Loading...
Plans (103) Z BuP2 .. l,,.- - 00071 Mill= ERIC ILI MM on miiiiiiiiiioi LANCJAUL'T H U ARCHITECT 3016 nw gravenstein street carnas, washington 98607 ILI S THESE ABBREVIATIONS ARE FOR STANDARD REFERENCE ONLY. N v. 360.798.3801 u" ENERAL NOTES ABBREVIATIUN NOT ALL SYSTEMS AND ASSEMBLIES LISTED OCCUR IN THESE DOCUMENTS VICINITY MAP f. 360.833.0585 ('J 1, VERIFY AND COORDINATE SITE CONDITIONS AND DIMENSIONS. BRING INCONSISTENCIES TO ATTENTION '°` N AB Anchor Bolt, Acoustical Gore Board H Hinge! Hi h S South! Shelf OF ARCHITECT BEFORE PROCEEDING WITH WORK. B b A/C Asphalt Concrete NHose B � DSR Shelf and Rod ACP Acoustical Gelling Panel HC Handicap/ Hollow Core SAN Sanitary f�7 12 ACT Acoustical Ceiling Tile HCT Hot t Clay Tile SCD Seat Cover Dispenser r 11 lj 2, PROVIDE SNORING AND BRACING AS NECESSARY TO ENSURE STRUCTURAL INTEGRITY WHEN WORK AD Area Drain HCW Hot -old Water/Hollow Gore Wood SCHED Schedule ADJ Adjustable/ Adjacent HDR Header SCW Solid Core Wood INCLUDES STRUCTURAL MEMBERS. AFF Above Finished Floor HDWD Hardwood SD Soap Dispenser e� � ��� �1G I- 1- �er� F'14a,�,to AHU Air HandlingUnit HM Hollow Metal r HORIZ Horizontal SECT Section f l ter € t AL/ALUM Aluminum HP Horsepower/ High Point/ Neat Pum SF Square Feet 3. IMMEDIATELY BRING ERRORS AND OMISSIONS FOUND IN THESE DRAWINGS TO ATTENTION OF ALT Alternate/ Alteration PR Hour/ Handrail g p SFC. Special Floor Coating AO Automatic Door Opener SPT Sheet ARCHITECT. WHERE CONTRACTOR IS AWARE OF CONFLICTS OR OMISSIONS AND HAS NOT BROUGHT THEM AP Access Panel/ Apron Panel HWUH Hot Water Hot Water Heater SPTG Sheathing TO ARCHITECT'S ATTENTION, IT 15 UNDERSTOOD THAT CONTRACTOR HAS MADE PROVISIONS FOR MORE ARCH Approximate HWR Hot Water Return SMD Sheet Metal Screws O ERRORS OR OMISSIONS OCCUR IN DRAWINGS ARCH Architect/ Architectural HWS Hot Water Supply SND Sanitary Napkin Dispenser COSTLY AND STRINGENT METHOD. WHERE CONFLICTS, AVE Avenue ppy SLAT Sealant 99W PROJECT MANUAL, AWP Acoustic Wall Panel ) SNW Sanitary Napkin Waste Receptacle OR OTHER RELATED CONTRACT DOCUMENT PROVISIONS SUCH AS MANUFACTURERS SPEC Specification ¢4 ID Inside Diameter/ Inside Dimension DQ Square INSTRUCTIONS, REFERENCE STANDARDS, AND REGULATORY AGENCIES AND CODES ASSUME MORE B IE Invert Elevation DD Solid Durfacing r1, STRINGENT REQUIREMENTS AND VERIFY WITH ARCHITECT BEFORE BEGINNING WORK. BOC Bottom or Curb IN Inches DST Stainless Dteel BLDG Building IN9UL Insulation BLKG Bic kin NT Interior STC Sound Transmission Class BM Beam/ Bench Mark JWR Indirect waste receptor STI Steell and ll�� 4. DO NOT SCALE DRAWINGS. FOLLOW DIMENSIONS SHOWN ON DRAWINGS AND ACTUAL FIELD BOT/BTM Bottom Qj MEASUREMENTS. NOTIFY ARCHITECT OF DISCREPANCIES. BTWN Between JAN Janitor S oStain R Storage BUR Butt-Up Roof JT Joint STRUCT Structure/ Structural BOW Bottom of Wall DUBFL Sub Floor K SURF Surface 5. ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE AND MASONRY, FACE OF FRAMING OR Sill C K Ki Cs) SUSP Suspended ��NAt"1 RD CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE. CB Catch Basin/ Chalk Board KD Kn Dried SWC Special Wail Coating CBB Cementitious Backer Board KAP 1000 pounds T CBG California Building Code KITCH Kitchen 6, COMPLY WITH BUILDING CODES AND OTHER APPLICABLE CODES AND ORDINANCES. CD Ceiling Diffuser, Cup Dispenser KO Knock Out T Top/ Threshold/ Tread/ Toilet U GG Corner Guard i TIB Top 4 BQttom CH a N k/ Channel KP Kirk Plate T G Tongue $ Groove Cot oo C a I !L B )A T Towel ar/ Tack Board 1. WORK INSTALLED IN CONFLICT WITH CONSTRUCTION DOCUMENTS IS NON-CONFORMING WORK AND CHRL Chairast lRailron L TBB Tile Backer Board L Left/ Length/Ladder TC Terra otta GIP Cast In Place U REQUIRES CORRECTION AT NO ADDITIONAL COST TO OWNER AS DIRECTED BY ARCHITECT. LAV LavatoryTD Towel 4 Waste CJ Control Joint / Construction Joint LB Pound TEL Telephone Q GL Center Line LF Linear Foot TEMP Tempered/ Temporary/ Temperature PROJECT S. COORDINATE WORK IN COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS TO ACCURATELY LOCATE CLG Ceiling LH Left Nand TER Terrazzo Djl CLR Clear, Clearance LHR Left Hand Reverse TO To or J1T AR MECHANICAL, ELECTRICAL, AND OTHER PENETRATIONS AND SYSTEMS WITH RESPECT TO STRUCTURAL CMU Concrete Masonry Units LL Live Load TOG Top of Curb/ Top or Concrete �C � FRAMING. DO NOT PENETRATE STRUCTURAL FRAMING EXCEPT AS ACCEPTED BY ARCHITECT. Co Chan Out LP Low Point TOD Top or Deck `1 CON( Concrete TOF Top of Framing j''�, CONT Continuous TOIL M TOP Tolle of Plate / Pavement 4✓ERIC T110MAS JNCIART 9. FOLLOW MANUFACTURERS' INSTRUCTIONS EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE CPT Carpet TOS Top or Steel GT Ceramic Tile/ Changing Table MAD Masonry TOW To of Wall INDICATED OR REQUIRED BY CODE. MAXMaximum GTR Center TP Telephone Panel Board cTDK Countersunk MB Machine Bolt / Marker Board TPD Toilet Paper Dispenser GU Cubic MDF Medium Density Fiberboard TV Television 10. COORDINATE SIZES AND LOCATIONS OF OPENINGS AND ROUGH-INS FOR MECHANICAL EQUIPMENT WITH CW Cold Water MECH Mechanical TVB Television/ VCR Bracket MECHANICAL CONTRACTOR, BEFORE PROCEEDING WITH THE WORK. MEJ Masonry Expansion Joint TYP Typical cJl MEMB Membrane D MTL/MET Metal U CAMAS,WA d penny (nails) M R ManholeManufacturer ! ManuFacturing U/C Under Counter J E T D 494 OJ UNLET11. ALL PIPE, CONDUIT, DUCTS AND STRUCTURE TO BE CONCEALED BEHIND FINISHED CONSTRUCTION db decibel UL Underwriters Laboraties DA Dental Air, Dental Air Compressor MIN Minimum/ Minute UL Unless Noted OtherwiseF �$, �' A SS NOTED AS EXPOSED TO VIEW ON DRAWINGS OR APPROVED Bl' ARCHITECT, DBL Double p MISC Miscellaneous + DEPT Department MO Masonry Opening UTIL Utility DET Detail MTD Mounted V 12. OFFSET AND ADJUST NON-LOAD BEARING FRAMING AS NECESSARY TO MAKE FINISHED SURFACES DF Drinking Fountain! Douglas Fir MUTCD Manual of Uniform Traffic Control Devices SITE ADDRESS= 16 200 SW PACIFIC HIGHWAY, SUITE S, TIGARD, OREGON 91224 DIA Diameter VCT Vinyl Composition Tile FLUSH AND TRUE TO LINE. DIAD Diagonal DiCA Drilled In Concrete Anchor VERT vertical DIM Dimension N North VP Veneer Plaster GOVERNING CODES= DL Disposal NA Not A hcable 13. VERIFY BLOCKING BACKING REQUIREMENTS WITH EQUIPMENT SUPPLIER CASEWORK FABRICATOR; DL Dead Load p� ill EXPIRES: 06.30.2012 DN Down NiG Not In ontract W West/ Water/ clothes BUILDING CODE 2010 OREGON STRUCTURAL SPECIALTY CODE }� INSTALL BLOCKING 4 BACKING AT ALL WALL-MOUNTED AND WALL-SUPPORTED ITEMS, TYPICAL DR Door/ Drain NO-/# Number NOM Nominal Washer/ WATT SIGNED: 0*,Q2,e,,7 DS Downspout NTs Not To Scale W/o Without W/2012 AMENDMENTS TO CHP 11 DSP Dry Stand Pipe W/ With 14. NOTES INCLUDING "AS REQUIRED" INDICATE AS REQUIRED BY LOCAL JURISDICTION, VERIFY DV Dental vacuum WD Wood DW Dishwasher WF Wide Flange REQUIREMENTS PRIOR TO BID AND BEGINNING THE WORK. DWG Drawing 0PLUMBING CODE 2011 OREGON PLUMBING SPECIALTY CODE DWR Drawer 0/ over WH Water Heater OG On Center WP Work Point/ Waterproof OD outside Diameter WR Waste Receptacle, Waste Receiver (drain) MECHANICAL CODE 2010 OREGON MECHANICAL SPECIALTY CODE 15. EXIT SIGNS AND EMERGENCY ILLUMINATION SHALL INDICATE PATH OF EGRESS TRAVEL. E OFD Overflow Drain WSBG Washington State Building Code EA East Each ON Op Opposite Hand WT Weight pp WWF Welded Wire Fabric EB Ex ansion Bolt F in OPP Opening sife WWM Welded Wire Mesh ELECTRICAL GODS 2011 OREGON ELECTRICAL SPECIALTY CODE EG EEF xhauslu't Grille Y OSB Oriented Strand Board EL ElIevation Joint OZ Ounce YD Yard Drain/ Yard FIRE CODE 2010 OREGON FIRE CODE - ELEG Electrical ELEV Elevator P ENERGY 2010 OREGON ENERGY EFFICIENCY SPECIALTY CODE _- ENTR Entrance P- Paint EP Electrical Panelboard/ End Panel PA Public Address EQ Eqqual/ Earth Quake PG Precast SUPPLEMENTAL ABBREVIATIONS EQJ EBPth Quake Joint ACCESSIBILITY CODE 2003 ICC/ANSI All-1.1 EQUIP Equipment PCD Paper Cup Dispenser ETR Existing To Remain PERF PerForated EWC Electric Water Cooler PERP Perpendicular SYMBOL5 USED Q EXP Expansion PH Phase AREA ANALYSIS Exst(E)/ g Existin PL Plate / Plastic Laminate A5 ABBREV I AT I ONS EXIST PLAM Plastic Laminate Q EXT Exterior PLAS Plaster And JURISDICTION: TIGARD, OR PLYWD Plywood Z_ Angle F PNL Panel0 At t PNT Paint CL Centerrne F Fahrenheit PREFIN Prefirished TOTAL IMPROVEMENT AREA' 3,282 SF FA Fire Alarm/ Forced Air PSF Pound Per Square Foot C channel - -- FAAP Fire Alarm Annunciator Panel # Number THESE SYMBOLS ARE FOR STANDARD REFERENCE ONLY. FACP Fire Alarm Control Panel PSI Pounds per Square Inch CONSTRUCTION TYPE= V-B. SPRINKLERED FES Flat Alarm Pull Box PSL Parallel Strand Lumber d Penny _NOG R A P H It'00' S Y Mmm B u" L S T ALL SYSTEMS AND ASSEMBLIES LISTED OCCUR IN THESE DOCUMENTS PT Paper attve Dispenser / Per FD Floor Drain PTD Paper Towel Dispenser Fe Property Line/ Plate REVISIONS 1) �'I FDC Fire Department Connection PTDW PT 4 Waste Receptacle Plus or Minus OCCUPANT LOAD= 33 PERSONS FE Fire Extinguisher PVC Polyvinyl Chloride - FEC Fire Extinguisher Cabinet D Round FFE Finish Floor Elevation Square/ Square Feet OCCUPANCY GROUP= B (PROFESSIONAL SERVICES - DENTISTS) BUILDING GRID LINES FH Flat Head QT Quarry Tile I FPC, Fire Host Cabinet QTR Quarter ELEVATION FRMS Flat Head Machine Screw SPRINKLER EXISTING MODIFY AS REQUIRED UNDER FHSMS Flat Head Sheet Metal Screw FLAWS Flat Head Wood Screw ABBREVIATED STRUCTURAL SHAPES B - CONCRETE AND MASONRY WOODS A PLASTICS R C American Standard Channel DEFERRED SEPARATE SUBMITTAL 2 Elevation I.D. FIN Finish R Riser / Relocate NHS Hollow Structural Shape FL Floor A3.12 Sheet Number Section View Section View FLUOR Fluorescent RAS, R/S Return Rod Shelf M iM Shapes WALL TYPE n e{e FM From RAD Radius MG Miscellaneous channel FIRE ALARM SYSTEM= NONE EXISTING, NONE REQUIRED INTERMENT INDICATOR a ° Co cr Flnish PL Plate 1101 SE Tgch Center Drive BUILDING , � � ® FOB Face OF Brick RB Rubber Base a WOOd FOC Face OF Concrete RCP Reflected (tiling Plan W W Shapes SECTION SEE A2.00 FOF Face Of Finish RD Roof Drain p SCOPE OF WORK= DEMOLITION OF (E) TENANT IMPROVEMENTS Suite 195 rJeC{Ion I.D. FOR WALL TYPES FOIL Furn. by Owner Installed by GG 0) FOTO Furn"by Owner Installed by Owner REG Recessed CONSTRUCTION OF (N) DENTAL OFFICE TENANT Vancouver, WA 98683 3 Sheet Number 3 / CMU / P1 wood FOiV Furn,b(Owner installed by Vendor REF Reference/ Refrigerator FOM Face o Masonry REINF R�InForced, Reinforcing Bar IMPROVEMENTS A3.5 ,A3.5 COO ROOF-CEILING Brick FOS Face or Studs READ Required ABBREVIATED TOILET ACCESSORIES FS Full Size/ Floor Sink RES Resilient GH Goat Nook WALL FLOOR-CEILING FT Foot or Feet RET Retainin / Return 9 GB Grab Bar NO. OF STORIES INDICATOR FTIC Furn.by Tenant Installed by GC REV Revision PCD Pa er cu pis enser SECTION - - - - - - - PL On FTIT Furn, by Tenant Installed by Tenant RF Rubber Flooring, Resilient Flooring PTD Paper Towel D�pe=er FURN Furnace/ Furnisend RFG Robe l p MEDICAL CCAS: NO PIPED CASES; CART-MOUNTED CYLINDERS, Grout / _ _ _ _ _ _ _ PTDW Paper Towe Dis Dispenser Waste Receptacle Section LD. r r Board FVIC Furnished by vend Installed by Contractor RP Robe ook/ Round Head/ Right Nand SD Soap pis�h/SoappDisptnstr Mortar Particle or, r q Sheet Number E N T L SCHEDULE = - - - - - - - oar RM Room TOTAL 192 CU FT OZ; 96 CU FT N 20 RO Rough Opening SND Sanitary Napkin Dispenser INDICATOR ROW RighT Of Way SNW Sanitary Napkin Waste Receptacle Large Scale GA Gauge RP Radius Point TB Towel Bar x'13 ox GBB G sum Backer Board RRL Rub Rail TPD Toilet Paper Dispenser PATIENT WATER NO PIPED WATER; BOTTLED WATER SYSTEM '@ DETAIL W34 W = Windows Acoustic GC Gepneral Contractor RSF Rts5lient sheet flooring TSCD Toilet Seat Cover Dispenser WR Waste Receptacle REFERENCE L = Louvers the Structural GFI Ground Fault Interrupter RWL Rain Water Leader p EACH PATIENT CHAIR Large Sheet HM = Hollow ^fetal Relights Wood GL Glazing ! Glue Laminated Wood 6 DENT A� L Detail Number S = Storefront System Framing GwB Gypsum Wall Board MEDICAL WASTE: DRY VACUUM SYSTEM Sheet Number Ceramic Tile ®ENTAL OFFIC x5.15 NORTH ARROW Quarry Tile Architectural PATIENT SEDATION LESS THAN THREE PATIENTS UNDER SEDATION OR Framing AT ANYTIME TENANT WALL MATERIALS A FINISHES Furring SIGNAGE I M P R®�E E 24 Detail Number 1 I Sign No Section View PR0JErA"8kT DIRECTORY SHEET INDEX N I 5.30 Sheet Number g INSULATION Gypsum PROJECT APPLICANT= CONTACT- DENTAL EQUIPMENT SUPPLIER= l l BENCH MARK, Section View INTERDENT CONTACT= ERIC LANCIAULT, AIA HENRY SCHEIN DENTAL COVER SHEET AO.OI TIGARD TOWNE SQUARE OR DATUM Board CONTACT= DEAN HAN50N 3016 NW GRAVENSTEIN STREET CONTACT= SCOTT GRAVERSON CODE ANALYSIS AO.02 - Large Areas WF' Rigid 1101 SE TECH CENTER DRIVE, STE 195 CAMAS, WA 98601 TEL. (800) 645-6594 PROJECT SPECIFICATIONS 'T '� I „, AO.03 SHOPPING CENTER g Work Point Ceramic Tile Insulation � _ Grout Set VANCOUVER, WA 98683 TEL: 360.198.3801 EMAIL: PROJECT SPECIFICATIONS •Ef3. •�= _�•«z.�F....= * •� AO.04 10200 SOUTHWEST Enclose The TEL, 360.449.5603 EMAIL., ericlanaOx.netcom.com Scott.graversona0henrgschein.com EQUIPMENT LIST ConditionallyApproved.............,I AO.05 Enlarged Area Batt Or FAX: 871.211.6074 RESPONSIBILITY SCHEDULE Lenarto:F011aW...*.***.,,.***a*.I � AO,OC, PACIFIC FIIGI-IW�1Y FLOOR LINE Blanket 6 REFERENCE SITE PLAN A A1.01 SUITE S Detail Number - - SUPPLEMENTAL SYMBOLS ,46.15 Sheet Number EL 108-1 Insulation Inana CONTRACTOR DIMENSION LAYOUT PLAN p►e'�ilit r,1' - 'fir: `�_ A2.00 •. . - - �:: Fire-proofing � - TIGARD, OR 97224 8NK CONSTRUCTION, INC DEMOLITION T ION PLAN Adm• ( - DA2.01 NEW CONSTRUCTION Or Sprayed CONTACT: RICK SHANDY FLOOR PLAN, SCHEDULES 4 WAL TYPE �-- � A2.01 Insulation 48 82ND DR. REFLECTED CEILING PLAN �3'� Date.°� A2.02 SPOT GLADSTONE, OR 91021 INTERIOR FRAMING A4.01 ELEVATION BASE LEGEND FLOOR MATERIALS $ FINISHES ALTERNATE INTERIOR FRAMING Approved fans A4.01 ALT ii ,n„ INTERIOR ELEVATION - - = INTERIOR DETAILS f A5.01 ISSUE DATE: 6 April 2012 1 CUT LINE I=III=I I I I Earth/ Compact Fill Section View shall be on job site. INTERIOR DETAILS A5.02 JOB NUMBER: 323 A1.01 Elevation Numbers III=III=III=III Ceramic Tile INTERIOR ELEVATIONS A1.01 C Sheet Number REVISION - - - Quarry Tile � EFE� RED SUBMITTALS" INDICATOR s� Gravel Grout Set W/ EQUIPMENT A9.01 M oo�o 000 00o loo�o�o o 1`A`� �LJ 4J ROOM ARK Cloud Around ��o°�'o°s�°�'°s� Membrane ELECTRICAL LAYOUT EO.O ° ° � ° � � � PLUMBING LAYOUT F'O.O 1 OFFICE Revision Resilient SUBMIT EXTERIOR SIGNAGE FOR SEPARATE PERMIT ELECTRICAL SYMBOLS SCHEDULES ELOO Room Name Flooring SUBMIT FIRE SPRINKLER FOR SEPARATE PLAN CHECK AND PERMIT A101 Room No w/ Buildin Quadrant �' Revision Number METAL g ELECTRICAL LIGHTING PLAN E2.00 g Large Scale ELECTRICAL POWER PLAN E3.00 Section View Carpet ELECTRICAL SPECS PLAN E4.00 UJ " � � Sheet Metal p ELECTRICAL SPEC'S PLAN E4.01 5F>ECIFICATION5 M50.01 Ch Typical Door Swing is Hollow Metal SPEC I F I CAT I ONS MSO.02 _p Shown 90 Degrees C CASED OPENING Large Scale SPECIFICATIONS M30.03 COVER SHEET Opening Number SPEGIAL INSPECT10"N%sdmkSCHEDULES AND DETAILS MO.OI T1 HVAC FLOOR PLAN M2.01 PLUMBING FIXTURE LAYOUT PO.01 TENANT SHALL RETAIN THE SERVICES OF A SPECIAL INSPECTOR FOR THE FOLLOWING SYSTEMS SCHEDULES AND DETAILS P1.01 AS REQUIRED BY AHJ. PLUMBING FLOOR PLAN P2.01 SUSPENDED CEILINGS MEDICAL WASTE VACUUM SYSTEMU1 �LID�NG CoANALYS Du DE 1� h P 7 q}P ` Bam�».amvv.�ec.:,..+..a.av�� u ,.«u...,......v.,.,..:.m,3m,..,.w.sac,wm..:.tea.... :.:. .'. ERIC -..m,.;.wwamsaha..s..h:-...m:.ro..:eo-mw...r�n.,.,.Nb)....:. .,,n....sam..x.a _v..a:.au:.«.Mawo��"naa.,.,�w-.saae.,.,asc.,v.,xnhn.asewz....,..w.,:..+.:�x....._mom«u�,.,.. EE ALSO A7.01 FOR r ADDITIONAL INFORMATION **TENANT IMPROVEMENT AREA 3,282 SQUARE FEET 11 LANCIA'LwL CODE REFERENCE IOSSC, UNO) CONTENTS INFORMATION � ,°�' 1 f ARCHITECT o wgFYY® lR "xwa-n "q " SECTION 304.1 OCCUPANCY GROUP BUSINESS GROUP (B) OCCUPANCY 3016 nw gravenstein street PROFESSIONAL SERVICES )K. - 4 P va 360.798.3801ton 98607 ,. r TABLE 1004.1.1 OCCUPANT LOAD SEE IIAO.02, THEREFORE 33 PERSONS ,. , 'j� ,� 'ter " ;1 1 %� f. 360.833.0585 C TABLE roO1 CONSTRUCTION TYPE TAPE V-B ��♦ rf - STRUCTURAL FRAME- 0 HR NOTE 1= OCCUPANT LOAD OF TP15 ROOM DOES . 1 INTERIOR NON-BEARING WALLS= O HR NOT CONTRIBUTE TO OVERALL SUITE OCCUPANT t ., o ,�2UIET O O �b, .G ...g_ �.cu .. _ .� . g. . > ..J . ..... 4 ,. d FLOOR FLOOR CEILINGS,• O NR �,� ,� .� -� 4 1 r LOAD; OCCUPANTS ARE THE SAME AS THOSE � � ♦ , I ROOFS FLOOR - CEILINGS- O NRDISTRIBUTEDTH IT ♦ ARES-- 4-2"6 SF F F _ �.,_N-..m _ �_ F?,E = ROUGHOUT REMAINDER OF SUITE ♦ G USE = BUSINESS AREA. ` _ I ♦ RATE= 100 �""" - SECTION 903 AUTOMATIC EXISTING, MODIFY AS REQUIRED j °$ ♦ , ', ' � %f I_. r SPRINKLER SYSTEM UNDER SEPARATE SUBMITTAL ` ♦ COUNT= 2 1: .fi : \ t- f ,� STAFF LOUNGE l 114 ` `` p ♦` ` , . SECTION 901.2.2 FIRE ALARM NONE EXISTING, NONE REQUIRED ♦ AREA= 125 SF ,,; . � _ ` �'° ♦ � � USE = ASSEMBLE' �NCOO�EN-T�AT�P SECTION 803.1.1 INT WALL 4 CEILING GROUP= B ♦ _ RATE= 15 i- ' ` ♦ `` COUNT= N/A SEE NOT 1 L----T-_-_--- �--_ TABLE 803.9 FINISH REQUIREMENTS EXIT PASSAGEWAYS= N/Ar .� 41. g I CORRIDORS= N/A, ALL CIRCULATION ALONG C _ T Y 8 AISLES `� ♦ ' ` ' ill �: ♦♦ ROOMS ENCLOSED SPACES CLASS C 93 ♦ ` USE B4111SS AREA , , i SECTION 804 INT FLOOR FIN 1 SH CLASS 11 MINIMUM REQUIRED FOR CARPET; b' w `, RATE- O i . CLASS I PROVIDED. COUNT SECTION 804.1 �va i qg EXCEPTION RESILIENT SHEET FLOORING NOT CLASSIFIED 3 ,moi 7 ( mn •._. SECTION 1014.3, MEANS OF EGRESS OCCUPANT LOAD LESS THAN ALLOWABLE= 1 33 < 49 AND "; STORAGE 1 EXCEPTION / a, ,i J ARE' = 53 SF COMMON PATH OF EGRESS TRAVEL �` ``\ .� ♦ ,4N -CEPH USE - T TABLE 1015.1 100'-0" MAXIMUM ALLOWABLE: 91'-0"(+/-) �`: , �: i OH = STORAGE Y1 r i ",< 112 RATE= 300 4 "'` COUNT= N/A SEE NOTE 1 ® SECT 10N 1015.1 ACTUAL 120 , � � ;,rw ° �� �- A2 - ;41 SF ,ACME""N ITHEREFORE, 1 EXIT REQUIRED AREA= 3 USE A1 EX I T PROVIDED US `` '' �� �,E BUSESS AREA c g , � ,� �� R,4TE= 100�� �� � . U DAR 112 = 1 —0 FPO]-323.dwg RATE- 0 , COUNT= N/A, SEE NOTE 1 COUNT=`� /'X t `� f �� ERIC THOMAS[ANCIAULT C� SECTION 1002.1 AISLE SPACES 103, 108, 118, 121 ARE � � �`�;,. . ..., q " PREDOMINANTLY UNENCLOSED EXIT ACCESS p � 41 � , 1�EC�f. O � o B a COMPONENTS � �` � O ST 1 I ATION 4 ER L Z ` i _ AIS 119 .,. ... USEEA- MECHANICAL TO Y 5 �` 118 i -fir AREA= 142 SF �4. :... _, . , RATE= `� CAMAS, SIA ��`�` _ .., .-,.-_.� . �._� �_.��_ R, E- 300 i �. r AAE USE - BUSINESS AREA COUNT= N/A, SEE NOTE 1 - i,, 494?. C 4EA= F � , i RATE= 100 = - ��°�,'`' SEE ALSO A1.01 FOR ° J ? � � `IOF 0 ADDITIONAL RAN", � •..., ,.,� .; - �:.- .0�� vim. US = i BU ESS AREA COUNT= 2 INFORMATION ` ,a 1 EXPIRES: 06.30.2012 �RV�II A1C � � N� ^r SIGNED: 04.06.12 • ,_a_.,.,r _ ..-. - g . rte, „_ ,a.,, .,� _ '.__ .i": � r' \ : ,,s'`r +` yM1 *t J✓ I � 1 I a '1 ALLOWABLE ` a,�- D � -\.\ �.t,~ , �� ��� .�I._,..,��.u� _._.�. - ..._,a.�..��u._. e. �_ MEN �, Egress Route/Common Path of Egress 100'- 130 `� r r, � _ J 110 o—————————————s \ € 1 1 30-O C+!-) r O „x° A x./.�` ` A' A j,�—_ 't ..�� �_,\ !t »,-n..x,w., cx.,.......s ..._:n..s... a.s ....-_... .,.. ;m ACTUAL �.. ;' �� O TO 6 EXIT, SEE ALSO A2.02 e ,, --------- ,� 1Tb ,Y 3 i 1 1 Calculated Number of Occu ants at Exit/Exit Access $" ` , o ARE 4 SE � 1 16� p E E �r 124 (.,> ## _ w. .___..__,..�4.a .._., USE USiNE AREA " .' I NOTE 1 I — I p USE P_ I SSS AREA , �. RATE- t 0 / A 1 (N) ACCESSIBLE ENTRANCE T _ �CO ' COUNT= 1 �, �` . �A ECOUNT= �- > a _... 1 r } � ., 4 ��' ',, r AREA= � 69 SF . D 0 FEC FIRE EXTINGUISHER �, ; USE = BUSINEy AREA E • = 1 p_ � ♦ ; . . '� , _ � � RATE- 100 O 1 i D i COUNT= 1 ' "' ` ✓ A ACCESSIBLE PER 1106.1.4 THROUGHOUT SUITE LINO s , 56 --T---------� __ _ '� %;'� ��. �` ° i� O t0 Y 4s I' 48 i' .'; , '' TORY 2 �� t� 3 W� � _ n ._.._ NSU i)° A EA= 115 SF -� EMPLOYEE WORK AREA PER SECTION 1102 AND 1108.4,17 ��;�, `�_;j 5 � ♦ Sr & '������� � ^/— A1S US = BUSINESS O \ "` ♦ ARE = J1 Sl=y,. i A1L ,96 SF ♦ USE = BU .4NE AREA � ' UJO N i 105 - �� RATE= 100 1 , � �� / - 108 �: 104 COUNT= 2 I PLAN REVIEW 12.22.2011 E = USINESS AREA - Q ♦ `� A EA- 7 SF ♦ RATE= 430 _ O � r 100 ♦ COUNT= 1` o ' - SINESS � � a S V ` ~1 \\ a O — - 1 E . G `' T= 1 ♦♦ ` , RATE- IT 0 REVISIONS DATE f OC ACCESSIBLE TOILET, SEE A B /A0.02 - )� ♦ � �` T= �s c uN 1 4 la \✓ - O 4 Ip r 1 NOTE - O3'-0" CLEAR WIDTH — ` < y _ L u, V' P J i? ��\ \ , / ♦ z ,.._ -.a-. +'` e�' <.yy .��,t�_ .._�:�.��.�.F.����.� �. � .��� I NTE RD ENT u ;' �AIS � ♦ (i, 121 ♦ ALLOWAB E - = = 1101 SE Tech Center Drive MEN 1 E AISLE PER 1002 AND 1011.1 4 n u _ � �� -----1 -- / � Vancouver, WA 98683 91'-O"(+!_) z 1 Suite 195 1/2 - 1 —O F OI-323_dw A b ;\ TOY 1 A15LE p g ACTUAL , F PUBLIC CHECK-IN= 3'-0" WIDE ACCESSIBLE WRITING SURFACE USE US� SS AREA , y RATE 100 .__ �..� -uti_L.w� , „, . u. � . .,.JJ .. ,,,.•��.w.J.._J.,..... �,> ! 1 �_J_. .._., .,,. . .t.,_, ` ��, ,.. p P 'a COU N f EN p G PUBLIC CHECK-OUT: 3'-0" WIDE ACCESSIBLE WRITING SURFACE p __- O , GENTLE l I 9 DOCTOR, 10(0 AREA= 164 SF � ENT L N 1> 1 I USE - 13USINf- e REC CEP 1 RU51NES5 OFFICE COUNT- a DENTAL OFFICE RATE= l0 1 102 - 2 ARE 24 SF i AREA 204 SF USE = A55EMBLY UNCONCENTRATED 1 � I' U �.u.E � TENANT 1 [ USE - � BUS I NE' S � 6 RATE= 15 c RATE=� 100 IMPROVEMENTS COUNT= 1� .; = 3 s A M, GOUN r. TIGARD T WNE S P a � O QUARE , 'D. - L I;' �7°f \'\. I i � 1 I 1 g ..R,......a..._.....-.,.. ..,,m..,..................,._........,...®..,_,..w.+.,_..,..R,.........,,.._._,.., ...>., Ru' b \ . ;I `Y SHOPPING CENTER P O _ t i`I,F, r P ,G 16200 SOUTHWEST ..y I : PACIFIC HIGHWAY r • r SUITE S � \ s r TIGARD, OR 97224 \ z`; PLAN 1 4 12 ISSUE DATE: 6April 2012 AEM' N JOB NUMBER: 323 1/411 = 11-01' Fpol-213,dwg O Uj U) IC CODE 2 ANALYSIS PROJECT SPECIFICATIONS SECTION OS 80 00 GLAZING (continued) DIVISION 6 - DOORS AND WINDOWS DIVISION 6 - WOOD AND PLASTICS 2.01 Materials DIVISION 1 - GENERAL REQUIREMENTSE OKOO'h I C A. Safet Glass: ASTM C1036, Type I transparent flat, class 1, clear, ualit SECTION OS 11 13 STEEL DOORS AND FRAMES SECTION OF 10 00 ROUGH CARPENTRY y yp p q y 3, full tempered with horizontal tempering conforming to ANSI A91.1, 2.01 Interior Doors= SDI-100 Level 111 performance Level A Model 2 Flush 1.01 Quality Assurance SECTION 01 11 00 SUMMARY OF WORK G y p p g g , p y Y inch thick minimum. Seamless Design, ASNI 151.1 Level A. A. Moisture Content= Maximum moisture content 19io 1.01 Work under This Contract 1. Provide where indicated and as required by IBC. A. Face Sheets- 16 gauge steel. 