Plans (88) t(ici 5 Stv t(c�r�c\`' CA c--AS` \XV
N w UL APPROV:D 36" WIDE FLUSH BEAM LhY
FACTORY-BUILT DIRECT ABOVE =
:.;,..4-
` VENT GAS FIREPLACE 1 2'
6x6 POST
r ` W/ GWB FINISH Entry
- I
iI'" II
a Living 2x6 39" HIGH
L 1 I WALL W/ FINISH InE
TRIM AT TOP
SAFETY
� � GLAZING
l'-11f' 12" TILE
�_—"' o HEARTH 1-6 -O F
Cr- C1)) m 2,-0 60I.3 2,-8)/2" � 2n N 4 WU / Xjr
3'-9%"6 5, 3H 02-6I,5-3 FO"2-I. 530 0" 2,-6 309/4 Porc
X x
16'-6Y2" 9'-5)2"
i
I /
20 �,`�/
All
9Y4 9, 0„
10'-7Y'
PLAN 7A FIRST FLOOR
1/4"=1'-0" ENGLISH REVIVAL
. UI L-I-J
I
s
13/4" x 9Y2" LVL --I-- 30"x30"x10"
I I ! I FOOTING W/
"
18"x18"x10" FTG. ' 1 ,j I (3) #4 EA. W'
W/ (2) #4 EW �I 1 6x6 P.T. PO
TYP. U.N.O. ' I-----
L_g-J “, 1 0 fill
13/4" x 9YZ'_ LVL ___ -11-- SIM. S6.0 SIM.
77-2; IPONY
\r
WALL r
I ' j 6,1
START FRMG. j -11�" ,1,..c.(6:1)
S6.0 SIM1 I 3&4 6
`n r L •��11 J-
1 S6.0
D
S
• \ /
l
314" CON
STHD14 10 0 -� I STHD14
S6.0 16'-61/2 9'-5y„
7 I THICKENED
') D1 �-/ SLAB EDGE
ABU44 7' I o
TOP OF SLAB -6�/z 6'-0"
834" X
10'-7j/2"
PLAN 7A FOUNDATION PLAN
1/4"=1'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 12-06-17 SCALE: 1/4" = -r-0" PAGE:
PREPARED BY: Alexia Fukui REF. SHEETS: A3, A6 MA-25.1
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
•
/ RJRJ \/
11A10 i - i���I
e .
Ara Ak .
mar ler
4
LJ
20
All
PLAN 7A ROOF PLAN
1/4"=1'-0" ( ENGLISH REVIVAL
N I
R
L 1 6X6 POST
i 2 r
COS9.0
. � II i `-----7---
cr
_ iiiil GT ABOVE GT ABOVE 2'75)--� n- -r1
o
x 1 STHD14 STHD14 v)
`r • .. 4x8 HDR 4x8 HDR 4x8 HDR,_4x8 HDR N Uo
�,t
1 (N
S9.0 O
O
®
8 0 —1,_ -
S1.2
6x6 POST L
W/ ACE4 m
MD
LOWER LEVEL SHEARWALLS
PLAN 7A UPPER LEVEL FLOOR FRAMING
1/4"=1'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BUU.ETIN
DATE: 12-06-17 SCALE: 1/4" = 1'-0" PAGE
PREPARED BY: Alexia Fukui REF. SHEET& A7, A8 MA-25.2
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
•
•
'1
e
�
. 42;
...,
12...,,,
7
11
A10
FIBER—CEMENT LAP SIDING
5" EXPOSURE '
[ •
Aki
12/- 1 . j
-- 4 // — -- —_ '1'—' I
0
20
—_ _ __ MI
1 t i• 1 1 i I i
7
D1
PLAN 7A LIVING SIDE ELEVATION
1/8"=1'-0" ENGLISH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 12-06-17 SCALE: 1/8" = 1'-0" PAGE
PREPARED BY: Alexia Fukui REF. SHEETS: A9 MA-253
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
M i D- 1 -- Cs `-5b
U C13" Si, V:r( c`,4.\C)'exc-
BulletinMILBRANDT ARCHITECTS
Bulletin#: MA-25 Date: 12-07-17 ATTACHMENTS: MA-25.1-MA25.3
Job Name: Polygon at River Terrace East(Area 3)-Plan 7A Job No: 1503
Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.The building was placed
too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A
full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into
the living area on the attached bulletin page:MA-25.1-MA25.3 and any accompanying structural documents.
Distribution
Job Site Paul McColm
Client Chris Walther Angela Grajewski Nichole Thorpe
Struct.Eng. Arne Solomon
City of Tigard Tom Hochstatter
;;� 25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM