Loading...
Permit (157) III CITY OF TIGARD MASTER PERMIT COMMUNITY DEVELOPMENT Permit#: MST2018-00190 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/11/2018 T r Cr,A R.I-) 13125 Parcel: 2S109DA04400 Jurisdiction: Tigard Site address: 15436 SW GREENFIELD DR Subdivision: SUMMIT RIDGE Lot: 21 Project: MOORE Project Description: Solar photovoltaic system. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $2,000.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add!500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: Y Other Description: 9.9 kW solar PV system Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: MOORE,JERRY ALLEN II&PEGGY MA PRO STAT SERVICES LLC Required Items and Reports(Conditions) 15436 SW GREENFIELD DR 8122 NE 91ST STREET TIGARD,OR 97224 VANCOUVER,WA 98662 PHONE: PHONE: 360-521-5742 FAX: 360-859-3749 Total Fees: $364.19 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OA 7 952-001-0090 You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. c Issued By: i l /.-/y�,... �� .ermittee Signature: 5C, V' / � � 7 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Residential rot/()I'Act.'' l SE()Ni., Cityof Tigard � i" Received / }( �y,�—�y G g a� Date/By: (!✓ v U 47),,........ Permit No./"L,J4�i d ... v Ill 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review /��� Other Permit: Phone: 503.718.2439 Fax: 503.598,196pI Date/13y: (4 jel I Inspection Line: 503.639.4175 JO IN 1 6 2018 Date Read B . rods: SI See Pae 2 for TIGARt) P y Internet: www.tigard-or.gov er., N tified/Method:. /f� ; j f . Supplemental Information I T v Ufa 1 testa is r�rrE' j i DIVISION cv» rlv ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 121.Addition/alteration/replacement ®Other:SOLAR equipment,materials,labor,overhead,and the profit for the CATEGORY',OF.CONSTRUCTION work indicated on this application. Valuation: $2,000.00 ►e1 1-and 2-family dwelling 0 Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB,SITE,INFORMATION AND LOCATION Total number of floors: Job site address:15436 SW Greenfield Dr Tigard,OR 97224 New dwelling area: square feet City/State/Z1P:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: � �_ v.-- Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DA,CONN RCIAL.USE C11 CKL1ST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OP WORK work indicated on this application. SOLAR 1W INSTALLATION Valuation: $ Existing building area: square feet New building area: square feet ` 0.PROPERTY OWNER 0 TENANT Number of stories: Name:MOORE Type of construction: Address:15436 SW Greenfield Dr Tigard,OR 97224 Occupancy groups: City/State/ZIP:Tigard,OR 97224 Existing: Phone:(503)816-5593 Fax:( ) New: ►ai A)"PUCANT CI CONTACT PERSON BUILDING PERMIT FEES* Business name:PROSTAT ELECTRIC fP(easerrleitnleeseardut): Structural plan review fee(or deposit): Contact name:DALE KRUEGER FLS plan review fee(if applicable): Address:1721 NE 64TH AVE Total fees due upon application: City/State/ZIP:VANCOUVER,WA 98661 Amount received: Phone:(503)539-7772 Fax::( ) E-mail:dale.krueger@comcastnet PHOTOVOLTAIC SOLAR M ,$YSTE)tD ES* CQNTRACT_ Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:PROSTAT ELECTRIC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:1721 NE 64TH AVE Solar Installation Specialty Code checklist. City/State/ZIP:VANCOUVER,WA 98661 Permit Fee(includes plan review $180.00 and administrative fees): Phone:(503)539-7772 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:189902 Total fee due upon application: $201.60 Authorized signature: C This permit application expires if a permit is not obtained ,� within 180 days after it has been accepted as complete. Print name:DALE KRUEGER Date:6/18/18 °Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Electrical Permit ApplicationRE(TIVEFOR OFFICE. SE t" ONL't pii City of Tigard '` Received 13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: Permit#: C Phone: 503.718.2439 Fax: 503.598.1960 , UN 1 8 -018 Plan Review Dale/By: Related Permit#: T I G A R D Inspection Line: 503.639.4175 Read Date/B Juris: Internet: www.tigard-or.gov J G zf� Nori6ed/Method: EI See Page 2 for Supplemental Information ,' T'Y'E.,br AgtipiNG O LVISIO PI;Aw*vov o New construction 0 Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked): ❑Demolition ►1 Other SOLAR 0 Service or feeder 400 amps or more 0 Building over three stories. where the available fault current 0 Marinas and boatyards. `.CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or 0 Floating buildings. .1 1-and 2-family dwelling 0 Commercial/industrial 0 Accessory building less to ground,or exceeds 14,000 0 Commercial-use agricultural amps for all other installations. buildings. 0 Multi-family ❑Master builder 0 Other: ❑Fire pump. 0 Installation of 150 RVA or ' JOB SITE IORMATIONi ANt) LOCATION 0 Emergency system. larger separately derived Job#: Job site address:1.5436 SW Greenfield Dr Ti and ❑Addition of new motor load of system. g 100HP or more. ❑"A","E","1-2","1-3", City/State/ZIP:Tigard,OR 97224 ❑Six or more residential units. occupancy. o Health-care facilities. 0 Recreational vehicle parks. Suite/bldg./apt.#: Project name:MOORE ❑Hazardous locations. ❑Supply voltage for more than ❑Service or feeder 600 amps or more. 600 volts nominal. Cross street/directions to job site: P1 E,SCHEDU E Descriptton 1 Qty. I Each I Total I New residential single-or multi-family dwelling unit. Subdivision: Lot#: Includes attached garage. Tax map/parcel#: 1,000 sq.ft.or less 168.54 4 Ea.add'l 500 sq.ft.or portion 33.92 1 '' DESCRIPTION OF WORK• Limited energy,residential SOLAR PV INSTALLATION (with above sq.ft.) 75.00 2 Limited energy,multi-family 75.00 2 residential(with above sq.ft.) Renewable Energy ® See Page 2 , 133.56 0 PROPERTY OWNER 0 TENANT Services or feeders installation,alteration,and/or relocation Name:MOORE 200 amps or less 100.70 2 Address: 15436 SW Greenfield Dr Tigard,OR 97224 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP:Tigard,OR 97224 601 amps to I,000 amps 301.04 2 Phone:(503)816-5593 Fax:( ) Over 1,000 amps or volts 552.26 2 Email: Temporary services or feeders installation,alteration,and/or relocation Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2 Owner signature:_ Da$e: 401 amps to 599 amps 168.54 2 ° ElBranch circuits—new,alteration,or extension,per panel,�A}"1'LCAIVT ;; ►�� COhi 1ACPFEON. A.Fee for branch circuits with Business name:PROSTAT ELECTRIC above service or feeder fee, 7.42 2 each branch circuit Contact name:DALE KRUEGER B.Fee for branch circuits without Address: 1721 NE 64TH AVE service or feeder fee,first 56.18 2 branch circuit City/State/ZIP:VANCOUVER,WA 98661 Each add'l branch circuit 7.42 2 Miscellaneous(service or feeder not included) Phone:(503)539-7772 Fax: :( ) Each manufactured or modular — dwelling,service and/or feeder 67.84 2 Email:dale.krueger@comcast.net Reconnect only 67.84 2 CONTRACTOR Pump or irrigation circle 67.84 2 Business name:PROSTAT ELECTRIC Sign or outline lighting 67.84 2 Address: 1721 NE 64T0 AVE Signal circuit(s)or limited-energy 0 See Page 2 2 panel,alteration,or extension. City/State/ZIP:VANCOUVER,WA 98661 Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25/hr Phone:(503)539-7772 Fax:( ) Investigation(1 hr min) 90.00/hr Email:dale.krueger@comcast.net Industrial plant(1 hr min) 78.18/hr Inspections for which no fee is CCB Lie.: 189902 Electrical . C597 Suprv.Lie.: 2275S specifically listed(%hr min) 90.00/hr , .ELECTRICALPERMIT FEES Suprv.Electrician signature,required:/°` ` Subtotal: 133.56 Print name: BRUCE LEIBY Date: 6/1 ❑Plan Review Required(25%of permit fee): State surcharge(12%of permit fee): 16.03 Authorized signature: ►1 TOTAL PERMIT FEE: 149.59 Oa ' • - This permit application expires if a permit is not obtained within 180 Print name: DALE KRUEGER Date: 6/18/18 days after it has been accepted as complete. * Number of inspections allowed per permit. 'Mending\Permits\ELC_PermitApp_Etdi_ERE.doe Rev 06/17/2015 440.46I5TQ 1/05/COM/-EB ' Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL IAL"WOE:ONLY k'scifEt3 it.E. Fee for all residential systems combined: $75.00 Description t `t Each Total Renewable electrical energy systems: Check Type of Work Involved: 5 kva or less 100,70 2 5.01 to 15 kva 1 133.56 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: n B• urglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 C Garage Door Opener* >100 kva(fee in accordance with OAR 918-309-0040) 552.26 2 El H• eating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 Vacuum Systems* >100 kva—no additional charge 0.0 3 Each additional inspection over allowable in any of the above: ❑ Other: Each gadditional d at an h arty(i th°thin) 6625/hr l Inspections for which no fee is 90.00/hr specifically listed(1A hr min) COW/MRCIAL WOI ONLY ELECTRICAL ',EMT Fee for each commercial system: $75,00 Subtotal(Enter on Page 1): I33.56 * Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: f] Audio and Stereo Systems El B• oiler Controls C Clock Systems C Data Telecommunication Installation n F• ire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* El Medical El Nurse Calls (l Outdoor Landscape Lighting* Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I:uuilding\Pertnits\ELC PermitApp_ELR ERE doe Rev 06/17/2015 Branden Taggart From: Branden Taggart Sent: Tuesday, June 19, 2018 9:18 AM To: 'DALE KRUEGER' Cc: #Building Permit Technicians Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr. Attachments: PhotoVoltaic-Checklist.pdf Hi Dale, We received the state's solar checklist; however,we will need you to complete our solar checklist. I have attached it above for you. Once we receive the completed checklist, I will route your submittal for review. Thanks, Branden Taggart v Oty of Tigard *v, Senior Permit Technician Community Development TIGARD 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent@tigard-or.gov From: DALE KRUEGER<dale.krueger@comcast.net> Sent: Monday,June 18, 2018 1:04 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Branden Taggart<brandent@tigard-or.gov> Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE Forgot to attach the applications with the previous submittal. Here they are. dk DALE KRUEGER PROSTAT ELECTRIC 503-539-7772 From: DALE KRUEGER<dale.krueger@comcast.net> Sent: Monday,June 18, 2018 12:18 PM To: 'tigardbuildingpermits@tigard-or.gov' <tigardbuildingpermits@tigard-or.gov>; 'brandent@tigard-or.gov' <bra ndent@tigard-or.gov> Subject: NEW SOLAR JOB IN TIGARD--MOORE Hi Branden: Thanks for your time on the phone last week. Prostat Electric will install a Solar PV system at the Moore property in Tigard. Site address is: 15436 SW Greenfield Dr Tigard,OR 97224 1 Branden Taggart From: DALE KRUEGER <dale.krueger@comcast.net> Sent: Wednesday,June 27, 2018 8:57 AM To: Branden Taggart Cc: #Building Permit Technicians Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr. Attachments: OR072 GL Moore Checklist TIGARD 6-27-18.pdf Here is the checklist. Please let us know as soon as permits are ready. Thanks for your help. dk DALE KRUEGER PROSTAT ELECTRIC 503-539-7772 From: Branden Taggart<brandent@tigard-or.gov> Sent:Tuesday,June 19, 2018 9:18 AM To: 'DALE KRUEGER'<dale.krueger@comcast.net> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE; 15436 SW Greenfield Dr. Hi Dale, We received the state's solar checklist; however, we will need you to complete our solar checklist. I have attached it above for you. Once we receive the completed checklist, I will route your submittal for review. Thanks, Pill Branden Taggart 4 City of Tigard ) N ., Senior Permit Technician ti Community Development 13125 SW Hall Blvd Tigard,OR 97223 )503)718-2449' bra nd ent Ms4 ti gard-o r.govv- From: DALE KRUEGER<dale.krueger@comcast.net> Sent: Monday,June 18, 2018 1:04 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Branden Taggart<brandent@tigard-or.gov> Subject: RE: NEW SOLAR JOB IN TIGARD--MOORE Forgot to attach the applications with the previous submittal. Here they are. dk DALE KRUEGER PROSTAT ELECTRIC 1 503-539-7772 From: DALE KRUEGER<dale.krueger@comcast.net> Sent: Monday,June 18, 2018 12:18 PM To: 'tigardbuildingpermits@tigard-or.gov' <tigardbuildingpermits@tigard-or.gov>; 'brandent@tigard-or.gov' <brandent@tigard-or.gov> Subject: NEW SOLAR JOB IN TIGARD--MOORE Hi Branden: Thanks for your time on the phone last week. Prostat Electric will install a Solar PV system at the Moore property in Tigard. Site address iS: 15436 SW Greenfield Dr Tigard,OR 97224 Attached are the Building and Electrical applications and files for review. The Solar checklist is pages 2-5 of the Solar Work Order. Please let me know if you need anything else. We need these permits asap please. I can pay fees by credit card. Please call the number below. Thanks for your help. dk DALE KRUEGER PROSTAT ELECTRIC 503-539-7772 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 2 City of Tigard III itti Building Division . - . NB gm , 13125 SW Hall Blvd,Tigard,OR 97223 a 1 2Q\ Phone: 50.718.2439 Fax: 503.598.1960 TIGARD Inspection Line: 503.639.4175 ,-,c (11Y: \JN www.tigaid-or.gov 2010 Oregon Solar Installation Specialty CodeIVUDII\‘G Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: i Sq A, ,s,w Glirecoc;4\ Dr,., City: T-2,, Zip: 1767,,j'y Owner's Name: 'Ttirfi A Vintlusul-c- Date: 6;41.267,546 Contractor's Name: (Item 46-.474 ..S444,-- CCB #: p 0132 , , ,t Design Parameters of the Property/Structure If"Yes",does not Is the installation Flood Hazard E Yes qualify for the Located in a flood prescriptive paOSSC or ORSC forth, follow Area plain/flood way? P "No design requirements. s Is the wind exposure If"Yes", qualifies for Wind Exposure "C"or less? 0 No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes Et<e; the prescriptive path. and/or their accessory Ground structures. Ej No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structures other than 2If"Yes",qualifies for above the prescriptive path. L] No 1 1./Building/Fonns/PhotoVoltaic-Check1Ist02-01-11.clocx Is the construction -r material wood and does ❑"" Yes Type of If"Yes", qualifies for the construction qualify Construction as"conventional light n No the prescriptive path. frame"construction? Is the spacing 24 inches or less? Pre-engineered trusses. Yes If"Yes",qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for the prescriptive path. No Is the combined weight yes of the PV modules and If"Yes",qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance Yes with Section 305.4(3)of If"Yes",qualifies for the 2010 Oregon Solar n No the prescriptive path. Code? ❑ Metal Single layer If roofing material is RoofingCheck thetype of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for ax. two layers the prescriptive path. of composition shingle. Is the roof mounted Yes Connections of solar assembly the solar assembly connected to roof If"Yes", qualifies for El No the prescriptive path. to the roof framing or blocking directly? I:Building/Forms!Photovoltaic-Checklist02-01-I 1.docx 2 Yes If'`Yes",qualifies for Is the gauge 26 or less? No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes",qualifies for E. Yes the prescriptive path. Li No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes",qualifies for El Yes the prescriptive path. No Attachment of roof mounted If the spacing falls Minimum 24 inches solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maxim 60 inches inches, qualifies for the prescriptive path. standing seam metal panels Width of roofing If the width of the panel is less than 18 inches, panels? 18 inches or less qualifies for the inches prescriptive path. Minimum#10 at 24 inches ole? Size and spacing of If"Yes",qualifies for fastener? UYes the prescriptive path. n No Is the roof decking of WSP min. i/2"thickness, LI Yes decking connected to If"Yes", qualifies for framing members LI No the prescriptive path. w/min. 8d nails @ 6"/12"o/c? Is the height less than or Maximum 18 inches equal to 18 in hes? Height of the from the top of the If"Yes",qualifies for solar modules module to the roof Yes the prescriptive path. surface. fl No 3 1:/Butiding/Forms/PhotoVoltaic,Checklist:02-01-1 Ldock Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines,and,as applicable,flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing(rafter size,type, and spacing)and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: SOL, Model Number: Sw 3 Listing Agency: 4 usuilding/Forms/Photovoitaic-checkiisto2-01-11.docx • , Oregon Solar Installation Specialty Code C,,"--F6-'-'*„.,;.. ...),1 hecklist for Prescriptive Photovoltaic Installations riEJ "" accordance with Section 3111.5.3 :, ioN . g 2016 Department of Consumer and Business Services CIT OF '1.il.:4AH,-.• Building Codes Division BUILDING DINICICr',x 1535 Edgewater NW,Salem,Oregon Mailing address:P.O.Box 14470,Salem,OR 97309-0404 Phone:503-378-4133.Fax:503-378-2322 Web:bcd.oregon.gov PROPERTY OWNER INFORMATION '� ?a? 1,Property owner name: �$-�1' � eInstallation address: 153(0 5 t,,) i kJd Dr, City: Ti 5,,,,.-,,)s, State: OR ZIP: /7224 Structure on which modules are to be installed: Day phone: (50, ) 8L( , 55,3 Evening phone: ( ) .9i4Mg Email address:Derr ,Tyvyyt e- C@' y' (-Q. . (c)v' Contractor: Clre oilAi" SAM( f, X26 CCB#: 211 JJ Dayphone: -I l& Eveningphone: -a9 O (5�3)�vl� � 3 (� ) � c'31.0 t� Email address: Gevyvt, / at 4. \--StAel Y . qk SITE PLAN • Attach a simple site plan showing the location of the PV system in relation to buildings, structures,property lines,and,as applicable,flood hazard areas. • System must be shown in sufficient detail to assess whether the requirements of Section 3111.4.8 or one of the exceptions have been met. • The site plan must be on 8.5-inch x 11-inch or larger paper. STRUCTURAL INFORMATION All structures: • Is this centional light framed wood construction? Yes [ No❑(check one) • Does the ructure have pre-engineered trusses? Yes[ No❑ (check one) OR • Does structure have roof framing members spaced at 24 inches on center maximum? Yes []rNo ❑ (check one) • Is the weight of the PV modules and racking less than 4.5 pounds per square foot? Yes Er No ❑ (check one) • Is the roofing material metal,single Layer wood shingle,or not more than two layers of composition shingle? Yes Et No ❑ (check one) tirmizowii 440-4910(9/15/COM) STRUCTURAL INFORMATION (continued) Standing seam metal roofs: • Is the metal gauge 26 or heavier? Yes ❑ No ❑ (check one) • Clamp design:Are clamps designed to withstand uplift of at least 115 pounds for clamps spaced at 60 inches on center or less or at least 75 pounds for clamps spaced at 48 inches on center or less? Yes❑ No El (check one) • Is the spacing of the clamps as measured along the seam less than or equal to 24 inches on center? Yes❑ No El (check one) • Is the roofing panel width 18 inches or less? Yes ❑ No ❑ (check one) • Will the roofing panel attachments be at least#10 screws at 