Permit (270) 14 CITY OF TIGARD BUILDING PERMIT
_ COMMUNITY DEVELOPMENT Permit#: BUP2014-00007
T l G A R O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/10/2014
Parcel: 2S115BA00102
Jurisdiction: Tigard
Site address: 16200 SW PACIFIC HWY P
Project: McDonald's Subdivision: DOVER LANDING Lot: B,WILLI
Project Description: Upgrade exterior of building,add 27 sq ft to drive-thru window area.
Contractor: RICH DUNCAN CONSTRUCTION INC Owner: ARCHLAND PROPERTY I LLC
200 HAWTHORNE AVE SE A130 BY DOUBLE K VENTURES INC
SALEM, OR 97301 8255 SW HUNZIKER ST#101
TIGARD, OR 97223
PHONE: 503-390-4999 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/14/2014 $1,287.15
Demolition
Occupancy Grp: A-2 Occupancy Load: 12%State Surcharge-Building 01/14/2014 $154.46
Dwelling Units: 0 Plan Review 01/14/2014 $836.65
Stories: 1 Height: 0 ft Plan Review-Fire Life Safety 01/14/2014 $514.86
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 02/10/2014 $174.00
Value: $130,000 DC Provision Review,COM TI-LRP 02/10/2014 $26.00
Info Process/Archiving-Lg$2.00(over 02/10/2014 $112.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 02/10/2014 $15.00
11x17)
Total Area: 0 Metro Const.Excise Tax-Commercial 02/10/2014 $156.00
Accessory Struct: 0 Use
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $3,276.12
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATT • _ • Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001 •010 through 0'- 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issue By: ,i / • Permittee Signature: y
Call 503.639.4175 by 7:00 a.m.for the next available Inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial RECEIVED FOR OFFICE USE ONLYIt of Ti and Received
-
City Tigard / _ __�
Permit No.: . /� ..,oce '7
13125 SW Hall Blvd.,Tigard,OR 97223�q N 1 2014 Plan Review /
Phone: 503.718.2439 Fax: 503.598.1960 Date/B : Other Permit: 6.n 5O/ —40 00 f
TI G A R D Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: Juris: ® See Page 2 for
Internet: www.tigard-or.gov Notified/Method: Supplemental Information
13UI1.DIIUr Dnc[014'1
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ I-and 2-family dwelling Valuation: $
®Commercial/industrial
❑Accessory building ❑Multi-family Number of bedrooms: V
❑Master builder El Other: Number of bathrooms: Z./
1P
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:16200 Southwest Pacific Highway New dwelling area: square feet 1��
City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: p Project name:McDonald's Covered porch area: square feet .
Cross street/directions to job site:SW Durham RD&SW Pacific HWY Deck area: square feet t
Other structure area: square feet M
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed. t
Tax map/parcel no.:25115BA00102 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
See Eer#ied e- Valuation: $260;990:00' I3 QOO
lk_i C�(1i��� x f/ZlG,2 Of "Bat
;4'7 ` , •- 4T U X21 Je..-77/1-4 (,tit xTho e) Existing building area: 4,910 square feet
4, New building area: 27 square feet
® PROPERTY OWNER I ❑ TENANT Number of stories: 1
Name:Jeff Chapman,McDonald's USA,LLC Type of construction: V-B
Address:12131 113th Avenue NE,#103 Occupancy groups:
City/State/ZIP:Kirkland,WA 98034 Existing: A2
Phone:(425)242-2421 Fax:(425)242-2498 New: No Change
❑ APPLICANT IN CONTACT PERSON BUILDING PERMIT FEES*
Business name: Freiheit&Ho Architects,Inc.,P.S.,P.C. (Please refer rofee schedule)
Structural plan review fee(or deposit):
Contact name:Derek Smith
FLS plan review fee(if applicable):
Address:5209 Lake Washington Blvd NE,Suite 200
Total fees due upon application:
City/State/ZIP:Kirkland,WA 98033
Phone:(425)827-2100 I Fax::(425)828-6899 Amount received:
E-mail:dsmith @FHOARCH.com
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: f +e k � U C'd ti`�7{ ttCT/C N f N� Submit two(2)sets of roof plan with connection details
1� � and fire department access,along with the 2010 Oregon
Address: l/ /Y-l4l c-mot A a�.c. /) 136 Solar Installation Specialty Code checklist.
City/State/ZIP: 1 9 N 02 4 7 3D4 Permit fee(includes plan review $18000
' 396- cigq.9 Fax:( ) and administrative fees):
Phone:(
1 � State surcharge(12%of permit fee): $21.60
CCB lie.: l5$330 044, Total fee due upon application: $201.60
Authorized signature: I/ C. �^,, This permit application expires if a permit is not obtained
-l�G�/t� within 180 days after it has been accepted as complete.
Print name: Oo% t. L- Sr NTH Date:1/8/2014 * Fee methodology set by Tri-County Building Industry
Service Board.
FIQ.pl NOT 4 I4 /04.4Idt1'V-GIs,IOC,f.).g.etc,.
I:1Building\PermitslBUP-COM PermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB)
+ I Building Permit Number: ku Pot/z/-OUOc 7
: . 7
UPI Building Permit Review e -
Commercial Projects with Approved Land Use
Sit ddress: i;ic7 ,00 U W 401)t 1'hvy , P
erify site address is valid.
Project Name : /14,,a,,„,46 /C eo%/
Planning Review n
Land Use Case Number: /V` AO 011)/3`j0 4�S
Plans Match Approved Land Use:
XSite Plan Landscape Plan r
❑ Urban Forestry Plan ❑ Elevation Plan �1 �'f�t/
X.Building Height: f' Maximum Height Actual Height
Conditions Met: ,4J, l.�dd 1 ❑ Prior to Permit Submittal ❑ Prior to Permit Issuance
Approved by: �(,� ( / } ,Q ^� J Date:
Notes: E/QV(A/r-i S4 t /off 0 —/Vc�f./ h eel D'� /i-ee/$O,( 1, h,►,, 4
SI eS XP 4,-C c1 D/,QL ill( /4,99/114( LA�•� 1'i€. `f'G pf# Qi rox.<,
Revisions (after Building Submittal only) eviewer Date
Revision 1 Approved 1=1 Z. Not Approved , /44—/e7
Revision 2 Approved Not Approved ❑ _3"f- 1t--N
Revision 3 Approved ❑ Not Approved ❑
Building Permit Submittal
Original Plan Submittal: Date: i/01.401 By: 8.
Site Plans: #
Building Plans: #
Create Case Record#: ❑ Enter case#above for Building Permit Number.
Workflow Routing: ❑ Planning ❑ Engineering ❑ Permit Coordinator ❑ Building
Workflow Sign-off: ❑ Sign-off for Planning staff,including notes from planning review(page 1)
Route Application Documents: ❑ Engineering: (1) copy of permit application, (1) site plan, (1) building plan and
original plan review routing form.
❑ Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Reviewed By: Date:
Notes:
I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_123013.docx
Engineering Review— reviewed by: Lac.. i
❑ Actual Slope:
❑ PFI Permit#
❑ Conditions Met
Notes:
Approved by: //t(. Date: i `1 /
pp :Y
Revisions (after Building Submittal only) Reviewer Date
Revision 1 Approved ❑ Not Approved ❑
Revision 2 Approved ❑ Not Approved ❑
Revision 3 Approved ❑ Not Approved ❑
Permit Coordinator onditions Met-Prior to Issuance of Building Permit
Notes:
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant
Revision Notice 3: Date Sent to Applic
i, � �y
Okay to Issue Permit- Date: 3
1 I:\Building\Forms\BldgPermitRvw COM_WithLandUse_1230I3.docx
1111 Building Division
■ ill
Accessibility: Barrier Removal Improvement Plan
TII.:\R1)
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering. [1] $ 200,000
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 50,000
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $ N/A
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL (shall equal line [2] of Valuation Computation): $
1:\Budding\Permits\BU P-COM PermitApp.doc 03/03/2011
RiFreihelt a Ho
architects
TRANSMITTAL VIA FEDEX
503-718-2421
DATE: JANUARY 9, 2014
RECEtVED
TO: City of Tigard JAN 1 3 2014
13125 SW Hall Blvd.
Tigard, OR 97223 CITY OF TIGARD
BUILDING DIVISION
ATTN: Permit Center
RE: McDonald's, Remodel
PROJECT NUMBER: Al2-402
WE ARE SENDING YOU:
1 — Building Permit Application - Commercial
1 — Building Permit Application — Site Work
4 — Sign Permit Application
2 — Sign Permit Drawings
1 — Sign Permit Intake Check ($712.00)
1 — Building Permit Intake Check ($3,710.59)
3 — Full Size Construction Drawings
2 — Structural Calculations (Building)
2 — Structural Calculations (DT Signage)
1 — ComCheck Form
THESE ARE TRANSMITTED:
FOR YOUR APPROVAL
FOR YOUR USE AND INFORMATION
AS REQUESTED
XX FOR REVIEW AND COMMENT
REMARKS:
Please e-mail a copy of the receipt to dsmith@FHOARCH.com. Thanks!
Sincerely,
FREIHEIT & HO ARCHITECTS, INC., P.S.
