PFI2018-00174 CITY OF TIGAR® PUBLIC FACILITIES IMPROVEMENT PERMIT
®MMUNITY DEVELOPMENT Permit#: P1712018-00174
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/12/2018
Parcel: SEG773
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job M2314716
Project Description: SEG773, associated with 11769 SW 69th Ave. Install street light circuits. Flagging on SW 68th Avenue
only. PGE Job M2314716
Owner: FEES
Description Date Amount
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
RODRIGO SOLIS
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-612-2935
Total
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: t
ct
Issued By: '-�
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00174
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit. Call Jonny Gish 971-713-0281. **NO WORK ON SW 68TH
AVE PRIOR TO 9AM OR AFTER 3PM**
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
M C ENE
JUL 10 2018
City of Tigard CITY OF TIGARD
PUBLIC WORKS — ENGINEERING PLANNING/ENGINEERING
1�1
public Facility Improwmcnt (\,PFI) Pc-rrmt
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way) [�TYPE 1--Francluse Utility Work
Check one: N�Utilities ❑ Sidewalk/driveway approach ❑ 5treetin1provecnents performed by NWN, PGE
Detailed description: Install street light circuits
and/or utility agency.
Flagging on SW 68th Avenue only El TYPE 2—Sidewalk/Driveway/Sewer
Work performed for the purpose of:
PGE Job M2314716
° Sidewalk installation or repair.
11769 SW 69th Avenue ° Driveway approach installation
Property address/location(s): and/or repair
SEG 773 Tigard, OR 97223 ° Sanitary sewer lateral installation
and/or main line tap
licant: Portland General Electric[Submitted by Amy Sweany) El TYPE 3—Full scale Development
pp Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tualatin, OR Zip: 97062 the following:
Phone: 503-612-2935 Email.: preregcoord@pgn.com ° Subdivisions or Partitions
Contact name: Rodrigo Solis Phone: 503-672-5417 Street widening
Mainline installation for Sanitary
Portland General Electric sewer, Storm server, Tigard eater
Contractor: and/or Tigard Water Service Area
CCB#: 103663 Expiration:
Address: SUBMIT COMPLETED APPLICATION TO:
City/state: Zip; City of Tigard
Phone: 503-464-7777 Email: Planning/Engineering
13125 SW Hall Blvd.
Contact name: Phone: Tigard,OR 97223
Applications for"niinor work in tight-of-way"
curly may he emailed to:
Engineer: NIA rowpermits o,tigard-oror.gov
Address:
City/state: Zip: 2
2�1 !
Phone: Email: Case No.: FI — 0017`!
Contact name: Application submittal fee(.007%of
Engineer's Estimate)
Estimated value of work is required(if over$5,000):$ 22,786.99 Additional fees:
(within the public right-of-way) Application accepted
By. Date: �6
Is work related to a LAND-USE DECISION? ❑ Yes C�No
Application.reviewed i
If so,please specify (MLP,SDR,SUB, etc.) case #:
B .-S°�-Date: 0 �9
y:
Is work related to a BUILDING PERMIT? ❑ Yes Lq No Applicant notified:
N)
If so,please specify(BUILDING PERMIT) case#: By: Date:
I:\ENG\PermitAppl'tcations\pfi_applicaLion Rev.10/16/2017
F�:�.�xr.,..::�.�1'w� �SC SY''.�:�-esaw"��:��:;.•3�_z��'a.�`:����.���:�""jsa=�'���,-���<.��'��m �:z,-x=����;r,:.0�:�...�sts�s. '��' _.-�;,:s+�s a:s'�.r.'�:..n.�� _w.r_ s"� y
City of'I'igard ° 13125 S`V'Hall Btvd. 'Tigard,Oregon 97223 \v-w-,vtigard-or.gov ° 503-718-2421 ° .,Page 1 of
APPLICANTS
NOTE: Person specified as "Applicant"shall be designated"Permittee" and shall provide Cmancial assurance for work,if
required by the city pursuant to TMC 15.0=11.140.
With the CNception of a utility,operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(,) must sign this application in the space provided or submit a written authorization with this application. Fi-anchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
proper
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and l.itnitations of the approval.
° All of the above statements and the statements in any plot plan,attachments,and exlribits transmitted hereNvith,are true;and
the applicants so acknowledge that an), pernli.t issued, based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application, including the policies and criteria,and understands die
regwrements r proving or denying the application.
1 pp i ant/Authotized Agernt's signatur Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
O-wner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard ° 13125 SW Hall Blvd. ° Tigard,Oregon 97223 ° \vn wdgard-or.gov 503-715-2421 ° Page 2 of4
Page 118 2011 Edition
�$
. a
� � $ � �yM '51
yDta ram 620
LanezClosureat�lntersecte®dwith�ala m h . . _.
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance(see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections(fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Posteicl5 acro BetweenSins ,�Baffer
q 3'c w " x s
Speedy ►
20 50
25 100 100 100 75
30 1 100
35 40 350 350 350 125
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 119
LareCl`osure N- Flaiggig� rnDlag°ani6�2O
�� .... ��
ROAD
WORK
AHEAD
ONE LANE .` 1
(Opdort� ROAD
AHEAD
B
BE
PREPARED
TO STOP
B
A (Opbonaq
•
ONE LANE
ROAD
• BE AHEAD
100ft.Max. _ PREPARED ROAD
TO STOP WORK
� AHEAD
A B B C
Buffer
4
L J- L
100 ft Max.�I
C B B A
ROAD •
BE
WORK PREPARm e
AHEAD TO STOP 100 ft.Max.
ONE LAN •
Roup •
AHEAD PP11 �
(Optional) I n A
B
BE
PREP
TO STOP
B (OPUOW
ONE LANE
1 1
ROAD
AHEAD
c
ROAD
WORK
AHEAD
December 2011 Chapter 5
13A 290 -. _.
- LIGHTING LEGEND
C 15 47216 25'-Unknown 45'-4 (UNLESS OTHERWISE SPECIFIED)
2002 2005 _._____ INSTALL 1-110 AL-TX ST LT CIRCUIT IN 1-3"SCH40 PVC
SW BAYLOR ST A 50 465$ INSTALLI-WAL-TX S LT CIRCUIT I 1
CONDUIT,PROVIDED &INSTALLED BY CUSTOMER
SCH40
PVC
---- -.- 14Z.14 T 5044 ------ CONDUIT,PROVIDED & INSTALLED BY CUSTOMER
5043 45� � _ 50 3931 - - - PVC
- 46 100T
yyg�pp ______ r 110 CU-TX L I 1
45'� .1996 6�-__.-__ ._-.__ 5144 CONDUIT,PROVIDED 8 INSTALLED BY CUSTOMER
1994 i ! - __ 40'-40 CUSTOMER INSTALLED 1730 SECONDARY VAULT
--
- 19671 4666 ; - _ _ - —
iI ! 45'-4 ? i 1951 CUSTOMER INSTALLED 1324 STREETLIGHT JUNCTION BOX
2002
1I- I I ! - -- INSTALL 35W LED CREE LIGHT
__
.. .__.._ ! ! I { ON 30'BRONZE FIBERGLASS POLE(25'MTG HGT)
1 C7 240 VOLTS
i i I i -
_ ..__...-__. (PROVIDED & INSTALLED BY CUSTOMER)
WITH 8 MAST ARM,SET 2 FP FC CONNECT
INSTALL 47W LED CREE LIGHT
ON 30'BRONZE FIBERGLASS POLE(25'MTG HGT)
WITH 8"MAST ARM, SET 2'FP-FC CONNECT 240 VOLTS
(PROVIDED & INSTALLED BY CUSTOMER)
i f
i � I
- - INSTALL 1 L
W LED E
7 K GRAYLIGHT
WITH 8'MA57 ARM ON ExISTINGFRONTIER POLE
I I
1
-- - j CONNECT 240 VOLTS
INSTALL STREET SIDE SHIELD FOR LED CREE LIGHTS
171.-12026
8 ' I
I
i
PL 124 !-_�._.________--I 53
201 VT n 3,1
7 12025 i� — -- J 35'-Unknown NOTE:
CONDUIT 1\\�( 5046 PGE TO PROVIDE BOTTOM PIECE OF POLE FOR CUSTOMER
------- �Xf-® 45'-4' f 2007
1 y -40'-4 TO INSTALL AT THE SAME TIME AS THE CONDUIT.
B 5 19790 1967; `y ►�
- - 1973 I A 25 95260 VT-68
1 i 0 I0 INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR SECONDARY
717' VT 116 ? ! INSTALL 3"POLE CONDUIT UNIT --- VAULTS CONSTRUCTION
IS 57 L7 POINT OF ATTACHMENT)FOR EACH
1 _ '-_51' I W/12"BRACKETS I i STREET ALIGHT PER PGE 7&D NS7RUC710N STANDARD LC-11550
+ i l ------- -
1! ; I I III �._�-------------- W
---- ----- 1 1)I 1 C1 1-36D Z AB
it 1,1
Q II I i
!1 ti L-I 1 11 71'
_ ... .. ..... - --- _ J._.
