Loading...
Report KA.N KA SUBMITTAL TRANSMITTAL PROJECT NAME: Pac Trust Bldg. 240&241 Upgrade Date: 2/10/2017 PROJECT NUMBER: 4116033-000 Reference Number: 0048 Description HVAC Rev Submittal Package No 0005-230000-1 Transmitted For Review Due Date 2/15/2017 Delivered Via Email Tracking Number Package Action Transmitted To: Transmitted By: Morgan Toth Lindsey Davis Mackenzie Skanska USA Building Inc. 1515 SE Water Avenue 222 SW Columbia Street, Suite 300 Suite 100 Portland, OR 97201 Portland, OR 97214 Tel: 503 382 0900 Tel: 503.224.9560 Fax: 503 382 0901 Fax: 503.228.1285 Qty Spec Section Register No Type Item Description Item Action 230000 00154-1 Shop Drawing Building 240 Shop Drawing 230000 00155-1 Shop Drawing Building 241 Shop Drawing 230000 00158-1 Product Data Titus Ceiling Diffusers and Grilles Sheets Cc: Company Name Contact Name Copies Notes Remarks Please see attached submittal. Thanks, Lindsey Signature do" 02/10/201'7 Signed Date Printed on: 2/10/2017 6West Page 1 Submittal Review Stamp Notes SKANSKA USA BUILDING, INC. This submittal REVIEW shall not be Construed as a complete check and indicates only that information presented conforms generally with Contract Documents, In no case is Subcontractor Skanska notes in blue or Supplier relieved of full responsibility for adherence to the Contract Documents and satisfactory construction of all work. Submitted to SKA to follow up on BACnet controls Owner, Architect, Engineer for final approval, for heat pumps Name: .0. Date,02/10/2017 [ ]No exception noted [ ]Rejected [x]Make corrections noted [ }Revise and resubmit This review is for general conformance with design concept only. Any deviation from plans or specifications not clearly noted by the contractor has not been reviewed. Review shall not constitute a complete check Mackenzie notes in green of all detailed dimensions or count or serve to relieve the contractor of contractual responsibility for any error or deviation from contract requirements. Group Mackenzie By: ajs Date: 02/15/2017 PACTRUST o APPROVED El APPROVED AS NOTED* 121 REVISE AND RESUBMIT o REJECTED a li0..c,011,444-nateci in o FOR INFORMATION ONLY rMackenafview,,,ReVise ad 11.Resubmit on diffusers as not . This review is only for general conformance of the project and k' ' ' general compliance. Corrections or comments made on these crawmgs during this review do not relieve ConaactorlSubcontractor from compliancy with the reculrerronts of the plans and specifications. Contractor is responsible all 1 dimensions and fabrication to he confirmed and correlated at the lab sae BY Michael Plummer DATE 2'15/2017 1