224.a4 C
Derek C. Smith
Architectural Designer
CC: File
(IF INFORMATION IS NOT RECEIVED AS INDICATED, KINDLY NOTIFY US AT ONCE.)
1-8-2014 - BUILDING PERMIT -TRANSMITTAL
TEL:425 827 2100 FAX.425 828 6899 WEB www.FHOARCH.COM ADDRESS 5209 Lake Washington Blvd N.E.i Ste 200 I Kirkland I WA 1 98033
RRRRRRRRRRRRFIRRItRfC INtIRfGfCRfC ARRRR1LfCftRftfCfCRRFCfCftrfiRifiA RRIVIIMtnitARftaiCRRRRR
RFCRRRRRRftRRRRRRRRRRRRRRRRRRRRRRRRRRRRRICRRRRPRRRRRRRRRRifiRRRRRRRRRRRRRR FREIHEIT B HO ARCHITECTS INC,PS
RRRftRIMARRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRftRRRRRRRRRIMRIVMMItRRRRR
M•MFreiheit & Ho
architects
TRANSMITTAL VIA FEDEX
503-718-2421
DATE: JANUARY 28, 2014 R ECEIVED
TO: City of Tigard
13125 SW Hall Blvd. SAN 2 9 204
Tigard, OR 97223 TIGARD
CITY OF
ATTN: Permit Center
RE: McDonald's, Remodel PLANNING/ENGINEERING
PROJECT NUMBER: Al2-402
WE ARE SENDING YOU:
3 — Full Size Construction Drawings (Sheets A2.0 & A2.1)
THESE ARE TRANSMITTED:
FOR YOUR APPROVAL
FOR YOUR USE AND INFORMATION
XX AS REQUESTED
FOR REVIEW AND COMMENT
REMARKS:
Sincerely,
FREIHEIT & HO ARCHITECTS, INC., P.S.
•
a. C .
Derek C. Smith
Architectural Designer
CC: File
(IF INFORMATION IS NOT RECEIVED AS INDICATED, KINDLY NOTIFY US AT ONCE)
1-28-2014 - BUILDING PERMIT COMMENTS - TRANSMITTAL
TEL 425 827 2100 FAX 425 828 6899 wE9.www.FHOARCH.CON ADDRESS 5209 Lake Washington Blvd N.E.I Ste 200 I Kirkland WA 1 98033
RRRfCftRftttitnattf ItctItitftftaftftRfCtfiftI C Ititat ftnitRRRf ttrtIlMftaftItI ItittCRMIMMItaftfCRRftftit C
P.RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR FREIHEIT fi HO ARCHITECTS INC.PS
RRftRRRRRRRtfiRftRRRRRRRRRftaftRRRRRftRRRRRRRRRRRRRRnaltIMRRRRRRRRRRRRRRRRRR
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
IN Transmittal Letter
i i ;,\I; I> 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: de4/k/ DATE RECEIV RILE'
DEPT: BUILDING DIVISION ' L
JAN 2 9 2014
FROM: ere-4( ,,S-r,, ,) CITY OF TIGARD
COMPANY: Fr; f i e_;+ Vt 11i, iir-aG.,j 7(s 1 .__ BUILDING DIVISION
PHONE: e 3-- -3 1 Se--?-i-0-1 Se--?-i-0-1 sy:
Z i a04-t--0000 j
RE: /6 a60 3L✓. AC,- t y 4e14 'N?ucjna.-oouo7
(Site Address) /
/' /C ChAtef id 1
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: I Copies: Description:
Additional set(s) of plans. Revisions:
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS:
FOR QFF E USE ONLY
Routed to Permit Technicia Date: ',0 /4- Initial
Fees Due: ❑ Yes L 3 No Fee Description: Amount Due:
$
$
$
$
Special
Instructions:
Reprint Permit(per PE): ❑ Yes ❑No ❑ Done
Applicant Notified: Date: Initials:
1:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
16200 SW PACIFIC HWY P, TIGARD, OR, 97224
Commercial - Building
299 Final inspection
PASS - C of O
May 27, 2014 at 10:27:59 AM
BUP2014-00007
Chip Barnett
Violation Summary:
Inspector Contractor
orrr 7
5-! 7-02-o/ - c2-cf-dc'/
COMcheck Software Version 3.9.2
Envelope Compliance Certificate
r •
2010 Oregon Energy Efficiency Specialty Code
Section 1: Project Information
Project Type: Addition
Envelope Compliance Method: Simplified Trade-Off
Project Title : McDonald's Restaurant Remodel
Construction Site: Owner/Agent: Designer/Contractor:
16200 Southwest Pacific Highway Jeff Chapman Jamie Love
Tigard,OR 97224 McDonald's USA, LLC Freiheit&Ho Architects, Inc., P.S.,P.C.