2.01 Materials A. Work of this contract is for the construction of interior tenant LAN C" I ftU Lowl 2. Label: Permanently identify each pane of safety glazing in accordance B, Rated Core Design= USG fire door coreboard, or accepted rated core A. Non-structural Framing Lumber= improvements for a dental office. ARCHITECT with IBC Section 2406, material, bonded to inside face of each face sheet. 1. Species: Douglas Fir-Larch, or Nem-Fir. B. Provide all labor, materials, transportation, equipment, supervisions, and C. Edge rail reinforcement= One piece, continuously arc welded full length to 2. Grade, WWPA or WCLIB, No. 2. service as necessary for and incidental to the completion of all work in 3016 nw gravenstein street face sheet. 3. Nominal 2 inch Thickness= 5-DRY connection with the drawings and specifications. . o camas washin ton 98607 NISI - FI I H mina) 4 inch thickness or Greater: S-GRN air dr to 19io maximum G. Verify existing site conditions prior to Bid. washing ton ON 9 N S ES 1. 14 gauge channel lock rail, beveled Y8 inch in 2 inches. 4. No y y g p v. 360.798.3801 2. 14 gauge channel hinge rail formed and tapered for hinges. moisture content prior to use. SECTION 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING D, Top and Bottom Rail Reinforcement= 12 gauge steel channel. B. Wall Sheathing= SECTION 01 45 00 QUALITY CONTROL f. 360.833.0585 t5 1 all Assurance and Control of Installation 2.01 Materials E. Finish= Tenneco Series FD 88-559 air dried primer ready to receive finish 1. Plywood, APA G-D Grade, /32 inch thick, minimum. 1.0 Quality A. Steel Framing; ASTM C645, formed from steel meeting requirements of scheduled Section 09130 00 2. Span rating= not less than 2410. A. Monitor duality control over suppliers, manufacturers, products, services, ASTM A568, Grade 33, Galvanized ASTM A525, G40. 2.02 Frame Types 3.01 Installation site conditions, and workmanship, to produce work of specified quality. B. Steel Studs= 25 gauge minimum, 1Y4 inch flanges with 90 degree angle A. Slip-on Gypsum Wallboard Frame= Timely®Industries. A. Install wood blocking and sheathing= B. Comply fully with manufacturers' instruction including each step in return leg s/16 inches long, punches webs. See also A4.01 1. Standard "S" Series frames with adjustable strike plate. 1. For support of dental equipment and fixtures, sequence. r y 2. Color= As selected b Owner from manufacturer's standard finishes. C. Should manufacturers' instructions conflict with Contract Documents, C. Runners= 25 gauge, 1Y4 inch flange minimum, faces knurled, except as otherwise indicated for top runners. B. Hollow Metal Frame= Pressed steel frames with 21nch face, Y2inch returns, SECTION 06 41 00 CUSTOM CASEWORK request clarification from Architect before proceeding. D. Top Runners Slip Track System: Dietrich Industries, SLP-TRK, double rabbet with 5/flinch stop. 1.01 Submittals D. Comply with specified standards as a minimum quality for the work except self-adjusting slotted top track allowing for both upward and downward 1. Frames 16 gauge for interior frames less than 48inche5 wide; 14 gauge A. Shop Drawings= Indicate materials, component profiles and elevations, when more stringent tolerances, codes, or specified requirements movement of building structure without adversely affecting positive for exterior doors and interior doors wider than 48inches. assembly methods, joint details, fastening methods, accessory listings, indicate higher standards or more precise workmanship. attachment of framing members. 2. Fully welded grout solid, hardware location, clearances, blocking requirements for anchor placement, E. Perform work by persons qualified to produce workmanship of specified 3. Fabricate frames and assemble as a compete, full welded unit. and schedule of finishes. quality. �I E. Sheet Metal Backing Channel= Minimum 20 gauge, 6 Inches wide with 1Y2 p y q y inch legs, notched and continuous between studs designed for wall 4. Hardware Reinforcement= Fabricate and weld into place. Include 1.02 Regulatory Requirements F. Secure products in place with positive anchorage devices designed supported items including: Wall hung cabinets, toilet room grab bars, concealed stiffeners, reinforcement, edge channels, and moldings A. Design and install casework using seismic braces, stiffeners to restrain and sized to withstand stresses, vibration, physical distortion, or pp g g g g wall hungshelving, wall sto s for swinging doors wall mounted specialties and fabricated from either cold-rolled or hot-rolled steel. overturning of casework, suitable for Sdi and Sds values of the site. disfi urement and seismic forces. g p p g g g g g p aq ui ment not otherwise scheduled for wood backing. 5. Finish: Shop prime Include ICC approved anchors. 1.02 Manufacturers Field Services III F. Fasteners= ASTM C1002 self-drillin self-tapping in framing screws designed a. Tnemec Co. Series FD88-559 Azeron Primer, 2.5 mils DFT. 2.01 Materials A. When specified in individuals specification sections, require material or p p q for gauge of framing. g pp g gb. Sherwin Williams, Kem-Kromik, B5OWZ1, 2.5 mils DFT. A. Exterior Exposed Cabinet Faces= Nigh pressure plastic laminate 0.030 product suppliers or manufacturers to provide qualified staff personnel G. Door Framing= Provide double 20 gauge studs at door framing. c. Rust-Oleum, 2082 Quick-pry Light Gray primer, 2.5 mils DFT. inch thickness meeting NEMA standards for vertical grade plastic laminate. to observe site conditions, conditions of surfaces and installation, d. Rodda 108225x, Barrier III HS, 2.5 mils DFT. B, Interior Exposed and Semi-Exposed Surfaces= Melamine. White color with quality of workmanship, as applicable, and to initiate instructions when , SECTION 09 29 00 GYPSUM BOARD SYSTEM CHardware- Factory prepare doors according to templates matte finish. necessar . 2.01 Materials supplied under work of Section OS 11 00. C. Exterior Unexposed Surfaces, Fully cured synthetic polymer treated kraft B. Where site decisions or supplemental instructions contrary to G sum Wallboard= Com 1 with ASTM G36 paper 0.020 inch thickness to assure structural balance of the panel. manufacturers' published instructions are observed, promptly report to pp yp pP A. Gypsum Wallboard= Complywith ASTM C36 D. Counter Top High Pressure Plastic Laminate= Architect and verify acceptance before continuing work. 1. Ends square cut and edges tapered. SECTION OS 14 00 WOOD DOORS 1. Standard horizontal grade 0.050 inch thickness for all general 2. Non-rated and Fire Rated Assemblies= 5/8 inch, type X, UL labeled. 1.01 Quality Assurance purpose work. SECTION 01 51 00 TEMPORARY CONTROLS B. Moisture Resistant Wallboard- s/s", Type WR, approved for moisture areas. A. Provide wood doors from single manufacturer. 2. Back countertops with 0.020 inch balancing sheet on underside of 1.01 Temporary Electricity C. Acoustical Board= Knight-Celotex Fiberboard, SoundStop 2.01 Door Construction core to provide a moisture-proof and stable countertop. A. Make arrangements and connect to power supply on Project Site. A. Flush Solid Non-Rated Doors= ANSI/NWMA I.S.I-A. E. PVC Edge Banding-, 3mm thick at door edges and countertop edges, B. Provide ower outlets for construction operations as required for 1. YZ inch thickness. A. � g g` g p g p p q �� D. Lead Board= 5/8 inch, type X, UL labeled with minimum 0.8 mm thick lead lining 1. 1 /4 inches thick, solid particle board core construction, wood veneer 0.020 inch at box edges and backeplashes. Provide at plastic laminated convenient use. Provide flexible power cords as required. laminated to board. face. faced casework exposed edges. Adhere with hot melt waterproof C. Permanent convenience receptacles may be utilized during construction. E E. Sound Sealant Tape at Wails with Acoustical Batt Insulation, Behr-ManningO 2. Bond stiles, rails, and hardware blocking securely to core and face adhesive under heat and pressure. Trim edges and corners and buff 1.02 Temporary Lighting CTHOMAS LANCIAULT � Norton, or approved polyvinyl chloride, minimum 14 pound density, veneers with Type I glue. smooth. A. Install temporary lighting. Comply with safety regulations for adequate n - i i "r For acoustical B. Wood Veneer= ANSI/NWMA Premium rade, AUDI Section 200, Grade A. F. Particle Board= Premium rade board of balanced construction. Density= lighting of work areas, areas of public access, and security. on porous, acoust cally tested, in thickness and widths required og g installation. 1. Species= Birch, plane sliced, slip matched and balanced flinches. 45 lbs per cubic foot with moisture content of Bio or less. B. Permanent building lighting may not be utilized during construction. F. Fasteners= Screws USG sum ora roved conformingto ASTM C1002. 2. Y inch thick edg e strips of woodspecies to match face veneer. G. Marine Grade Plywood: For countertops at sink locations. 1.03 temporary Heat t u le or an head lengths as required to secure matrials in lace. C, Finish, AUDI Section 1500, TR-4 Conversin Varnish, or TR-6 Catalyzed H. Hardware P A. Provide heating devices and heat as required to maintain specified CAMAS WA 2.02 Finish: 4 pFinish, throughout q p Polyurethane. P 1. Hinges= Blum No. 13T5580, Self closing, concealed. conditions for construction operations. ` 4942 3.01 Acoustical Accessories Installation D. Hardware= Factor Prepare doors according to templates supplied under 2. Pulls, 33/4" wire pull, satin chrome finish. B. Maintain minimum ambient temperature of 50 degrees F in areas where Factory p g p pp A. Seal construction at perimeters, behind control and expansion joints, and at work of Section 08 11 00 3. Grommets= 65mm with removable cap, color black, construction is in progress, unless otherwise indicated in specifications. o r4 o opening and penetrations with a continuous bead of acoustical sealant. Install E. Accessories 4. Standard Drawer Slides= Accuride No. 3832. 1.04 Temporary Ventilation 1. Glass Stops: Wood NWWDA 1. S lA Option M3 Li Moldin mitered 5. File Drawing Slides= Accuride No. 4034 full extension, 1501b rating. A. Ventilate enclosed areas to assist cure of materials, to dissipate acoustical sealant at both faces of partitions at perimeters and through p � p � p g� g - g• p penetrations. Comply with ASTM C919 and manufacturer's written corners, 6. Shelf Clip= Allen Fields/PX industries No. 55036, double pin, locking. humidity, and to prevent accumulation of dust, fumes, vapors or recommendations for locating edge trim and closing off sound-flanking 2. Glass Safety Glazing as specified Section OS 80 00. 