Permit (32) CITY OF TIGARD BUILDING PERMIT
ilil '�
2 .' COMMUNITY DEVELOPMENT Permit#: BUP2018-00170
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/20/2018
1 fa t1 D Parcel: 1 S 135BA00100
Jurisdiction: Tigard
Site address: 10145 SW WASHINGTON SQUARE RD
Project: Jaguar Land Rover Subdivision: None Lot: None
Project Description: Demolition of a 7,477 sq.ft.commercial building for construction of a new Jaguar Land Rover car dealership.
Contractor: PERLO CONSTRUCTION LLC Owner: PPR SQUARE TOO LLC
16101 SW 72ND AVE SUITE 200 PO BOX 847
TIGARD, OR 97224 CARLSBAD, CA 92018
PHONE: 503-624-2090 PHONE:
FAX: 503-639-4134
Specifics: FEES
Description Date Amount
Type of Use: COM DC Provision Review,COM TI-Ping 06/20/2018 $91.00
Class of Work: DEM Type of Const:
Occupancy Grp: Occupancy Load: Permit Fee-Additions,Alterations, 06/20/2018 $804.75
Demolition
Dwelling Units: 0 Erosion Control w/Development 06/20/2018 $161.40
Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 06/20/2018 $2.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $60,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,059.15
Required: Required Items and Reports(Conditions)
1 Ersn Cntrl 503-639-4175
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of r - • .irect questions to OUNC by call' 03.232.1987 or 1.800.332.2344.
Issued By: ' verminee`Signature: /.,,
all 1 .639.4175 by 7:00 a.m.for the next available i, pectio date.
This permit card shall be kept in a conspicuous place on the job si until com letion of the project.
Approved plans are required on the job site at the ti e of each ins.ection.
' Buiidin2 Permit Application
Commercial ,C lei ma OFFICE USE ONLY
" City of Tigard Received
`,1 t� Permit No.:
Date/BY: AO 8u/"poi et)) )U
13125 SW Hall Blvd.,Tigard,OR 97223 MAY 2 2 201: Plan Revie r
Phone: 503.718.2439 Fax: 503.598.1960 Date/By: -Zc-/C...- Other Permit:
T I G A R D Inspection Line: 503.639.4175 `i TT' Ready/By: j 7uris: ® See Page 2 for
Internet: www.ti and-or. ov 'I�� ��� ��ifed/Method: f/
g g � /f/��•�6' Supplemental Information
BUILDING DIVI I 1 ... :. , C..
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ®Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master
builder 0 Other: Number of bathrooms:
/0/9.5* JOB SITEINFORMATION AND LOCATION Total number of floors:
Job site address^1OT2 SW Washington Square Road New dwelling area: square feet
City/State/ZIP:Tigard Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Jaguar Land Rover Covered porch area: square feet
Cross street/directions to job site:West of Greenburg,north of I 405 Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: 100 Permit fees*are based on the value of the work performed.
Tax map/parcel no.:1S1 35 BA Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Demolition of existing commercial building Valuation: $$60,000.00
Existing building area: IAS') square feet
New building area: square feet
® PROPERTY OWNER 0 TENANT Number of stories:
Name:PPR Square Too,LLC Type of construction:
Address:11411 N Tatum Blvd Occupancy groups:
City/State/ZIP:Phoenix,AZ 85028 Existing:
Phone:( ) Fax:( )
New:
® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name:Mildren Design Group (Please refer to fee schedule)
Structural plan review fee(or deposit):
Contact name:Curt Trolan
FLS plan review fee(if applicable):
Address:7650 SW Beveland St,Ste 120
Total fees due upon application:
City/State/ZIP:Tigard,Oregon 97223
Phone:(503)244-0552 Fax: :( )
Amount received:
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail:curt@mdgpc.com
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Perlo Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:16101 SW 72nd Ave,Ste 200 Solar Installation Specialty Code checklist.
City/State/ZIP:Tigard,Oregon 97223 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)624-2090 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:189245
%� Total fee due upon application: $201.60
Authorized signature: / �' This permit application expires if a permit is not obtained
v within 180 days after it has been accepted as complete.
Print name:Curt Trolan Date:4/2/2018 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-46131(11/02/COM/WEB)
Agnes Lindor
From: Agnes Lindor
Sent: Wednesday,June 6, 2018 12:10 PM
To: 'curt@mdgpc.com'
Subject: BUP2018-00170 Demo
Hi Curt-
You permit has been approved but is not being released until engineering receives an erosion control plan.Your permit
is placed on hold until we receive this information.Thanks,
Agnes Lindor I Associate Planner
City of Tigard I Community Development
13125 SW Hall Boulevard
Tigard, Oregon 97223
Phone: 503.718.2429
Email: AgnesL@tigard-or.gov
1
City of Tigard
v COMMUNITY DEVELOPMENT DEPARTMENT
111111I
T 1 G A R D Building Permit Review — Commercial - With Land U s e
Building Permit #: 6.4p;701 S----00 j 7i)
Site Address: Jo jL7I c— ,c)0 l 17,g dt,k freC,Q Suite/Bldg#:
Project Name: 02-r- A i. %;
(Nam,erfommercial business occupying the space. If vacant,enter Spec Space.)
Planning Review 1
Proposal: il?6 C��16 cfr;' M (? w,t Pr-c°r v/(i/t fn
v J
Verify site address/suite# exists and active in permit system
k , er Terrace Neighborhood: ❑ Yes No
II and Use Case#: cJ ) p Q 1.. - -- if) z.);.c---
i Plan atch Approved Land Use: {_
Site Plan randscape Plan '7I•Ker:
\urban Forestry Plan 1 Vevation Plan
luilding Height: Maximum Height Actual Height
01
onditions Met:
❑ Prior to Submittal ❑ Prior to Permit Issuance
usiness Lice e:
•sts: Yes ❑ No,applicant notified to obtain business license
Public Facilitie mprovement (PFI) Permit: Pim7y2O/ _00/66
Required: Yes,applicant was notified A No A
pplied For: Yes ❑ No, to
intake
. /
Notes: ,;1•• d2/' /- i (\Zi r Gj
e i .-) P it)
!,:t—
iiii , Ayr's , r)`h r- pe1-J-- i /,'
Approved by Planning: ..�= .4, _ Date: -CJe)
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 5/ -/t(
Site Plans: # /o
Building Plans: #
Building Permit#: nter building perm tt above.
Workflow Routing: Planning [ l-""Engineeringoordinator ❑ Building
Workflow Sign-off: pff for Planning(include notes from planning review)
Route Application Documents: ea.-1—',uilding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: / e,rki /J/i
By Permit Technician: � Date: �y '"
s �
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 060116.docx
Engineering Review
❑ Slope at building pad:
"` ❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: 111Yes ❑ No
LIDA Facility on lot: El Yes El No
O NOT Approved by Engineering: Date y
Notes: I7 Qt o4 lifc94. -- i I^ti7? L� 11/d7`7ZG.1 Ct • Z C7L-
0iK.O /
Approved by Engineering: 44 Ilea_. 14..y , Date: /j 6 I48
Revisions (after Building Submittal only) Reviewer _?ilDate
Revision 1: "Approved ❑ Not Approved j ( • 3 Cj t�' It)
It Revision 2: 0 Approved ❑ Not Approved ,'PAS-10104l
�
Revision 3: 0 Approved ❑ Not Approved
Permit Coordinator Review
Conditions "Met"prior to issuance of building permit
t Approved,NOT Released: p ,--�& — -al Date: (o 1 to (v£,
Notes: it1 la3ack I-9)0VA-- YtafJVlil . 0-Pl'`l -treepv 1cc n6+- 1 vaevzet ?crd'W.
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
aSDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N N/A
Tigard Trans SDC: El Yes CiEr N/A
Parks SDC: ❑ Yes N/A
, K to Issue Permit 4-/ 9/2fi
Approved by Permit Coordinator: v Date: Ce L$
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 070915.docx