. D. PERMITS,FEES,AND CHARGES. MEP Engineer of Record REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. A. PRIMARY HEATING,VENTILATION,AND AIR CONDITIONING UNITS ARE TO OF 2,000 FPM AND PRESSURE OF 4"W.G. PROVIDE MANUFACTURER NEW PIPING IS REQUIRED.REUSE OF EXISTING PIPING IS NOT ALLOWED. E. TESTS AND TEST CERTIFICATES. BE BYTRANEASSCHEDULED. ALL COMPRESSORS ARE TO F. COST FOR SHUT DOWN FEES. Randall A. Nelson FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF 2. TENANT'S CONSTRUCTION MANAGER'S REVIEW OF SHOP DRAWINGS OR SCHEDULES RECOMMENDED STEEL SLEEVE OF LENGTH AS REQUIRED TO MEET THE INCLUDEA5-YEAREXTENDEDWARRANTY. 2. PIPING 2. THE CONTRACTOR THAT DOES THE ACTUAL SPRINKLER WORK IS REQUIRED TO BE 14817 West 95th Street RESPONSIBILITY IN PERFORMANCE OF WORK. SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS, INSTALLED LOCATION. PROVIDE A QUALIFIED 120 VOLT ELECTRIC ACTUATOR B. EQUALS EQUIPMENT AS MANUFACTURED BY CARRIER OR YORK ARE OMISSIONS OR OTHER DEFICIENCIES OR DEVIATIONS IN THE SHOP DRAWING FROM INSTALLED BY THE MANUFACTURER AT TIME OF DAMPER FABRICATION. ACCEPTABLE. A REFRIGERANT PIPING SHALL BE TYPE ACR COPPER TUBING.TUBING SHALL A LANDLORD APPROVED SPRINKLER CONTRACTOR. 5. WHEN USED,THE TERM"PROVIDED BY CONTRACTOR"SHALL BE INTERPRETED AS THE CONTRACT DRAWINGS AND SPECIFICATIONS. ACTUATORS SHALL BE RATED FOR A MINIMUM OF 20,000 CYCLES OF Lenexa, Kansas 66215 C. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL BE CLEAN AND CLEAR OF DEBRIS,AND EVACUATED WITH A DEEP VACUUM MEANING'fURNISHEDAAID INSTALLED"WITH THE EXCEPTION WHERE ITEMS ARE OPERATION,SHALL COMPLY WITH THE LOCALLY ADOPTED BUILDING CODE AND 3. BEFORE STARTING WORK,THE CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, "PROVIDED BY TENANT"WHICH MEANS"FURNISHED ONLY"(INSTALLED BY J. RECORD DRAWINGS DEVICES,APPURTENANCES,AND ACCESSORIES PROVIDED TO MEET THE SHALL OPEN IN 15 SECONDS OR LESS AND CLOSE IN 15 SECONDS OR LESS PRIOR TO REFRIGERANT CHARGE.THE CONTRACTOR SHALL CONFIRM THE STRUCTURAL,MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO Phone 91 3 322 51 5O CONTRACTOR),EXCEPT AS SPECIFICALLY NOTED OTHERWISE. DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AFTER ALARM OR SMOKE DETECTION HAS OCCURRED. PROVIDE STAINLESS DIAMETER OF THE REFRIGERANT PIPING RUNS IN EXCESS OF 50 SEQUENCE,COORDINATE,AND INTEGRATE THE VARIOUS ELEMENTS OF THE FIRE 1. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS AND SPECIFICATIONS AND SPECIFIED HEREIN. EQUIVALENT FEET WITH THE ARCHITECT,ENGINEER,AND MANUFACTURER B. GENERAL REQUIREMENTS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS,SUCH AS: D. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE STEEL SPRING LOADEDNEILEAKAGE SEALS I IN SIDES LA CASING, TERMINAL FOR ALL SPLIT SYSTEMS.NO REFRIGERANT PIPING RUNS EXCEEDING 100 PROTECTION SYSTEM,MATERIALS,AND EQUIPMENT WITH OTHER CONTRACTORS TO BLOCK FOR CONNECTION TO THE BUILDING FIRE ALARM SYSTEM. AVOID INTERFERENCES AND CONFRONTATIONS. 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIALS,EQUIPMENT, A. LOCATION CONCEALED PIPING VALVES AND DUCTS. MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST EQUIVALENT FEET ARE TO BE INSTALLED WITHOUT LIMITED BRANDS' SERVICES,TOOLS,TRANSPORTATION,INCIDENTALS AND DETAILS NECESSARY TO B. REVISIONS,OF CONCEALED UIS,AND CHANGE ORDERS. HAVE A CONDENSATE DRAIN AND BE TRAPPED IN ACCORDANCE WITH B. DAMPER SHALL BE MANUFACTURED BY RUSKIN,AIR BALANCE, S DOOR,ECK, PERMISSION.THE MANUFACTURER SHALL PROVIDE ALL FINAL PIPE SIZING 4. RELOCATION OF EXISTING MAINS,LATERALS,BRANCHES AND RISERS TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL MECHANICAL SYSTEM AS SHOWN ON C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, MANUFACTURERS DATA SEE DRAWINGS FOR ADDITIONAL DETAILS. CESCO,UNITED AIR OR NULOR INDUSTRIES.PROVIDE ACCESS SIZED AND COIL SELECTIONS FOR ALL REFRIGERANT PIPING SYSTEMS. FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. THE DRAWINGS,CALLED FOR IN THE SPECIFICATIONS,AND AS REQUIRED BY JOB APPROVED EQUIPMENT SUBSTITUTIONS,AND CONTRACTOR'S COORDINATION E. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL PER SMACNA WITH MINIMUM SIZE OF 10"BY 10",IN DUCT FOR INSPECTION INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF VAV AND SERVICE TO FIRE DAMPER AND FUSIBLE LINK PROVIDE DUCT ACCESS B. ALL FITTINGS AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE B. SHOP DRAWINGS CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD WITH OTHER TRADES. BOXES. SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE DOOR(S)WITHIN 12 INCHES OF THE DEVICE TO ALLOW FOR TESTING AND (ANSI B16.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE D. EXACT ROUTING OF ALL SANITARY AND DOMESTIC WATER PIPING UNDER CONDENSATE PUMPS,AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO A COPPER-PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE 1. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS __Cr ENTIRE INSTALLATION WITH THE LANDLORD,AS REQUIRED. FIELD VERIFY FLOOR. MOP SINK OR AS SPECIFIED ON PLANS. MAINTENANCE. LABEL EACH DOOR(WITH MINIMUM 1"LETTERING)INDICATING BRAZED WITH SILFOS-5 ALLOY. AND CALCULATIONS FOR HIS WORK. SUBMIT SIX(6)COPIES TO GENERAL ,_� �° THE EXACT TYPE,SIZE AND LOCATION,ETC.OF EXISTING PIPE AND DUCTS IN WHICH DAMPER TYPE IS SERVED. DOOR SHOULD BE CAPABLE OF BEING CONTRACTOR FOR APPROVAL. NO WORK SHALL BEGIN UNTIL TENANTS • 7rn 46:: iA THE TENANT SPACE PRIOR TO BID. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL,THE CONTRACTOR 2. VARIABLE AIR VOLUME BOXES(VAV) FULLY OPENED OR PROVIDE REMOVABLE DOOR. PROVIDE REMOVABLE C. ALL ELBOWS ARE TO BE LONG RADIUS TYPE. CONSTRUCTION MANAGER APPROVES HEAD AND PIPING LOCATIONS. . SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY SECTION OF DUCT WHERE DUCT SIZE IS TOO SMALL FOR 10"BY 10"ACCESS OREGON "� 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER OF EACH PRINT BY SIGNATURE THEREON. THE DRAWINGS ARE TO BE TURNED A. WHERE SHOWN ON DRAWINGS,PROVIDE VAV BOXES COMPLETE WITH DOOR.PROVIDE ACCESS DOOR IN CEILING OR WALL AS REQUIRED TO ACCESS 3. INSTALLATION 2. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING MAR 1 AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE PROVIDED EVEN OVER TO THE TENANT. CONTROLS,HEATING COILS(FANS AS REQUIRED). ALL DUCT CONNECTIONS DAMPER. COORDINATED DRAWINGS,CALCULATIONS,HEAD TYPES AND COLORS TO ALL 9 1% �'. THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR FLEXIBLE DUCT/PIPE CONNECTIONS SHALL BE PROVIDED BY THE A REFRIGERANT PIPE SIZING SHALL BE THE RESPONSIBILITY OF THE HVAC AUTHORITIES HAVING JURISDICTION FOR APPROVAL. NO WORK SHALL BEGIN /k WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE K GUARANTEE CONTRACTOR. 15. FLEXIBLE AIR DUCT UNTIL ALL APPROVALS HAVE BEEN RECEIVED. ' " 4: SPECIFICATIONS,BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, SUPPLIER.CONTRACTOR WILL PROVIDE A SCHEMATIC PROPOSED LAYOUT A. 1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK UNDER HIS 3. TOILET EXHAUST FANS A FLEXIBLE AIR DUCT SHALL BE 1"INSULATED CLASS 1 AND RATED FOR THE OF THE SYSTEM INCLUDING ALL ELBOWS,RISES,RUNS,ETC.,WITH 3. A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING`.? 0 AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER,SHALL BE CONTRACT AND SHALL MAKE GOOD,REPAIR OR REPLACE AT HIS OWN EXPENSE, OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL DIMENSIONS.THE HVAC SUPPLIER WILL THEN PROVIDE WRITTEN BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO THE TENANTS:.XPIRATION DATE: 3f PROVIDED AS PART OF CONTRACT. ANY DEFECTIVE WORK,MATERIAL,OR EQUIPMENT WHICH MAY BE DISCOVERED A WHERE SHOWN ON DRAWINGS,PROVIDE A TOILET EXHAUST FAN UNIT (PLASTIC,CLOTH,ALUMINUM)MUST ADHERE TO LOCAL CODES AND DOCUMENTATION OF PIPE SIZES AND ADDITIONAL REQUIRED SYSTEM le( _�I t� CC WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE(IN WRITING) COMPLETE WITH GRAVITY BACK DRAFT DAMPERS. ALL DUCTWORK,ROOF LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. COMPONENTS TO THE FIELD. CONSTRUCTION MANAGER. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OF THE INSTALLATION BY THE TENANTS CONSTRUCTION MANAGER. PROVIDE OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM B. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITH C. EQUIPMENT U W LsJ OR THE LANDLORD'S TENANT CRITERIA,THE CONTRACTOR IS STILL RESPONSIBLE EXTENDED WARRANTIES AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. IN CASE SHALL BE PROVIDED BY THE CONTRACTOR. REFER TO PLANS FOR PRIOR APPROVAL FROM TENANTS CONSTRUCTION MANAGER. B. SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND/OR DOUBLE o FOR PROVIDING THE SYSTEM AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, OF REPLACEMENT OR REPAIR OR EQUIPMENT DUE TO FAILURE WITHIN GUARANTEE APPLICABILITY. C. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5'-0"IN LENGTH AT ANY ONE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND 1. SPRINKLER HEADS: - UNLESS SPECIFICALLY NOTED OTHERWISE. Q N� PERIOD,GUARANTEE ON THAT PORTION OF WORK SHALL BE EXTENDED FOR A LOCATION. EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. Q N PERIOD OF ONE(1)YEAR FROM DATE OF SUCH REPLACEMENT OR REPAIR. 