Loading...
Report (89) s'\ • Generated by COMcheck-Web Software Envelope Compliance Certificate Section 1: Project Information Energy Code:2009 IECC Project Title: River Terrace Swim Center Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Tigard,Oregon Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 2% Building Use:Activity Type(s) Floor Area 1-Club Room,Managers Office,Restrooms,Exercise Room 2581 (Exercise Center):Nonresidential Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSES Design 1%better than code. Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factor(a) Perimeter Roof:Attic Roof,Wood Joists,[Bldg.Use 1 -Club Room,Managers 2581 49.0 0.0 0.021 0.027 Office,Restrooms,Exercise Room] Roof:Attic Roof,Wood Joists,[Bldg.Use 1 -Club Room,Managers 2581 49.0 0.0 0.021 0.027 Office,Restrooms,Exercise Room] Ext.Wall:Wood-Framed,16in.o.c.,[Bldg.Use 1-Club Room, 25810 21.0 0.0 0.062 0.064 Managers Office,Restrooms,Exercise Room] Window:Vinyl Frame,Pert.Specs.:Product ID 5320 LoE(Fixed), 4 -- --- 0.350 0.350 SHGC 0.40,[Bldg.Use 1-Club Room,Managers Office, Restrooms,Exercise Room](b) Window:Vinyl Frame,Pert.Specs.:Product ID 5320 LoE(Fixed), 8 -- — 0.350 0.350 SHGC 0.40,[Bldg.Use 1 -Club Room,Managers Office, Restrooms,Exercise Room](b) Window:Vinyl Frame,Pert.Specs.:Product ID 5320 LoE(Fixed), 120 -- -- 0.350 0.350 SHGC 0.40,[Bldg.Use 1 -Club Room,Managers Office, Restrooms,Exercise Room](b) Window:Vinyl Frame,Pert.Specs.:Product ID 5320 LoE(Fixed), 18 -- -- 0.350 0.350 SHGC 0.40,[Bldg.Use 1 -Club Room,Managers Office, Restrooms,Exercise Room](b) Window:Vinyl Frame,Pert.Specs.:Product ID 5220 Argon/LoE 112 -- --- 0.350 0.350 Slider,SHGC 0.40,[Bldg.Use 1 -Club Room,Managers Office, Restrooms,Exercise Room](b) Window:Vinyl Frame,Pert.Specs.:Product ID 5220 Argon/LoE 48 -- -- 0.350 0.350 Slider,SHGC 0.40,[Bldg.Use 1-Club Room,Managers Office, Restrooms,Exercise Room](b) Door:,Pert.Specs.:Product ID Glazed Doors,SHGC 0.70,[Bldg. 120 --- -- 0.350 0.350 Use 1 -Club Room,Managers Office,Restrooms,Exercise Room](b) Floor:Unheated Slab-On-Grade,[Bldg.Use 1 -Club Room, 271 --- -- Managers Office,Restrooms,Exercise Room] (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Project Title: River Terrace Swim Center Report date: 03/01/16 Data filename: Page 1 of 7 Air Leakage, Component Certification, and Vapor Retarder Requirements: ❑ 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. ❑ 2. Windows,doors,and skylights certified as meeting leakage requirements. ❑ 3. Component R-values&U-factors labeled as certified. ❑ 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. ❑ 5. 'Other'components have supporting documentation for proposed U-Factors. ❑ 6. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. ❑ 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ❑ 8. Cargo doors and loading dock doors are weather sealed. ❑ 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk. ❑ 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: ❑ Building entrances with revolving doors. ❑ Doors not intended to be used as a building entrance. Li Doors that open directly from a space less than 3000 sq.ft.in area. ❑ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. ❑ Doors opening directly from a sleeping/dwelling unit. Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. David R Burnett David Burnett - Project Arch. DavidR.0urnett :30 5-4-16 -07'00' Name-Title Signature Date Project Notes: Construction of a wood framed building containing Type A,B and S occupancies. Project Title: River Terrace Swim Center Report date: 03/01/16 Data filename: Page 2 of 7