24 inches on center? Yes❑ No❑ (check one) • Will the roofing panels be installed over minimum 1/2-inch nominal wood structural panels attached to framing with 8d nails at six inches on center at panel edges and 12 inches on center field nailing? Yes El No ❑ (check one) lino, on any of these requirements, the project may not be submitted using the prescriptive path. ROOF DESIGN AND ATTACHMENT • Attach a simple structural plan showing the roof framing(rafter size,type,and spacing)and PV system racking attachment. • System must be shown in sufficient detail to assess whether the requirements of Section 3111.5.3 have been met. • The structural plan must be on 8.5-inch x 11-inch or larger paper. WIND DESIGN • Does the project si exceed 95 mph in exposure C or 105 mph in exposures A or 13? Yes ❑ No (check one) Ifyes, the project may not be submitted using the prescriptive path. • Is the m dole height less than 18 inches above the roof in accordance with section 3111.5.3? Yes Lf No ❑ (check one) PV MODULES Manufacturer: SaAa"( w Y Model number: SW Soo Listing agency: (A(_ C703 GLlvtS V�j�i r/ "yAik S 3o r6 Applicant name(please print) Applicant ure Date 440-4910(9/15/COM) Oregon Solar Installation Specialty Code Checklist for Prescriptive Photovoltaic Installations in accordance with The Oregon Solar installation Specialty Code (OSISC)Sections 304.9 and 305.4 Washington County Department of Land Use&Transportation Development Services,Building Services Section 155 N First Avenue,Ste.350 MS 12• Hillsboro,OR 97124-3072 Phone: (503)846-3470• Fax: (503)846-3993.TTY: (503)846-4598 www.co.washington.or.us PROPERTY OWNER INFORMATION Property owner name: 3-exr...\ wore. Installation address: 1593 w t it\A City:State:ZIP: Ti9gx-d O re-- °Cl aa`k Structure on which modules are to be installed: SITE AND ROOF PLANS • Attach a simple site plan showing the location of the PV system in relation to buildings,structures, property lines, and, as applicable,flood hazard areas. • System must be shown in sufficient detail to assess whether the requirements of section 304.9 or one of the exceptions have been met. 1. Show the layout of the panels on the roof. 2. If the panels cover more than 1000 square feet,the"General Pathway Requirements"of section 304.9.1 need to be shown on the roof plan. (Roof slope 2:12 or greater.) 3. If the panels cover 1000 square feet or less,the following applies:(Roof slope 2:12 or greater.) a) Where the array does not exceed 25%of the total roof area,a 12 inch unobstructed pathway shall be maintained along each side of any horizontal ridge. b) Where the array exceeds 25%of the total roof area, a minimum of one 36 inch unobstructed pathway from ridge to eave,over a structurally supported area, must be provided in addition to a minimum 12 inch unobstructed pathway along each side of any horizontal ridge. 4. See exceptions 2 and 3 of 304.9.1 for non-occupied accessory structures and townhouses. •The site and roof plans must be on 8.5-inch x 11-inch or larger paper. STRUCTURAL INFORMATION All structures: • Is this conventional light framed wood construction? Yesl No0 • Does the structure have pre-engineered trusses? Yes a No0 OR • Does struc re have roof framing members spaced at 24 inches on center maximum? Yes( No0 • Is the weight of the PV modules and racking less than 4.5 pounds per square foot? Yes Nol **Please provi e a cut-sheet for the PV Panels • Is the roof ng material metal,single layer wood shingle,or not more than two layers of composition shingle? Yes O Noi Sta0ding seam metal roofs: • Is the metal gauge 26 or heavier? Yes i No 0 • Clamp design:Are clamps designed to withstand uplift of at least 115 pounds for clamps spaced at 60 inches on center or less or at least 75 pounds for clamps spaced at 48 inches on center or less? Yes 0 No i • Is the spacing of the clamps as measured along the seam less than or equal to 24 inches on center? Yes() No • Is the roofing panel width 18-inches or greater? Yes[ No • Will the roofing panel attachments be at least#10 screws at 24 inches on center? YesO No 0 • Will the roofing panels be installed over minimum Y2-inch nominal wood structural panels attached to framing with 8d nails at six inches on center at panel edges and 12 inches on center field nailing? Yes° No 0 **If answer is no,on any of these requirements,the project may not be submitted using the prescriptive path. ** ROOF DESIGN AND ATTACHMENT • Attach a simple structural plan showing the roof framing(rafter size,type, and spacing) and PV system racking attachment. •System must be shown in sufficient detail to assess whether the requirements of section 305.4 have been met. 1. Roof Structure is engineered trusses or roof framing at a spacing of 24 inches on center.The ground snow load does not exceed 50 psf and the wind loads do not exceed 95 MPH in exposure C or 105 MPH in exposures A or B. 2. Roofing material shall be metal,single layer wood shingle or shake, or not more than (2) layers of composition shingle. 3. Installation shall comply with Figure 305.4(1)and the combined weight of the modules and racking does not exceed 4.5 pounds per square foot.The attachments must be spaced no more than 48 inches on center in any direction.The attachments shall be spaced at no greater than 24 inches on center in any direction where: a) Ground snow load exceeds 25 psf. b) Located within 3 feet of a roof edge, hip, eave,or ridge or c) Wind exposure is B or more and the wind speed is 95 MPH or more,or wind exposure C and wind speed is 85MPH or more. 4.Maximum module height above roof shall be 18 inches from top of module to roof surface in accordance with Figure 305.4(1) •The structural plan must be on 8.5-inch x 11-inch or larger paper. WIND DESIGN • Does the project site Ce-ed 95 mph in exposure C or 105 mph in exposures A or B? Yes 0 No **if yes,the project may not be submitted using the prescriptive path. • Is the mod height less than 18 inches above the roof in accordance with section 305.4? Yes No 0 PV MODULES • Please provide cut sheet to show listing and labeling of PV Modules. • Please provide cut sheet to show listing and labeling of attachment brackets. • Please provide a wiring diagram for the electrical permit requirements. S:\EngineeringBuilding Services Website Forms Storage-2014\Oregon Solar Installation Specialty Code.docx REENLIGHT LAP&ROOFING CGs° SOLAR WORK ORDER or,),stat —Electric RECEIVE) Customer Information ION 1 g 018 CIr ur JOB#: OcL09-2_ 3oLDING orosRDN customer: el. Ve.,CAC:\ M(024 Utility: P Address: k54st4 %Lk) GAr ten Dtz... City: 71.0‘afd State: 0 County: `s,X)Okbr\ Zip: ci-1334 Phone: • ak.0 • c3c5cR Email:3e..y vncorc(1) Job Information System Size: Cfk .°‘ Panel Type: \,(x(\NOt1ci Inverter Type: PtVS kicsocr (280/285/290/295) Racking/color: VAINY..._ t•g ::: aCk,..... Electrical upgrade: Ai V:t Sales Date: 19 1 2-6 Estimated Install Date: Ca1i5 ZO S.-- Structure Type: V—CA.VV‘..AA-n Within City Limits: Attic Space: Roof Type/Pitch: Rcr0.-v21mcauls--,% 'Pvr-en - La rnitcluia 14) 12_ Notes City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 15436 SW GREENFIELD DR, TIGARD, OR, 97224 Record Type: Record ID: Residential - Master Permit MST2018-00190 Inspection Type: Inspector: 199 Electrical final Jeff Grove Result: PASS Comments: Violation Summary: Inspector Contractor City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 15436 SW GREENFIELD DR, TIGARD, OR, 97224 Record Type: Record ID: Residential - Master Permit MST2018-00190 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor