Permit (238) CITY OF TIGARD REROOF PERMIT
1111: COMMUNITY DEVELOPMENT Permit#: RER2018-00022
l [GAR E) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/09/2018
Parcel: 2 S 103AA00101
Jurisdiction: Tigard
Site address: 10865 SW WALNUT ST
Project: Fowler Middle School Subdivision: None Lot: None
Project Description: Reroof--remove and replace. Replacing wet insulation.
Contractor: SNYDER ROOFING OF OREGON LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT
PO BOX 23819 BY MAPLETHORPE, BONITA
TIGARD, OR 97281 6960 SW SANDBURG ST
TIGARD, OR 97223
PHONE: 503-620-5252 PHONE:
FAX: 503-684-3310
FEES
Description Date Amount
Permit Fee 07/09/2018 $7,741.61
Specifics: 12%State Surcharge-Building 07/09/2018 $928.99
Type of Use: COM
Class of Work: ALT Type of Const:
Occupancy Load:
Stories: Height: 0 ft
Project Valuation: $1,493,825.00
General Information
Building Area: 0
Re-Roof Area: 0
Roof Class:
Tear Off:
Overlay:
Existing Roof Layers:
Parapets:
Total $8,670.60
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center hose rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1* 7 0' :00.332.2344.
"141410
Issued By: Permittee Signature:
Ayr
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion • he project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Re-Roof FOR OFFICE USE()NEN
Received
City of Tigard Permit No.:
`J g Date/B : /t A•if /i ` .„At
1111 II 13125 SW Hall Blvd.,Tigard,OR 97 7j ti Plan Review
■- �1Other Permit:
•Phone: 503.718.2439 Fax: 503.598. 9 v Date/B
TI G A R D Inspection Line: 503.639.4175 Date Ready/By: See Page 2 for
Internet: www.tigard-or.gov J U L 9 2018 Notified/Method: Supplemental Information
TYPE ~$9'
1- UUGA D REQUIRED DATA:1-AND'2-FAMILY DWELLING
ti
❑New construction ❑
Deemoh lohl- I .1.)-°�. Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Z Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
EI1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building ElMulti-familyNumber of bedrooms:
0 Master builder ❑Other: Number of bathrooms:
JOB SITE,INFORMATION AND LOCATION, Total number of floors:
Job site address:10865 SW walnut St New dwelling area: square feet
City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Fowler Middle School Covered porch area: square feet
Cross street/directions to job site:SW Tiedman Ave&14th Tier Deck area: square feet
Other structure area: square feet
I REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WOR work indicated on this application.
Re-condition existing roof by removing gravel Valuation: $1,493,825.
Replace gravel same as Existing building area: 85500 square feet
Remove replace wet insulation per plan New building area: square feet
❑ PROPERTY OWNER 0.TENANT" Number of stories: 2
Name:Tigard-Tualatin School District Type of construction: Roofing
Address:6960 SW Sandberg St Occupancy groups:
City/State/ZIP:Tigard,OR 97223 Existing:
Phone:( ) Fax:( ) New:
:. APPLICANT Y;.1,CONTACT PERSON
, � � NOTICE
Business name:Snyder Roofing All contractors and subcontractors are required to be
Contact name:Dave Laton licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be licensed in the
Address:12650 SW Hall Blvd jurisdiction in which work is being performed.If the
City/State/ZIP:Tigard,OR 97223 applicant is exempt from licensing,the following reasons
apply:
Phone:(503)307-4137 Fax: :( )
E-mail:dlayton@snyder-builds.com
CONTRACTOR ,
Business name:Snyder Roofing BUILDING PERMIT FEES*
Address:12650 SW Hall Blvd (Please refer to feeschedule)
Structural plan review fee(or deposit):
City/State/ZIP:Tigard,OR 97223
Phone:(503)620-5252 Fax:( ) FLS plan review fee(if applicable):
CCB lie.:135987 Allit, Total fees due upon application:
/ Amount received:
Authorized signature:�" This permit application expires if a permit is not obtained
� within 180 days after it has been accepted as complete.
Print name:Dave Layton Date: 7/1!l/ * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\ROOF-PermitApp.doc 10/01/09 440-4613T(11/02/COM/WEB)
City of Tigard: Re-Roofing Permit Checklist
Page 2 -Supplemental Information
...0 F k y:0 0 rkI
❑ REPAIR(major)plan review required by plans examiner:
building permit is required when structural changes are made or the space sheathing is
removed or replaced.
SUBMIT TWO (2) SETS OF PLANS SPECIFYING:
A. Roof area and nearest street.
B. Attic vents: Provide 1 sq. ft. for each 150 sq. ft. of attic space. Vents shall be
located in the upper 1/3 of the roof Provide 1 sq. ft. for each 300 sq. ft. when
eave and attic venting is provided.
Note: No permit is required for residential re-roof if not more than two (2) layers of
roofing will exist upon completion of the re-roofing.
d:'' r. .'fix .,fi€ ✓C H "a'.". aw. ..ri , ,ti.. ..lbti -k,c ,". ,.'.2 ....,,. .. _ .>,.. ^,a=`. 4$, s, 'q
® RE-ROOF: Pre-inspection is required for all roofs sloped 2:12 and less. Please make
an appointment by calling the Building Division at 503.718.2439.
❑ PLAN REVIEW:
Note: Depending on the conditions noted at the pre-inspection,plans may be required
to address any non conformm t items
a t Sri t .f t � a� �� t'k x z ,z.. r � �r .u^`„, s:.
,r.Xy,,� . k vu=.,��.F a<�,�.A s b �.., tix." .;,s: ,>:k,. 7 �gig n�t�., o#,t.2 ,r ` .'�i ieg
VALUATION OF PROJECT: $ 1,493,825.
sq.ft. 85500 of roof area
Permit Fee based on valuation: $
(see Building Permit Fees chart)
12% State Surcharge: $
65% Plan Review Fee: $
(Required for major repairs of residential and
special purpose roofing of commercial projects.)
TOTAL: $
C:\Users\sElvig\AppData\Local\Microsoft\Windows\Temporary Internet Filq\Content.Outlook\ZAAIO2FO\ROOF PermitApp.doc