Loading...
Report fl 2v($ - (701st( t 6Sq'l S t. 004ka LA/ 13uol,vrr1ar,,012. 4771,&7 44 * 124 C EODESIGN. FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: Zane Rogers Project Name: River Terrace East Date: 7/18/18 Location: SW Scholls Ferry&Roy Rogers,Bvrtn. Report#: 255 Arrival: 930 Departure: 1030 Weather: Sunny, 70s Permit#: TBD Site Visit Requested By: Spencer(NEI) Met With (on site): Spencer(Cell Phone), Ken Wilde (Polygon) Ken (Cell Phone) Purpose: Lot 124 subgrade, Retaining Wall, Evaluate Structural Fill Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) - Decommission temporary storm and sewer lines through Tract E FR252B(7/10) -Vertical cut at base of retaining walls on lots 119 and 126 Lot 124 Subgrade Upon arrival, I observed lot 124 had been prepared to final subgrade elevation. Subgrade appeared to consist of brown silt. I used a1/2"diameter steel foundation probe to evaluate the consistency of the subgrade. Resistance to penetration indicates generally very stiff subgrade conditions. Retaining Wall Lots 119 and 126 I observed the base of undermined lock and load wall adjacent to lots 119 and 126 had not been backfilled.We recommend that contractor place and compact a wedge of crushed rock with a minimum slope of 1 .5:1 (H:V)to cover at least the lower 6inches of the lowest wall unit for temporary support. Pond Fill While onsite I was asked to observe structural fill being placed within a previously used detention pond. I was informed fill within the area observed was at final grade. I used a Troxler 3430 nuclear density gauge to evaluate compaction in the area.Tests were compared to a lab produced optimum dry density of 112.1 at 16% moisture. Tests performed in this area met recommended compaction efforts of 92%of optimum Based on observations and testing, it is our opinion that structural fill, as well as Lot 124 subgrade observed today and where indicated on the attached site plan is being prepared in general accordance with our geotechnical recommendations Distribution: Attachments: Site Plan (2); NDGDs (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative Our work does riot include supervision or direction of the contractor,the contractor's employees or agents. Our firm Is not responsible for site safety.This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager.as Indicated by initials in the"Reviewed By"section Signature: 9450 SW Commerce Circle,Suite 300 l Wilsonville,OR 97070 1503.968,8787 I www.geodesigninc.com