Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (162)
CITY OF TIGARD BUILDING PERMIT .1114' a COMMUNITY DEVELOPMENT Permit#: BUP2018-00030 R13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/12/2018 T f c_;A I 1) g Parcel: 2S111ACO2901 Jurisdiction: Tigard Site address: 9500 SW MURDOCK ST Project: Templeton Elementary School Subdivision: None Lot: None Project Description: Construction of a new 2-story,80,000 sq.ft.elementary school building with 28 classrooms,library,cafeteria,gym, kitchen,and auxiliary spaces. Contractor: TRIPLETT WELLMAN INC Owner: TIGARD-TUALATIN SCHOOL PO BOX 160 DISTRICT 23J WOODBURN,OR 97071 6960 SW SANDBURG ST TIGARD, OR 97223 PHONE: 503-982-4188 PHONE: FAX: 503-982-0390 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 07/12/2018 $84,211.17 Occupancy Grp: E Occupancy Load: 4164 12%State Surcharge-Building 07/12/2018 $10,105.34 Dwelling Units: 0 Plan Review 03/13/2018 $54,737.26 DC Provision Review,COM TI-Ping 07/12/2018 $361.00 Stories: 2 Height: 20 ft Info Process/Archiving-Lg$2.00(over 07/12/2018 $684.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $18,675,000 Info Process/Archiving-Sm$0.50(up to 07/12/2018 $750.00 11x17) Plan Review-Fire Life Safety 07/12/2018 $33,684.47 Floor Areas: Metro Const.Excise Tax 07/12/2018 $12,000.00 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $196,533.24 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Yes Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow •- .. -•••ted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain:copy of the rules or• -ct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: _J� Permi ee r C 603.639.4176 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ROGERS ENGINEERING Structural Engineering■Building Design ■Code Consulting■Inspection Services 558 S.E.Jackson St. Roseburg,Oregon 97470 Ph: (541)672-0315 Fax: (541)672-1787 rogerst iAroseneLnet June 29, 2018 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Templeton Elementary School Rogers Engineering has completed a structural plan review of the submittal for the Templeton Elementary School project on behalf of the City of Tigard. Rogers Engineering recommends approval of the construction documents as listed in the attached Project Documents. Should you have questions or need additional information, contact me at your convenience. Respectfully Submitted, I /*IX/I Tom Rogers,P.E., CBO Project Documents Templeton Elementary School Drawings as noted on the cover page of drawings prepared by Dull Olson Weekes-IBI Group Architects-02.09.18 Structural Drawings as identified on sheet 50.00-Froelich Consulting Engineers-02.09.18 Structural Calculations-Froelich Consulting Engineers-February 9, 2018 Revised Structural Calculations-Froelich Consulting Engineers-March 27, 2018 Supplemental Structural Calculations-Froelich Consulting Engineers-6/18/18 Supplemental Structural Information-Froelich Consulting Engineers-6/28/18 Supplemental Structural Information-Froelich Consulting Engineers-6/29/18 Following is a list of structural drawings and issue date: S0.00 2/9/18 54.01 2/9/18 50.01 12/1/17 54.02 2/9/18 S0.02 5/16/18 S4.03 2/9/18 50.03 12/1/17 54.10 6/15/18 S0.04 12/1/17 S4.11 2/9/18 S1.01 2/9/18 55.00 5/16/18 51.02 2/9/18 55.01 6/15/18 51.03 2/9/18 S5.02 5/31/18 52.10 6/15/18 56.00 2/9/18 S2.11 6/15/18 56.01 3/21/18 S2.12 6/15/18 56.02 3/21/18 S2.13 6/15/18 56.03 6/15/18 52.20 6/15/18 57.00 5/16/18 S2.21 3/21/18 S7.01 2/9/18 S2.22 2/9/18 57.02 2/9/18 S2.30 6/15/18 57.03 3/21/18 S2.31 3/21/18 58.00 3/7/18 S2.32 3/21/18 59.00 3/21/18 S2.33 3/21/18 59.01 2/9/18 53.10 2/9/18 S9.10 5/16/18 S3.11 2/9/18 S9.11 5/16/18 S3.12 2/9/18 S9.12 6/15/18 S3.13 2/9/18 S9.20 2/9/18 53.20 2/9/18 S3.21 2/9/18 S3.22 2/9/18 Albert Shields From: Albert Shields Sent: Wednesday,April 11, 2018 3:01 PM To: 'Shawn Christensen' Cc: Mike White; Monica Bilodeau;Angela Caffrey Subject: Twality-Templeton, BUP2018-00030 &-00077 Attachments: Conditions -04-11-2018.pdf Shawn, re both BUP2018-00030 for Templeton and BUP2018-00077 for Twality, multiple conditons of approval still need to be met before we can issue either permit. I've attached a list of the Conditions of Approval on which I've highlighted the conditions that remain Not Met. Please let me know if your records show anything different. Mike and Monica, please look there over and let me know if anything needs to be changed. Thanks,Albert. 