C-25 4�0$ O I i l7s' - - ;Ii !' i 00
cc PD-57
6747 1
45.4 3 3
PL 118
1 � 521983 -8747 L nkn35'- own
1
81;137' I i 2007 I !
,
CONDUIT
JUNCTION BOX INSTALLATIONS
1 PL 119 4665 ! FOR STREET LIGHTING
1 40'-4 ( CONTACT PGE FOR APPROVED MANUFACTURERS
PL 123 ! J CONSTRUCTION NOTES: SLCST
I �' 1950 + FINAL GRADE IF HARD SURFACE(FLUSH)
-- INSTALL 3"POLE CONDUIT UNIT 4662 I ~) FINAL GRADE IF SOFT SURFACE
�14 W/12"BRACKETS --- 20
""- -'`---- - --`-- - 45'-4 ! 14 1.CUSTOMER TO PROVIDE ALL TRENCHING,BACKFILLING,CONDUIT,ELBOWS,JUNCTION
I 20' s e'GROUND ROD 13 x24 x18"DEEP OR BOXES,VAULTS AND PADS.JOINT USE TRENCH WITH GAS,TRENCH TO BE
j I 1967 ; INSI ALLED BY 17"x30'x18"DEEP 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM FINAL GRADE.
cusToi.�El. PGE APPROVED
I 01 JUNCTION BOX
I DETERMINED BY PGE 2. A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS
' RADIUS 90%END` JUNCTION BOXES AND EQUIPMENT/FACILITIES,INCLUDING CONNECTION OR INSTALLATION
1 ( I- - -- - ---- ---__.-...._.-. j I OF CONDUITS ANIS PULL STRINGS.CALL SERVICE COORDINATION AT 503-3236700
it TO SCHEDULE A PGE STANDBY CREW.
:I GRA
I
TO OPTIONAL ST LT POLE
1'PVC SCH 40 ELECTRICAL DE
----------� 3. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL
i i I
PG£TO GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST).
i j 1 I I DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED.
MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN
t ! GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH&SMALLER TO BE 36 INCH RADIUS.
j ' ! 'SCH 40 GREY PVC FACTORY BENDS RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF
751' 2"OR 3'PVC SCH 40 (STEEL OR PGE APPROVED FIBERGLASS 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES
PL 120 - ELECTRICAL GRADE FOR RUNS OVER 150',OR 180 DEGREES
IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET R
! e,, I' ( (DE RMINED BY PGE)
EQ TE
I I �.�-�t
� I ' TORY MADE REFER TO LETTER OF RESPONSIBILITY FOR
OR MORE 8J BENDS)
TOO VIEW 6"Of COMPACTED
BENDS MUST MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL
, IL____-- _ N S AC
----- _ ! EET MIDE AROUND
BACKFILL FURTHER DETAILS.
20'® _.-" -—-- - -- -'-I f 1'CONDUIT TO AROUND AND
`''•• PL 122 136' 20,® — _ L l STREET LIGHT POLE UNDER SPLICE BOX 4. ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE
A --- PL 121 57' 2-OR 3*
FLUSH TO CURB!SIDEWALK
coriDUlr r oft 3• .INSTALL GROUND ROD AND 5. CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND
40 CONDUIT CONDUIT ON THE SOURCE SIDE FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP,
GROUND MEASURED FROM FINAL GRADE.
,P�. Ron
'N 25 24169 6. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE) DUCT
SW CLINTON ST OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL
CONNECTION PRODUCT) AS AN ALTERNATIVE TO((HDPE DUCT.HDPE SHALL MEET THE
11 48 REQUIREMENTS OF PEE SPECIFICATION 02051 (AVAILABLE
I BLE ON REQUEST FROM PGE PROJECT
{I��
674$0" I -40''-4-. 35'-Unknown EXTRl1DEb RED STRIPES(WHICH S A SPECIFICATION REQUIREMENT)
THMANDRELATEST OFCE
4549
- 4 4 8888 j --- 40'-4 20 P r.
! 1959 3981 07 35-L HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT.
_ --
1958 j C 2511 194 ! -- _- ._ 45'-4 7. TRANSFORMER PADS ARE TOBE SET W THE
AS INDICATED INCHES
ABOVE
1 (3A 25 6134 49 FINAL GRADE. CONDO S T BEINSTALLEDA
19$3 I•-{_. _ AND TO EXTEND 1 INCH ABOVE THE PAD.
I
35' lJ
i I -Unknown a
! 0 VT 75._____ S. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN) FROM ANY COMBUSTIBLE
I I 2007 ABUILDING,WALL OR OVERHANG AND 4 FEET(MR FROM ANY FIRE HYDRANT.
PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA
VT
_76 iI ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
2 PIECE FIBERGLASS (COMPOSITE)POLE - I I 9. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
TO VEHICLES.
P.0 String Top Section Slips
Toped to I Over stub 10.AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E.) TO BE 8 FEET(MIN ,
Sbe of Canduk 10 FEET(PREFERRED) .
11.CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER
Polo TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE
Stub 4'Above WILL BE EXCAVATOR,PGE,TELCO,CAN,AND GAS.
section Finish Grade
12.CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAD
See Note 2 INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING.WHEN YOU ARE
For Innolling READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) CALL 503736-5450
Sheet Melo/ lepve Empty GROUNDING STREET LIGHTS ON DISTRIBUTION POLES OR 503-463-4348 (SALEM AREA) .ALLOW UP TO 2 WORKING DAY FOR INSPECTION TO OCCUR.
p REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS.
screws o ?'Below Finish Grade CONTACT SERVICE COORDINATOR
.4' T Lawe Eshn FOR TRENCH AND CONDUIT INSPECTION PRIOR 13, DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDER-
Rock for 6ackfiit WIND ROD TO 8ACKFILL.PGE WILL NOT INSTALL WIRE GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER.
j� 0 UNTIL TRENCH Is loop BACKFILLED. PGE CONSTRUCTION DRAWING
JBRACKETAST SERVICE COORDINATOR
T NEW LED 503-323-6700 OR 800-542-8818 DATE: SCALE: ACCOUNT: AWO: OB NO.
STREETLIGHT 62V2018 NTS 1070001 1000004600 M2314716
TITLE
` 36'Radius Elbows '--PER
LC 11560 ANY DEVIATION FROM THIS DESIGN MUST DVKOCR LLC/City of Tigard/Hampton Inn
See Note 1 jc THE 2017 NESC REQUIRES THAT MAST ARMS BE EFFECTIVELY BONDED
�'-Mins Depending°O i°"°ttafton IF THE CLEARANCE BETWEEN THE BRACKET AND COMMUNICATION BE APPROVED BY PGE PROJECT MANAGER CIRCUIT srzE
Crushed Rock COMPANY ATTACHMENT POINT IS LESS THAN 40 INCHES.
WEST PORTLAND-WEST PORTLAND 13 17x22
TO BOND A MAST ARM FOR NEW INSTALLATIONS AND RETROFITS: CALL 811 BEFORE YOU DIG PGE LOCATION
BOTTOM PIECE POLE INSTALLATION CONNECT A 6-AWG COPPER NEUTRAL JUMPER CONDUCTOR FROM ATTENTION: 11769 SW 69TH AVE,TIGARD
THE POLE GROUND WIRE,C THE GROUND WIRE DOES gU tl tlLl6 V OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED T
Nares, NOT EXIST THE THE SERVICE NEUTRAL,USING AN ALUMINUM- d c1 hil �� O DESCRIPTION
t. Tamped 314-inch inns—had rock bacMdf TO-COPPER PARLLEL GROVE CLAMP TO THE MAST ARM BY THE OREGON UTILITY NOTIFICATION CENTER. ��
is required o—nd oB Pales and foot USING A 2 INCH GROUNDING CLAMP. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 INSTALL ST LT CIRCUIT,7 LED GREE ON 30'FB BRONZE B W33W LED LEOTEK ON PGE P4 CONNECT @240V
regardless of wit condition m mornro SAFETY THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF � � L
eounm EerloN(s) woRx WITH SHEET
Proper Pok aliens+ 1I rip THE RULES BY CALLING THE OREGON UTILITY WASHINGTON CII-36D X[2297699
2. Install 2-010,34'sheaf mctatsc e.s PHONE OR CABLE FIRS'n 8 NOTIFICATION CENTER ADMINISTRA710N @ (503-232-1987) � BEAVERTON 1 OF l
(PGE RN 02522)18dapan through pole lop MPANY ATTACHMENT LINE CPXW CENTER IDESfGN BY PHONE(503)1 DRAWN BY
and stub to pro trutotion ofpale top. ,. TO REQUEST UTILITY LOCATES CLL THE OREGON Know whaYs below. 2213 SW 153kD OR Rodrigo Solis 672-5417 LANE WHITNEY
UTILITY NOTIFICATION CENTER,811 AT LEAST Call before di BEAVERTON,OR 97006
eore ou
2 BUSINESS DAYS PRIOR TO EXCAVATION. Y g• Q PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED