Loading...
Permit (238) CITY OF TIGARD REROOF PERMIT 1111: COMMUNITY DEVELOPMENT Permit#: RER2018-00022 l [GAR E) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/09/2018 Parcel: 2 S 103AA00101 Jurisdiction: Tigard Site address: 10865 SW WALNUT ST Project: Fowler Middle School Subdivision: None Lot: None Project Description: Reroof--remove and replace. Replacing wet insulation. Contractor: SNYDER ROOFING OF OREGON LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT PO BOX 23819 BY MAPLETHORPE, BONITA TIGARD, OR 97281 6960 SW SANDBURG ST TIGARD, OR 97223 PHONE: 503-620-5252 PHONE: FAX: 503-684-3310 FEES Description Date Amount Permit Fee 07/09/2018 $7,741.61 Specifics: 12%State Surcharge-Building 07/09/2018 $928.99 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Load: Stories: Height: 0 ft Project Valuation: $1,493,825.00 General Information Building Area: 0 Re-Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: Parapets: Total $8,670.60 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center hose rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1* 7 0' :00.332.2344. "141410 Issued By: Permittee Signature: Ayr Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion • he project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Re-Roof FOR OFFICE USE()NEN Received City of Tigard Permit No.: `J g Date/B : /t A•if /i ` .„At 1111 II 13125 SW Hall Blvd.,Tigard,OR 97 7j ti Plan Review ■- �1Other Permit: •Phone: 503.718.2439 Fax: 503.598. 9 v Date/B TI G A R D Inspection Line: 503.639.4175 Date Ready/By: See Page 2 for Internet: www.tigard-or.gov J U L 9 2018 Notified/Method: Supplemental Information TYPE ~$9' 1- UUGA D REQUIRED DATA:1-AND'2-FAMILY DWELLING ti ❑New construction ❑ Deemoh lohl- I .1.)-°�. Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Z Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. EI1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ElMulti-familyNumber of bedrooms: 0 Master builder ❑Other: Number of bathrooms: JOB SITE,INFORMATION AND LOCATION, Total number of floors: Job site address:10865 SW walnut St New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Fowler Middle School Covered porch area: square feet Cross street/directions to job site:SW Tiedman Ave&14th Tier Deck area: square feet Other structure area: square feet I REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WOR work indicated on this application. Re-condition existing roof by removing gravel Valuation: $1,493,825. Replace gravel same as Existing building area: 85500 square feet Remove replace wet insulation per plan New building area: square feet ❑ PROPERTY OWNER 0.TENANT" Number of stories: 2 Name:Tigard-Tualatin School District Type of construction: Roofing Address:6960 SW Sandberg St Occupancy groups: City/State/ZIP:Tigard,OR 97223 Existing: Phone:( ) Fax:( ) New: :. APPLICANT Y;.1,CONTACT PERSON , � � NOTICE Business name:Snyder Roofing All contractors and subcontractors are required to be Contact name:Dave Laton licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:12650 SW Hall Blvd jurisdiction in which work is being performed.If the City/State/ZIP:Tigard,OR 97223 applicant is exempt from licensing,the following reasons apply: Phone:(503)307-4137 Fax: :( ) E-mail:dlayton@snyder-builds.com CONTRACTOR , Business name:Snyder Roofing BUILDING PERMIT FEES* Address:12650 SW Hall Blvd (Please refer to feeschedule) Structural plan review fee(or deposit): City/State/ZIP:Tigard,OR 97223 Phone:(503)620-5252 Fax:( ) FLS plan review fee(if applicable): CCB lie.:135987 Allit, Total fees due upon application: / Amount received: Authorized signature:�" This permit application expires if a permit is not obtained � within 180 days after it has been accepted as complete. Print name:Dave Layton Date: 7/1!l/ * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\ROOF-PermitApp.doc 10/01/09 440-4613T(11/02/COM/WEB) City of Tigard: Re-Roofing Permit Checklist Page 2 -Supplemental Information ...0 F k y:0 0 rkI ❑ REPAIR(major)plan review required by plans examiner: building permit is required when structural changes are made or the space sheathing is removed or replaced. SUBMIT TWO (2) SETS OF PLANS SPECIFYING: A. Roof area and nearest street. B. Attic vents: Provide 1 sq. ft. for each 150 sq. ft. of attic space. Vents shall be located in the upper 1/3 of the roof Provide 1 sq. ft. for each 300 sq. ft. when eave and attic venting is provided. Note: No permit is required for residential re-roof if not more than two (2) layers of roofing will exist upon completion of the re-roofing. d:'' r. .'fix .,fi€ ✓C H "a'.". aw. ..ri , ,ti.. ..lbti -k,c ,". ,.'.2 ....,,. .. _ .>,.. ^,a=`. 4$, s, 'q ® RE-ROOF: Pre-inspection is required for all roofs sloped 2:12 and less. Please make an appointment by calling the Building Division at 503.718.2439. ❑ PLAN REVIEW: Note: Depending on the conditions noted at the pre-inspection,plans may be required to address any non conformm t items a t Sri t .f t � a� �� t'k x z ,z.. r � �r .u^`„, s:. ,r.Xy,,� . k vu=.,��.F a<�,�.A s b �.., tix." .;,s: ,>:k,. 7 �gig n�t�., o#,t.2 ,r ` .'�i ieg VALUATION OF PROJECT: $ 1,493,825. sq.ft. 85500 of roof area Permit Fee based on valuation: $ (see Building Permit Fees chart) 12% State Surcharge: $ 65% Plan Review Fee: $ (Required for major repairs of residential and special purpose roofing of commercial projects.) TOTAL: $ C:\Users\sElvig\AppData\Local\Microsoft\Windows\Temporary Internet Filq\Content.Outlook\ZAAIO2FO\ROOF PermitApp.doc