1 setW'a ,, �y, a'"s fl�, :x r 44f '' q ,.. t� r° yt r4 T 07. Prior to commencing site improvements,a Public Facility Improvement(PFI) Permit is required for this project to cover all public infrastructure work including storm water quality and detention facilities and any other work in the public right-of-way. Six(6)sets of detailed public improvement plans shall be submitted for review to the Engineering Department. An Engineering cost estimate of improvements associated with public infrastructures including but not limited to street, street grading, utilities, stormwater quality and water quantity facilities,sanitary sewer,streetlights,and franchise utilities shall be required at the time of PFI Permit submittal. Engineering cost estimate of water improvement shall be listed as a separate line item from the total cost estimate. NOTE:these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement permit plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall and the City's web page(www.tigard-or.gov). 08. EXACT LEGAL NAME ON PFI Partial 3/29/18 Mike White Albert Shields 08. Prior to commencing of site improvements,submittal of the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the"Permittee", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 09. SUBMIT PLANS TO ENGINEERING/FRONTAGE Not Met 3/29/18 Mike White Albert Shields ET AL 09(a). Prior to commencing of site improvements,the Applicant shall submit plans showing the following items to Engineering for review and approval: SW 97th Ave along the proposed redevelopment frontage shall be shown to have: •29-foot right of way dedication from centerline •8-foot Public Utility Easement(PUE) •6-foot concrete curb tight sidewalk • Driveway approaches meeting the City of Tigard Standards •Street trees in the planter strip spaced per TDC requirements •Streetlights as recommended from the approved photometric analysis •ADA ramps meeting the Public Right of Way Accessibility Guidelines(PROWAG) •Crosswalk and street striping meeting the Manual of Uniform Traffic Control Devices(MUTCD)and the City of Tigard Standards •Traffic signs meeting the MUTCD and the City of Tigard Standards SW 97th Ave along the frontage of the Tax Lot 251111 BA09300 shall be shown to have: • 18-foot pavement to accommodate 12-foot travel lane and 6-foot bike lane • Standard curb • 6-foot concrete curb tight sidewalk to connect to the existing sidewalk to the north • Guard rail where applicable • Taper meeting the City of Tigard Standards • Driveway approach meeting the City of Tigard Standards • Street striping meeting the MUTCD and the City of Tigard Standards • Traffic signs meeting the MUTCD and the City of Tigard Standards SW Inez St along the proposed redevelopment frontage shall be shown to have: • Existing ramps to be removed and replaced with 6-foot curb tight concrete sidewalk 09. SUBMIT PLANS TO ENGINEERING/FRONTAGE Met 3/29/18 Mike White Albert Shields ET AL Page 2 of 5 Albert Shields From: Shawn Christensen <schristensen@daycpm.com> Sent: Wednesday, March 28, 2018 11:57 AM To: Albert Shields Cc: Angela Caffrey; Monica Bilodeau; Mike White Subject: FW: BUP2018-00030 & SIT2018-00001, Templeton School Albert, Please see my earlier response in regards to campus population in regards to SDC and Transportation Development Tax. Please confirm this is enough information. Thank you, Shawn Christensen I Project Coordinator DAYCPM, An Otak Division Cell: 971.727.4168 From:Shawn Christensen Sent:Sunday, March 11, 2018 9:19 AM To:Angela Caffrey<acaffrey@daycpm.com>;Albert Shields<albert@tigard-or.gov> Cc: Monica Bilodeau <MonicaB@tigard-or.gov>; Mike White<MikeW@tigard-or.gov>;Tom Hochstatter<TomH@tigard- or.gov> Subject: RE: BUP2018-00030&SIT2018-00001,Templeton School Albert, RE: Item 2 below highlighted There is currently approximately 620 students and 70 staff on the Templeton Campus. We are proposing to demo two classroom buildings and add (8) modular classroom buildings. (submitted under separate permit)The student and teacher population on campus will remain the same through 2021 until the completion of the Twality Middle School Building. After 2021,the Templeton Core building will be remodeled and converted to Pre-K usage and the (2) remaining original Templeton Classroom buildings on the campus will be demolished. The total population for the Templeton Campus will increase at that time by the counts shown in the table below. Please let me know if this is enough information to complete the Transportation Development Tax and Parks SDC. Thank you Excerpt from the Kittelson&Associates Traffic Analysis... 