Loading...
Permit (214) CITY OF TIGARD MASTER PERMIT 111-. - COMMUNITY DEVELOPMENT Permit#: MST2018-00185 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/18/2018 T f�. I t7 9 Parcel: 2S102BCO2004 Jurisdiction: Tigard Site address: 10680 SW FONNER ST _ Subdivision: NORTH TIGARDVILLE ADDITION Lot: 24 Project: WADSWORTH Project Description: Solar photovoltaic system. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $6,000.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 Drains: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 • Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add!500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: Y Other Description: 7.93 kW Roof top PV system Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: WADSWORTH,MICHAEL A&ZAHRA J TESLA ENERGY Required Items and Reports(Conditions) 10680 SW FONNER ST 6132 NE 112TH AVE TIGARD,OR 97223 PORTLAND,OR 97220 PHONE: PHONE: 503-894-6903 FAX: 866-445-7459 Total Fees: $360.69 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You ma obtain a cop of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. & � v Issued By: Permittee Signature: i !�� Call 603.639.4176 by 7:00 a.m.for the next available inspection date. `i i%/� 7 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Residential .,EI City of Tigard JUN 2 Q ?_01 RDateBy:IIIIM)II,IllTFIIIMIIIWH. erm "/!/V1,Vt/G1,1111 'l 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review tvg/t s iOther Permit:Phone: 503.718.2439 Fax: 503.5t OF I �AD Date/By: Li T.„ DInspection Line: 503.639.4175 � Date Ready/By: 7/ Jam GARInternet: www.tigard-or.gov 3LJJLDpNG DIVISION! �otified/Method: fa See Page t for Supplemental Information ormation T .,. W -. � Y3.3' '''));,;I:in*,,,,,,Til, 414i1i �; ,. r#� M1 L ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the }iii = €€� ' _ � `'' work indicated on this application. [1 1-and 2-family dwelling 0 Commercial/industrial Valuation: 6000 ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: E 1 €€ $fl Ili,�'R 1. IOcAT'IO Total number of floors: Job site address: 10680 SW Fonner St, New dwelling area: square feet City/State/ZIP: Portland,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Michael Wadsworth Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet r'^IR'EQUIRIK T :O 3 ,€C .E CyIIECKLI8T'.. Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the [ , work indicated on this aP lication.( h , RipTIiy€ � P iy PV ROOF MOUNT Valuation: $ Existing building area: square feet New building area: square feet 3i3 P*OP RTY SSI$ �,,, Number of stories: Name: Michael Wadsworth Type of construction: Address: 10680 SW Fonner St, Occupancy groups: City/State/ZIP:Portland,OR 97223 - Existing: Phone:( ) Fax:( ) New: ,.. Business name: TESLA f C ? TESLA Structural plan review fee(or deposit): Contact name: Melissa Farias FLS plan review fee(if applicable): Address: 6132 NE 112th Ave, Total fees due upon application: City/State/ZIP: Portland OR 97220 Phone:(503 ) 894 6903 Fax::(1866)445 7459 Amount received: E-mail: AFARIAS@TESLA.COM € CITO '� €Pn* ` ' T SEB*. „€ 3 }3 Commercial and residential prescriptive installation of kV �t -3 .;[ �P 1„ ,` <„ ,, roof-top mounted Photovoltaic Solar Panel System. Business name: TESLA Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 6132 NE 112th Ave, Solar Installation Specialty Code checklist. City/State/ZIP: Permit Fee(includes plan review Y Portland OR 97220 and administrative fees): $180.00 Phone:( 503 ) 894 6903 Fax:(1866) 445 7459 State surcharge(12%of permit fee): $21.60 CCB lic.: 180498 Total fee due upon application: $201.60 Authorized signature: ' This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: A. Mel1SS arias jttg Date: 6.18.18 *Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Building Permit Application Checklist One- and Two-Family Dwelling FOR orr,cl; t sl; om.1 Received City of TigardIll i Dateve Permit No.: ■ 13125 SW Hall Blvd.,Tigard,OR 97223 I Phone: 503.718.2439 Fax: 503.598.1960 Associated permits: 24-Hour Inspection Line: 503.639.4175 ❑ Electrical ❑ Plumbing ❑ Mechanical TIGARD Internet: www.tigard-or.gov ❑ Other: THE FOLLOWING ITEMS ARE REQUIRED FOR PLAN REVIEW 1"es No N/A 1 Land use actions completed. See jurisdiction criteria for concurrent reviews. ❑ ❑ ❑ 2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. ❑ ❑ ❑ 3 Verification of approved plat/lot. ❑ ❑ ❑ 4 Fire district approval required. Name of district: . ❑ ❑ 0 5 Septic system permit or authorization for remodel. Existing system capacity1:1El0 6 Sewer permit. ❑ ❑ ❑ 7 Water district approval. ❑ ❑ ❑ 8 Soils report. Must carry original applicable stamp and signature on file or with application. ❑ ❑ ❑ 9 Erosion control 0 plan ❑permit required. Include drainage-way protection,silt fence design and location of catch- ❑ ❑ ❑ basin protection,etc. 10 3 Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state ❑ ❑ ❑ building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if copyright violations exist. 11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if ❑ ❑ ❑ there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and surface drainage. 12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size ❑ ❑ ❑ and location. 13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, ❑ ❑ ❑ furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc. 14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- ❑ ❑ ❑ floor,wall construction,roof construction. More than one cross section may be required to clearly portray construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings and foundation,stairs,fireplace construction,thermal insulation,etc. 15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. ❑ ❑ ❑ Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope. Full-size sheet addendums showing foundation elevations with cross references are acceptable. 16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- ❑ ❑ ❑ prescriptive path analysis provide specifications and calculations to engineering standards. 17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing ❑ ❑ ❑ locations. Show attic ventilation. 18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered ❑ ❑ ❑ systems,see item 22,"Engineer's calculations." 19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists ❑ ❑ ❑ over 10 feet long and/or any beam/joist carrying a non-uniform load. 20 Manufactured floor/roof truss design details. ❑ ❑ ❑ 21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required 0 El ❑ for four or more appliances. 22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or ❑ ❑ ❑ architect licensed in Ore:on and shall be shown to be a..licable to the .ro'ect under review. JURISDICTIONAL SPECIFICS 23 Three(3)site plans are required for Item 11 above. Site plans must be 8-1/2"x 11"or 11"x 17". ❑ ❑ ❑ 24 Two(2)sets each are required for Items 16, 19,20 and 22 above. ❑ ❑ ❑. 25 Building plans shall not contain red lines or tape-ons. "Mirrored"building plans will not be accepted. ❑ ❑ ❑ 26 "Reversed"building plans must meet criteria outlined in the Permit&System Development Fees document. ❑ ❑ ❑ 27 "Drawn to scale"indicates standard architect or engineer scale. ❑ ❑ ❑ 28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard ❑ ❑ ❑ Street Tree List. 29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, ❑ ❑ ❑ and protection measures must be drawn to scale and must include the project arborist's signature of approval. 30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, ❑ ❑ ❑ including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings on a lot of record approved prior to September 9, 1995. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Electrical Permit Applicata 4—$ FOR OFFICE I SF O\I,l' City of Tigard J U 14 2 0 2018 DateBea Permit No.: ,1111 a 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ' 2 Phone: 503.718.2439 Fax: 503.5erry OF r1GIAH ) Date/B : Other Permit: 3.1 R 0 Inspection Line: 503.639.4175 i } (� �€€G Ixl Date Ready/By: loris: ® See Page 2 for Internet: www.tigard-or.gov BUILDING DIV ISI ''' NotifiedA4ethod: Supplemental Information t F 3 t' *' z _ I -73,,i,,;, i i �' 'mak .u . . __''., € .:.: .3., .ack 6.. ds �. :.. checked below): ❑Service or feeder 400 amps or more ❑Building over three stories. ❑Demolition ❑Other: where the available fault current 0 Marinas and boatyards. ;I`., :i tAri a g F ' '" 411 ' ",, 1 `;i exceeds 10,000 amps at 150 volts or 0 Floating buildings. s. =� less to ground,or exceeds 14,000 ❑Commercial-use agricultural m 1—and 2-family dwelling ❑Commercial/industrial ❑Accessory building amps for all other installations. buildings. ❑Multi-family 0 Master builder 0 Other: ❑Fire pump. 0 Installation of 150 KVA or _ ❑Emergency system. larger separately derived system. M ; , INFO . 'k r E iN: ,EWA : I °a 1 IAND ,...1<il = ❑Addition of new motor load of ❑"A" "E" "1-2" "1-3» Job no.: Job site address: 10680 SW Fonner St, 100Hor more, occupancy. ❑Six or more residential units. ❑Recreational vehicle parks. City/State/ZIP: Portland,OR 97223 ❑Health-care facilities. ❑Supply voltage for more than ❑Hazardous locations. 600 volts nominal. Suite/bldg./apt.no.: I Project name: Michael Wadsworth • ❑Service or feeder 600 amps or more. - €: '15 'i, ,Ei' LE 'i,... , :: ' 7 Cross street/directions to job site: Description I Qty. I Fee. Total New residential single-or multi-family dwelling unit. • Includes attached garage. Subdivision: I Lot no.: 1,000 sq.ft.or less 168.54 4 Ea.add'l 500 sqft.or portion 33.92 1 Tax map/parcel no.: Limited energy,residential a€ I 75.00 2 I CR ' ,,.O' `WO`h 1111h. V - (with above sq.ft.) —"O : ,--=':. - _Pt, , Q1," , Limited energy,multi-family 75.00 2 PV ROOF MOUNT residential(with above sq.ft.) - Renewable Energy 0 See Page 2 , 7.93 Services or feeders installation,alteration,and/or relocation : ` f!PE "I"Y W 1� € 3 ,,, ,_ ,. ❑ . € ' 200 amps or less 100.70 2 201 amps to 400 amps 133.56 2 Name: Michael Wadsworth 401 amps to 600 amps 200.34 2 Address: 10680 SW Fonner St, 601 amps to 1,000 amps 301.04 2 Over 1,000 amps or volts 552.26 2 City/State/ZIP: Portland,OR 97223 Temporary services or feeders installation,alteration,and/or Phone:( ) Fax:( ) relocation 200 amps or less 59.36 1 Owner installation:This installation is being made on property that I own which is not 201 amps to 400 amps 125.08 2 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 401 amps to 599 amps 168.54 2 Owner signature: Date: Branch circuits—new,alteration,or extension,per panel ` `; r4 " i, A.Fee for branch circuits with '..s�' `' m above service or feeder fee, 7.42 2 Business name: each branch circuit TESLA B.Fee for branch circuits without Contact name: MELISSA FARIAS service or feeder fee,first 56.18 2 branch circuit Address: 6132 NE 112TH AVE, Each add'l branch circuit 7.42 2 City/State/ZIP: PORTLAND OR 97220 Miscellaneous(service or feeder not included) Each manufactured or modular 67.84 2 Phone:(503 ) 894 6903 Fax: :(1866) 445 7459 dwelling,service and/or feeder Reconnect only 67.84 2 E-mail AFARIAS i 4 TESLA COM Pump or irrigation circle 67.84 2 . . :L €�:€ ,... .. , ,[,, : 9�° ''.1.,,t ..»... y l. la" ,.:. 11,74,. J1. E ia,, Sign or outline lighting 67.84 2 Business name: TESLA Signal circuit(s)or limited-energy See panel,alteration,or extension. Page 2 2 Address: 6132 NE 112TH AVE, Each additional inspection over allowable in any of the above City/State/ZIP: PORTLAND OR 97220 Additional inspection(1 hr min) 66.25/hr Investigation(1 hr min) 66.25/hr Phone:( 503 ) 894 6903 Fax:(1866)445 7459 Industrial plant(1 hr min) 78.18/hr Inspections for which no fee is 90.00/hr CCB Lie.: 180498 Electrical Lie.: C562 Suprv.Lie.: 5873S s.ecificall listed(/s hr min) Suprv.Electrician signature,required: ... � �' A. � �. � �� �(� . Subtotal: Print name: NICK ARMSTRONG Date:6.18.18 Plan review(25%of permit fee): State surcharge(12%of permit fee): Authorized signature: 1. i TOTAL PERMIT FEE: This permit application expires if a permit is not obtained within 180 Print name: A.MELISSA FARIAS I Date: 6.18.18 days after it has been accepted as complete. * Number of inspections allowed per permit. I:\Building\Permits\ELC_PermitApp_ELR ERE.doe Rev 05/21/2013 440-4615T(11/05/COM/WEB Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: titIA TO( Fee for all residential systems combined $75.00 Description 1 Qty. Fee f Total Renewable electrical energy systems: Check Type of Work Involved: 5 kva or less 100.70 2 5.01 to 15 kva 1 133.56 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 ElBurglar Alarm Wind generation systems in excess of 25 kva: 25.01 to 50 kva 301.04 2 ❑ Garage Door Opener* 50.01 to 100 kva 552.26 2 >100 kva(fee in accordance with 552.26 2 ❑ Heating, Ventilation and Air Conditioning OAR 918-309-0040) System* Solar generation systems in excess of 25 kva: Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva—no additional charge 0.0 3 ElOther: additional inspection over allowable in any of the above: Other: Each additional inspection is charged at an hourly(1 hr min) 66.25/hr 1 Inspections for which no fee is 90.00/hr E.. „ specifically listed('/:hr mm) EttlAUt MO Cll.:1 Fee for each commercial system $75.00 Subtotal: (SEE OAR 918-309-0000) Plan review,if required(25%of permit fee): State surcharge(12%of permit fee): Check Type of Work Involved: TOTAL PERMIT FEE: This permit application expires if a permit is not obtained within 180 ❑ Audio and Stereo Systems days after it has been accepted as complete. * Number of inspections allowed per permit. ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* n Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling Other Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I:\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 05/21/2013 RECEIVED City of Tigard '' Building Division SUN 2018 ' . 13125 SW Hall Blvd, Tigard, OR 97223 O T GARD Phone: 503.718.2439 Fax: 503.598.1960 11JILDING DIVISION T I GARD Inspection Line: 503.639.4175 www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 10680 SW Fonner St City: tigard Zip: 97224 Owner's Name: Michael Wadsworth Date: Contractor's Name: TESLA CCB #: 180498 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation El Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? ® No OSSC or ORSC for design requirements. Is the wind exposure ® Yes If"Yes" Wind Exposure p , qualifies for "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ® Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? ® If"Yes", qualifies for structures other than Yes the prescriptive path. above ❑ No 1 1:/Building/Forms/PhotoVoltaic-Checkl ist.docx Is the construction material wood and does Yes Type of If"Yes", qualifies for the construction qualify Construction as "conventional light 111No the prescriptive path. frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. ® Yes If"Yes", qualifies for the prescriptive path. ❑ No • Roof framing members Is the spacing 24 inches or less? Nominal lumber. ® If"Yes", qualifies for Yes the prescriptive path. ❑ No Is the combined weight ® Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance ® Yes with Section 305.4(3) of If"Yes", qualifies for the 2010 Oregon Solar ❑ No the prescriptive path. Code? ❑ Metal Single layer If roofing material is RoofingCheck the type of ❑ of wood yP one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. ® of composition shingle. Is the roof mounted ® Yes Connections of solar assembly the solar assembly connected to roof If"Yes", qualifies for ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:Building/Forms/PhotoVoltaic-Checklist.docx ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panelsWidth of roofing If the width of the panel is less than 18 inches, panels? 18 inches or less qualifies for the inches prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? ❑ Yes the prescriptive path. ❑ No Is the roof decking of WSP min. '/z"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof Yes the prescriptive path. surface. ❑ No 3 I:Bui lding/Forms/PhotoV oltaic-Checkl ist.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: solarcity/trina Model Number: 325 Listing Agency: UL1703 4 1:/Building/Forms/PhotoVoltaic-Checkl ist.docx