12131 113th Ave NE 5209 Lake Washington Blvd. NE
Suite 103 Suite 200
Kirkland,WA 98034 Kirkland,WA 98011
(425)242-2421 (425)820-8264
jeff.chapman @us.mcd corn jlove @fhoarch.com
Section 2: General Information
Building Location (for weather data): Tigard,Oregon
Climate Zone: 4c
Building Space Conditioning Type(s): Nonresidential
• Vertical Glazing/Wall Area Pct.: 11%
Building Type Floor Area
Dining:Cafeteria/Fast Food 27
Section 3: Requirements Checklist
Envelope PASSES:Design 2%better than code.
Climate-Specific Requirements:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factoria)
Perimeter
Roof 1: Insulation Entirely Above Deck 27 --- 38.0 0.026 0.048
Exterior Wall 1:Wood-Framed, 16"o.c. 48 21.0 0.0 0.062 0.064
Exterior Wall 2:Wood-Framed, 16"o.c. 163 21.0 0.0 0.062 0.064
Window 2: Metal Frame with Thermal Break:Double Pane with 26 --- --- 0.400 0.460
Low-E, Clear, SHGC 0.45
Exterior Wall 3:Wood-Framed, 16"o.c. 68 21.0 0.0 0.062 0.064
Exterior Wall 4:Wood-Framed, 16"o.c. 27 21.0 0.0 0.062 0.064
Window 3: Metal Frame with Thermal Break:Double Pane with 7 --- --- 0.400 0.460
Low-E,Clear, SHGC 0.45
Floor 1:Slab-On-Grade:Unheated, Horizontal with vertical 2 ft. 27 --- 10.0
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance 'Plans reference page/section'identifies where in
the plans/specs the requirement can be yenfied as being satisfied.
Fenestration Product Rating:
j 1. U-factors of fenestration products(windows.doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory, and labeled and certified by the manufacturer or are determined using the commercial size category values
Project Title: McDonald's Restaurant Remodel Report date- 12/03/13
Data filename: Y:\Architectural Projects112141XA12-40211 DOCUMENTSI8 Energy Calcs\12-402 Comcheck Form.cck Page 1 of 3
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Exception(s):
J Site-built fenestration products shall have a single certificate specifying glazing type, special coatings,spacers.gas fills,
center-of-glass and overall U-factor, and center-of-glass SHGC for every type of site built glass used These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section:
❑ 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited, independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Exception(s):
j Site-built fenestration products shall have a single certificate specifying glazing type, special coatings,spacers,gas fills,
center-of-glass and overall U-factor, and center-of-glass SHGC for every type of site built glass used These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section:
Air Leakage, Insulation, and Component Certification:
J 3. Sealing of the building envelope. Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material. Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials.
Plans reference page/section:
❑ 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMAANDMA/CSA 101/I.S.2/A440, or NFRC 400 by an accredited, independent laboratory, and
labeled and certified by the manufacturer.
Exception(s):
Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3.
Plans reference page/section:
❑ 5. Curtain wall, storefront glazing and commercial entrance doors. Curtain wall,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283. For curtain walls and storefront glazing,
the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Exception(s):
.. Requirement is not applicable.
Plans reference page/section:
6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed. Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
LI 7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
j 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S. FTC R-value
rule.
j 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
• 10.Outdoor air intakes and exhaust openings. Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized, leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D. Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems.
Exception(s):
Requirement is not applicable.
Plans reference page/section:
11.Loading dock weatherseals. Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Exception(s):
Li Requirement is not applicable.
Project Title McDonald's Restaurant Remodel Report date: 12/03/13
Data filename: Y:\Architectural Prolects\12\4\XA12-40211 DOCUMENTS\8 Enerav Calcs112-402 Comcheck Form cck Pane 2 of 3
Plans reference page/section:
• 12.Recessed lighting. Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Exception(s):
O Requirement is not applicable.
Plans reference page/section:
• 13.Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception(s):
• Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms.
Doors opening directly from a sleeping unit or dwelling unit.
❑ Doors that open directly from a space less than 3000 sq.ft. in area.
LI Revolving doors.
❑ Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors.
• Requirement is not applicable.
Plans reference page/section:
• 14.'Other components have supporting documentation for proposed U-Factors.
Exception(s):
• Requirement is not applicable.
Plans reference page/section:
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2010 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements
Checklist.
Name-Title Signature Date
Project Notes:
Owner listed is the owner's contact for this project.
a
Project Title McDonald's Restaurant Remodel Report date: 12/03/13
Data filename: Y.\Architectural Proiects112441XA12-40211 DOCUMENTS\8 Energy Calcs112-402 Comcheck Form.cck Paae 3 of 3