1 Albert Shields From: Albert Shields Sent: Tuesday, March 6, 2018 3:05 PM To: 'acaffrey@daycpm.com' Cc: Monica Bilodeau; Mike White;Tom Hochstatter Subject: BUP2018-00030 &SIT2018-00001, Templeton School Attachments: Albert Shields.vcf Angela two things: 1. The drawings for both applications include sheets for the PFI work. The PFI is being reviewed separately but we already have corrections on the PFI plans and the corrected versions need to be included in the BUP and SIT plans. We can't approve these applications so long as they include elements such as the PFI plans that need revision. Please submit revised drawing sets after you have received our PFI comments. 2. In order to calculate the Transportation Development Tax and Parks SDC for the new building I need to know the number of students that the new building will serve and the number that the demo'ed buildings served, plus the number of staff needed for each of the new and to be demo'ed buildings. Please give me these student and staff numbers so that I can complete my calculations and forward the applications along. Accordingly, I have classified both BUP2018-00030 and S1T2018-00001 as"Approved (for Plan Review) but Not Released." Plan Review will proceed but the applications will otherwise be on Hold until the revised drawings are submitted and the student and staff numbers have been provided. Please let me know if you have any questions. Albert Shields City of Tigard Permit.Coordinator 's OEt:. 13125 SW Hall Blvd. Tigard, Oregon 97217 vww,tigard-or.gov 1 ''- '� y''. .» :,,� @c :° .�*" �i :�4• i�. ` '.: '1"u"a F ¢449, '`: ".� , y 07. Prior to commencing site improvements, a Public Facility Improvement(PFI)Permit is required for this project to cover all public infrastructure work including storm water quality and detention facilities and any other work in the public right-of-way. Six(6)sets of detailed public improvement plans shall be submitted for review to the Engineering Department. An Engineering cost estimate of improvements associated with public infrastructures including but not limited to street,street grading, utilities, stormwater quality and water quantity facilities,sanitary sewer,streetlights,and franchise utilities shall be required at the time of PFI Permit submittal. Engineering cost estimate of water improvement shall be listed as a separate line item from the total cost estimate. NOTE:these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement permit plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall and the City's web page(www.tigard-or.gov). 08. EXACT LEGAL NAME ON PFI Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin 08. Prior to commencing of site improvements,submittal of the exact legal name,address and telephone number of the individual or corporate entity who will be designated as the"Permittee", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC,etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 09. SUBMIT PLANS TO ENGINEERING/FRONTAGE Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin ET AL 09(a). Prior to commencing of site improvements,the Applicant shall submit plans showing the following items to Engineering for review and approval: SW 97th Ave along the proposed redevelopment frontage shall be shown to have: •29-foot right of way dedication from centerline •8-foot Public Utility Easement(PUE) •6-foot concrete curb tight sidewalk •Driveway approaches meeting the City of Tigard Standards •Street trees in the planter strip spaced per TDC requirements •Streetlights as recommended from the approved photometric analysis •ADA ramps meeting the Public Right of Way Accessibility Guidelines(PROWAG) •Crosswalk and street striping meeting the Manual of Uniform Traffic Control Devices(MUTCD)and the City of Tigard Standards •Traffic signs meeting the MUTCD and the City of Tigard Standards SW 97th Ave along the frontage of the Tax Lot 251111 BA09300 shall be shown to have: • 18-foot pavement to accommodate 12-foot travel lane and 6-foot bike lane • Standard curb • 6-foot concrete curb tight sidewalk to connect to the existing sidewalk to the north • Guard rail where applicable • Taper meeting the City of Tigard Standards • Driveway approach meeting the City of Tigard Standards • Street striping meeting the MUTCD and the City of Tigard Standards • Traffic signs meeting the MUTCD and the City of Tigard Standards SW Inez St along the proposed redevelopment frontage shall be shown to have: • Existing ramps to be removed and replaced with 6-foot curb tight concrete sidewalk 09. SUBMIT PLANS TO ENGINEERING/FRONTAGE Not Met 2/7/18 Khoi Le Gloria Pinzon-Marin ET AL • Page 2 of 