Loading...
Report 4/Sr/e2/9- qc Portland,Oregon visTA Kansas City, Missoun f40" —STRUCTURAL June 19,2018 RECEIVED JUN 2 2 2018 Sage Built Homes, LLC 1815 SW 169'Place,Suite 1040 CITY OF TIGARD Beaverton,Oregon 97006 BUILDING DIVISIONJ Re: Lot 1,Ash Creek, Plan 2098 Vista Structural Engineering,LLC,was asked to address the following field revisions for the above referenced project. 1. Issue:All 31.°floor I-joist hangers were installed as top-flange hangers,nailed only at the top flange and not nailed through the side holes of the hangers. The hangers are manufactured by USP Connectors, Model#TI-10 17118. Response: The floor joists in question do not require uplift resistance at the ends, per the city-approved calculation package. Per USP's design documentation, not installing limits the uplift resistance to 85 pounds at each end of the joist;with no design uplift,the joist installation without nails into the joist meets all minimum design requirements. Our firm recommends approval of the joist hangers as they are currently installed, without nails into the joists. Our firm appreciates the opportunity to serve you. If you have any questions or if you need anything further, please feel free to contact us. Sincerely, Vista Structural Engineering,LLC Dennis Heier, P.E. çt.. PRopo oNeo irk 43) 01, 4,3 85273 CC tir *,u 31,e 9/2018 EXPIRES:8/30/20a VISTA STRUCTURAL ENGINEERING/ LLC 14718 NW DELIA STREET PHONE: 971.645,0901 PORTLAND, OREGON 97229 - 1 - VISTASTRUCTURAL.COM