Loading...
Report CYC-) \�� . L : k5ki, . RECEIVED MAY 2 2 2018 CERTIFICATE OF ABATEMENT COMPLETION CITY OF TIGARD RUIL.L WG DJVIS-ON Project Nam io� O Project No.: Cs 3 if Address: Sck& A-A-g1E2v,.Selt-y fC V.dinic, Owner Project No.: Space No.: c_C p02._. //tt Certificate No.: Contractor: eq., - Date of Issuance: 51'2-- Time f .Time of Issuance: (PIP O r Consultant: c c.1C4l.�k�3cac,.c Based on on-site observations and Project data,the following materials have been abated(List materials with quantity and location per space): Lr R,vo MAST, c (I B7 SF) The following known ACM materials are still in place(List materials with quantity and location. If none,state so): l�J*vtr It has been determined to the best of the Environmental Consultant's knowledge,information and belief to be substantially complete gp in accordance with the Scope of work and Specifications, including Clearance Testing analysis that documents that airborne fiber concentrations for the Work Area are within the guidelines established by the Environmental Protection Agency (EPA) for reoccupation(by unprotected personnel)of an area that has undergone asbestos-abatement, and that all Asbestos-Containing Waste Materials have been removed from the project area. As of the Date of Issuance of this Certificate, Contractor may proceed with replacement material Work when included in the Contract,and/or all field close-out activities,as required. • ,21(r C/7.- 1/c? Environmental Consultant's Title/Certification No. Date Representative The undersigned Contractor certifies to the best of the Contractor's knowledge,information and belief,that Work identified above has been completed in accordance with the Contract Documents. itbtk\ (pee?, `mac-tpet Contractor's Representative Title Date 01/26/10 c