5 : � :< .t AC ION BY s�.. �.tm..sar 09(b). SW Murdock Ave shall be shown to have: *Driveway approach meeting the City of Tigard Standards *Pavement width to accommodate two 11-foot travel lanes and two 5-foot bike lanes *Standard curb and 6-foot concrete curb tight sidewalk on the south side of the road and connecting to the existing sidewalk and curb on SW 96th Ave *Intersection curb radii meeting the City of Tigard Standards *Intersection ADA ramp meeting PROWAG *Crosswalk and street striping meeting the MUTCD and the City of Tigard Standards *Traffic signs meeting the MUTCD and the City of Tigard Standards The unimproved right of way between Tax Lot 2S111AB04900 and 2S111AC01600 shall be shown to have: *10-foot hard surface pedestrian path meeting the City of Tigard Standards 10. CONSTRUCTION VEHICLE ACCESS&PARKING Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin PLAN/PFI PHASE 10. Prior to commencing of site improvements,the Applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. All construction vehicle parking shall be provided onsite. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of site improvements or buildings proposed by this application,and shall include the vehicles of all suppliers and employees associated with the project. 11. PROVIDE PHOTOMETRIC ANALYSIS/SW 97TH Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin AVE 11. Prior to commencing of site improvements,the Applicant shall provide Engineering Division a photometric analysis along SW 97th Ave for the review and approval. Photometric analysis will follow the recommended values and requirements per ANSI/IESNA. New streetlights are required based on the photometric analysis;the Applicant shall submit plans showing the location of streetlights to Engineering Division for review and approval. Type and color of pole and light fixture shall also be included on the plan for review and approval. 12. SUBMIT SITE PLANS/OVERHEAD UTILITIES/SW Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin 97TH 12. Prior to commencing of site improvements,the Applicant shall submit site plans as part of the PFI Permit indicating that all existing overhead utilities along the frontage on or crossing SW 97th Ave to be placed underground to Engineering Division for review and approval. Alternatively,the Applicant can submit a request including reasons how the Applicant meets the criteria for a fee in lieu of underground. 13. SUBMIT FINAL STORM DRAINAGE REPORT Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin 13. Prior to commencing site improvements,submit a final storm drainage report as part of the PFI permit indicating on how run-off from new and disturbed area located onsite and off-site will be collected,treated and detained to Engineering Division for review and approval. The storm drainage report shall be prepared and include a maintenance plan in accordance with CWS Design and Construction Standards and the City of Tigard Design Guidelines. 14. SUBMIT PLANS/RUN-OFF TREATMENT Not Met 12/14/17 Khoi Le Gloria Pinzon-Marin 14. Prior to commencing of site improvements,submit site plans as part of the PFI permit indicating how run-off from new and disturbed area located onsite and off-site will be collected,treated and detained to Engineering Division for review and approval. 15. OBTAIN CWS STORMWATER CONNECTION Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin AUTHORIZATION 15. Prior to commencing of site improvements,the Applicant shall obtain a CWS Stormwater Connection Authorization prior to issuance of the City of Tigard PFI Permit. Plans shall be submitted to the City of Tigard for review. The city will forward plans to CWS after preliminary review. 16. SUBMIT PLANS/SANITARY SEWER Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin Page 3 of 5 x •« t� Ti ,. . .ACTION BY 16. Prior to commencing of site improvements,the Applicant shall submit site plans as part of the PFI Permit showing the location of the proposed sanitary sewer laterals and connections to Engineering for review and approval. Plans also shall include any existing and proposed public sanitary sewer easements. All public sanitary sewer facilities and easements shall be designed and constructed in accordance with the City of Tigard and CWS Design and Construction Standards. 17. SUBMIT SITE PLANS/WATER IMPROVEMENTS Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 17. Prior to commencing of site improvements,the Applicant shall submit as part of the PFI Permit site plans showing the location of proposed water improvements including but not limited to the location of the tap,water meter,double check and fire vaults and any associated facilities to Engineering Division for review and approval. 18. EROSION CONTROL PLAN Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 18. Prior to commencing of site improvements, an erosion control plan shall be provided as part of the Public Facility Improvement permit drawings. The plan shall conform to the"CWS Erosion Prevention and Sediment Control Design and Planning Manual"(current edition)and submitted to City of Tigard with the PFI plans. 19. FINAL GRADING PLAN Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 19. Prior to commencing of site improvements, a final grading plan shall be submitted showing the existing and proposed contours. The plan shall detail the provisions for surface drainage, and show that they will be graded to insure that surface drainage is directed to the street or a public storm drainage system approved by the Engineering Division. 20. GRADING PLAN/NATURAL SLOPES Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 20. The design engineer shall indicate, on the grading plan,which area will have natural slopes between 10 percent and 20 percent, as well as area that will have natural slopes in excess of 20 percent. This information will be necessary in determining if special grading inspections and/or permits will be necessary when the lots develop. 21. INCORPORATE RECOMMENDATIONS FROM Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin GRI REPORT 21. A Geotechnical Report prepared by GRI,dated June 20 2017 was submitted. The Applicant shall incorporate the recommendations of the report into their design. 22. FINAL CONSTRUCTION PLANS/AS-BUILT Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin GRADING PLAN 22. The final construction plans shall be signed by the geotechnical engineer to ensure that they have reviewed and approved the plans. The geotechnical engineer shall also sign the as-built grading plan at the end of the project. 23. OBTAIN 1200C GENERAL PERMIT Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 23. The applicant shall obtain a 1200-C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 24. TVF&R APPROVAL Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 24. Prior to commencing of site improvements,the Applicant will be required to provide written approval from Tualatin Valley Fire and Rescue(TVF&R)for fire flow, hydrant placement,and emergency vehicular access and turn around. 25. SUBMIT REVISED SITE PLAN/BICYCLE PARKING Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin 25. Prior to issuance of building permit the applicant shall submit a revised landscape or site plan showing the bicycle parking spaces totaling 100. 26. COVERED BICYCLE PARKING DETAILS Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin 26. Prior to issuance of building permit the plans shall include covered bicycle parking details or justification why they cannot be provided.The details of the bicycle parking racks are to be submitted. 27. SERVICE PROVIDER LETTER/ADDRESS BOTH Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin ENCLOSURES • Page 4 of 5 4 , .4, y.. :-APPL '... Iuit6t 27. Prior tsanceof building permits a service provider letter from Pride is required to meet the Franchise hauler requirements and sign off as detailed in letter from Pride dated September 19, 2017(Attachment 5).The service provider letter shall address both enclosures on Templeton and Twality. The current letter only addresses one enclosure. 28. SUBMIT REVISED PLANS/PEDESTRIAN Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin CROSSINGS 28. Prior to issuance of building permit the applicant shall submit a revised site plans showing the seven internal proposed pedestrian crossings.These seven locations shall be shown on the revised site plans indicating the pavement material change and striping plan. 29. FINAL PLANNING INSPECTION Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin 29. Prior to a final building inspection,the applicant shall call for a final planning inspection to ensure the project was completed according to the approved plan. 30. WRITTEN VERIFICATION RE URBAN FORESTRY Not Met 12/18/17 Monica Bilodeau Gloria Pinzon-Marin PLAN 30. Prior to final inspection,the project arborist shall perform a final site inspection to document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the project planner within one week of the site inspection.The report will be used to mark the beginning of the tree establishment bond period. 31. RECORD DEED DEDICATION&PUE Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 31. Prior to final building inspection,the deed dedication of the four foot right of way dedication along SW 97th Ave shall be recorded. The eight foot PUE along the development frontage on SW 97th Ave shall also be recorded. Both documents shall be on City forms. 32. COMPLETE ALL PUBLIC IMPROVEMENTS Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 32. Prior to final building inspection,the Applicant shall complete any work in the public right-of-way(or public easement)as well as storm water quality and detention facilities and obtain approval from the Engineering Division. 33. FEE IN LIEU OF UNDERGROUND Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 33. When the fee in lieu request is approved by the City Engineer,the fee shall be calculated by the frontage of the site that is parallel to the utility lines and will be calculated based on unit price per lineal foot as indicates on the City Master Fee Schedule. The fee in lieu of undergrounding shall be paid prior to final building inspection. 34. DEMONSTRATE AGREEMENT RE WATER Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin QUALITY FACILITY MAINTENANCE 34. Prior to final building inspection,the Applicant shall demonstrate that they have entered into an agreement on City forms for the maintenance of the private on-site water quality and detention facilities. 35. FINAL SIGHT DISTANCE CERTIFICATION Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 35. Prior to final building inspection,the Applicant shall submit to the Engineering Division a Final Sight Distance Certification for the access driveways at SW 97th Ave for review and approval. 36. SUBMIT AS-BUILTS Not Met 12/18/17 Khoi Le Gloria Pinzon-Marin 36. Prior to final building inspection,the Applicant shall provide the City with as-built drawings of the public improvements as follows: 1)3 mil mylar, 2)a diskette of the as-builts in"DWG"format, if available; otherwise"DXF"will be acceptable, and 3)the as-built drawings shall be tied to the City's GPS network. The applicant's engineer shall provide the City with an electronic file with points for each structure(manholes, catch basins,water valves, hydrants and other water system features) in the development, and their respective X and Y State Plane Coordinates, referenced to NAD 83(91). Page 5 of 5 City of Tigard INIIr COMMUNITY DEVELOPMENT DEPARTMENT e TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: ea/6i '-at 3 Site Address: G SO 0 g'w M U rot oCk_. ..S-t- . Suite/Bldg#: Project Name: "rein')p( k-o n £1en't l tot r SchOO i (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: bo n EA-Y\, drib 0c- ri env 2 Story E-Eadie-rl+cl Schon l 71 Verify site address/suite#exists and active in permit system. XRiver Terrace Neighborhood: ❑ Yes ❑ No 4 Land Use Case#: ppa 2017- 00,002 cA)P2o1l _00c0o3 7 Plans Match Approved Land Use: ASite Plan ,e`1 Landscape Plan ❑ Other: 4 Urban Forestry Plan ET Elevation Plan Building Height: Maximum Height 5 I C4- Actual Height 1-15`/ Conditions Met: ❑ Prior to Submittal /Prior to Permit Issuance VBusiness License: Exists: ❑ Yes g No,applicant notified to obtain business license / Public Facilities Improvement (PFI) Permit: .Fi 1 Required: ❑ Yes,applicant was notified ❑ No Applied For: 0 Yes ❑ No,stop intake Notes: 0V±StIlCCL1VL Gpnc itibr)S -(-r ) be rMe--- p(RD r to iSSVGt►?CQ Approved by Planning: M O' '—;. kr`-...'-''''--- Date: 2iI S/ I $ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Milt Site Plans: # 3 Building Plans: # 3 Building Permit#: g„..E��nter building�permit above. Workflow Routing: [4.15 anning I•'Engineering ermit Coordinator ILL-8 Workflow Sign-off: =,off for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: r G 3/02/' !'t -/'GCt-,1i,�J 6 fi,A.,e-,r�p die--- .S 4,..,,,7-Aqc,-4,fl•?� .,/ c^ . 4 By Permit Technician: Date: „,2/26 iii 1:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No , NOT Approved by Engineering: MA 14-- Date (� Notes: f t ¢41..1 qtt. , , SiLg, r �� Approved by Engineering: -.--174,1/ frac 2 00—L- • N k ate: -/// Revisions (after Building Submittal only) eviewer ate Revision 1: Approved ❑ Not Approved y 6 g 18 Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit Approved,NOT Released: Date: 3 6 (� Notes: ��j✓fj OW- )" Def.,HI)I.5 5 . /4--A/$GJB,i^_ J g € Fj 321 l B /47- i44,`d-kn U( �p y y v r° L . Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: 3/"J1 Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes LA Tigard Trans SDC: ❑ Yes �N A Parks SDC: ❑ Yes N/A eOK to Issue Permit / 0 // Approved byPermit Coordinator: PP ;�/ - Date: G..i /4 e erve-E-- nrprz ✓�t}C1 res, , ,I(© LTi —o,rz Pn2r,c.b 74,x/ ,47:9 - _ - AL. 4- 6V- -to k,C61A-t eir-t plAtty, I:\Building\Fonns\B1dgPermitRvw_COM_WithL.andUse 070915.docx FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 114 Transmittal Letter r:c;i\{i n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE REF3EGEIVED DEPT: BUILDING DIVISION JUL 9 2018 ,, DefN" CITYOF TiGA D FROM: P(VtC(, .cam tilLDlt iG DIVISION COMPANY: cD Q PHONE: 553- 7-3-�J �)b3 By: RE: G1 jb b 6 ) Uwcct.O k- OY '.-D1 - ovv 0 (Site Address) (Permit Number) le . BVI (Project name or subdivision name and lot number) 1. ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: WAdditional set(s) of plans.( Z Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): ,p REMARKS: q sci �'�1r1,t itt, -&Q (.u-vd c (\nn Oc.,�-e)v (" \e!vt.wv-vs s C �v-tRmAct.�►� l� '`P y0�Ccc—Qin ��U ��i. 7 co Is (9v . ,_c.f- a\ill, ) Letuvisr e_ PFT._ i' ..ki. .inr*,(44 ----- attle-)1Aa44 --(--- 6 (js 4 --6A,),1-vv -a-k -e-/ (TV\ '---iic't 1(‘ FOR OFFICE USE ONLY Routed to Permit Technician: Date: 7 _1) - 3 Initials: 'I1 Fees Due: ❑ Yes No Fee Description: Amount Due: $----?1 $ $ Special Instructions: Reprint Permit(per PE): ❑ Yes No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc Site Address: 9s00 S rn�r dock _S T Building Division T I GA R D Deferred Submittal Transmittal Letter TO: , 'Y) DATE RECEIVED: DEPT: BUILDING DIVISION AtA..4 SEP 17 201, FROM: / 6r/ ir(,/kV, CITY OF �. COMPANY: /r',p eif� li'2'1tt/!/ �Illllllt PHONE: 3) r)-1//o RE: l5i0 j(N/A1 ' cS �v • of 01 00030 (Site Address) 'ermit/Case Number) e.rn 0,18"1-c• 1 I^l e.rn eNN-t"c�.l"\I (Projecfname or subdivision name and lot number Valuation of Deferred Submi . : $ o r ATTACHED IS THE FOLLOWING DEFE ' 0 SUBMITTAL ITEM: Copies: Description: J...._r..�.......��r......+�.1t1..t....... (................................................................................................................................................_........._...._..._..__...................................... Remarks: NOTE: Documents for deferred submi - items shall be submitted to the registered design professional in responsible charge who shall review t m and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submitt!items shall not be installed until the design and submittal documents have been approved by the building officia/Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: ) 0- a_ j Initials: Fees Due: ," Yes ❑ No Fee Description: Amount Due: Deferred Submittal Fee: .la- Additional fee based on valuation: $ : as , 40a, Other: $ Total Fees Due: $ c .6 a0 , ) Special Instructions: Reprint Permit (per PE): n Yes jj No ❑ Done Applicant Notified: y Date: /1)/42//r""' Initials: i3 ,-r The fee for processing an.'jr-viewing deferred plan s{�bmittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee. This fee is in addition to the project plan review fee based on the total project value. I:Building\Fonns\TransmittalLetter-DefrdSubmtl.doc 04/04/07 Site Address: (-10 0 5VV Mvtrct04- ,t , Ti i l ar ct , O R 1.3'714 1111 '1 ■ Building Division TIGARD Deferred Submittal Transmittal Letter TO: rQ/Y) DATE REC VED: DEPT: BUILDING DIVISION FROM: MaH NIQ ten as COMPANY: .Tri Fiat W l! Y w n PHONE: 503 1'2- ttliPo By:R RE: ISO() SW mvrc k St � �� r.Y) c (Site Address) ermit/ ase umbe lkift tot n Etzrn�&aty So otr (Project name or subdivision name and I• number) Valuation of Deferred S •mittal: $ 0 22 0.. 00 ATTACHED IS THE FOLLOWING D ERRED SUBMITTAL ITEM: Copies: Description: e '‘ Remarks: NOTE:Documents for defe •mittal items shall be submitted to the registered design professional in responsible charge who shall -v -w them and forward them to the building official with a notation indicating that the deferred submittal docume s have been reviewed and been found to be in general conformance to the design of the building.The deferred su• ittal items shall not be installed until the design and submittal documents have been approved by the building of'cial. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit T- hnician: Date: I J - a `! .- is,. Initials: t Fees Due: J -s ❑ No Fee Description: Amount Due: Deferred Submittal Fee: $ Additional fee based on valuation: $ Other: $ Total Fees Due: $ 44-.3 If 7, 7 3 Special Instructi, s: Rep 'n 'ermit(per PE): ❑ Yes No ❑ Done A r • Scant Notified: .r Date: id-/13//g/ Initials: 1 .7 The fee for processing a reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07