Loading...
Plans (88) t(ici 5 Stv t(c�r�c\`' CA c--AS` \XV N w UL APPROV:D 36" WIDE FLUSH BEAM LhY FACTORY-BUILT DIRECT ABOVE = :.;,..4- ` VENT GAS FIREPLACE 1 2' 6x6 POST r ` W/ GWB FINISH Entry - I iI'" II a Living 2x6 39" HIGH L 1 I WALL W/ FINISH InE TRIM AT TOP SAFETY � � GLAZING l'-11f' 12" TILE �_—"' o HEARTH 1-6 -O F Cr- C1)) m 2,-0 60I.3 2,-8)/2" � 2n N 4 WU / Xjr 3'-9%"6 5, 3H 02-6I,5-3 FO"2-I. 530 0" 2,-6 309/4 Porc X x 16'-6Y2" 9'-5)2" i I / 20 �,`�/ All 9Y4 9, 0„ 10'-7Y' PLAN 7A FIRST FLOOR 1/4"=1'-0" ENGLISH REVIVAL . UI L-I-J I s 13/4" x 9Y2" LVL --I-- 30"x30"x10" I I ! I FOOTING W/ " 18"x18"x10" FTG. ' 1 ,j I (3) #4 EA. W' W/ (2) #4 EW �I 1 6x6 P.T. PO TYP. U.N.O. ' I----- L_g-J “, 1 0 fill 13/4" x 9YZ'_ LVL ___ -11-- SIM. S6.0 SIM. 77-2; IPONY \r WALL r I ' j 6,1 START FRMG. j -11�" ,1,..c.(6:1) S6.0 SIM1 I 3&4 6 `n r L •��11 J- 1 S6.0 D S • \ / l 314" CON STHD14 10 0 -� I STHD14 S6.0 16'-61/2 9'-5y„ 7 I THICKENED ') D1 �-/ SLAB EDGE ABU44 7' I o TOP OF SLAB -6�/z 6'-0" 834" X 10'-7j/2" PLAN 7A FOUNDATION PLAN 1/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 12-06-17 SCALE: 1/4" = -r-0" PAGE: PREPARED BY: Alexia Fukui REF. SHEETS: A3, A6 MA-25.1 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. • / RJRJ \/ 11A10 i - i���I e . Ara Ak . mar ler 4 LJ 20 All PLAN 7A ROOF PLAN 1/4"=1'-0" ( ENGLISH REVIVAL N I R L 1 6X6 POST i 2 r COS9.0 . � II i `-----7--- cr _ iiiil GT ABOVE GT ABOVE 2'75)--� n- -r1 o x 1 STHD14 STHD14 v) `r • .. 4x8 HDR 4x8 HDR 4x8 HDR,_4x8 HDR N Uo �,t 1 (N S9.0 O O ® 8 0 —1,_ - S1.2 6x6 POST L W/ ACE4 m MD LOWER LEVEL SHEARWALLS PLAN 7A UPPER LEVEL FLOOR FRAMING 1/4"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BUU.ETIN DATE: 12-06-17 SCALE: 1/4" = 1'-0" PAGE PREPARED BY: Alexia Fukui REF. SHEET& A7, A8 MA-25.2 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. • • '1 e � . 42; ..., 12...,,, 7 11 A10 FIBER—CEMENT LAP SIDING 5" EXPOSURE ' [ • Aki 12/- 1 . j -- 4 // — -- —_ '1'—' I 0 20 —_ _ __ MI 1 t i• 1 1 i I i 7 D1 PLAN 7A LIVING SIDE ELEVATION 1/8"=1'-0" ENGLISH REVIVAL PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 12-06-17 SCALE: 1/8" = 1'-0" PAGE PREPARED BY: Alexia Fukui REF. SHEETS: A9 MA-253 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. M i D- 1 -- Cs `-5b U C13" Si, V:r( c`,4.\C)'exc- BulletinMILBRANDT ARCHITECTS Bulletin#: MA-25 Date: 12-07-17 ATTACHMENTS: MA-25.1-MA25.3 Job Name: Polygon at River Terrace East(Area 3)-Plan 7A Job No: 1503 Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.The building was placed too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into the living area on the attached bulletin page:MA-25.1-MA25.3 and any accompanying structural documents. Distribution Job Site Paul McColm Client Chris Walther Angela Grajewski Nichole Thorpe Struct.Eng. Arne Solomon City of Tigard Tom Hochstatter ;;� 25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM