Report (47) "r-3r s\r`•..) -C-3,AC2-\( "C\C-N _
ac s %iiia;
COMcheck Software Version 4.0.8.1
Exterior Lighting Com piianco
Certificate
Section 1: Project Information
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title: Durham Square-Building 2
Project Type: New Construction
Exterior Lighting Zone: 2(Neighborhood business district)
Construction Site: Owner/Agent: Designer/Contractor:
7560 SW Durham Road Zach Byers
Tigard,OR 97221 Frahler Electric
11860 Southwest Greenburg Rd.
Tigard,OR 97223
503-639-4627
zbyers@frahlerelectric.com
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D E F
Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed
Watts Wattage Watts Watts
/Unit (B x C)
Parking(Parking area) 26789 ft2 0.06 Yes 1607 361
Total Tradable Watts*. 1607 361
Total Allowed Watts= 1607
Total Allowed Supplemental Watts**. 600
*Wattage tradeoffs are only allowed between tradable areas/surfaces.
**A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Parking(Parking area 26789 ft2):Tradable Wattage
LED 1:BL/BR:Pole Mtd LED Luminaire:Other: 2 2 73 146
LED 2:C:LED Wallpack:Other: 1 5 43 215
Total Tradable Proposed Watts= 361
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Controls, Switching, and Wiring:
• 1. Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that
will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected.
Plans reference page/section: N/A
Exterior Lighting Restrictions and Exceptions:
✓ 2. Mercury vapor and incandescent lighting is not permitted for use as exterior lighting.
✓ 3. Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are identified in
Section 3 table above.
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 4 of 5
Plans reference page/section: N/A
Section 5: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon
Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.8.1 and to comply with the mandatory requirements in the
Requirements Checklist.
Zach Byers, Estimator/Project Manager � �/� 04/04/18
Name-Title Signature Date
Project Title: Durham Square-Building 2 Report date: 04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 5 of 5
COMcheck Software Version 4.0.8.1 'as'
Interior Lighting Compliance
Certificate
Section 1: Project Information
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title: Durham Square-Building 2
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
7560 SW Durham Road Zach Byers
Tigard,OR 97221 Frahler Electric
11860 Southwest Greenburg Rd.
Tigard,OR 97223
503-639-4627
zbyers@frahlerelectric.com
Section 2: Interior Lighting and Power Calculation
A B C D
Floor Area Allowed Allowed Watts
Watts/ft2
Core and Shell Space for future tenants(Office) 9956 0.91 9060
Total Allowed Watts= 9060
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Core and Shell Space for future tenants(Office 9956 sq.ft.)
Linear Fluorescent 1:A:Chain Hung Strip:48"18 32W:Electronic: 2 1 64 64
Total Proposed Watts= 64
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Lighting Wattage:
• 1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Wattage:9060 Proposed Wattage:64
Complies:YES
Mandatory Requirements:
✓ 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side.
Plans reference page/section: Luminaire Schedule-E0.1
• 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting
in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic
daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control,
while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a
single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east,
south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration.
Plans reference page/section: N/A
✓ 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and
each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are
a remote switch that identifies the lights served and indicates their status.
Project Title: Durham Square-Building 2 Report date: 04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 1 of 5
Plans reference page/section: N/A
✓ 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room.
Plans reference page/section: N/A
✓ 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during
periods that the building space served by the means of egress is unoccupied.
Plans reference page/section: E2.1
✓ 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of
Sections 505.2.2.1 and 505.2.2.2.
Plans reference page/section: N/A
✓ 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least
50 percent by either
1)controlling(dimming or multi-level switching)all luminaires;or
2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or
3)switching the middle lamp luminaires independently of other lamps;or
4)switching each luminaire or each lamp.
Exception applies:Only one luminaire in space.
Plans reference page/section:
✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic
control device shall function on either:
1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not
exceed 10,000 square feet and are not more than one floor;or
2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or
3)a signal from another control or alarm system that indicates the area is unoccupied.
Plans reference page/section:2/E2.1
✓ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation.
Plans reference page/section: N/A
✓ 11 An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space.
Plans reference page/section:N/A
✓ 12Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a
space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and
supply rooms up to 1000 square feet.
Plans reference page/section: N/A
✓ 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device
that: 1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or
so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an
override is initiated,and 5)controls an area not exceeding 2,000 square feet.
Plans reference page/section: E2.1
✓ 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature
that turns off all loads for at least 24 hours,then resumes the normally scheduled operation.
Plans reference page/section: N/A
✓ 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a
photosensor and a time switch,or an astronomical time switch. Lighting designated for dusk-to-dawn operation shall be controlled by
an astronomical time switch or photosensor.
Plans reference page/section:2/E2.1
✓ 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired:
1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet
center-to-center of each other.
2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted
within 1 foot edge-to-edge of each other.
Plans reference page/section: N/A
✓ 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control
of the nonexempt lighting.
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 2 of 5
Plans reference page/section: N/A
18.Each dwelling unit in a building is metered separately.
Plans reference page/section: N/A
Interior Lighting PASSES:Design 99%better than code.
Section 5: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 4.0.8.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Zach Byers, Estimator/Project Manager -/I d c-rS 04/04/18
Name-Title Signature Date
Project Title: Durham Square-Building 2 Report date: 04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 3 of 5
rod
r'
frAl d's COMcheck Software Version 4.0.8.1
C
Interior Lighting Compliancer� =�
Certificate R' 7�>
Section 1: Project Information
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title: Durham Square-Building 2
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
7560 SW Durham Road Zach Byers
Tigard,OR 97221 Frahler Electric
11860 Southwest Greenburg Rd.
Tigard,OR 97223
503-639-4627
zbyers@frahlerelectric.com
Section 2: Interior Lighting and Power Calculation
A B C D
Floor Area Allowed Allowed Watts
Watts/ft2
Core and Shell Space for future tenants(Office) 9956 0.91 9060
Total Allowed Watts= 9060
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Core and Shell Space for future tenants(Office 9956 sq.ft.)
Linear Fluorescent 1:A:Chain Hung Strip:48"T8 32W:Electronic: 2 1 64 64
Total Proposed Watts= 64
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Lighting Wattage:
• 1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Wattage:9060 Proposed Wattage:64
Complies:YES
Mandatory Requirements:
• 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side.
Plans reference page/section:Luminaire Schedule-EO.1
• 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting
in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic
daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control,
while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a
single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east,
south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration.
Plans reference page/section: N/A
• 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and
each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are
a remote switch that identifies the lights served and indicates their status.
Project Title: Durham Square-Building 2 Report date: 04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 1 of 5
Plans reference page/section: N/A
✓ 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room.
Plans reference page/section: N/A
✓ 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during
periods that the building space served by the means of egress is unoccupied.
Plans reference page/section: E2.1
✓ 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of
Sections 505.2.2.1 and 505.2.2.2.
Plans reference page/section: N/A
✓ 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least
50 percent by either
1)controlling(dimming or multi-level switching)all luminaires;or
2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or
3)switching the middle lamp luminaires independently of other lamps;or
4)switching each luminaire or each lamp.
Exception applies:Only one luminaire in space.
Plans reference page/section:
✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic
control device shall function on either:
1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not
exceed 10,000 square feet and are not more than one floor;or
2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or
3)a signal from another control or alarm system that indicates the area is unoccupied.
Plans reference page/section:2/E2.1
✓ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation.
Plans reference page/section: N/A
✓ 11 An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space.
Plans reference page/section:N/A
✓ 12Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a
space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and
supply rooms up to 1000 square feet.
Plans reference page/section: N/A
✓ 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device
that:1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or
so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an
override is initiated,and 5)controls an area not exceeding 2,000 square feet.
Plans reference page/section: E2.1
✓ 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature
that turns off all loads for at least 24 hours,then resumes the normally scheduled operation.
Plans reference page/section: N/A
✓ 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a
photosensor and a time switch,or an astronomical time switch. Lighting designated for dusk-to-dawn operation shall be controlled by
an astronomical time switch or photosensor.
Plans reference page/section:2/E2.1
✓ 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired:
1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet
center-to-center of each other.
2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted
within 1 foot edge-to-edge of each other.
Plans reference page/section: N/A
17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control
of the nonexempt lighting.
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 2 of 5
Plans reference page/section: N/A
18.Each dwelling unit in a building is metered separately.
Plans reference page/section: N/A
Interior Lighting PASSES:Design 99%better than code.
Section 5: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 4.0.8.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Zach Byers, Estimator/Project Manager G `AA- j 04/04/18
Name-Title Signature ✓ Date
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF1379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 3 of 5
1111111111111 COMcheck Software Version 4.0.8.1
Exterior Lighting Compliance
Certificate
Section 1: Project Information
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title: Durham Square-Building 2
Project Type: New Construction
Exterior Lighting Zone: 2 (Neighborhood business district)
Construction Site: Owner/Agent: Designer/Contractor:
7560 SW Durham Road Zach Byers
Tigard,OR 97221 Frahler Electric
11860 Southwest Greenburg Rd.
Tigard,OR 97223
503-639-4627
zbyers@frahlerelectric.com
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D E F
Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed
Watts Wattage Watts Watts
/Unit (B x C)
Parking(Parking area) 26789 ft2 0.06 Yes 1607 361
Total Tradable Watts*= 1607 361
Total Allowed Watts= 1607
Total Allowed Supplemental Watts**= 600
*Wattage tradeoffs are only allowed between tradable areas/surfaces.
**A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Parking(Parking area 26789 ft2):Tradable Wattage
LED 1:BL/BR:Pole Mtd LED Luminaire:Other: 2 2 73 146
LED 2:C:LED Wallpack:Other: 1 5 43 215
Total Tradable Proposed Watts= 361
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Controls, Switching, and Wiring:
• 1. Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that
will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected.
Plans reference page/section: N/A
Exterior Lighting Restrictions and Exceptions:
• 2. Mercury vapor and incandescent lighting is not permitted for use as exterior lighting.
• 3. Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are identified in
Section 3 table above.
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 4 of 5
. s
Plans reference page/section: N/A
Section 5: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon
Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.8.1 and to comply with the mandatory requirements in the
Requirements Checklist.
Zach Byers, Estimator/Project Manager 2 %'.. ,yam,&.(j 04/04/18
Name-Title Signature / Date
Project Title: Durham Square-Building 2 Report date:04/03/18
Data filename:W:\WF\379_Frahler Electric\006_Durham Square\002_Building 2 Electrical\COR\Durham Square BLDG 2 Lighting Code Forms
04-03-18.cck Page 5 of 5