Loading...
Permit (11) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2018-00090 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/12/2018 T f C A I<.n g Parcel: 2S114AA00100 Jurisdiction: Tigard Site address: 9000 SW DURHAM RD Project: Tigard High School Subdivision: None Lot: None Project Description: Demolition of portions of Tigard High School for modernization project:Entry,commons,girls Lockers,offices,and classrooms south of auto shop. Contractor: LCG PENCE CONSTRUCTION LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT 2720 SW CORBETT AVENUE 6960 SW SANDBURG ST PORTLAND, OR 97201 TIGARD, OR 97223 PHONE: 503-252-3802 PHONE: FAX: 503-256-3684 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 07/12/2018 $12,579.14 Demolition Occupancy Grp: E Occupancy Load: 12%State Surcharge-Building 07/12/2018 $1,509.50 Dwelling Units: Plan Review 03/29/2018 $8,176.44 Stories: Height: ft Info Process/Archiving-Lg$2.00(over 07/12/2018 $150.00 Bedrooms: Bathrooms: 11x17) Value: $2,920,726 DC Provision Review,COM TI-Ping 07/12/2018 $361.00 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $22,776.08 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: -""qr, Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT . 71 Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 Agnes Lindor /I t II MINIM From: Agnes Lindor Sent: Thursday,June 28, 2018 1:31 PM To: Matthew Lewis; Deepa Bharatkumar Cc: #Building Permit Technicians;Albert Shields;Tom McGuire Subject: SIT2018-00006/ BUP2018-00090 Tigard HS Good afternoon- The following permits have been approved, but are on hold: SIT2018-00006—Site work for the THS modernization project BUP2018-00090-Demo permit for THS Conditions of approval shall be met prior to issuance. The PFI also needs to be issued prior to these permits being issued.Thanks, Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email:AgnesL@tigard-or.gov 1 • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT :11Fh " Plan Submittal Requirements Commercial &&Multi4Farnil - New Additions or Alterations TIGARD ._, 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies -fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# 0 project name ❑ site address ❑ suite number I=1 zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Permits\BUP_COM_PemutApp.doc Rev.12/18/2014 a It • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT !pi Plan Submittal Requirements Matrix Commercial& Mu1t><k Farruly New, Additions or Alterations TIGARD 13125 SW Hall Blvd.•Tigard, Oregon 97223 • 503.718..2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations) Required„at Sub ictal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard ® IJ COMMUNITY DEVELOPMENT D . \RTMENT I T 1 c u n Building Permit Review - Commercial - With Land Use Building Permit #: o/ -- j?J6) Site Address: °IUD SVS blAVIA6U0 ati . Suite/Bldg#: Project Name: I l a,vA +e f me rno (Nd e of commbusiness occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: *MO Verify site address/suite#exists and active in permit system. .River Terrace Neighborhood: ❑ Yes 121 No LandUse Case#: PD .2o —pCYZ13 /v Plans Match Approved Land Use: �� ❑ Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan 4%_ilding Height: Maximum Height Actual Height P. onditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: ❑ Yes K No,applicant notified to obtain business license ` Public Facilities Improvement(PFI) Permit: Required: Yes,applicant was notified ❑ No Applied For: X Yes ❑ No,stop intake Notes: C L c no-1-- vv'a . DD V o4- l Sbue . Approved by Planning: "A j`y`0„/ Date: 5/2a/Ii Revisions (after Building Submi al only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3Ay!r Site Plans: # Building Plans: # Building Permit#: nter building permit#above. ,,, _� Workflow Routing: 1ning ,ngtneering e. it Coordinator al!tritlding Workflow Sign-off: -off for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: / �" Date: =_041 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx Engineering Review c ❑ lope at building pad: y' 6 %. 34 PFI Permit#: PF'/,?0,e'-6007`7 ❑ Conditions "Met"prior to issuance of building permit CoA sins UN/16"7— asements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: 12-'Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: o N0 r ,BELE 1 SG T/L G,j Approved by Engineering: C' P( is5eGfAie . Date: G be//g, Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved -rmit Coordinator Review ❑ onditions "Met"prior to issuance of building permit 0. Approved,NOT Released: AC- Date: (0(2s I kl Notes: Cfieldlfi S htk , t&- AKA P41 cSSU-Pc. pnY - ISSI:kc-vt.cQ ,noi,f-ucx cLO9 c - Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: _ Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: IZLSDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 11 N/A Tigard Trans SDC: ❑ Yes ►d N/A Parks SDC: ❑ Yes 'W N/A 221(OK to Issue Permit Approved by Permit Coordinator: Date: 77)Vi /p1=-/ 4-( 111'' I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 070915.docx