4. BASEBOARD,CABINET,AND UNIT HEATERS A ALL SPRINKLER HEADS SHALL BE NEW(EXISTING HEADS SHALL BE 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE 16. SUPPLY AIR TAKE-OFF FITTINGS REPLACED AS NECESSARY),U.L.,F.M.LISTED AND APPROVED AUTOMATIC LLJ FOR OPERATING,SERVICING,MAINTAINING,AND REPAIRING. THE CONTRACTOR L. OPERATIONS MANUALS A WHERE SHOWN ON DRAWINGS,PROVIDE ELECTRIC HEATERS COMPLETE WITH C. BRAZE ALL JOINTS WITH SILFOS-5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT.THE SEALS ON THE OUTDOOR UNIT SPRAY TYPE AS MANUFACTURED BY CENTRAL SPRINKLER CO.,GLOBE, c N IS RESPONSIBLE FOR PROVIDING SUFFICIENT ACCESS TO ALL EQUIPMENT FOR ELECTRIC HEATING COIL,CONTROLS,AND INTEGRAL THERMOSTAT. A PROVIDE CONICAL OR"BELL-MOUTH"TAKE-OFFS FROM MAIN DUCTWORK TO SHALL BE BROKEN LAST.A NITROGEN BLEED SHALL BE USED DURING ALL GRINNELL,RELIABLE,STAR,OR VIKING. 0 (n SERVICE. 1. ONE COPY OF EACH OPERATION AND MAINTENANCE MANUAL FOR ALL EQUIPMENT 5. INLINE PUMPS ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS. BRAZING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL B. ALL SPRINKLER HEADS SHALL BE RATED FOR 165°F UNLESS INDICATED FURNISHED ON JOB SHALL BE COLLECTED AND INSERTED IN A 3"THREE RING B. PROVIDE 45°RECTANGULAR TAKE-OFFS FROM MAIN DUCTWORK TO OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODESBE CAPPED AND SEALED BEFORE LEAVING THE SITE DURING . V) z 5. THE CONTRACTOR SHALL DO ALL CUTTING,CORE DRILLING,CHASING OR BINDER AND TURNED OVER TO THE TENANT. EACH NOTEBOOK SHALL INCLUDE BUT A. WHERE SHOWN ON DRAWINGS PROVIDE AN INLINE CLOSE COUPLED PUMP(S), RECTANGULAR BRANCHES. CONSTRUCTION.PRESSURE TEST FOR LEAKS WITH AN INERT GAS UP TO C. ALL SALES FLOORS HEADS ARE TO HAVE BE FACTORY APPLIED COLOR CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THIS DIVISION. NOT BE LIMITED TO INSTALLATION,MAINTENANCE AND OPERATING BRONZE FITTED,PUMPS SHALL BE FURNISHED WITH BRONZE CASE WEARING 245 PSIG.REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. FINISH TO MATCH ARCHITECTURAL CEILING FINISH. VERIFY HEAD TYPES Q Q Q CUTTING SHALL HAVE PRIOR APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER INSTRUCTIONS,PAMPHLETS OR BROCHURES APPROVED SHOP DRAWINGS AND RINGS,BRONZE SHAFT SLEEVE AND MECHANICAL SHAFT SEAL RATED FOR. 17. DAMPERS EVACUATE ENTIRE SYSTEM TO 200 MICRONS OF MERCURY.CHARGE AND COLORS WITH TENANTS CONSTRUCTION MANAGER AND SUBMIT WITH Z I- O AND THE LANDLORD. PATCHING SHALL MATCH,FINISH OF SURROUNDING AREA. WARRANTIES OBTAINED FROM EACH MANUFACTURER OF PRINCIPAL ITEMS OF PUMPS TO BE SO CONSTRUCTED THAT THEY MAY BE MOUNTED IN A A. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH SYSTEM WITH 25 PSI OF R-22 AND A INERT GAS TO 245 PSI AND SPRINKLER DRAWINGS FOR PERMIT. C. CODES EQUIPMENT. HORIZONTAL OR VERTICAL PIPE LINE. MOTOR TO BE 1750 RPM UNLESS HANDLE OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO RETEST SYSTEM.ENERGIZE CRANK CASE HEATERS 24 HOURS PRIOR TO D. SPRINKLER HEAD TYPES SHALL BE AS FOLLOWS: Z O z NOTED OTHERWISE. FACILITATE AIR BALANCING. STARTING COMPRESSOR TO ENSURE THAT ALL REFRIGERANT LIQUID IS OUT 1. FINISHED CEILING(SALES AREA)-FULLY RECESSED/CONCEALED TYPE - 1. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING M. SLEEVES B. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED,YOUNG'S OF THE COMPRESSOR. 2. FINISHED CEILING(NON-SALES AREA)-SEMI-RECESSED TYPE 6. VIBRATION ISOLATION DEVICESO = z GOOD ENGINEERING PRACTICES.ALL WORK SHALL CONFORM TO THE 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR REGULATORS SHALL BE USED. 3. NO-CEILING-CHROME UPRIGHT TYPE. C LANDLORD'S CRITERIA,THE COUNTRY'S AND LOCAL CODES AND ORDINANCES, FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS A. VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN ALL SUPPORTS C. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR,RELIEF AIR,OR RETURN AIR D. UPON COMPLETION OF TESTING,BUT BEFORE THE REFRIGERANT PIPING (/) Q SAFETY AND HEALTH CODES,NFPA CODES,ENERGY CODES AND ALL OTHER RESPECTIVE FLOOR,WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH BETWEEN VIBRATING EQUIPMENT(FANS,ROOFTOP UNITS,AIR HANDLERS, DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT INSULATION IS APPLIED,THE PIPING MUST BE INSPECTED BY A NOTE:SEMI-RECESSED HEADS SHALL PROTRUDE NO MORE THAN 1" Z Q J APPLICABLE CODES AND REQUIREMENTS.THE CONTRACTOR SHALL INQUIRE SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR,WHICH SHALL EXTEND FAN POWERED VAV BOXES,ETC.)AND STRUCTURE. DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. BELOW LEVEL OF CEILING OF SOFFIT. ALL HORIZONTAL SPRINKLER W - > I- INTO AND COMPLY WITH ALL APPLICABLE CODES,ORDINANCES,AND 2"ABOVE THE FLOOR. B. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH D. ALL MOTORIZED DAMPERS NOT FURNISHED WITH EQUIPMENT ARE TO BE RUNS AT SIDEWALL SOFFITS SHALL BE CONCEALED WITHIN SOFFIT J REGULATIONS.AFTER CONTRACT IS ISSUED,NO ADDITIONAL COST DUE TO RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM HONEYWELL DAMPERS. E. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES WITH FRAMING. CODE ISSUES SHALL BE REIMBURSED BY THE TENANT TO THE CONTRACTOR. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. RUBATEX OR ARMSTRONG 1 INCH THICK PIPE INSULATION WITH FLAME > O BE FIRE SEALED WITH CALCIUM SILICATE,SILICONE"REV FOAM,"3M"FIRE 18. DIFFUSERS,GRILLES,AND REGISTERS SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED D. GENERAL PIPING > 0_ C. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING D. LICENSES,PERMITS,INSPECTIONS&FEES RATED SEALANTS OR EQUAL,SO AS TO RETAIN THE FIRE RATING OF THE FLOOR DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID A PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH INDUSTRY 1 A FIRE PROTECTION SYSTEM STUB IN SHALL BE FURNISHED BY THE LANDLORD. Q () OR WALL. CONFORM TO U.L.ASSEMBLY RATING OF FLOOR OR WALL. "GROUNDING"THE ISOLATOR. TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH STANDARDS. DO NOT INSULATE THE HOT GAS(LIQUID)LINES OR ANY SPRINKLER SPACING SHALL NOT EXCEED 130 SQ.FT.IN"SALES"AREAS AND • 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES,PERMITS, D. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AS INDICATED. HOT GAS BYPASS. 100 SQ.FT.IN"STOCK"AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. > Ln INSPECTIONS,AND FEES REQUIRED OR RELATED TO HIS WORK. 3. SLEEVES IN BEARING AND MASONRY WALLS,FLOORS,AND PARTITIONS SHALL BE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES,DUCTS, B. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN F. PROVIDE UL LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING DO 2. FURNISH TO THE TENANT'S CONSTRUCTION MANAGER ALL CERTIFICATES OF EQUIPMENT,ETC. CEILING PLAN. MASONRY PARTITIONS,THROUGH SUSPENDED CEILINGS,OR FOR CONCEALED E. CONSULT MANUFACTURER FOR APPLICATION DATA. C. APPROVED MANUFACTURERS: TITUS IS SPECIFIED,EQUALS BY METALAIRE PENETRATIONS THROUGH RATED WALLS.PENETRATIONS SHALL 2. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED,AVOIDING Ln INSPECTION AND FINAL INSPECTION APPROVAL AT SUBSTANTIAL COMPLETION VERTICAL PIPING,SLEEVES SHALL BE NO.22 U.S.G.GALVANIZED STEELMEET THE REQUIREMENTS OF UL DETAILS WL1001(UNINSULATED WALL) INTERFERENCE WITH LIGHTS,DUCTS,PIPES,STORAGE DECK,ETC. FIRE DATE OF PROJECT. MINIMUM. 7. CURBS AND STEEL FRAMING FOR SUPPORT OR KRUEGER IS ACCEPTABLE. AND WL5039(INSULATED WALL). PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS MEDIUM PRESSURE DUCT INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS,SPRINKLER LINES, E. DRAWINGS 4. DUCT SLEEVES TO BE MINIMUM 14 GAUGE STEEL. A THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS AND STEEL 19. 4. INSPECTION LIGHTS,DIFFUSERS,GRILLES AND REGISTERS PRIOR TO INSTALLATION. 1. DRAWINGS(PLANS,SPECIFICATIONS,AND DETAILS)ARE DIAGRAMMATIC AND N. HANGERS FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR 20. DUCTWORK INSULATION HORIZONTAL SPRINKLER RUNS AT MERCHANDISE SOFFITS SHALL BE PLACED INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14"HIGH, A CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC INSIDE SOFFIT STRUCTURE. VERTICAL DROPS FROM CEILING TO MERCHANDISE BECAUSE OF THE SMALL SCALE OF THE DRAWINGS,IT IS NOT POSSIBLE TO 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED. INSULATE A INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S TO THE LOCAL MANUFACTURER REPRESENTATIVE FOR APPROVAL PRIOR TO SOFFIT SHALL BE LOCATED FLUSH AGAINST DEMISING WALLS. INDICATE ALL DUCT AND PIPING OFFSETS,FITTINGS AND ACCESSORIES THAT BANDS,C-CLAMPS WITH RETAINING CLIPS,CHANNELS,HANGER RODS,ETC., UNDER THE COMPRESSOR SECTION TO PREVENT CONDENSATION. ALL CURBS WRITTEN INSTRUCTIONS,AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY BEGINNING INSTALLATION.UPON COMPLETION OF PIPING,THIS CONTRACTOR MAY BE REQUIRED. NECESSARY FOR THE INSTALLATION OF WORK MUST BE INSTALLED SO THAT TOP OF CURBS ARE"DEAD"LEVEL. ALL PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A MUST CALL THE LOCAL REPRESENTATIVE FOR FIELD INSPECTION OF WORK 3. WHERE POSSIBLE,REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE PERFORMED.ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER REQUIREMENTS OF THIS DESIGN. RELOCATE ALL MAINS AND BRANCHES 2. THE LAYOUT SHOWB. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS.N ON THE DRAWINGS IS BASED ON A PARTICULAR MAKE OF 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL,CONCRETE,OR MASONRY,BUT TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. PERFORMANCE BY MANUFACTURER REPRESENTATIVE MUST BE CORRECTED. INTERFERING WITH CEILING HEIGHTS,EQUIPMENT,AND MAJOR COMPONENTS EQUIPMENT. IF ANOTHER MAKE OF EQUIPMENT IS USED WHICH REQUIRES NOT TO PIPING OR DUCTWORK. HANGING FROM METAL DECK IS NOT PERMITTED. INSULATE SUPPLY AND RETURN AIR RECTANGULAR DUCTWORK WHERE SHOWN THIS INSPECTION IS PERFORMED AT LSD&C EXPENSE. INCLUSIVE OF ADJACENT TENANTS AND MALL COMMON AREAS. REMOVE ALL ISSUE FOR SD 12/15/15 MODIFICATION OR CHANGE OF ANY DESCRIPTION FROM THE DRAWINGS OR HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE C. METAL DUCTWORK-NO FIBERGLASS DUCT ALLOWED ON PLAN. DUCTWORK SHALL BE EXTERNALLY WRAPPED WITH 1-1/2"THICK, UNUSED PIPING. NO DUCTWORK SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANT'S FOIL FACED FIBERGLASS INSULATION. ISSUE FOR DD-LLL 01/08/16 SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE AS PART OF THIS INTERFERENCES OCCUR,IN ORDER TO SUPPORT DUCTWORK OR PIPING,THE 1. F. SYSTEM TESTING,ADJUSTING,AND BALANCING 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY THE LOCAL FIRE PROTECTION WORK,FOR MAKING ALL SUCH MODIFICATIONS AND CHANGES,INCLUDING THOSE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL CONSTRUCTION MANAGER. SIGNIFICANT DEVIATIONS FROM DESIGN MUST BE C. ALL ROUND AND OUTSIDE AIR DUCTWORK ABOVE THE CEILING SHALL BE OFFICIAL AND THE TENANTS CONSTRUCTION MANAGER BEFORE INSTALLATION. ISSUE FOR DD-LLD 01/08/16 INVOLVING OTHER TRADES WITH THE COST THEREOF INCLUDED IN HIS BID. IN BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, APPROVED BY TENANT'S CONSTRUCTION MANAGER PRIOR TO FABRICATION OR EXTERNALLY INSULATED WITH A MINIMUM OF 1"THICK,1-1/2 LB.DENSITY 1. TESTING,ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN HEADS MUST BE LOCATED IN THE CENTER OF CEILING TILES AND IN A SUCH CASE,CONTRACTOR SHALL SUBMIT DRAWINGS AND SPECIFICATIONS PRIOR VALVES,ACCESS DOORS AND OTHER EQUIPMENT SERVICE REQUIREMENTS AND/OR INSTALLATION. ALL DUCT MAINS ARE TO BE RECTANGULAR UNLESS NOTESR=5.6 DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED ASSOCIATED AIR SYMMETRICAL PATTERN WITH OTHER CEILING FIXTURES. ADDITIONAL MONIES ISSUE FOR CD-LLL 03/11/16 TO STARTING WORK SHOWING ALL SUCH MODIFICATIONS AND CHANGES. HIS OTHER TRADES. HANGER TYPES AND INSTALLATION METHODS ARE SUBJECT TO OTHERWISE.ALL DUCT BRANCHES TO DIFFUSERS ARE TO BE ROUND RIGID DUCT. MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO BALANCING COUNCIL(AABC)OR NATIONAL ENVIRONMENTAL BALANCING BUREAU WILL NOT BE ALLOCATED FOR ADDITIONAL HEADS REQUIRED BY FIELD FIRE PROPOSAL SHALL BE SUBJECT TO THE APPROVAL OF THE TENANTS CONSTRUCTION LANDLORD CRITERIA. (FLEXIBLE DUCT CONNECTIONS TO THE DIFFUSER ARE NOTALLOWED ON THE THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION (NEBB)BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BEISSUE FOR CD-LLD 03/11/16 INSPECTOR AFTER BIDS ARE ACCEPTED. HEADS IN MERCHANDISE BAYS SHALL MANAGER. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE SALES FLOOR) WITHOUT INTERRUPTION THROUGH WALLS,FLOORS,AND SIMILAR REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE BE CENTERED SIDE TO SIDE AND FRONT TO BACK ISSUE FOR PERMIT XXIXXIXX OUTER DIAMETER OF INSULATION.INSTALL 6"LONG SPLIT CIRCLE GALVANIZED PENETRATIONS. IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. F. EXISTING SHELL SPACE CONDITIONS SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 2. EXCEPT AS OTHERWISE INDICATED,FABRICATE AND INSTALL RECTANGULAR PAYMENT OF ALL COSTS FOR TESTING SHALL BE MADE BY THE HVAC CONTRACTOR. 5 PROVIDE AND INSTALL A VALVED TEST CONNECTION FOR THE SPRINKLER SYSTEM ISSUE FOR BID XX/XX/XX DUCTS WITH GALVANIZED SHEET STEEL,IN ACCORDANCE WITH THE D. DUCTWORK LOCATED IN THE CONDITIONED SPACE SHALL NOT BE INSULATED AS REQUIRED OR REQUESTED BY THE MALL,LOCAL INSPECTOR,OR INSURANCE 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE COUNTRY'S"HVAC DUCT CONSTRUCTION STANDARDS"LATEST EDITION. UNLESS OTHERWISE NOTED ON PLANS. INSULATE ALL DUCT DROPS OR 2. THE HVAC CONTRACTOR SHALL INSTALL NEW FILTERS IN ALL UNITS PRIOR TO CARRIER. COORDINATE LOCATION WITH TENANTS CONSTRUCTION MANAGER AND DEMOLITION OF EXISTING MECHANICAL WORK SHOWN ON THE MECHANICAL 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR THE FIRST 20 FEET OF DUCT AT THE HVAC UNITS IN ALL CASES. THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH LOCAL FIRE PROTECTION OFFICIAL PRIOR TO ROUGH-IN. DRAWINGS AND THE MECHANICAL DEMOLITION SHOWN ON THE ARCHITECTURAL SEPARATED FROM ONE ANOTHER. METAL THICKNESS,REINFORCING TYPES AND INTERVALS,TIE ROD OUTSIDE AIR DAMPERS IN MINIMUM POSITION. DRAWINGS. 0. ACCESS DOORS APPLICATIONS,AND JOINT TYPES AND INTERVALS. E. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 3. BALANCE AIR AND WATER QUANTITIES TO WITHIN+5%OF THAT INDICATED ON 6. SPRINKLER HEADS LOCATED IN STOCK,CORRIDOR ON TOILET ROOM CEILINGS OR 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 WHEN TESTEDWALLS BELOW 8'-0"ABOVE THE FINISHED FLOOR ARE TO BE PROTECTED WITH 2. THE CONTRACTOR SHALL INCLUDE,AND WILL BE HELD RESPONSIBLE FOR,THE 1. FURNISH STEEL ACCESS DOORS AND FRAMES,MIN.16"X 20"OR AS SHOWN ON 3. EXCEPT WHERE OTHERWISE INDICATED,CONSTRUCT DUCT SYSTEMS TO THE IN ACCORDANCE WITH ASTM C 411,OR AS REQUIRED BY LOCAL CODES. THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES,BELTS,PULLEYS,OR THE APPROVED GUARDS. REMOVAL OF ALL EXISTING FIRE PROTECTION,PLUMBING FIXTURES,PIPING, DRAWINGS,TO GENERAL CONTRACTOR FOR ALL LOCATIONS WHERE NECESSARY TO FOLLOWING PRESSURE CLASSIFICATIONS: (VERIFY WHETHER RETURN OR EXHAUST ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE HVAC UNITS,REFRIGERANT RECAPTURE,EXHAUST FANS,ETC.AND ASSOCIATED PROVIDE ACCESS TO CONCEALED VALVES,AND OTHER EQUIPMENT REQUIRING DUCT IS POSITIVE OR NEGATIVE PRESSURE). 21. SYSTEM CLEANOUT PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE ROOF CURBS NOT TO BE REUSED ON THIS PROJECT,UNLESS SPECIFICALLY NOTED TENANT OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED SERVICE OR INSPECTION. LOCATION,TYPE,SIZE AND NUMBER AS DETERMINED A.SUPPLY DUCTS: 2 INCHES WATER GAUGE,POSITIVE PRESSURE A. DUCTWORKAND AIR HANDLING EQUIPMENT IS TO BE CLEANED OUT AND ABANDONEDHEQUIPMENT,TCT,PITES,DUCTWORK,WIAND EQUIPMENT PRIOR REMOVAL. BY CONTRACTOR AND APPROVED BY TENANT CONSTRUCTION MANAGER TO SUIT B.RETURN AND EXHAUST DUCTS: 2 INCHES WATER GAUGE,NEGATIVE BLOWN OUT BEFORE PAINTING IS STARTED BY THE GENERAL CONTRACTOR. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING E. PIPING: • ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED UNLESS NOTED FOR EQUIPMENT REQUIREMENTS. GENERAL CONTRACTOR WILL INSTALL ACCESS DOORS PRESSURE. B. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. INFORMATION: AND FRAMES. PRESSURE TEST DUCTS FOR LEAKAGE. REMAKE LEAKING JOINTS AND APPLY A MBC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING 1. SCHEDULE DAMLESS ,ANSI 360 PIPE,ASTM A-53UG FOR FERROUS PIPING,WELDED REUSE OR RECONFIGURATION ON PLANS. ROOF PATCHING SHALL BE PERFORMED SEALANTS AS REQUIRED TO FABRICATE A SYSTEM THAT DOES NOT EXCEED 5% D. HYDRONIC PIPING CONTRACTOR. AND SEAMLESS,ANSI B-36-10-70 FOR WROUGHT STEEL PIPE. AT THE CONTRACTOR'S EXPENSE BY A ROOFING CONTRACTOR APPROVED BY THE 2. ACCESS DOORS LOCATED IN FIRE-RATED WALLS,FLOORS,CEILING-FLOOR OR LEAKAGE OR LESS AS STATED BY PRESSURE CLASS RATINGS IN SMACNA B. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND LANDLORD. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF(ABOVE CEILING-ROOF ASSEMBLIES SHALL BE FIRE RATED,UNDERWRITER'S STANDARDS. C. TESTED.1. FURNISH AND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE.REFER MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN THIS SPACE)NOT APPLICABLE TO THE NEW WORK OR PART OF THE LANDLORD'S LABORATORIES,INC.,LISTED AND LABELED. TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM IS REQUIRED. 2 INCHES. OR ANOTHER TENANTS ACTIVE SYSTEM MUST BE REMOVED AND ROOFIWALLIFLOOR4. AS A MINIMUM,CROSSBREAKALL FLAT SURFACES OR REINFORCE WITH A BEAD D. AIR CFM AND STATIC PRESSURE READINGS(DISCHARGE AND SUCTION)AS 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED 3. ACCESS DOORS SHALL BE FLUSH TYPE,MANUFACTURED FROM NO.14 GAUGE MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. APPROXIMATELY 3/8"WIDE X 3/16"DEEP ON 12"CENTERS TO PREVENT 2. PIPING PIPES 2 INCHES AND SMALLER. REVISIONS PIPES,DUCTS,OR EQUIPMENT IN THE FLOOR,EMBEDDED IN CONCRETE,OR STEEL,COMPLETE WITH FLUSH FLANGE TYPE FRAMES MANUFACTURED FROM NO. E. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN 16 GAUGE STEEL,PROVIDED WITH ANCHORS. ACCESS DOORS SHALL BE SUITABLE VIBRATIONS. READINGS FOR EACH LEG. 4. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE,WHERE APPROVED BY CODE AND A HYDRONIC PIPING FOR CHILLED WATER,CONDENSER WATER AND/OR HEATING THE LANDLORD. FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. FOR INSTALLATION IN WALL OR CEILING MATERIALS SHOWN IN ROOM FINISH 5. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS. WATER SHALL BE ASTM A-53,SCHEDULE 40,ERW,BLACK STEEL PIPE WITH F. MOTOR AND FAN RPMS,SHEAVE SIZES AND BELT SIZES. IF REQUIRED BY LANDLORD OR CODES,ABANDONED PIPING AND/OR DUCTWORK SCHEDULES. G. OUTSIDE,RETURN,MIXED AND SUPPLY AIR TEMPERATURES AT FULL F. TESTS MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION 6. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS PLAIN ENDS.INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE IS 2-1/2 COOLING. PRIOR TO BID AND INCLUDE IN BID PROPOSAL. P. ELECTRICAL MOTORS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET INCH AND LARGER.INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS. H. WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET 1. WHEN COMPLETED,THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE INSTALL TYPE"K'COPPER PIPE FOR 2 INCH AND SMALLER PIPE.PROVIDE OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING TEMPERATURE AND PRESSURE READINGS(WHERE APPLICABLE). HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF THE 3. ACTIVE LANDLORD OR OTHER TENANT SERVICES ENCOUNTERED IN WORK SHALL BE 1. FURNISH,INSTALL AND ALIGN ALL MOTORS REQUIRED FOR THIS EQUIPMENT. DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS.ALL PIPING SHALL BE IN I. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHOW NO SIGNS OF PROTECTED AND SUPPORTED. IF EXISTING SERVICES NOT ANTICIPATED REQUIRE UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT,ALL STARTERS AND AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE STRICT CONFORMANCE WITH ASTM,ASA,AND LANDLORD'S REQUIREMENTS. J. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS(INCLUDING RETURNS LEAKAGE OR OTHER DEFECTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION,CONTACT THE TENANTS CONSTRUCTION MANAGER IMMEDIATELY. ASSOCIATED WIRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS WHICHEVER IS MOST STRINGENT.UNIONS OR FLANGES MUST BE USED AT WHERE DUCTED). DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING,OR TO ALL COSTS FOR REPAIR OF DAMAGES TO ACTIVE LANDLORD OR OTHER TENANT FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. STARTERS SHALL REQUIRED BY STATE AND COUNTRY CODES OR BY LANDLORD. EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. K INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS. ITS CONTENTS,PEOPLE,ETC.,CAUSED BY LEAKS IN ANY OF THE EQUIPMENT MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL DIVISION OF THE SERVICESHERING CONSTRUCTION SHALL BE PAID FOR BY THE CONTRACTOR INSTALLED TIM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT CAUSING THE DAMAGE. SPECIFICATIONS. 7. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS,PROVIDE AS MINIMUM 1- B. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT L. REPORT SHALL INCLUDE VAV BOX AIRFLOW SENSOR DIFFERENTIAL PRESSURE THIS CONTRACTOR'S EXPENSE. 4. TIE-INS AND MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE 2. DESIGN,CONSTRUCTION AND PERFORMANCE CHARACTERISTICS OF MOTORS SHALL 112"X1-112"X118"STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE A MINIMUM PRESSURE OF 125 PSI. READING AT MAX.AND MIN.COOLING. ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH 5. ALL CONTROL SEQUENCES SHALL BE TESTED INTERLOCKED EQUIPMENT,SMOKE 2. PROPERLYITES"SCOMPLETED AND SIGNED"SPRINKLERTHE L CONTRACTOR'S ORD,AU HORITIES AND WITH MINIMUM INTERRUPTION OF LANDLORD OPERATION AND DURING HOURS CONFORM TO ALL APPLICABLE PROVISIONS OF LATEST NEMA,ANSI,/SEE C. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SPECIFIED BY THE LANDLORD. THE CONTRACTOR IS RESPONSIBLE FOR STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS SHALL BE SUITABLE FOR SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. SYSTEM SHALL BE CLEANED AND FLUSHED.REMOVE,CLEAN,AND REPLACE DETECTORS,SMOKE EVACUATION,ECONOMIZER,ETC.)AND OPERATING STATUS TEST CERTIFICATES"SHALL BE FURNISHED TO LANDLORD,AUTHORITIES NO. DATE DESCRIPTION CONFIRMING EXACT WORKING HOURS OF THIS WORK WITH THE LANDLORD PRIOR OPERATION ON VOLTAGE VARIATION OF PLUS OR MINUS 10%,40 DEGREES C 8. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY AIR DUCT SHALL BE SEALED AIR STRAINER SCREENS.FILL TENANTS SYSTEM WITH DOMESTIC WATER AND VENT RECORDED IN THE REPORT. HAVING JURISDICTION,AND TENANT'S CONSTRUCTION MANAGER. TO SUBMITTING HIS BID. THE CONTRACTOR SHALL INCLUDE IN HIS BID,ALL AMBIENT TEMPERATURE;HAVE A SERVICE FACTOR OF NOT LESS THAN 1.15. TIGHT WITH DAP CMC DUCT SEALER. JOINTS ALSO SHALL BE RIVETED OR ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S 6. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE PREMIUM TIME REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN LOW VOLTAGE(24 VOLT)WRING CONNECTED WITH SHEET METAL SCREWS. SYSTEM.CONTRACTOR SHALL NOT FILL TENANTS SYSTEM WITH WATER FROM GENERAL CONTRACTOR TO THE TENANTS CONSTRUCTION MANAGER FOR APPROVAL. MECHANICAL LNORMAL ANDLORD.WORKING HOURS. ALL SUCH WORK MUST BE COORDINATED WITH THE 9. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM 1. THE CONTRACTOR IS TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR HIS THE LANDLORD'S FIELD REPRESENTATIVE.ANY RUNS THRU A CHASE OR SHAFT 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND �+ SEAL FLANGED JOINTS. SPECIFICATIONS G. DISCREPANCIES IN DOCUMENTS EQUIPMENT. THIS WORK INCLUDES ALL TRANSFORMERS AND DEVICES TO MAKE WILL BE DONE WITH FEWEST JOINTS POSSIBLE USING THE LONGEST LENGTH OF BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE THIS A COMPLETE FUNCTIONAL SYSTEM. 10. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS HARD COPPER PIPE AVAILABLE.SHOULD A JOINT BE REQUIRED,CONTRACTOR DRAWINGS. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT THE 1. DRAWINGS(PLANS,SPECIFICATIONS,AND DETAILS)ARE DIAGRAMMATIC AND SPECIFICALLY NOTED OTHERWISE. SHALL MAKE ALL EFFORTS TO KEEP THE JOINTS IN ACCESSIBLE AREAS. TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO THE TENANT. 2. ALL WORK IS TO CONFORM TO THE LATEST ADDITION C.E.C.AND TO DIVISION INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. 8. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION&MAINTENANCE WHERE DRAWINGS,EXISTING SITE CONDITIONS,SPECIFICATIONS OR OTHER 16 ELECTRICAL SPECIFICATIONS. 11. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS,FIRE DAMPERS,CONTROLS,AND D. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM,CONTRACTOR SHALL MANUALS. TRADES CONFLICT OR ARE UNCLEAR,ADVISE THE GENERAL CONTRACTOR IN 3. ANY CONDUIT REQUIRED BY CODE OR THE LANDLORD WILL BE INSTALLED BY THE OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, WRITING,PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS ELECTRICAL SUBCONTRACTOR. ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA,IT MUST BE THAT ALL TESTING,FLUSHING,AND PROPER FILLING OF THE TENANTS SYSTEM G. FINAL HVAC INSPECTIONS RESPONSIBLE TO ADVISE THE TENANTS CONSTRUCTION MANAGER,IN WRITING, APPROVED BY THE TENANT'S CONSTRUCTION MANAGER PRIOR TO INSTALLATION. HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS SHEET NUMBER OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. DIVISION 15-MECHANICAL LAY-IN SUPPLY AND RETURN AIR DIFFUSERS,GRILLES AND REGISTERS WITH AND THAT THE TENANTS SYSTEM IS READY TO BE CONNECTED TO THE 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE,THE TENANT OTHERWISE,TENANTS CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT SECTION 15500 PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. LANDLORD'S SYSTEM. SHALL HAVE THE RIGHT TO AN INDEPENDENT HVAC CONTRACTOR INSPECT THE DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION HEATING,VENTILATION,AND AIR CONDITIONING FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE 12. FLEXIBLE CONNECTIONS PLANS,SPECIFICATIONS,AND CODES. THE INSTALLING CONTRACTOR WILL BE PERMITTED. 3. PIPING SPECIALTIES A SCOPE OF WORK A. FLEXIBLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN A PRESSURE/TEMPERATURE TEST PLUGS(PETE'S PLUG)-1/4INCH NPT FITTINGS RESPONSIBLENRATOTO BRINGALLITEMS REPORTEDBY THE R MENTDATT HVAC H. TRADE NAMES AND MANUFACTURERS CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS AT NO COST TO 1. THE HVAC CONTRACTOR SHALL FURNISH ALL LABOR,MATERIALS,EQUIPMENT, VIBRATING EQUIPMENT(FANS,ROOFTOP UNITS,AIR HANDLERS,FAN TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE,1/8 INCH O.D. TENANT. 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SERVICES,TOOLS,TRANSPORTATION AND FACILITIES NECESSARY FOR, POWERED VAV BOXES,ETC.)AND DUCTS OR CASINGS. ALSO,PROVIDE FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL,RATED AT M611 SPECIFICATIONS,THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM REASONABLY IMPLIED AND INCIDENTAL TO,THE FURNISHING,INSTALLATION, FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 400 PSIG,0 TO 200 DEGREES STANDARD FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS B. FLEXIBLE CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE-COATED F. BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL SHOWN ON THE DRAWINGS,CALLED FOR IN THE SPECIFICATIONS,AND AS FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW B. STRAINERS-"Y"PATTERN STRAINERS,125 PSIG,CAST IRON BODY WITH IN WRITING BY THE TENANTS CONSTRUCTION MANAGER PRIOR TO ACCEPTANCE. REQUIRED BY JOB CONDITIONS,TO INCLUDE,BUT NOT BE LIMITED TO THE FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. PERFORATED STAINLESS STEEL SCREEN,THREADED FOR 2 INCHES AND THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND FOLLOWING:(REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) C. FLEXIBLE CONNECTION IS TO BE RATED FOR THE OPERATING PRESSURE OF SMALLER,FLANGED FOR 2-1/2 INCHES AND LARGER.SCREEN OPENING SIZE AT REPLACEMENT AT THE CONTRACTOR'S EXPENSE. THE SYSTEM. 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BLOWDOWN VALVE WITH HOSE END FITTING.