Permit (157) III CITY OF TIGARD MASTER PERMIT
COMMUNITY DEVELOPMENT Permit#: MST2018-00190
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/11/2018
T r Cr,A R.I-) 13125
Parcel: 2S109DA04400
Jurisdiction: Tigard
Site address: 15436 SW GREENFIELD DR
Subdivision: SUMMIT RIDGE Lot: 21
Project: MOORE
Project Description: Solar photovoltaic system.
BUILDING
Floor Areas Required Setbacks Required
Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0
Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke
Dwelling Units: 0 Third: 0 sf Right: 0 Detectors:
Total: 0 sf Value: $2,000.00 Rear: 0
PLUMBING
Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0
Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0
0
Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0
Bckflw Prevntr: 0
Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0
Other Fixtures: 0
Drywell-Trench Drain: 0
Other Fixture Units:
MECHANICAL
Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0
Heat Pump: N Hoods: 0 Other Units: 0
Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0
Furn>=100K: 0
ELECTRICAL
Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits
1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0
Ea add!500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0
Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0
601-1000 amp: 0 601+amp-1000v: 0
1000+amp/volt: 0
ELECTRICAL-RESTRICTED ENERGY
SF Residential
Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All
Other: Y Other Description: 9.9 kW solar PV system Ecompasing: N
BUILDING INFO
Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet:
ALT SF VB R-3 0
Owner: Contractor:
MOORE,JERRY ALLEN II&PEGGY MA PRO STAT SERVICES LLC Required Items and Reports(Conditions)
15436 SW GREENFIELD DR 8122 NE 91ST STREET
TIGARD,OR 97224 VANCOUVER,WA 98662
PHONE: PHONE: 360-521-5742
FAX: 360-859-3749
Total Fees: $364.19
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OA 7 952-001-0090 You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or
1.800.332.2344. c
Issued By: i l /.-/y�,... �� .ermittee Signature: 5C, V' / � �
7 Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Residential rot/()I'Act.'' l SE()Ni.,
Cityof Tigard � i" Received / }( �y,�—�y G
g a� Date/By: (!✓ v U 47),,........
Permit No./"L,J4�i d ... v
Ill 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
/��� Other Permit:
Phone: 503.718.2439 Fax: 503.598,196pI Date/13y: (4 jel I
Inspection Line: 503.639.4175 JO IN 1 6 2018 Date Read B . rods: SI See Pae 2 for
TIGARt) P y
Internet: www.tigard-or.gov er., N tified/Method:. /f� ; j f . Supplemental Information
I T v Ufa 1 testa is
r�rrE' j i DIVISION cv» rlv
❑New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
121.Addition/alteration/replacement ®Other:SOLAR equipment,materials,labor,overhead,and the profit for the
CATEGORY',OF.CONSTRUCTION work indicated on this application.
Valuation: $2,000.00
►e1 1-and 2-family dwelling 0 Commercial/industrial
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB,SITE,INFORMATION AND LOCATION Total number of floors:
Job site address:15436 SW Greenfield Dr Tigard,OR 97224 New dwelling area: square feet
City/State/Z1P:Tigard,OR 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name: � �_ v.-- Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DA,CONN RCIAL.USE C11 CKL1ST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OP WORK work indicated on this application.
SOLAR 1W INSTALLATION Valuation: $
Existing building area: square feet
New building area: square feet
` 0.PROPERTY OWNER 0 TENANT Number of stories:
Name:MOORE Type of construction:
Address:15436 SW Greenfield Dr Tigard,OR 97224 Occupancy groups:
City/State/ZIP:Tigard,OR 97224 Existing:
Phone:(503)816-5593 Fax:( ) New:
►ai A)"PUCANT CI CONTACT PERSON BUILDING PERMIT FEES*
Business name:PROSTAT ELECTRIC fP(easerrleitnleeseardut):
Structural plan review fee(or deposit):
Contact name:DALE KRUEGER
FLS plan review fee(if applicable):
Address:1721 NE 64TH AVE
Total fees due upon application:
City/State/ZIP:VANCOUVER,WA 98661
Amount received:
Phone:(503)539-7772 Fax::( )
E-mail:dale.krueger@comcastnet PHOTOVOLTAIC SOLAR M ,$YSTE)tD ES*
CQNTRACT_ Commercial and residential prescriptive installation of
roof-top mounted Photo Voltaic Solar Panel System.
Business name:PROSTAT ELECTRIC Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:1721 NE 64TH AVE Solar Installation Specialty Code checklist.
City/State/ZIP:VANCOUVER,WA 98661 Permit Fee(includes plan review $180.00
and administrative fees):
Phone:(503)539-7772 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:189902 Total fee due upon application: $201.60
Authorized signature: C This permit application expires if a permit is not obtained
,� within 180 days after it has been accepted as complete.
Print name:DALE KRUEGER Date:6/18/18 °Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
Electrical Permit ApplicationRE(TIVEFOR OFFICE. SE t" ONL't
pii City of Tigard '` Received
13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: Permit#:
C Phone: 503.718.2439 Fax: 503.598.1960 , UN 1 8 -018 Plan Review Dale/By: Related Permit#:
T I G A R D Inspection Line: 503.639.4175 Read Date/B Juris:
Internet: www.tigard-or.gov J G zf� Nori6ed/Method: EI See Page 2 for
Supplemental Information
,' T'Y'E.,br AgtipiNG O LVISIO
PI;Aw*vov
o New construction 0 Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked):
❑Demolition ►1 Other SOLAR 0 Service or feeder 400 amps or more 0 Building over three stories.
where the available fault current 0 Marinas and boatyards.
`.CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or 0 Floating buildings.
.1 1-and 2-family dwelling 0 Commercial/industrial 0 Accessory building less to ground,or exceeds 14,000 0 Commercial-use agricultural
amps for all other installations. buildings.
0 Multi-family ❑Master builder 0 Other: ❑Fire pump. 0 Installation of 150 RVA or
' JOB SITE IORMATIONi ANt) LOCATION 0 Emergency system. larger separately derived
Job#: Job site address:1.5436 SW Greenfield Dr Ti and ❑Addition of new motor load of system.
g 100HP or more. ❑"A","E","1-2","1-3",
City/State/ZIP:Tigard,OR 97224 ❑Six or more residential units. occupancy.
o Health-care facilities. 0 Recreational vehicle parks.
Suite/bldg./apt.#: Project name:MOORE ❑Hazardous locations. ❑Supply voltage for more than
❑Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site: P1 E,SCHEDU E
Descriptton 1 Qty. I Each I Total I
New residential single-or multi-family dwelling unit.
Subdivision: Lot#: Includes attached garage.
Tax map/parcel#: 1,000 sq.ft.or less 168.54 4
Ea.add'l 500 sq.ft.or portion 33.92 1
'' DESCRIPTION OF WORK• Limited energy,residential
SOLAR PV INSTALLATION (with above sq.ft.) 75.00 2
Limited energy,multi-family 75.00 2
residential(with above sq.ft.)
Renewable Energy ® See Page 2 , 133.56
0 PROPERTY OWNER 0 TENANT Services or feeders installation,alteration,and/or relocation
Name:MOORE 200 amps or less 100.70 2
Address: 15436 SW Greenfield Dr Tigard,OR 97224 201 amps to 400 amps 133.56 2
401 amps to 600 amps 200.34 2
City/State/ZIP:Tigard,OR 97224 601 amps to I,000 amps 301.04 2
Phone:(503)816-5593 Fax:( ) Over 1,000 amps or volts 552.26 2
Email:
Temporary services or feeders installation,alteration,and/or
relocation
Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2
Owner signature:_ Da$e: 401 amps to 599 amps 168.54 2
° ElBranch circuits—new,alteration,or extension,per panel,�A}"1'LCAIVT ;; ►�� COhi 1ACPFEON. A.Fee for branch circuits with
Business name:PROSTAT ELECTRIC above service or feeder fee,
7.42 2
each branch circuit
Contact name:DALE KRUEGER B.Fee for branch circuits without
Address: 1721 NE 64TH AVE service or feeder fee,first 56.18 2
branch circuit
City/State/ZIP:VANCOUVER,WA 98661 Each add'l branch circuit 7.42 2
Miscellaneous(service or feeder not included)
Phone:(503)539-7772 Fax: :( ) Each manufactured or modular
— dwelling,service and/or feeder 67.84 2
Email:dale.krueger@comcast.net Reconnect only 67.84 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name:PROSTAT ELECTRIC Sign or outline lighting 67.84 2
Address: 1721 NE 64T0 AVE Signal circuit(s)or limited-energy
0 See Page 2 2
panel,alteration,or extension.
City/State/ZIP:VANCOUVER,WA 98661 Each additional inspection over allowable in any of the above
Additional inspection(1 hr min) 66.25/hr
Phone:(503)539-7772 Fax:( ) Investigation(1 hr min) 90.00/hr
Email:dale.krueger@comcast.net Industrial plant(1 hr min) 78.18/hr
Inspections for which no fee is
CCB Lie.: 189902 Electrical . C597 Suprv.Lie.: 2275S specifically listed(%hr min) 90.00/hr
, .ELECTRICALPERMIT FEES
Suprv.Electrician signature,required:/°` ` Subtotal: 133.56
Print name: BRUCE LEIBY Date: 6/1 ❑Plan Review Required(25%of permit fee):
State surcharge(12%of permit fee): 16.03
Authorized signature: ►1 TOTAL PERMIT FEE: 149.59
Oa ' • - This permit application expires if a permit is not obtained within 180
Print name: DALE KRUEGER Date: 6/18/18 days after it has been accepted as complete.
* Number of inspections allowed per permit.
'Mending\Permits\ELC_PermitApp_Etdi_ERE.doe Rev 06/17/2015 440.46I5TQ 1/05/COM/-EB
' Electrical Permit Application—City of Tigard
Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
RESIDENTIAL IAL"WOE:ONLY k'scifEt3 it.E.
Fee for all residential systems combined: $75.00 Description
t `t Each Total
Renewable electrical energy systems:
Check Type of Work Involved: 5 kva or less 100,70 2
5.01 to 15 kva 1 133.56 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
n B• urglar Alarm 25.01 to 50 kva 301.04 2
50.01 to 100 kva 552.26 2
C Garage Door Opener* >100 kva(fee in accordance
with OAR 918-309-0040) 552.26 2
El H• eating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System*
Each additional kva over 25 7.42 3
Vacuum Systems* >100 kva—no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
❑ Other:
Each
gadditional
d at an h arty(i th°thin) 6625/hr l
Inspections for which no fee is 90.00/hr
specifically listed(1A hr min)
COW/MRCIAL WOI ONLY ELECTRICAL ',EMT
Fee for each commercial system: $75,00 Subtotal(Enter on Page 1): I33.56
* Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
f] Audio and Stereo Systems
El B• oiler Controls
C Clock Systems
C Data Telecommunication Installation
n F• ire Alarm Installation
❑ HVAC
❑ Instrumentation
❑ Intercom and Paging Systems
❑ Landscape Irrigation Control*
El Medical
El Nurse Calls
(l Outdoor Landscape Lighting*
Protective Signaling
❑ Other:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
I:uuilding\Pertnits\ELC PermitApp_ELR ERE doe Rev 06/17/2015
Branden Taggart
From: Branden Taggart
Sent: Tuesday, June 19, 2018 9:18 AM
To: 'DALE KRUEGER'
Cc: #Building Permit Technicians
Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr.
Attachments: PhotoVoltaic-Checklist.pdf
Hi Dale,
We received the state's solar checklist; however,we will need you to complete our solar checklist. I have attached it
above for you. Once we receive the completed checklist, I will route your submittal for review.
Thanks,
Branden Taggart
v Oty of Tigard
*v, Senior Permit Technician
Community Development
TIGARD
13125 SW Hall Blvd
Tigard,OR 97223
(503)718-2449
brandent@tigard-or.gov
From: DALE KRUEGER<dale.krueger@comcast.net>
Sent: Monday,June 18, 2018 1:04 PM
To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Branden Taggart<brandent@tigard-or.gov>
Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE
Forgot to attach the applications with the previous submittal. Here they are.
dk
DALE KRUEGER
PROSTAT ELECTRIC
503-539-7772
From: DALE KRUEGER<dale.krueger@comcast.net>
Sent: Monday,June 18, 2018 12:18 PM
To: 'tigardbuildingpermits@tigard-or.gov' <tigardbuildingpermits@tigard-or.gov>; 'brandent@tigard-or.gov'
<bra ndent@tigard-or.gov>
Subject: NEW SOLAR JOB IN TIGARD--MOORE
Hi Branden:
Thanks for your time on the phone last week.
Prostat Electric will install a Solar PV system at the Moore property in Tigard.
Site address is: 15436 SW Greenfield Dr Tigard,OR 97224
1
Branden Taggart
From: DALE KRUEGER <dale.krueger@comcast.net>
Sent: Wednesday,June 27, 2018 8:57 AM
To: Branden Taggart
Cc: #Building Permit Technicians
Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr.
Attachments: OR072 GL Moore Checklist TIGARD 6-27-18.pdf
Here is the checklist. Please let us know as soon as permits are ready.
Thanks for your help.
dk
DALE KRUEGER
PROSTAT ELECTRIC
503-539-7772
From: Branden Taggart<brandent@tigard-or.gov>
Sent:Tuesday,June 19, 2018 9:18 AM
To: 'DALE KRUEGER'<dale.krueger@comcast.net>
Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr.
Hi Dale,
We received the state's solar checklist; however, we will need you to complete our solar checklist. I have attached it
above for you. Once we receive the completed checklist, I will route your submittal for review.
Thanks,
Pill Branden Taggart
4 City of Tigard
) N ., Senior Permit Technician
ti Community Development
13125 SW Hall Blvd
Tigard,OR 97223
)503)718-2449'
bra nd ent Ms4 ti gard-o r.govv-
From: DALE KRUEGER<dale.krueger@comcast.net>
Sent: Monday,June 18, 2018 1:04 PM
To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Branden Taggart<brandent@tigard-or.gov>
Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE
Forgot to attach the applications with the previous submittal. Here they are.
dk
DALE KRUEGER
PROSTAT ELECTRIC
1
503-539-7772
From: DALE KRUEGER<dale.krueger@comcast.net>
Sent: Monday,June 18, 2018 12:18 PM
To: 'tigardbuildingpermits@tigard-or.gov' <tigardbuildingpermits@tigard-or.gov>; 'brandent@tigard-or.gov'
<brandent@tigard-or.gov>
Subject: NEW SOLAR JOB IN TIGARD--MOORE
Hi Branden:
Thanks for your time on the phone last week.
Prostat Electric will install a Solar PV system at the Moore property in Tigard.
Site address iS: 15436 SW Greenfield Dr Tigard,OR 97224
Attached are the Building and Electrical applications and files for review. The Solar checklist is pages 2-5 of the Solar
Work Order. Please let me know if you need anything else. We need these permits asap please. I can pay fees by credit
card. Please call the number below.
Thanks for your help.
dk
DALE KRUEGER
PROSTAT ELECTRIC
503-539-7772
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
2
City of Tigard
III itti Building Division
.
-
. NB
gm , 13125 SW Hall Blvd,Tigard,OR 97223 a 1 2Q\
Phone: 50.718.2439 Fax: 503.598.1960
TIGARD Inspection Line: 503.639.4175 ,-,c
(11Y: \JN
www.tigaid-or.gov
2010 Oregon Solar Installation Specialty CodeIVUDII\‘G
Check List for Prescriptive Installation of Roof-Mounted
PhotoVoltaic Solar Panel System
Property Information
Installation Address: i Sq A, ,s,w Glirecoc;4\ Dr,.,
City: T-2,, Zip: 1767,,j'y
Owner's Name: 'Ttirfi A Vintlusul-c- Date: 6;41.267,546
Contractor's Name: (Item 46-.474 ..S444,-- CCB #: p 0132
, , ,t
Design Parameters of the Property/Structure
If"Yes",does not
Is the installation
Flood Hazard E Yes qualify for the
Located in a flood prescriptive paOSSC or ORSC forth, follow
Area
plain/flood way? P "No
design requirements.
s
Is the wind exposure If"Yes", qualifies for
Wind Exposure
"C"or less? 0 No the prescriptive path.
Installations on detached Is the Ground Snow
single/two-family Load 70 psf or less?
dwelling/single/two- If"Yes", qualifies for
family townhomes Et<e; the prescriptive path.
and/or their accessory
Ground structures. Ej No
Snow Load
Is the Ground Snow
Installations on all Load 50 psf or less?
structures other than 2If"Yes",qualifies for
above the prescriptive path.
L] No
1
1./Building/Fonns/PhotoVoltaic-Check1Ist02-01-11.clocx
Is the construction
-r material wood and does ❑"" Yes
Type of If"Yes", qualifies for
the construction qualify
Construction as"conventional light n No the prescriptive path.
frame"construction?
Is the spacing 24 inches
or less?
Pre-engineered trusses. Yes If"Yes",qualifies for
the prescriptive path.
❑ No
Roof framing
members Is the spacing 24 inches
or less?
Nominal lumber. If"Yes", qualifies for
the prescriptive path.
No
Is the combined weight yes
of the PV modules and If"Yes",qualifies for
racking less than or ❑ No the prescriptive path.
Solar equal to 4.5 psf?
installation Is the solar installation
layout in accordance Yes
with Section 305.4(3)of If"Yes",qualifies for
the 2010 Oregon Solar n No the prescriptive path.
Code?
❑ Metal
Single layer If roofing material is
RoofingCheck thetype of ❑ of wood
one of the three types
material roofing material shingle/shake checked, qualifies for
ax. two layers the prescriptive path.
of composition
shingle.
Is the roof mounted Yes
Connections of solar assembly
the solar assembly connected to roof If"Yes", qualifies for
El No the prescriptive path.
to the roof framing or blocking
directly?
I:Building/Forms!Photovoltaic-Checklist02-01-I 1.docx 2
Yes
If'`Yes",qualifies for
Is the gauge 26 or less?
No the prescriptive path.
115 lbs for 60 inch
spacing or less?
If"Yes",qualifies for
E. Yes the prescriptive path.
Li No
Minimum Uplift rating
of Clamps? 75 lbs for 48 inches
spacing or less?
If"Yes",qualifies for
El Yes the prescriptive path.
No
Attachment of
roof mounted If the spacing falls
Minimum 24 inches
solar systems Spacing of clamps? within 24 inches and 60
directly to inches
Maxim 60 inches inches, qualifies for the
prescriptive path.
standing seam
metal panels Width of roofing If the width of the panel
is less than 18 inches,
panels? 18 inches or less
qualifies for the
inches
prescriptive path.
Minimum#10 at 24
inches ole?
Size and spacing of If"Yes",qualifies for
fastener? UYes the prescriptive path.
n No
Is the roof decking of
WSP min. i/2"thickness, LI Yes
decking connected to If"Yes", qualifies for
framing members LI No the prescriptive path.
w/min. 8d nails @
6"/12"o/c?
Is the height less than or
Maximum 18 inches equal to 18 in hes?
Height of the from the top of the If"Yes",qualifies for
solar modules module to the roof Yes the prescriptive path.
surface. fl No
3
1:/Butiding/Forms/PhotoVoltaic,Checklist:02-01-1 Ldock
Submittal Documents required for Prescriptive Installations
Show the location of the PV system in relation to buildings, structures,
property lines,and,as applicable,flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5 x 11 inches.
Attach a simple structural plan showing the roof framing(rafter size,type, and
spacing)and PV module system racking attachment.
System must be shown in sufficient detail and clarity to assess whether it
Structural Plan meets the prescriptive construction requirements as listed earlier above in the
matrix.
Minimum size of the plan is 8.5 x 11 inches.
PV Modules
Manufacturer: SOL,
Model Number: Sw 3
Listing Agency:
4
usuilding/Forms/Photovoitaic-checkiisto2-01-11.docx
•
,
Oregon Solar Installation Specialty Code
C,,"--F6-'-'*„.,;.. ...),1 hecklist for Prescriptive Photovoltaic Installations riEJ ""
accordance with Section 3111.5.3 :,
ioN . g 2016
Department of Consumer and Business Services
CIT OF '1.il.:4AH,-.•
Building Codes Division
BUILDING DINICICr',x
1535 Edgewater NW,Salem,Oregon
Mailing address:P.O.Box 14470,Salem,OR 97309-0404
Phone:503-378-4133.Fax:503-378-2322
Web:bcd.oregon.gov
PROPERTY OWNER INFORMATION
'� ?a? 1,Property owner name: �$-�1' � eInstallation address: 153(0 5 t,,) i kJd Dr,
City: Ti 5,,,,.-,,)s, State: OR ZIP: /7224
Structure on which modules are to be installed:
Day phone: (50, ) 8L( , 55,3 Evening phone: ( ) .9i4Mg
Email address:Derr ,Tyvyyt e- C@' y' (-Q. . (c)v'
Contractor: Clre oilAi" SAM( f, X26 CCB#: 211 JJ
Dayphone: -I l& Eveningphone: -a9 O
(5�3)�vl� � 3 (� ) � c'31.0 t�
Email address: Gevyvt, / at 4. \--StAel Y .
qk
SITE PLAN
• Attach a simple site plan showing the location of the PV system in relation to buildings,
structures,property lines,and,as applicable,flood hazard areas.
• System must be shown in sufficient detail to assess whether the requirements of Section 3111.4.8
or one of the exceptions have been met.
• The site plan must be on 8.5-inch x 11-inch or larger paper.
STRUCTURAL INFORMATION
All structures:
• Is this centional light framed wood construction?
Yes [ No❑(check one)
• Does the ructure have pre-engineered trusses?
Yes[ No❑ (check one)
OR
• Does structure have roof framing members spaced at 24 inches on center maximum?
Yes []rNo ❑ (check one)
• Is the weight of the PV modules and racking less than 4.5 pounds per square foot?
Yes Er No ❑ (check one)
• Is the roofing material metal,single Layer wood shingle,or not more than two layers of
composition shingle?
Yes Et No ❑ (check one)
tirmizowii
440-4910(9/15/COM)
STRUCTURAL INFORMATION (continued)
Standing seam metal roofs:
• Is the metal gauge 26 or heavier?
Yes ❑ No ❑ (check one)
• Clamp design:Are clamps designed to withstand uplift of at least 115 pounds for clamps spaced at
60 inches on center or less or at least 75 pounds for clamps spaced at 48 inches on center or less?
Yes❑ No El (check one)
• Is the spacing of the clamps as measured along the seam less than or equal to 24 inches on center?
Yes❑ No El (check one)
• Is the roofing panel width 18 inches or less?
Yes ❑ No ❑ (check one)
• Will the roofing panel attachments be at least#10 screws at 24 inches on center?
Yes❑ No❑ (check one)
• Will the roofing panels be installed over minimum 1/2-inch nominal wood structural panels
attached to framing with 8d nails at six inches on center at panel edges and 12 inches on center
field nailing?
Yes El No ❑ (check one)
lino, on any of these requirements, the project may not be submitted using the prescriptive path.
ROOF DESIGN AND ATTACHMENT
• Attach a simple structural plan showing the roof framing(rafter size,type,and spacing)and PV
system racking attachment.
• System must be shown in sufficient detail to assess whether the requirements of Section 3111.5.3
have been met.
• The structural plan must be on 8.5-inch x 11-inch or larger paper.
WIND DESIGN
• Does the project si exceed 95 mph in exposure C or 105 mph in exposures A or 13?
Yes ❑ No (check one) Ifyes, the project may not be submitted using the prescriptive path.
• Is the m dole height less than 18 inches above the roof in accordance with section 3111.5.3?
Yes Lf No ❑ (check one)
PV MODULES
Manufacturer: SaAa"( w Y
Model number: SW Soo
Listing agency: (A(_ C703
GLlvtS V�j�i r/ "yAik
S 3o r6
Applicant name(please print) Applicant ure Date
440-4910(9/15/COM)
Oregon Solar Installation Specialty Code
Checklist for Prescriptive Photovoltaic Installations in accordance with The Oregon Solar installation Specialty Code
(OSISC)Sections 304.9 and 305.4
Washington County
Department of Land Use&Transportation
Development Services,Building Services Section
155 N First Avenue,Ste.350 MS 12• Hillsboro,OR 97124-3072
Phone: (503)846-3470• Fax: (503)846-3993.TTY: (503)846-4598 www.co.washington.or.us
PROPERTY OWNER INFORMATION
Property owner name: 3-exr...\ wore.
Installation address: 1593 w t it\A
City:State:ZIP: Ti9gx-d O re-- °Cl aa`k
Structure on which modules are to be installed:
SITE AND ROOF PLANS
• Attach a simple site plan showing the location of the PV system in relation to buildings,structures, property lines,
and, as applicable,flood hazard areas.
• System must be shown in sufficient detail to assess whether the requirements of section 304.9 or one of the
exceptions have been met.
1. Show the layout of the panels on the roof.
2. If the panels cover more than 1000 square feet,the"General Pathway Requirements"of section
304.9.1 need to be shown on the roof plan. (Roof slope 2:12 or greater.)
3. If the panels cover 1000 square feet or less,the following applies:(Roof slope 2:12 or greater.)
a) Where the array does not exceed 25%of the total roof area,a 12 inch unobstructed
pathway shall be maintained along each side of any horizontal ridge.
b) Where the array exceeds 25%of the total roof area, a minimum of one 36 inch
unobstructed pathway from ridge to eave,over a structurally supported area, must be
provided in addition to a minimum 12 inch unobstructed pathway along each side of any
horizontal ridge.
4. See exceptions 2 and 3 of 304.9.1 for non-occupied accessory structures and townhouses. •The site
and roof plans must be on 8.5-inch x 11-inch or larger paper.
STRUCTURAL INFORMATION
All structures:
• Is this conventional light framed wood construction?
Yesl No0
• Does the structure have pre-engineered trusses?
Yes a No0
OR
• Does struc re have roof framing members spaced at 24 inches on center maximum?
Yes( No0
• Is the weight of the PV modules and racking less than 4.5 pounds per square foot?
Yes Nol
**Please provi e a cut-sheet for the PV Panels
• Is the roof ng material metal,single layer wood shingle,or not more than two layers of composition shingle?
Yes O Noi
Sta0ding seam metal roofs:
• Is the metal gauge 26 or heavier?
Yes i No 0
• Clamp design:Are clamps designed to withstand uplift of at least 115 pounds for clamps spaced at 60 inches on
center or less or at least 75 pounds for clamps spaced at 48 inches on center or less?
Yes 0 No i
• Is the spacing of the clamps as measured along the seam less than or equal to 24 inches on center?
Yes() No
• Is the roofing panel width 18-inches or greater?
Yes[ No
• Will the roofing panel attachments be at least#10 screws at 24 inches on center?
YesO No 0
• Will the roofing panels be installed over minimum Y2-inch nominal wood structural panels attached to framing
with 8d nails at six inches on center at panel edges and 12 inches on center field nailing?
Yes° No 0
**If answer is no,on any of these requirements,the project may not be submitted using the prescriptive path. **
ROOF DESIGN AND ATTACHMENT
• Attach a simple structural plan showing the roof framing(rafter size,type, and spacing) and PV system racking
attachment.
•System must be shown in sufficient detail to assess whether the requirements of section 305.4 have been met.
1. Roof Structure is engineered trusses or roof framing at a spacing of 24 inches on center.The ground
snow load does not exceed 50 psf and the wind loads do not exceed 95 MPH in exposure C or 105 MPH
in exposures A or B.
2. Roofing material shall be metal,single layer wood shingle or shake, or not more than (2) layers of
composition shingle.
3. Installation shall comply with Figure 305.4(1)and the combined weight of the modules and racking
does not exceed 4.5 pounds per square foot.The attachments must be spaced no more than 48 inches
on center in any direction.The attachments shall be spaced at no greater than 24 inches on center in
any direction where:
a) Ground snow load exceeds 25 psf.
b) Located within 3 feet of a roof edge, hip, eave,or ridge or
c) Wind exposure is B or more and the wind speed is 95 MPH or more,or
wind exposure C and wind speed is 85MPH or more.
4.Maximum module height above roof shall be 18 inches from top of module to roof surface in accordance
with Figure 305.4(1)
•The structural plan must be on 8.5-inch x 11-inch or larger paper.
WIND DESIGN
• Does the project site Ce-ed 95 mph in exposure C or 105 mph in exposures A or B?
Yes 0 No
**if yes,the project may not be submitted using the prescriptive path.
• Is the mod height less than 18 inches above the roof in accordance with section 305.4?
Yes No 0
PV MODULES
• Please provide cut sheet to show listing and labeling of PV Modules.
• Please provide cut sheet to show listing and labeling of attachment brackets.
• Please provide a wiring diagram for the electrical permit requirements.
S:\EngineeringBuilding Services Website Forms Storage-2014\Oregon Solar Installation Specialty Code.docx
REENLIGHT
LAP&ROOFING
CGs° SOLAR WORK ORDER or,),stat
—Electric
RECEIVE)
Customer Information
ION 1 g 018
CIr ur
JOB#: OcL09-2_ 3oLDING orosRDN
customer: el. Ve.,CAC:\ M(024 Utility: P
Address: k54st4 %Lk) GAr ten Dtz... City: 71.0‘afd State: 0
County: `s,X)Okbr\ Zip: ci-1334
Phone: • ak.0 • c3c5cR Email:3e..y vncorc(1)
Job Information
System Size: Cfk .°‘ Panel Type: \,(x(\NOt1ci Inverter Type: PtVS kicsocr
(280/285/290/295)
Racking/color: VAINY..._ t•g ::: aCk,..... Electrical upgrade: Ai V:t
Sales Date: 19 1 2-6 Estimated Install Date: Ca1i5 ZO S.--
Structure Type: V—CA.VV‘..AA-n Within City Limits:
Attic Space: Roof Type/Pitch: Rcr0.-v21mcauls--,%
'Pvr-en - La rnitcluia 14) 12_
Notes
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
15436 SW GREENFIELD DR, TIGARD,
OR, 97224
Record Type: Record ID:
Residential - Master Permit MST2018-00190
Inspection Type: Inspector:
199 Electrical final Jeff Grove
Result:
PASS
Comments:
Violation Summary:
Inspector Contractor
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
15436 SW GREENFIELD DR, TIGARD,
OR, 97224
Record Type: Record ID:
Residential - Master Permit MST2018-00190
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - NoCofO
Comments:
Violation Summary:
Inspector Contractor