1. Metal Frames and Brackets= Size as necessary, color black, gases. EXPIRES: 06.30.2012 paths around and or through gypsum board assemblies, including sealing 8. Wire dividers hafele 111.80.253 1,05 Temporary Water Service SIGNED: 04.06.12 partitions above acoustical ceilings. SECTION OS 11 00 FINISH HARDWARE 9. Filtered vents= shoemaker mfg fl series, 12"x12" A. Make arrangements and connect to water service on site as necessary 3.02 Lead Board Installation 1.01 Coordination I. Colors= for water access. A. Fasten at munimum 8 inches on center at the edges of each sheet and A. Coordinate work of this Section with other directly affected Sections 1. Base Laminate, As selected by tenant, see material schedule, sheet 1.06 Temporary Sanitary Facilities minimum 12" on center Field. involving manufacturer of any internal reinforcement For door hardware. A2,01 A. Provide and maintain facilities and enclosures. Existing facilities shall B. Apply 2 inch wide strip of sheet lead of same thickness as lead facing to 1.02 Verify each door operation with Owner to determine hardware sets 2. Accent Laminate= As selected by tenant, see material schedule, sheet not be used. each of the joint studs prior to installing lead board, requirements. A2,01 1.01 Barriers C. Cover each fastener with lead disc equal in thickness to lead facing. A. All hardware and operation to comply with accessibility requirements. 3. Top Cap Laminate= As selected by tenant, see material schedule, A. Provide barriers to prevent unauthorized entry to construction areas to 2.01 Manufacturers sheet A2.01 allow for Owner's use of site, and to protect existing facilities and Q A. Hinges, Ball Bearing Type- Laves, Stanley, Boomer, McKinney. 4. Restroom Wainscot= As selected by tenant, see material schedule, adjacent properties from damage due to construction operations and SECTION 09 30 13 CERAMIC TILE B, Latch Sets= Schlage, Style as selected by Owner. sheet A2.01 demolition. Q 1.01 Requirements C. Locks Schlage. B. Protect non-owned vehicular traffic, stored materials, site and A. Section Includes= Ceramic the thin-set interior floor installations. D. Exit Device, VonDuprin. DIVISION 1 - THERMAL AND MOISTURE PROTECTION structures from damage. _ B. System Description= Waterproof Interior Floor: TCA Method F122. Ceramic Tile E. Closers: LCN on Waterproof Membrane, Thin-Set. F. Casketing= Pemko, National Guard, 5teelcraft. SECTION 01 21 16 BATT AND BLANKET INSULATION SECTION 01 13 29 CUTTING AND PATCHING EXECUTION Q C. Field Samples= G. Thresholds: Pemko, National Guard. 1.01 Materials 1.01 Preparation 1. Install one field sample using not less than 10 square feet of floor the with A. Acoustical Batt Insulation Unfaced, friction fit thermal glass fiber batt A. Provide temporary supports to ensure structural integrity of the work. Joints routed, for approval bg Tenant. insulation, ASTM C665, Type I. Provide devices and methods to protect other portions of project Q and adjacent areas from damage. 2. Acceptable field samples may be incorporated in the Work. DOOR HARDWARE SCHEDULE 1. Surface Burning Characteristics= ASTM E84 D. Temperature Requirements: Maintain 50 degrees F minimum temperature in work a. Flamespread= Maximum 25. B. Maintain excavations free of water. Q areas for 24 hours prior to and during installation tion and curing of tile work, HW SET-01 b, Smoke Developed= Maximum 50. 1.02 Cutting and Patching E. Tem orar Ventilation Provide exhaust ventilation during installation and curia DOOR NUMBER: 101a, 2.01 Location A. Execute cutting, fitting, and patching including excavation and fill to 0 of work. P g g A. Acoustical Wall Insulation= Provide in thickness to fill full width of studs complete work. REVISIONS DATE 2.01 Manufacturers EACH TO HAVE= HARDWARE MATCH ALL EXISTING BUILDING STANDARD, PROVIDE PANIC at interior partitions and ceilings where indicated in drawings. B. Fit products together to integrate with each other. A. Floor Tile DEVICE CLOSER C. Remove and replace defective or non-conforming work. 1. Designation= GT SECTION 01 84 00 FIRESTOPPING D. Match finish of patched material. Where necessary, refinish to nearest 2. Tile= as selected by tenant, see material schedule sheet A2.01 1.01 Requirements= Joint, break line, intersection, or adjoining construction to eliminate B. Trim, Manufacturer's standard= Coved Floor Base HW 5ET=02 A. Provide firestopping system for pipe and conduit penetrations of fire evidence of patching. C Substrate Membrane Grouts Adhesives Sealers and Mortar Bed Accessories DOOR NUMBER= 101b rated wall and ceilingassemblies. E. Where patching occurs at painted surfaces, extend pain finish coating 1. Basis of Design= Materials by Laticrete with GreenGuard®Indoor Air B, Provide firesafing system for concealed spaces of non-bearing metal wall over entire unbroken surface. Re-coat as necessary to comply with Quality Certification, LEED Compliant Systems. EACH TO NAVE= frame with fire retardant treated wood blocking. appearance requirements of Section 09900 INTERDENT F. Patch and maintain fire resistive construction at construction joints, 1101 SE Tech Center Drive 2. Waterproofing Membrane= ASTM C 836, Laticrete(§9235. 3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 3. Mortar= Latex-Portland Cement Mortar conforming to ANSI A118.4. 1 EA PUSH PLATE 8200 4" X 16" 630 IVE 2.01 Components voids, openings, and penetrations in accordance with Section 01 84 00. Suite 195 4. Grout= Polymer-modified the grout conforming to ANSI A118.1, 1 EA PULL PLATE 8302-6 4" X 16" 630 IVE A. Unfaced Mineral Fibrous Fire Safing Insulation 1.03 Execution Vancouver, WA 98683 D. Color: as selected by tenant, see material schedule sheet A2.01 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1. Industry Standard= ASTM C665, Type I. A. Coordinate floor slab cutting with landlord prior to proceeding with the 3.01 Performance 1 EA KICK PLATE 8400 10" X 2" LDW 630 IVE 2. Thickness= 4 inches, maximum. work. A. Verification of Conditions, 1 EA WALL STOP W5401CCV 630 IVE 3. Density= 4 pcf. 1. Examine substrate surfaces and conditions under which the work is to be 3 EA SILENCER SR66 GRY IVE 4. Fire Rating: ASTM E84, Class 1. DIVISION 3 - CONCRETE completed. B. Firestopping Mortars and Caulks= IHW SET= 03 1. Performance Requirements= Intumesced material capable of SECTION 03 30 00 CAST - IN - PLACE CONCRETE 2. Verify that surface of floor slab is within a inch in 10 feet for this set the and within inch in 10 feet for mortar bed tile. DOOR NUMBER= 105 expanding up to 10 times when exposed to temperatures beginning 1.01 Regulatory Requirements GENTLE j 3. Verify that concrete substrate is free of curing agents and has a light at 250 degrees F. A. Comply with provisions ACI 318 for Building Code Requirements. broom finish. EACH TO NAVE- 2. Industry Standard= Intumesced material with UL Classification B. Special Inspections= Comply with requirements of IBC.. Required during DENTAL 4. Start of tiles work will indicate acceptance of surfaces and conditions within 3 EA HINGE 5PB1 4.5 X 4.5 652 IVE approved ratings to 4 hours in accordance with ASTM E814, placement of concrete with specified 28 days strength greater than each area. 1 EA OFFICE LOCK AL50PD NEP 626 SCH C. Composite Firestopping Sheets and Strips= 2500 psi, B. Surface Preparation 1 EA WALL STOP W5401 CCY 630 IVE 1. Performance Requirements= Intumesced material capable of 1.02 Coordination DENTAL OFFICE 1. Clean existin concrete floor surfaces as recommended in forward to ANSI 3 EA SILENCER SR66 GRY IVE expanding up to 10 times when exposed to temperatures beginning A. Finish Flooring: Coordinate with carpeting and resilient flooring Sections G g at 250 degrees F. to prevent moisture conditions, bond breaking curing agents, and alkaline TENANT '4108.5• HW SET, 04 2. Industry Standards- UL Classification approved ratings up to 4 hours conditions at interior concrete slabs which are incompatible with 2. Install waterproofing membrane. p g in accordance with ASTM E814. manufacturers warranty provisions. IMPROVEMENTS C. Manufacturer's Instructions DOOR NUMBER= 106, 101, 109, 114, 116, 128 1. Comply with mortar and grout manufacturer's printed installation instructions. EACH TO HAVE: 3. Composition= 28 gauge galvanized steel backing, ceramic core, with 2.01 Materials 2. Com I with the manufacturer's rimed installation instructions. 3 EA HINGE 5PB1 4.5 X 4.5 652 IVE hexagon shaped steel wire mesh and aluminum foil face. A. Portland Cement= ASTM C150, Type 1 - Normal, p y p 1 EA PASSAGE SET AL10S NEP 626 SCP 4. Sheet size: '/4 by 36 by 36 inches. B. Fine and Coarse Aggregate= ASTM C33 Angular Coarse Aggregate, D. Installation of Floor Tile on Concrete on Grade: Comply with ANSI A108.1, ANSI maximum 11 inch diameter. TIGARD TOWNE SQUARE A108, and TGA F122. 1 EA WALL STOP W,5401 CGV 630 IVE 5. Strip size- /4 by 2 by 24 inches. 2 E. Installation of Tile Joints 3 EA SILENCER SR66 GRY IVE D. Penetration Collars= C. Water= Comply with ASTM C94. 1. Overall Height: 434 inches. D. Sand= ASTM C33. SHOPPING CENTER 1. La the in rid pattern with aligned joints. g 1600 SOUTHWEST P g p g HW SET, 05 2. Composition: Galvanized steel restricting collar with notched to E. Fly Ash= ASTM C618, Class F Pozzolan, must not inhibit air entraining of 2. Adjust location of joints to minimize tile cutting. p g p concrete. DOOR NUMBER= 104, 110, 115, edge and flanged tabs with mounting holes. PACIFIC HIGHWAY 3. Install uniform the joints. 2.02 Admixtures 4, install sealant specified Section 01 92 00. EACH TO HAVE: SECTION 01 92 00 JOINT SEALERS A. Air Entrainment: ASTM C260 SUITE S 3 EA HINGE 5PB1 4.5 X 4.5 652 IVE 101 Environmental Requirements 1. For exterior concrete TIGARD, OR 97224 SECTION 09 51 13 ACOUSTICAL CEILING PANELS . aB. Fiber Reinforcement- Synthetic Industries®, Fibermesh® InforceTm e3TM 1.01 Materials 1 EA PRIVACY LOCK L9496P 11A L583-363 626 SCN A. Do not install solvent curing sealants in enclosed building spaces. y 1 EA WALL STOP WS401 CCV 630 IVE B. Maintain temperature and humidit A. Lay in acoustical type 3 SET SOUND SEAL S88D (HEAD AND JAMBS) BRN PEM manufacturer P recommended by the sealant micro-reinforcement system. 1. For interior concrete slabs scheduled to receive carpeting, tile, and 1. Fire resistance' Class A. manufacturer during and after installation. 2. 15/16" angled tegular 2.01 Materials 2.03 Accessorieset floor finishes. 3. 2'x4'x4" HW SET= 06 A. General Sealant= Printable, siliconized acrylic latex sealant, complying DOOR NUMBER= 111 with ASTM C834. Where installed at non-painted surfaces, match A. Bonding Agent= ASTM C1059 Type 11 and ASTM C1042 Type 11 acrylic ISSUE DATE: 6 April 2012 B. Designator; ACPemulsion designed to ermanentl bond new concrete and Portland JOB NUMBER: 323 C. Finish as selected by tenant, see material schedule sheet A2.01 adjacent field color or provide colors as selected by Architect. g p y EACH TO HAVE, 1. Sonneborn, sonolac, Acrylic Latex. cement sand mixes to horizontal and vertical in-place concrete at interior 3 EA HINGE 5PB1 4.5 X 4.5 652 IVE 2. DAP, Acrylic Latex. and exterior conditions. SECTION 09 51 23 ACOUSTICAL CEILING TILES 1 EA CLASSROOM LOCK AL 10PD NEP 626 SCN 2.04 Mix Design 1.01 Install on walls above protective wall covering in mechanical room, full height and 3. Pecos, AC-20 Acrylic Latex. g � p g g A. Proportioning= Conform to requirements ACI 318, 1 EA WALL STOP W3401 CGY 630 IVE 4. Tremco, Acrylic Latex 834. mechanical room ceiling B. Strength Minimum 2,500 psi 28 day strength. I SET SOUND SEAL SSSD (HEAD AND JAMBS) BRN PEM �I 2.01 Materials B. Non-Exposed Gypsum Board= Synthetic rubber sealant complying with 1 EA DOOR BOTTOM 4131CNE3L - SEMI-MORTISE AL PEM ASTM D211. C. Water/cement Ratio= 0.45. A. Armstrong ®Cortega Minatone, No. 145 1. Tremco, Acoustical Sealant. D. Fly Ash= 159o, maximum LU 1. Tile size= 12inches by 12inches by g inch E. Air Entrainment: Approximately 5io for concrete exposed to elements. C. Threshold Sealant= Consistency for use with gun or knifes without paint pp y p B. Accessories, provide as needed for complete installationfinish, light gray color. F. Fiber Reinforcement= Add in proportion to design mix as instructed by 1. Adhesives W.W. Henry Co. No.@231 fire rated SECTION OS 80 00 GLAZING 1. Sonneborn, Sonolastic NP2. manufacturer. Acoustic - Gum acoustical the 3.01 Placing Concrete 1.01 Qualit Assurance 2. Tremco, NPL. g P.. PROJECT adhesive or as recommended by manufacturer A. Perform Work in accordance with FGMA Glazing Manual glazing installation D. Primer= as required or recommended by manufacturer. A. Place concrete in accordance with ACI 304. 2. Edge molding: white metal U - molding or white plastic T- molding for P g g g 1. Where new concrete is to be laced against hardened concrete, methods. E. Backer Rods Non-adhering closed cell polyethylene foam rod, Y3 greater p g SPECIFICATIONS inch tile, at all exposed edges. 1.02 Submittals than width of joint where it is to be installed. coat surface of hardened concrete with concrete bonding agent. 3. Other Accessories= In accordance with manufacturer's installations or 2. Do not interrupt successive placement; do not permit cold joints recommendations for conditions of installation. A. Fabricator= provide detailed design drawings, analysis and test data to meet requirements IBC 2403. Fm to occur. Place each lift while previous lift is still plastic. _ ig B. Shop Drawings indicate glass type, size, support spacing, and holes for B. Conform to ACI 305, recommended practice for hot weather concreting C. Conform to ACI 306, recommended practice for cold weather attachment of appurtenances. concreting. UJ 1. Do not place concrete on ice or frozen ground. 3.02 Curing L A0003 A. Cure floor surfaces in accordance with AGI 308. DIVISION 10 - SPECIALTIES SECTION 09 53 00 CEILING SUSPENSION SYSTEMS 1.01 Performance Criteria SECTION 10 26 23 PROTECTIVE WALL COVERING A. Maximum deflection Y36o under maximum uniforml distributed load in E I C 1.01 Requirements accordance with ASTM C635, Table 1, Intermediate Duty assembly. A. Classification= Class A in accordance with ASTM E&4. 2.01 Materials LANCIAULIF B. Flexural Strength- 10,000 psi, minimum, when tested in accordance with A. Suspended Acoustical Lay-in Framing System- Heavy Duty ASTM C190. 1. ASTM A366, roll formed steel with minimum yield strength of 33,000 ARCHITECT C. Barcol Hardness- ASTM D2583, 35 minimum. psi. D. Abrasion Resistance- 0.0205. maximum weight loss when tested in 2. Electrogalvanized. accordance to Taber Test. 3. Factory-applied baked-on enamel paint finish, color white. 3016 nw gravenstein street 2.01 Materials 4. Main Runner (Tees): 0.015 inch thick steel 15/i6 inch wide by 1Y2 inches camas,washington 98607 A. Composition= Modified polyester copolymer with inorganic fillers and high. v. 360.798.3801 random chopped fiberglass roving (glass fiber reinforced plastic). 5. Cross Runners(Tees)- 0.015 inch thick steel, i5/r, inch wide by lY f. 360.833.0585 B. Thickness 0.090 inch, minimum inches high. C. Trim and Fittings= As recommended by manufacturer. B. Accessories D. Color and Finish= As selected by owner from manufacturer's standard 1. Hanger Wire- Minimum 12 gauge galvanized soft annealed mild steel range of colors and finishes. wire when spaced at 4 foot intervals, except where S gauge is required by loading conditions in accordance with ICCES ER1905, SECTION 10 44 10 INTERIOR SIGNAGE Ceiling Suspension Systems. 1.01 Submittals 2. Tie Wire- 18 gauge, galvanized soft annealed steel wire. A. Shop Drawings- Provide dimensioned drawings and mounting details for 3. Fastening Devices- Comply with ASTM C636 and as instructed by concourse signage. manufacturer. 1. Submit to Architect for review and approval. C. Supporting Capacity- lOOlbs, minimum. 2.01 Materials 4. Escutcheons= Provide oversized escutcheons where required. A. Toilet Room Signs- Color phenolic core with laminated contrasting 5. Wall Molding- 2 inch legs, finish to match ceiling assembly. colored melamine face on both sides, 0.125 inch total thickness. 6. Stabilizer bars, splices, and expansion joints as required for complete 1. Letter Style= Helvetica Medium or approved. system installation. 2. Colors= 3.01 Installation a. Background= as selected From manufacturer's standard colors. A. Conform to Ceiling and Interior System Construction Association (C1SCA) b. Raised letters foiled hot stamped colors= black or white. Guidelines for Seismic Restraint for Direct Hung Suspended Ceiling 2.02 Toilet Room Sign Mounting Assemblies. A. Foam tape and glue. B. Mounting height= As required. SECTION 09 65 00 VINYL COMPOSITION TILE AND BASE 1.01 Manufacturer A. Flooring= As selected by tenant, see Material Schedule, sheet A2.01 SECTION 10 26 29 CORNER GUARDS B. Flooring Accent- As selected by tenant, see sheet A2.01 1.01 Materials 1. 12 inch by 12 inch. A. Clear butyrate, 0/4" x 111/4" x 48" with mechanical fastener 2. LCA, 2100, VCT adhesive 1. Install at top of wall base. C. Base= Roppe, as selected by tenant, see Material Schedule, sheet A2.01 1. 4 foot lengths D. Rubber Transitions SECTION 10 52 20 FIRE EXTINGUISHER CAB I NETS 1. #111 carpet the jointer ODARC 1.01 Materials 2. #169 carpet reducer A. J.L. Industries,&, Ambassador model 1811F11. 3. #112 VCT reducer 1. Accommodate 5 Ib fire extinguisher ERiCTHOKAS[ 2. Extinguisher type- Class 2A/10-BC SECTION 09 68 13 TILE CARPETING 3. Mount top of cabinet 0 4'-0" AFF 1.01 Requirements A. Class 1 in accordance with ASTM E84. Environment Requirements. SECTION 10 SO 00 TOILET ROOM AND OPERATORY ACCESSORIES B. Provide permanent HVAC operation minimum 2 weeks prior to installation. 1.01 Sequencing and Scheduling G. Provide permanent lighting prior to installation. CAMAS,WA A. Coordinate the work of this Section with the Placement of Internal wall D. Maintain room temperature between 60 degrees F and 90 degrees F and � 4942 reinforcement to receive anchor attachments. relative humidity ranging From 255. to 509. prior to, during, and after .''� 2.01 Manufacturer installation of carpeting. OF A. American Specialties, Inc., unless noted otherwise E. Concrete moisture- Test concrete surfaces prior to installation of 1. Mirror- 20650 24"x36". carpeting for moisture content as recommended by manufacturer. 2. Paper Towel Dispenser With Waste Receptacle- 64623 2.01 Materials 3. Paper Towel Dispenser- 0215. A. Carpet Tile- As selected by tenant, see Material Schedule, sheet A2,01 EXPIRES: 06.30.2012 4. Toilet Paper Dispenser- 20031. 1. 2 feet by 2 feet carpet tile. SIGNED: 04.06.12 5. Grab Bar- Model 3100, 2. Patcraft 5100, pressure sensitive adhesive. 6. Seat Cover Dispenser- 6411. B. Resilient Base- As specified Section 09 65 00. 1. Cup Dispenser- 0002-5M. 3.01 Preparation S. Xray Apron Hanger- 0155-55, 24" wide OR Gamco, 100 Series A. Seal concrete subfloor in accordance with carpet manufacturer's Grab Bar with concealed flanges, color white, 24" wide recommendations, B. Concrete testing- test concrete subfloor for moisture levels in accordance with manufacturer's recommendations. C. Notify Architect of testing results and any unsatisfactory conditions. Q 3.02 Installation A. Install in accordance with manufacturers recommendations and requirements. SECTION 09 90 00 PAINTS AND COATINGS 1.01 Environmental Requirements Q A. Provide continuous ventilation and heating facilities to maintain surface and ambient temperatures above 45 degrees F for 24 hours before, during, Q and 48 hours after application of finishes, unless required otherwise by manufacturer's instructions. Q 2.01 Finishes A. Paint colors- Manufacturer's name used in color selection for purpose of Q color matching only and does not accept Manufacturer for all coating products unless specifically indicated. Q 1. P-1- As selected by tenant, sae Material Schedule, sheet A2.01 2. P-2- As selected by tenant, see Material Schedule, sheet A2.01 REVISIONS DATE A. Furnish drop cloths, shields, and protective methods to prevent spray and droppings from disfiguring other surfaces. 3.02 Painting Schedule A. Gypsum Board, General Use 1. Acrylic Primer Coat a. Benjamin Moore Super Craft Interior Latex Primer, 250 2. Two Coat Acrylic Eggshell Finish INTERDENT a. Benjamin Moore ben Interior Acrylic Latex Eggshell, W626 1101 SE Tech Center Drive 1. 1.3 mil DFT per coat. Suite 195 B. Gypsum Board, Utility Areas- Includes walls and ceilings of areas subject to Vancouver, WA 98683 moisture such as toilet rooms, mechanical rooms, lab, and sterilization area. 1. Acrylic Primer Coat a. Benjamin Moore Super Craft Interior Latex Primer, 250 2. Two Coat Acrylic Semi-Gloss Finish a. Benjamin Moore ben Interior Acrylic Latex Semi-gloss W627 1. 1.5 mil DFT per coat. G E N'T L E DENTAL DENTAL OFFI E TENANT IMPROVEMENTS TIGARD TOWNE SQUARE SHOPPING CENTER 16200 SOUTHWEST PACIFIC HIGHWAY SUITE S TIGARD, OR 97224 ISSUE DATE: 6 April 2012 JOB NUMBER: 323 Ion UJ PROJECT SPECIFICATIONS ERIC EQUIFMENT LANCIAULT ARCHITECT MODEL COLA HOT REDUCED NATURAL TANKDEDICATED LOW REMOTE LOCATION ON ITEM MFR EQUIPMENT DESIGNATION WATER WATER DRAIN PRESSURE AIR GAS VACUUM NITROUS, PENT ELECRICAL VOLTAGE, AMPERAGE CIRCUIT VOLTAGE SWITCH DRAWINGS DESIGNATION 3016 nw gravenstein street DEVICE OXYEN camas,Washington 98607 v. 360.798.3801 f. 360.833.0585 1 PELTON 4 CRANE WORK STATION AT CHAIR (PART OF ITEM 2) TBD X X X 115V, 20A OPERATORIES, A2.01 SPIRIT HYDRAULIC CHAIR W/ENTERPRISE PACKAGE 115V, SA FLOOR OR OPERATORIES, 2 PELTON CRANE UTILITY CENTER 1800 SERIES X WALL MOUNTED A2.01 RECEPTACLE LFTI I, QUIET 3 PELTON CRANE LIGHT FANTASTIC II SINGLE TRACK MOUNT TRACK LIGHT 045515GY X 120V, 1.6A OPERATORY, T A2.02 4 50REDEX CRANEX PANORAMIC CEPHALO-METRIC XRAY D-9C X 120V, 16A XTYPE X-3, X-3 EO.O1 5 INSTRUMENTARIUM INTRAORAL XRAY FOCUS X 115V X TYPE X-1, X-2, X-1, X-2 EO.O1 MECHANICAL 6 AIR TECHNIQUES AIR5TAR 50 OILLE55 AIR COMPRESSOR AS 50 X 208/23OV, 30A X X EO.O1, PO.O1 DA-1 A/A9.01 D ARC DENTAL VACUUM 5T546 WITH 8 GALLON CAS TANK, DRNA MECHANICAL 1 AIR TECHNIQUES AMALGAM 5PEPARATOR (FTIT), VACUUM EQUALIZER STS - 6 X X X X X 200/25OV, 20A X X X EO.01, PO.01 DV-1 ERIC TF10%S 1ANCRUIEf CLEAN5HIELD B, M/A9.01 8 PELTON 4 CRANE DELTA Q 10" STERILIZER 054200 X 115V, 15A X 5TEREO.OITION, t;0 CAMAS, VVA 4942 9 SCICAN STATIM 500012000 AUTOCLAVE 201103 X 115V, 11.3A X STERILIZATION, EO.01 FLOW METER SYSTEM PORTABLE NITROUS/OXYGEN SYSTEM 10 PORTER 3445-2AV X MOBILE W/MOBILE STAND 4 SCAVENGER EXPIRES: 06.30.2012 SIGNED: 04.06.12 11 SULTAN CHEMIST PRO-SONIC 1000 ULTRA50NIC CLEANER 61095 X X 115V STERILIZATION, EO-01 12 GLECO PLASTER TRAP GT-64 X WT-1 AB, PO. G/A9.01 13 BUFFALO MODEL TRIMMER, 10 INCH, Y2 HP 611LAB, EO.O192 X X X X 115V, lOA P0.01, H/A9.01 14 TBD LATHE TBLAB EO-01,D X 115V PO.01 m 15 BUFFALO VACUUM FORMER 80186 X 115V LAB, EO.01 REVISIONS DATE 16 DRNA AMALGAM SEPARATOR (PART OF ITEM 1) FTIT 9Vdc - 12Vdc, 2A MECHANICAL, P E 13U 10 30 X X (MAX) J/A9.01 11 AIR TECHNIQUES VACUUM EQUALIZER (PART OF ITEM 1) P/N 56200 X 115/208 OR 230. 15A X X X MECHANICAL, VE-1 EO.01 INTERDENT 1101 SE Tech Center Drive Suite 195 18 KAYO HAND PIECE CLEANER QUATTROCARE X X 120V STERILIZATION, Vancouver, WA 98683 N/A9.01 TBD* - TO BE DETERMINED. LATHE TO BE TABLETOP MODEL, NO GA5, NO WATER, NO AIR. GENTLE NOTES GENERAL CONDITIONS T I ONS GENERAL DENTAL ALL PLUMBING AND ELECTRICAL LINES TO BE CONCEALED UNLESS OTHERWISE SPECIFIED. HENEY SCHEIN DENTAL TO THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR THE EXECUTION OF NIS/HER WORK AND FOR ANY CHANGES EQUIPMENT SPECIALISTS. AND/OR DEVIATIONS FROM EQUIPMENT DRAWINGS OR SPECIFICATIONS MADE WITHOUT PRIOR WRITTEN APPROVAL FROM THE ASSEMBLE AND PLACE VACUUM PUMP 4 AIR COMPRESSOR. ELECTRICAL CONTRACTOR PLUMBER TO MAKE OWNER AND/OR THE OWNERS EQUI MENT S CIA IST. TH COST OF CO ECTIONS RESULTING FROM CHANGES ANP/OR HENRYSCHEIN DENTAL IS REFERRED TO AS THE EQUIPMENT VENDOR ENGAG Y TH ®ENTAL OFFICE CONNECTIONS. P PE L E RR R EDB E OWNER UNDER A SEPARATE DEVIATIONS SHALL BE BORNE BY THE CONTRACTOR. CONTRACT. HENRY SCHEIN CONTACT IS SCOTT GRAVERSON (SOO)645-6594. TENANT ALL LABOR AND MATERIAL NECESSARY FOR CHANGES IN EXISTING PLUMBING, CARPENTRY AND ELECTRICAL WORK MUST THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE OWNER'S CONSULTANT FROM AND AGAINST DURING CONSTRUCTION, HENRY SCHEIN DENTAL'S REPRESENTATIVE WILL BE AVAILABLE TO ASSIST IN THE INTERPRETATION BE DONE AND SUPPLIED BY THE CONTRACTOR. ALL CLAIMS FOR DAMAGE TO PERSON AND/OR PROPERTY SUFFERED AS A RESULT OF THE PERFORMANCE OF WORK, WHETHER OF DRAWINGS AND SPECIFICATIONS AND FOR PERIODIC FIELD VISITS. VISITS INCLUDING A PRE-CONSTRUCTION JOB MEETING, IMPROVEMENTS ROUGH - IN AND FINISH WORK FOR DENTAL EQUIPMENT IS TO BE ACCORDING TO TEMPLATES FURNISHED BY THE OR NOT, CAUSED BY NEGLIGENCE, AND ANY EXPENSES (INCLUDING, WITHOUT LIMITATIONS, ATTORNEY'S FEES AND PERIODIC LAYOUT CHECKS AND SUPPLYING INSTRUCTIONS TO THE VARIOUS TRADES IN THE WORK PERTAINING TO DENTAL DISBURSEMENTS) INCURRED IN THE CONNECTION THEREWITH. EQUIPMENT. PROVIDE REASONABLE ADVANCE NOTICE TO HENRY SCHEIN DENTAL OF ANY VISIT REQUESTS.STS.MANUFACTURERS OF EQUIPMENT BEING INSTALLED. A REPRESENTATIVE OF SULLIVAN SCHEIN DENTAL WILL POSITION THE AR TEMPLATES IN THEIR PROPER LOCATIONS, AT WHICH TIME ALL SPECIFICATIONS ON THE PLANS WILL BE EXPLAINED TO THE TIGARD TOWNE SQUARE THE CONTRACTOR SHALL INSURE THE PROTECTION OF ALL EQUIPMENT FURNISHED UNDER HIS/HER CONTRACT AND BY IT REMAINS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO HAVE PLUMBING, WIRING AND BACKING CHECKED CONTRACTOR OR SUBCONTRACTOR(S). ANY INFRACTIONS ON SIZES OR HEIGHTS OF PIPES, TUBING AND/OR FITTINGS WILL HAVE SHOPPING CENTER OTHERS. BEFORE POURING SLABS, SEALING PART I T I ONS AND CEILING. TO BE CONNECTED BEFORE THE EQUIPMENT CAN BE INSTALLED AND SUCH EXTRA EXPENSE WILL BE THE RESPONSIBILITY OF THE 16200 SOUTHWEST CONTRACTOR AND/OR THE SUB. THE TENANT (OWNER) RESLRVES THE RIGHT TO PERFORM WORK RELATED TO THE PROJECT WITH HIS OWN FORCES, AND TO A PRE - CONSTRUCTION MEETING IS REQUIRED WITH THE GENERAL CONTRACTOR, PLUMBER, ELECTRICIAN, CABINET MAKER PACIFIC HIGHWAY AWARD SEPARATE CONTRACTS IN CONNECTION WITH OTHER PORTIONS OF THE PROJECT OR OTHER WORK ON SITE UNDER THESE AND HENRY SCHEIN DENTAL. ALL TEMPLATES CRITICAL TO EQUIPMENT INSTALLATION WILL BE DIST I UT AT THIS MEETING. CONT ACT R B ED i R OR SHALL REMOVE RUBBISH AND DO ALL PATCHING AFTER OUCH IN IS COMPLETE.R PLESUITE S OF SIMILAR CONDITIONS OF CONT ACT. IF TN CONTRACTOR CLAIMS THAT DELAY OR ADDITIONAL COST IS INVOLVED BECAUSE R E RA R L OF SUCH ACTION BY THE OWNER, HE SHALL MAKE SURE CLAIM AS PROVIDED ELSEWHERE IN THE CONTRACT DOCUMENTS. HENRY - SCHEIN DENTAL'S REPRESENTATIVE WILL INSPECT PREMISES PRIOR TO THE INSTALLATION OF ITS EQUIPMENT AT TIGARD, OR 97224 ROUGH-IN AND FINISH WORK FOR DENTAL EQUIPMENT IS TO BE ACCORDING TO TEMPLATES FURNISHED BY THE WHICH TIME ALL FINISHES (CEILINGS, FLOORING, PAINTING AND DECORATING) AND MECHANICAL WORK MUST BE COMPLETED. MANUFACTURERS OF EQUIPMENT BEING INSTALLED. A REPRESENTATIVE OF HENRY SCHEIN DENTAL WILL POISTION THE THE CONTRACTOR SHALL AFFORD THE OWNER AND SEPARATE CONTRACTORS REASONABLE OPPORTUNITY FOR THE RESPONSIBILITIES FOR THE INSTALLATION AND/OR HOOK-UP OF DENTAL EQUIPMENT WILL BE DEFINED N E I THE SPECIFICATIONS TEMPLATES IN THEIR PROPER LOCATIONS, AT WHICH TIME ALL SPECIFICATIONS ON THE PLANS WILL BE EXPLAINED TO THE INTRODUCTION AND STORAGE OF THEIR MATERIALS AND EQUIPMENT AND THE EXECUTION OF THEIR WORK, AND SHALL CONNECT FOR EACH TRADE. CONTRACTOR OR SUBCONTRACTORS. ALL SPECIFIED SIZES OF PIPES, TUBING FITTINGS, ETC MUST BE RIGIDLY FOLLOWED AS AND COORDINATE THEIR WORK WITH OTHERS AS REQUIRED BY THE CONTRACT DOCUMENTS. ANY COSTS CAUSED BY DEFECTIVE WELL AS PROPER HEIGHTS MARKED. ANY WORK FOUND NOT TO FOLLOW SPECIFICATIONS SHALL BE REMOVED AND AND/OR ILL-TIME WORK SHALL BE BORNE BY THE PARTY RESPONSIBLE THEREFORE. THE CONTRACTOR IS TO INCLUDE THE FINAL NOOK-UP TO ALL DENTAL EQUIPMENT. THE INSTALLATION DATE TO BE CONFORMING WORK SHALL BE INSTALLED AT THE EXPENSE OF THE CONTRACTOR. COORDINATED WITH HENRY SCHEIN DENTAL. ISSUE DATE: 6 April 2012 THE CONTRACTOR SHALL PARTICIPATE AT J0P_ COORDINATION MEETINGS WITH HENRY SCHEIN DENTAL AND ENSURE JOB NUMBER: 323 ATTENDANCE OF REPRESENTATIVES OF THE MECHANICAL TRADES. THE HENRY SCHEIN DENTAL REPRESENTATIVE SHALL GIVE INSTRUCTION TO THE GENERAL CONTRACTOR R R ON YL . ALL COMMUNICATIONS AND COORDINATION WITH TRADESMEN SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS ALL TRADES SHALL DO THEIR OWN CUTTING. THE GENERAL CONTRACTOR SHALL DO ALL PATCHING TO CONFORM TO MATERIAL, PREDETERMINED TO BE OTHERWISE. TEXTURE, AND SURFACE ALIGNMENT WITH THE ADJOINING SURFACE AND FINAL TOUCH UP OF ALL FINISHED SURFACES. THE GENERAL CONTRACTOR MUST SIGN AN EQUIPMENT SHEET FURNISHED BY HENRY SCHEIN DENTAL STIPULATING THAT THE CONTRACTOR SHALL ENSURE THE PROTECTION OF ALL EQUIPMENT FURNISHED UNDER NIS/HER CONTRACT AND BY OTHERS. HE/SNE UNDERSTANDS AND WILL COMPLY WITH ALL SPECIFICATIONS BEFORE THE WORK WILL START. A SIGNED COPY OF THE PLANS ARE TO BE RETURNED TO THE TENANT AND HENRY SGH IN DENTAL. PRIOR TO THE FLOOR POUR-BACK AND WALL FRAMING COVER, CONTRACTOR SHALL CONTACT HENRY SCHEIN FOR INSPECTION OF SYSTEMS TO BE COVERED. EQUIPMENT THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE EXECUTION OF THIS WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AND TO FURNISH ALL LABOR AND MATERIALS REQUIRED THEREOF, INCLUDING WORK NOT EXPRESSLY INDICATED IN THE DRAWINGS AND SPECIFICATIONS AS NECESSARY TO COMPLETE FIRST CLASS CONSTRUCTION. THE LIST CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE DRAWINGS SPECIFICATIONS AND CONDITIONS THIS c COVERING ER � JOB. B THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR THE ACCURACY OF FIELD MEASUREMENTS AND CONDITIONS AND SHALL BE RESPONSIBLE FOR THE PROPER MODIFICATIONS TO ANY EXISTING WORK. PREVIOUSLY INSTALLED WORK AND/ Uj OR OTHER TRADES. WRITTEN APPROVAL MUST BE OBTAINED FROM THE EQUIPMENT SPECIALIST BEFORE ANY CHANGES AND/ OR DEVIATIONS FROM DRAWINGS AND SPECIFICATIONS ARE MADE. Aom05� RESPONSIBILITY SCHEDULE ERIC LEGEND: O - EXISTING 1 - NEW L - LANDLORD T -TENANT (GENTLE DENTAL) V - OWNER'S VENDOR C - CONTRACTOR LANCIAULT FURNIS INSTALL FURNIS INSTALL ARCHITECT DESCRIPTION HED BY ED BY SUPPLIER CONTACT REMARKS DESCRIPTION HED BY ED BY SUPPLIER CONTACT RAMARKS LTVCLTVC TLTVCLTVC 3016 nw gravenstein street TAR F camas, washington 98607 E RONT ENERAL v. 360.798.3801 CONCRETE SLAB X X 0 - EXISTING 5 N f. 360.833.0585 STRUCTURAL STEEL FRAMING X X p E G LAS O GRADE STOREFRONT GLAZING AND MULLION SAW CUT 5LA13 / TRENCHING OR CORE X X 1 - REMOVE (E) DOOR, ADD (N) MULLION 5Y5TEM PER PLAN BILLING / CONCRETE POUR-SACK X X 1 - SEE AO.03 5PECIFICATION5 FOR CONCRETE MIX AND REINFORCEMENT Y5TEM STOREFRONT ENTRANCE DOOR AND DEMOLITION X X LAZINGX Ix 1 - REMOVE (E) GLAZING AND MULLION SYSTEM, ADD (N) DOORS PER PLAN DUMP5TER5 X X 1 - COORD I NATE LOCATION WITH LANDLORD CONSTRUCTION BARRICADESX 1 - COORDINATE LOCATION WITH LANDLORD X TEMPORARY UTILITIES X X 1 - COORDINATE LOCATION WITH LANDLORD DOORS LTVCLTVC JANITORIAL SERVICE - FINAL EXTERIOR DOORS HARDWARE X1 X X 1 -- PANIC DEVICES, SEE SPECIFACATIONS LEANING X X INTERIOR INITIAL WINDOW CLEANING 1XI 1XI DOORS ER R D OR __ X X 1 SEE SPECIFICATIONS DOOR HARDWARE / DOOR FRAMES XX 1 -- SEE SPECIFICATIONS LOCK CORES __ X Ix 1 FINAL KEYING BY TENANT, COORDINATE WITH VENDOR EQUIPMENT L T V C L T V C FIRE EXTINGUISHERS X1 I X 1 -- INCLUDING CABINETS; VERIFY LOCATION WITH FIRE MARSHAL SCOTT GRAVERSEN EILING/SOFFITS LTVCLTVC DENTAL EQUIPMENT X X HENRY SCHEIN 1 -- COORDINATE INSTALLATION W/ VENDOR (253) 961-8410 GW SOFFIT / C B S CEILINGS INCLUDING X X __ COMPUTER5 I FAXES / PRINTERS I SPEN51ON SYSTEM 1 SEE A2.02 AND SPECIFICATIONS ERVERS X X 1 - COORDINATE NECE55ARY CONDUIT FOR CONCEALED RACEWAYS ACOUSTICAL CEILING PANEL WITH X X 1 -- SEE A2.02 AND SPECIFICATIONS SOUND 5Y5TEM RACEWAY, ROUGH-IN MANNY VELLEJ05 1 - SPEAKERS PROVIDED AND INSTALLED BY VENDOR, TERMINATIONS BY VENDOR; USPENSION SYSTEM - X X tELEDIGIT ASL I NG 503) 122-8084 OORD I NATE 4 INSTALL ALL NECE55ARY CABLING, SEE A2.02 DIRECT-APPLIED ACOUSTICAL TILE X X 1 -- SEE A2.02 AND SPECIFICATIONS IT EQUIPMENT CABLING / COMPUTER ABLING / VOIP CABLING / LOW X X 1 - COORDINATE SCHEDULING WITH LOW VOLTAGE TERMINATION TEM I NATION VEN DO ROLTAGE CABLING -- RACEWAY ERIC'TOMAS �CALLS LTVCLTVC NNCI SLT OUGH- C I TCA CABLING I COMPUTER EM151NG WALL WITH GWB FINISHES X X O -- SEE NOTE 1 E QUI M NT P E SL P ER ABLING / VoIP CABLING / LOW x K 1 - COORDINATE SCHEDULING WITH LOW VOLTAGE TERMINATION VENDOR EXPOSED STRUCTURAL COLUMN FINISHNOT USED VOLTAGE CABLING (� NTERIOR NON-LOAD SEARING IT EQUIPMENT CABLING / COMPUTER CAMAS X X 1 -- SEE 5PECIFICATION5 AND SHEET A4.o1 OR A4.01 ALT, SEE NOTE 3, TYP ABLING / VoIP CABLING / LOW TELEDIGIT MANNY VELLEJ05 1 - COORDINATE SCHEDULING WITH LOW VOLTAGE TERMINATION VENDOR r 49- ART I T I ONS AND FIN 15H s (503) 122-8084 OLTAGE CABLING -- TERMINATIONS STRUCTURAL BACKING / FRAMING 1 -- COORDINATE LOCATION WITH INTERIOR ELEVATIONS AND VENDOR OF � R G X X QU I REMENTS TELEPHONE JUNCTION SOX NOT USED EXTERIOR WALL FRAMING X X O -- NOTIFY ARCHITECT OF ANY DAMAGE TO FRAMING SECURITY SYSTEM NOT USED EXTERIOR WALL FURRING GWB FINIS X X -- H O PATO 4 REPAIR FINISH AS NECESSARY FOR PROJECT COMPLETION, NOTE 2, VERIFY SOUND PROOFING X X 1 -- SEE WALL TYPES 4 MECHANICAL ROOM FIN 15HE5 2012 SIGNED: 0 EXPIRES: 06.30.6.30. 2 WALL FINISH X1 X1 1 __ SEE A2.01 MECHANICAL LTVCLT V C ER GUARDS X X 1 SEE SPECIFICATIONS AND SHEET A2.01 COR N __ HVAC EQUIPMENT (ROOF TOP UNITS) X X 0 - SEE MECHANICAL DRAWINGS D EXHAUST FANS X X 1 - SEE MECHANICAL DRAWINGS THERMOSTATS AND SENSORS X x I - SEE MECHANICAL DRAWINGS FLOORING LTVCLTVC PACIFIC MODULAR JIM C00KE (911) 510-1381 AIR BALANCING REPORT X x I- BY HVAC SUBCONTRACTOR �- DAMPERS X X 1 - SEE MECHANICAL DRAWINGS CARPET X x 1 SEE A2.01 FLOOR PLAN AND MATERIAL SCHEDULE COORDINATE VENDOR RD E W/ TILE X X 1 -- SEE A2.01 F DIFFUSERS, GRILLS ZONE BOXIE5 x x 1 - SEE MECHANICAL DRAWINGS FLOOR PLAN AND MATERIAL SCHEDULE; COORDINATE W/ VENDOR 4 _ DUCTS X X 1 - SEE MECHANICAL DRAWINGS VCT X X 1 - SEE A2.o1 FLOOR PLAN AND MATERIAL SCHEDULE; COORDINATE W/ VENDOR SHEET VINYL E L X X 1 SEE A2.01 FLOOR PLAN AND MATERIAL SCHEDULE; GOO / II COORDINATE W VENDOR SASE / WAINSCOT X X 1 -- SEE A2.01 FLOOR PLAN AND MATERIAL SCHEDULE; COORDINATE W/ VENDOR -- ELECTRICAL LTVCLTVC Q TRANSITION STRIPS X X 1 COORDINATE W/ VENDOR GROUT X X 1 __ COORDINATE W/ VENDOR SERVICE X X O - EX15TING MAIN SERVICE SUITE PANELS X X 1 - PROVIDE AS INDICATED, SEE E1.00 EQUIPMENT ROUGH IN I X X 1 - SEE ELECTRICAL DRAWINGS REVISIONS DATE EQUIPMENT INSTALL FINISH x X 1 - SEE ELECTRICAL DRAWINGS OILET ROOM(S) ACCESSORIES LTVCLTVC EMERGENCY 4 EXIT LIGHT SYSTEM X X 1 - SEE ELECTRICAL DRAWINGS GRAB BARS X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS URVEILLANCE SECURITY ALARM DETECTORS NOT USED WASTE RECEPTACLES X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS LIGHT FIXTURES AND LAMPS X X I - SEE ELECTRICAL DRAWINGS INTERDENT PAPER TOWEL DISPENSERS X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS HVAC WIRING - LINE VOLTAGE X x 0 - RE-GABLE/RECONNECT AS NECESSARY TO MAINTAIN POWER CONNECTIONS 1101 SE Tech Center Drive HVAC WIRING 4 CONNECTIONS - LOW Suite 195 TOILET TISSUE DISPENSERS X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS VOLTAGE X x 1 - SEE MECHANICAL DRAWINGS, INSTALL THERMOSTATS AS INDICATED Vancouver,WA 98683 SEAT COVER DISPENSER X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS HVAC EQUIPMENT (ROOF TOP UNITS) X X 0 - EX15TING UNITS MIRRORS X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS TEMPORARY POWER IXI X 1 - SEE ELECTRICAL DRAWINGS, VERIFY WITH LANDLORD EXTERIOR LIGHTING X X O - SEE ELECTRICAL DRAWINGS AND NOTE 4 CONVENIENCE OUTLETS XX 1 - SEE ELECTRICAL DRAWINGSGENTLE I 1I MILLWORK/ FURNITURE L T V C L T VICI DENTAL EQUIPMENT WIRING / X x 1 - COORDINATE REQUIREMENTS W/ DENTAL EQUIPMENT SUPPLIER ONNECTIONS - LOW VOLT. -- ROUGH-IN DENTAL CABINETS / COUNTERS X X RS MANUFACTURING ROBERT 5TEVEN50N 1 -- REVIEW VENDOR-FURNISHED SHOP DRAWINGS; COORDINATE DIMENSIONS AND DENTAL EQUIPMENT WIRING / 425)114-1211 NSTALLATION WITH VENDOR ONNECTION5 - LOW VOLTAGE K K I - COORDINATE REQUIREMENTS W/ DENTAL EQUIPMENT SUPPLIER BREAKROOM TABLE 4 CHAIRS X X 1 -- CONTACT FACILITIE5'@INTERDENT.COM FOR DELIVERY SCHEDULING ABLING DENTAL OFFICE WAITING ROOM CHARS 4 ENDTABLE5 X X 1 -- CONTACT FACILITIE6'@INTERDENT.COM FOR DELIVERY SCHEDULING DENTAL EQUIPMENT WIRING / MANNY VELLEJ05 _ TENANT ONNECTION5 LOW VOLTAGE TELEDIGIT (503) 122-8084 1 COORDINATE SCHEDULING WITH LOW VOLTAGE VENDOR TASK CHAIRS X1 x 1 -- CONTACT FACILITIES�@INTERDENT.COM FOR DELIVERY SCHEDULINGTERMINATIONS IMPROVEMENTS DOCTOR / ASSISTANT STOOLSX X 1 -- CONTACT FACILITIE5'@INTERDENT.COM FOR DELIVERY SCHEDULING FIRE ALARM NOT USED TIGARD TOWNE SQUARE SHOPPING CENTER INTERIOR ACCESSORIES LTVCLTVC PLUMBING L T V C L T V C 16200 SOUTHWEST MICROWAVE X I X 1 -- CONTACT PAC ILITIE5 1NTERDENT.COM FOR DELIVERY SCHEDULING WATER SERVICE XX O - EXISTING DOMESTIC WATER LINE PACIFIC HIGHWAY REFRIGERATOR X X 1 -- CONTACT FAC I L I T I E50I NTERDENT.COM FOR DELIVERY SCHEDULING WATER INTO SUITE 1 - AS NECE55ARY FROM WATER SERVICE TO SUITE MECHANICAL ROOM WITH BACKFLOW SUITE S CUP D15PEN5ER5 X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS REVENTER TIGARD, OR 97224 ROUGH I N FOR EQUIPMENT X X j PLASTER BIN X X 1 -- SEE A1.01 INTERIOR ELEVATIONS EQUIPMENT HOOK - UP X X j XRAY APRON HANGER X X1 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONS FINAL CONNECTION X X PAPER TOWEL D15PEN5ER X X 1 -- SEE A1.01 INTERIOR ELEVATIONS AND SPECIFICATIONSISSUE DATE: 6 April 2012 WATER 4 5EWER LINES x X JOB NUMBER: 323 TOILET ROOM FIXTURES X X SIGNAGE LTVCLTVC WATER HEATER(5) 1XI X EXTERIOR STOREFRONT SIGNS RAMSAY SIGN DARIN HAUSER 1 -- INSTALL ALL POWER, CONDUIT AND J-BOXE5 A5 NECESSARY; COORDINATE WITH 51GNAGE FLOOR DRAINS / FLOOR 51NK5 IXI X (911) 221-4325 VENDOR , SEE AL50 NOTE O/EO.01 AIR DELIVERY SYSTEM IXI 1XI INTERIOR SIGNAGE K x 1 -- SEE A2.01 AND A5.01 VACUUM SYSTEM X X Uj STOREFRONT GLA55 FILM NOT USED WATER STUBS x x �A GRAND OPENING BANNER x 1 -- CONTACT FAC I L I T I E5,a I NTERDENT.COM FOR DELIVERY SCHEDULING M AIR 4 VACCUM PIPING X X EDUCED PRESSURE BACKFLOW RESPONSIBILITY NOTES= REVENTER X X 1 - AT MECHANICAL ROOM; AL50 AT LAB AS REQUIRED I. FI V _ SCHEDULE FIELD VERIFY E) DEMISING WALLS ARE IN PLACE AND FINISHED; WHERE INCOMPLETE, COMPLETE CONSTRUCTION AND FINISH ALL DEMISING WALLS TO BE FRAMED AND FINISHED FULL HEIGHT TO UNDERSIDE OF DECK. IRE PROTECTION L T V C L T V C 2. FIELD VERIFY (E) PERIMETER WALL FURRING AND FINISH ARE IN PLACE; WHERE INCOMPLETE, COMPLETE CONSTRUCTION AND FINISH; COMPLETE EXTERIOR WALL INSULATION INSTALLATION AS REQUIRED. SPRINKLER (MAIN) X X 0 - EXISTING MAIN 3. WHERE NOTED "SEE SHEET A4.01, CONTRACTOR HAS OPTION TO USE A4.01 ALT IN LIEU OF A4.01 SPRINKLER HEADS BRANCH LINES X O - NEW A5 REQUIRED UNDER DEFERRED SUBMITTALUj 4. VERIFY (E) EXTERIOR LIGHT LEVELS AT SUITE EXITS, WHERE LIGHT LEVEL DO NOT COMPLY WITH CODE REQUIREMENTS PROVIDE ADDITIONAL LIGHTING AS REQUIRED ERIC LANCIAULT ARCHITECT 3016 nw gravenstein street camas, washington 98607 v. 360.798.3801 f. 360.833.0585 S. W. DURHAMROAD (CO. RD. NO. x- 29 ) GA5 •d'i VALVE i7 R4 .p ad •_ ELECT . d ° VAULT -- .• 1 ° TEL .-.. .•• •'- -a •- •'d. •� .: .•d- • : .'q.. �}� PEDo o TEL — — 55.00 — — — — — — `/ J VAULT D 4 IG PFIG TEL VAULT a CT SIGN 81 POLE PED ... O — TEL �z vAULr p Gm " I e O LP CB a O fAR J Y♦ \r a•. LP O p O FLA �' POL dot r , LT LP F,� /� ji VA VA VA d `w/ CB a.� i 'w , .4 d O• I, r-c"•.J:"1 �,t--�1>.Ii-L�_f, YVL'1 •/ T N r °' • LP LP I r a•< EXPIRES: 06.30.2012 — °m SIGNED: 04.06.12 d' 9 BIKE, tN \ / I Fw x c e`° •I I�� '` G O GAS c .• LP G 4. ( c G G v O c c LP c c CB 0 CB / OU' ® LPO LP P CB O O L FN GB . ' ,. •:•_` ... - .d•'i ,°a �- _ "' • 4i i • _ d- ..•' •a.. _ .. a •• r. •d ` - .. •t - - - - d• j.d.•. a •• .. ad-. .'d L 'r....r ' .a" .°�. '.1 .; a _ S--'•: �. _ - - _ d•• •ee" - - - -.a V _ _ _ - - 5 IK _ B ti 4 a"°' _ _ d e •` ].. •" 'j ° •±' 1 BIKE' a: 13 a'•" a;_L-A a RAG a' :. %a i• `: �.• RACKS'-• O _�• �d 0 •r, • P -_ -- -_' '.� _ .• - REVISIONS •'�' D .. -,• ATE • •, ,� :; '.a.: _ a.: GARDEN u�uu,u---.. 1 GB •:•.'a. AREA OF TENANT IMPROVENMENT5 LP • INTERDENT e O ' V 1101 SE Tech Center Drive Suite 195 / (E) ACCE5516LE ROUTE = Vancouver, WA 98683 y /.• °•• .. ............. . (E) ACCE551BLE PARKING _ /�'1•� T EL GM p / p' •' T Klip • d T . RACKS .,e. CB CB d r I. ENTLE Gil C DENTAL �3 C- COMPA 3 ®ENTAL OFFICE ®GB U" WM a' . • 'TENANT ._ LOADING COMPACT R ..::'. - - - - - - IMPROVEMENTS • I POWER TRANS LP e°- P • ❑ ❑ OWER d• • - VAULT / L# T cuRB LI TIGARD TOWNE SQUARE c c c c I cB CB ® L.a 4 5 6 6 . 10 II b 13 I4 p5 ® SHOPPING CENTER a. G C C C G ••. p 0 TEL O 1.; SPEP Dp F1 r-1: MN GONNA LP ;FIREb PoDELE '�62 O SOUTHWEST FIRE FIRE FH VAULT LP VAULT Y�LT PACIFIC HIGHWAY • I.:,. O P SUITE S — — — — — — — — — — TIGARD, OR 97224 N RRC SITE PLAN ISSUE DATE: 6 April 2012 116411 = 11_011 s Ol.dw JOB NUMBER: 323 p g Uj 0 REFERENCE PSITE ERIC WALL AND PARTITION TYPE 5CH U b LANCIAULT GENERAL NOTES b 1:: _. � __— -- _ Ix_ _ .__ _ � _ _� --- b ,� ARCHITECT 1. BASIC WALL PARTITION TYPE !; / c<I.II j r O1 IS AT NEW STUD WALLS ANp MAY NOT ALWAYS BE REFERENCED 3016 nw gravenstein street ON / , , ;, camas,Washington 98607 _ -- f, i THE DRAWINGS BY A WALL � PARTITION TYPE SYMBOLyj �-�i--a-�``f 116 �_'-:�---__�:�_-:__.; v. 360.798.3801 f. 360.833.0585 2. WALL 4 PARTITION TYPES ARE REFERENCED BY A WALL PARTITION SYMBOL CONTAINING THE f ASSEMBLY IDENTIFICATION NUMBER 3. WALL PARTITION TYPES ARE CONTINUOS UNLESS REFERENCED OTHERWISE4. WALL PARTITION TYPES ARE DEFINED FOR EACH CONDITION IN THE PROJECT. CONSTRUCTION COMPONENTS INDICATED ARE THE MINIMUM THAT WILL BE ACCEPTED FOR EACH SPECIFIC WALL V111; ;- --- PARTITION TYPE. EXCEPTIONS TO THESE COMPONENTS ARE NOTED BY A SUBSCRIPT T P O THE WALL , - 1 - ------ PARTITION TYPE SYMBOL AND INDICATE THE FOLLOWING= S - SOUND CONTROL BATT INSULATION, FOR THIS WALL 4 PARTITION TYPE, IS TO BE INSTALLED WHERE THIS SUBSCRIPT APPEARS.RS. SOUK CONTROLROL BATT INSULATION SHALL BE AS SPECIFIED —kA I UNL SS OTHERWISE NOT I E : , ED ON THIS SCHEDULE. ALL PARTITION PENETRATIONS TO BE ACOUSTICALLY ,�'+ .`" ` , � , :' 01 3 O SEALED. ALL OTHER PARAMETERS OF THE WALL PART I T I ON TYPES REMAIN UNCI-IANGED. SEE , F/A4. 1 ALSO L O OR E/A4.01 ALT I P { X14 L - LEAD BOARD, FOR THIS WALL PARTITION TYPE, IS TO BE INSTALLED WHERE THIS SUBSCRIPT -63 \,\, APPEARS. LEAD BOARD SHALL BE AS SPECIFIED UNLESS OTHERWISE NOTED ON THIS SCHEDULE. NO ;f. ` `\\` .. ,�, I\',, 4 PARTITION PENETRATIONS ARE ALLOWED. ALL OTHER PARAMETERS OF THE WALL � PART PARTITION I ON �°'. �• .,`°`.____-- ___ --__-__---__-------._._.__ _.__ I \ I TYPES REMAIN UNCHANGED, UNO i 10 5. WALL PARTITION SCHEDULE FORMAT IS DIVIDED INTO TWO MAIN PARTS. THE LEFT PART LISTS TESTS I CONSTRUCTION COMPONENTS AND FUNCTIONAL REQUIREMENTS. THE RIGHT PART INCLUDES A DRAWING - �, OF THE PARTITION IN PLAN VIEW AND DRAWING NOTES ,tp �y ' 6. "GWB" (GYPSUM WA BOARD) I � >/' � .i �' /" LLB RD S USED GENERICALLY IN THE WALL4 PARTITION TYPE SCHEDULE AND �, f / \ '".,�, o, a � .� XTP �CIART i. REPRESENTS A VARIETY OF GYPSUM AND CEMENTITIOUS BOARD PRODUCTS. THESE INCLUDE THE 0 /`/ \ �� �' ':/' � � ` � FOLLOWING AND THEIR FIRE RATED COUNTERPARTS AS SPECIFIED ,!\,f !! `� � .,� 110 - 10, v+ f A. (GWB) SHALL B STANDARD �'��� ' ! ;f •\\` \` '.>r—'h_I > '': r..`, :.I '�IDa'� \� \ `.J 21'l�ll v.._— E GYPSUM WALL BOARD (GWB) CONSISTING OF A PAPER FACED, ' SEE 03 f CAMAS, WA (� 4942 GYPSUM CORE PANEL AT ALL TYPICAL NON-FIRE-RATED WALL ASSEMBLIES MINIMUM \ 0 B. (GWB X) SHALL BE FIRE RATED TYPE-X GYPSUM WALLBOARD CONSISTING OF A SPECIALLYO = OF 0 TREATED PAPER FACE AND GYPSUM CORE PANEL AT ALL FIRE RATED WALL ASSEMBLIESv l� Y 11 w 111 � - -- —_�.I I <:, r,' — — II C. (MR-GWB) SHALL BE A GYPSUM WALL BOARD WITH A MOISTURE RESISTANT PAPER FACE AND � ,--„-�,-- -�;c �-���. � � , \ -._ cn I.' ,I EXPIRES: 06.30.2012 I$ SIGNED: 04.06.12 GYPSUM CORE PANEL AT ALL PLUMBING AND WET WALL AND TOILET ROOM CONDITIONS. 7. WALLS PARTITIONS ARE DIMENSIONED ON THE PLANS TO FACE OF FRAMING UNLESS SHOWN \\..� rol I OTHERWISE. WALLS PARTITIONS NOT DIMENSIONED ARE LOCATED BY COLUMN CENTERLINE WINDOW , 'f f .\ MULLION OR THERE SUCH OBVIOUS REGULATOR GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR01 COORDINATING THE WALL PARTITION LAYOUTS, f.,'/ \\ \ \' �' 11 4 — I 8. DIFFERING WALL PARTITION TYPES SHALL ALIGN SO WALL PLANES CONTINUE UNBROKEN WITHIN _-- �. ROOMS AND ADJACENT FACE OF FINISHES ALIGN UNLESS OTHERWISE INDICATED - 9. SOUND TEST NUMBERS (WP DESIGNATION) ARE BASED ON PUBLISHED STANDARDS FROM GYPSUM ASSOCIATION. FIRE RESISTANCE DESIGN MANUAL FOR WALLS AND PARTITIONS 10. SEE FINISH SCHEDULE FOR MATERIALS APPLIED TO WALL TYPES, IE TILE PAINT, FINISH WHERE OCCURS, b ,\` �,- �\ \ \\ 2 /��, l; f IS INDICATED BY A DASHED LINE j %> /' \ ,,`\\� ,\ // i`' `\ '' Np 100, I'I 11. DOUBLE STUDS ALL DOOR JAMBS. COORDINATE EQUIPMENT AND CASEWORK WALL BACKINGS AND '' � i BLOCKING WITH SUPPLIER b. A /,f'' �(I \� \;� ' \� ;` „ r : -: - _ 108 -- -- Q � \:, /,h, ,•' % \ j `.vA REVISIONS DATE 1 + i I 12. COORDINATED EQUIPMENT WALL BACKING AND BLOCKING WITH DENTAL EQUIPMENT SUPPLIER, SEE ” L., '' \� \� <.':- - - ` ; s _ • \ \, ALSO 4/A5.01 ,\ 12 - - - ---- 103 - 10'T 13. FRAME ALL STUDS FULL HEIGHT WITH COMPENSATION FLANGE HEAD G `\ /> '\ <, , �. \\ r 125 �' INTERDENT b \v \ �, O 1 ' 1101 SE Tech Center Drive<f O O Suite 195 I ' _. U �J ````,.`'•, ` " ' '' \ \-_.�:�-. .._._.___._ -- - :.:J.. 1.1_- _ _ _...- --i Vancouver, WA 98683 ` .,°� III O1 RATING TEST/FILE VALUE I = � I �' b �� � �� \ �- � \ 31-3"(+/-) ' 9" 8 I_211 91_pil `f OII 77 FIRE - - I SOUND CONTROL \..\\ ��' `\`./ \ \ -- _ LU I I INSULATION Ot b G p, b �`ti, SOUND W 1 Olt 5TC 45, MIN 0 F \\ \\ L - P #w GENTLE r 'I• 11 - 43 FRAME SZE GAUGE SPACING II L- 3-(0 1 _ 13_5JL O141-29 QLU 5EE FIN15H SCHEDLE MFOR APPLIED FIN15HTL 3 SEE A4.01 24"oc UNO (r- E(TYP UNO)FACING MATERIAL THICKNE55 1 —1LU I r � i I ' 1 lager CzWB-X 5/8" i — LEAD BOARD DENTAL 1 I GWB-X 5/8IN5ULATION l 1041 0 4 I = DENTAL OFFICE O PLAN \ , RATING TEST/FILE VALUE I 4 '4' �' n V b N j�_ `\\ ��,'� r TENANT 02 ISOUND CONTROL / ' _ . > a IMPROVEMENT b f+ A FIRE - INSULATION 02 _:-' - -_ S � \\ !n LU 5 ;\ ,t a 1`iii SOUND WP 1012 STC 45, MINI I �< I I c/, .f :_1C_EI TIGARD T OWNE SQUARE 51ZE / GAUGE 5PACING 102 LU MTL 6" 5 A4.o1 I SHOPPING CENTER EE 24"oc UNO > \ I P \\ 16200 SOUTHWEST ��—SEE FINISH SCHEDULE FOR APPLIED FINISH _------- n 4 \\ FACING MATERIAL / TNICKNE55 I I l TYP UNO) �� \��\, � O � PACIFIC HIGHWAY h r b G. `\,,, ! SUITE S b., I, — 1 lager GWB-X 5/8 %'� : f j / / f! -7- -/X i�1 TIGARD ®R 972241 lager GWB XZ PLAN r_ I n q \ / 1' b b b u b RATING TE5T/FILE VALUE I I b b01 GD 0 � , _ f�i+!j!� ,SII,.t -x '. '' n 9 r b I> b I, > c y,. u Gs b i= -• - a FIRE — — A b• :,rJ � \§--,�r b D D . ,. I %' :G. l> Ir Ir ° • b SOUND CONTROL R N b b b i` f i b b b 5 b 1 P �� r- ISSUE DATE e : 6 April 1 : I INSULATION f' a i �' - - 12012 02 - tip,. .-�,I! , - �,VI I 1 b U Y 9 > ab SOUND WP 1548 STC 50, MIN , _ �\: ,;,� w��\r, .. � . ,. �: _ I•° _ - a j [ JOB NUMBER: 323 n I ( J r. I `-'� "'-f-ry/' l\�\� C\ '.,1\�'.,Uv >�r�-r' a .. - I"3 ,. , a - b r b ' 4i.•`' ., - _ FRAME 51ZE / GAUGE / 5PACING Q �. (, j �: b b is }' b LU II I I SEE FIN ISN SCHEDULE \ r. n b MTL 3 SEE A4.01 24 0C I : I FOR APPLIED FINISH FACING MATERIAL / TNIGKNE55 (TVP UNO) 1 la II —1— er, ea side A /2 y B 1 1 lager, ea side II I . . �Z _ C-jWB 5/S 1 4 12 O �Z FLAN, Uj PLAN N I II I II 1/4 = 1 -O g f 01.dw DIMENSION p LAYOUT PLAN WALL TYPES r it 1+ Limit; LANCIAULT �r ARCHITECT ` P X r 7 7-- 3016 nw gravenstein street PLAN NOTEV sh�y,i �<,.,J_.n:. .a. '`r ais✓ r/,,-..,�L l 'f ..2:n. ,�� ',+/...�J�_....� fes._...:_ '�� _.: ` - camas,washing ton 98607 360.798.3801 A REMOVE WALL, COMPLETE ' rM \\\\DBC zIrp b>,I .I� 1I�r P\.\f•,�`.'��`se +_i"-}—`Q\J;,\Q:`��`f fte-_r\_�.\t���._t�•A�r.Qi_��.: p y A eP\ Q s^'�- p`°_�-x...y,,w.,ybrg-_C•_,_P}>\ ..� ,X�X; 'Q G�✓o-,_\�.�,,:,.mo:.i,..%,-,I,;P�f–�-�--..�n:...._. ��°P_ � ._I'/;,i'•.',�' /•/.d/'',:..,��/'.��'�Li.Jlµ%>I,' f ,ae_d_,i..l..Q_f%_._..�G,�, _,a. p /iP,r,;.,�;'•!�r,'/.-filf-%+�',/lY..'J/i/:-,,-/„.f.r_,,.;%_//;':;.'_;>:;,f,: +g .:_,"�sjf.•e...,.�s.,_�.�....._4 s_ns'.,_�.zs,�P._xp':i.i�._::1__1;7_j�7U._-':_'.J-is_�,c-,,sI' .f.f_ic__'`/_-•,;,,/;_,i9_A�/\_}_"_�_�_ra'y/s�.;__ /J/ J ' -q ; _ , r .b r; ' f. 360.8 33. 0 5L85 E WI IREMOVE (E) DOOR ASSEMBLY, COMPLETE F REMOVE (E) STOREFRONT DOOR AND (E) WINDOW FOR (N) WINDOW AND (N) DOOR d' ! "A4" REMOVE (E) FLOORING, CEILINGS, LIGHT FIXTURES, HVAC UNITS DUCTWORK AND ALL OTHER FINISHES ASNECESSARY FOR (N) CONSTRUCTION, THROUGHOUT SUITE A A REMOVE (E) TOILET, CAP UTILITIES IN CONCEALED LOCATION B REMOVE (E) SINK AND FAUCET, GAP UTILITIES IN CONCEALED LOCATION , (E) EXTERIOR DOOR TO REMAIN12 A , R - C ERIC O 5I "CULT L T VA AAs, wA49.4-2 � EXPIRES: 06.30.20 1�2 SIGNED: 04.06.12 / REVISIONS DA T Er, /'x, INTERDENT 1101 SE Tech Center Drive Suite 195 Vancouver, WA 98683 f 1 ADDENDUM 1 03.22. 11 (; ENTLE DENTAm L ENTAL OFFICE TENANT IMPROVEMENTS TIGARD TOWNE SQUARE SHOPPING CENTER / 6200 SOUTHWEST \ PACIFIC HIGHWAY X SUITE S ` TIGARD■ OR 97224 y Q ISSUE DATE: 6 April 2012 JOB NUMBER: 323 4' Uj 1 4 12 0 SUITE Ji SITDEMOLITIONFLAN0 DEMOLITION 1/4 1 0 fpo1 311_dwg PLAN 12 Uj MATERIAL SCHEDULE (ELEMENT) - VERIFY WITH TENANT ERIC LANCIAULT} ITEM MANUFACTURER MATERIAL DESCRIPTION C - c CPT . � � � ARCHITECT P CARPET SHAW CONTRACT i¢-- Y BYLINE - ELEMENT „ U L �...,n.,, .. ... --__ P 0��� GROUP - ' C r �a" 3016 nw gravenstein street VCT-1 FLOORING - VINYL CE 112 ALE, NOTE 1 QUIET -- EXISTING BEARING AND BURRING WALL camas, washington 98607 AZROCK COLOR ESSENCE VCT-2 FLIGHTHOUSE, 91 ryF N - LOOR I NG - VINYL ACCENT CE 123 LI HTHOUSE NOTE 1 OP v. 360.798.3801ERATO Y 9 1u., RB WALL BASE FLEXCO RUBBER 4" DRIFTWOOD " PAINT 2 116 -� :_ -- EXISTING COLUMN AND 5TRUCTURE f. 360.833.0585 i CT RESTROOM FLOOD TILE CROSSVILLE COLORBLOX 12X12 A1114 TREEHOUSE 4 6 -- RESTROOM TILE GROUT LATICRETE #35 MOCHA NEW WALL CONSTRUCTION FRP O WALL FINISH FI ... BER REINF PANEL BRIGHT WHITE � BASE PAINT / A D -- SIGNAGE, SEE ll/A5.01 P-1 RESTROOM PAINT BENJAMIN 1"IOORE 940 ANC I ENT OAK ,4 P-2 ACCENT PAINT BENJAMIN MOORS 1644 BLUE DUSK o ,.�r _ � : _ -• ;. ..u�.m�...� r__. .y.�. O1 -- WALL TYPE, SEE A2.00 I PL-1 BASIC LAMINATE 1503-60 � � REF PUTTY �' p� NOTE 13 ,� ; I. PROVIDE INDEPENDENT TESTING FOR MOISTURE WILSONART MATTE LAMINATE �• , I PL-2 ACCENT LAMINATE 459-60 MYSTIQUE MARINE TYP. 'a) X-2 , CONTENT OF CONCRETE SLAB ON GRADE, VERIFY � SLAB I S READY FOR FLOORING I ,� D R PR OR TO COUNTERTOP LAMINATE E -3 + INSTALLATION PL RESTROOM WAINSCOT WILSONART MATTE LAMINATE 4814-CSO TUNGSTEN EV �\ NOTE 18 Y 21 2. PROVIDE JAMB FRAMING EA SIDE OF O1 S A-t.o1 PASS-THROUGH XRAY CABINET OPENING, EXTEND TO ACP LAY-IN CEILING PANEL ARMSTRONG 2x4 GRID WITH D SECOND LOOK II - 2x2 LOOK #2112 , STRUCTURE, BRACE, INSTALL 6x6 WD BLKG, E DEMISING STAFF COORDINATE LOCATION W/DENTAL EQUIPMENT ACTSURFACE-APPLIED ARMSTRONG 12 I x 12 CORTEGA MINATONE WALL, SEE NOTE 1 LOUNGE VENDOR, SEE G/A4.01 OR C/A4.01 ALT; SEE AL SO CEILING TILE #145 OPERATORY S AI5LE 114 C/A9.01 NOTES: m 113 0 c I. PROVIDE RANDOM PATTERN AP OX 90., VCT-1 1 ico 3. FLOOR-MOUNTED CHAIR UTILITY CENTER SEE Piz O VCT-2 <5� NOTE 4 � K/A9.01 02 �� ,. NOTE 14 ` 4. SEE D/A9.01 FOR AN c R P O CEPH SUPPORT ROOM FINISH S -�, � REQUIREMENTS c RM WALLS f �` �� STORAGE 1 5. POINT OF USE WATER COOLER, FVIV, 115 COORDINATE W/ VENDOR NO. ROOM NAME N S ` _ A�.01 6 E W CLG FLR REMARKS •. AR c _, �, � G PAHO A1.01 "" ` C. PROVIDE o DE PANIC DEVICE 'a7 EXIT DOOR OR 101 RECEPTION P-1 P-1 P-1 P-1 ACP CPT CPT BASE INSTALL� � 00 + \' CEPH 28 LL SIGN TYPE A AS REQUIRED r 112 C X-3 , IT G�iASL4:'� 102 BUSINESS OFFICE P-1 P-1 P-1 - ACP CPT NOTE 2, TYP � � C NOTE 3, TTP � �``• �, i cn 11 11 ALL ROOMS , c 0 �. 42 W x 18 H CONTINUOUS BACKING FOR XRAY � G i a� \Y _-' I 11 UNO TYPICAL � � ,� APRON HANGER, c>J 31-011 103 - - - e° .� NOTE 14 AISLE P-2 P 1 P 1 ACP CPT - OPERATORY-e,,� � 104 WOMEN P-1 P-1 P-1 P-1 P-1 CT NOTE 3, 4 % OPERATORY �� F/ S. MAINTAIN 3'-0" CLEAR ON AT LEAST ONE SIDE OF �'� SEE C O3 I � � I G i I rDV- - CAMAS,� � 120 � D 1 , � ) 1 PATIENT GNAIR, SEE ALSO A0.02 ' K/A9.01 �� �� NOTE 11 c� � �. CG L------�, ��_�� EP 105 CONSULT P-1 P-1 P-1 P-1 ACP CPT 4942 ULTRASONIC `fi` `� NOTE 9 �� 4 9. ANO P CEPH COMPUTER fi P ER LOCATION S O.O 1 _ _ _ EE E 106 DOCTORS' OFFICE - - R E P1 Pl Pl P1 ACP GPT ti CLEANER NOTE 7, TYP � - �. `--- O 10-1 MANAGER -1 -1 -1 - 6., (� 5TERI L IZAT ION CG MECN• 11 P P P P 1 ACP CPT - �` � 10. PARTIAL N - .,, � �, EP L EIGHT WALL 'c�3 O � � m � cc,108 AISLE -2 - - - - '� P P 1 ACP CPT Q �Q -q c ��- } r7 11. LOCATE FEC AS REQUIRED, FIRE EXTINGUISHER EXPIRES: 06.30.2012 N N c is �r< �) of 24 111 �,� FS 1/ \1 109 LAB P-1 P-1 P-1 P-1 ACP VCT-1, VCT-2 - OPERATORI' �, �� ���� `�` �� �.� HAND 0 It t-W1 111 TO BE CLASS 2A/10-BC MULTIPURPOSE DRY SIGNED: 04.06.12 O I �. BA �r A1.01 STERILIZER/ RP___ , 122 � L----J- CHEMICAL L 110 0 � I C C______� MEN P-1 P-1 P-1 P-1 P-1 GT NOTE 3 4 �, � � P E E �• AUTOCLAVE < > � I 02 � �,�` � .� ,. CLEANER 25 � � ,..�� ,��.� � ��. �., � , u. .,..�� ,.. - 111 MECHANICAL FRP FRP FRP FRP ACT VCT-1 NOTE 1 NOTE 2, � ,�, CG 110 SCD 1 12. COORDINATE GROMMETS W/ TENANT, TYPICAL 112 PANG CEPH P-1 P-1 - P-1 P-1 CPT TYP E v <`� YELLOW � � ALL CASEWORK AND COUNTERTOP LOCATIONS v NOTE 19 3 AISLE -1 -1 - I I P P P 2 ACP CPT �� ,\ ��- �� �-�--�-_-_L_-J_ p NOTE 11 � � 13. PROVIDE 4X4 WD POST BACKING, SEE L/A9.01 OPERATORY, I I I 114 STAFF LOUNGE P-1 P-1 P-1 P-1 ACP VC-T-1, VCT-2 - PERA RY 6 __ \�♦ ��� \� ��� 121 �� �' L_-J -j � 18 FDD B MEN 14. LOCATE LEAD BOARD AS REQUIRED BY - _ _ _ A7.oi o ` � -- U DD EQUIPMENT PMENT V N O 115 STORAGE 1 P-1 P l P 1 P 1 P-1 CPT - E D RAND AHJ __ P Lir W 110 116 QUIET OPERATORY 9 P-1 P-2 -1 -1 - - ' c I I LL 19 P P ACP VCT 1, VCT-2 , o �--- 15. REMOVE c � E E) DOORS AND/OR (E) WINDOW, INFILL � O1 Ill OPERATORY 8 -2 -1 - - - - '� s �' P P P 1 P 1 AC VGT 1 V T- O P G 2 � � TO MATCH A _ �0 Ol < ,� > TRIMMER PTDW p � ADJACENT STOREFRONT SYSTEM Q 118 AI - - P SLE 1 - - - 2 1 P P P ACP CPT 02L� ATH E � : . 1h O1 s ` 16. REMOVE (E) STOREFRONT GLAZING ASSEMBLY 119 STERILIZATION P-1 P-1 P-1 P l ACP VCT-I, VGT-2 <� > 11 A1.01 AS NECESSARY FOR INSTALLATION OF (N) EXIT 120 OPERATORY _1 P-2 P-1 P-1 P-1 ACP VCT-1, VCT-2 - OPE1v4TORY 3 c�� �� �' VACUUM LA$ DOOR, MATCH DOOR 4 FRAMING TO (E) BUILDING 1 FORMER STANDARD 124 . N A1.0115 �-, � 109 121 OPERATORY G P-1 P-1 P-2 P 1 ACP VGT 1, VGT 2 - � .� � 1 109 l I 14 1� 0 VERIFY IN FIELD IF WALL HAS FIRE RATED 122 OPERATORY 5 P 2 P 1 P 1 P-1 ACP YCT-1, VCT-2 - -1- � AISLE PENETRATION ASSEMBLIES, IF ASSEMBLIES ARE `� � et�exasr�r:c�araua 123 OPERATORY 4 P-1 P-1 P-2 P-1 AGP VCT-1, VCT-2 - ` PRESENT CAULK L ALL PENETRATIONS WITH FIRE 124 OPERATO Y 3 - - - - - $ RATED ASSEMBLIES. SEE ALSO F/A4.01 OR E/A4.01 REVISIONS DATE R P 2 P 1 P l 1 AC VCT-1 - P P VCT-2 cG Ol 01 O ALT FOR ACOUSTICAL PENETRATIONS c 5 _ _ f: O T s 125 OPERATORY 2 P-2 P-1 P 1 P 1 ACP VC-T-1, YGT-2 - �, � PERA ORY � 123 NOTE 15 c i 18, COORDINATE CASEWORK WITHREFRIGERATOR 126 OPERATORY 1 P I P 1 P-2 P 1 ACP VGT-1, VGT-2 - FD G � 01 (E) DEMISINGPTDW WOM CONSU T121 AISLE P-2 - P-1 ACP CPT 1AN4 107 WALL SEE NO TE 1� 19. WRAP (E) COLUMN W/ GWB WHERE EXPOSED 128 STORAGE 2 P-1 P l P 1 -1 -1 - ° � r 105 P P GPT OPERATORY 2 c� A10 A-1.01 9 ?� k ROOM FINISH SCHEDULE NOTES \�; 125 INTERDENTS 1. FRP FROM FIN FLR UP TO 48 " AFF SURFACE APPLIED ACOUSTICAL :��\ A7.01 11 N ,� 1101 SE Tech Center Drive a O i5 �, _ 101 TILE (ACT) '@ 48 AFF UP TO CEILING, ALL WALL50 0 Suite 195 2. 4" HIGH RESILIENT BASE, TYPICAL, UNO f � : ; ,,� t :,� � I; Vancouver, WA 98683 \ . \� \ � 3. CERAMIC TILE BASE � � NOTE 10 TYP 4. PL-3 FROM CERAMIC TILE BASE UP TO 48" AFF 106 5. SEE MATERIAL SCHEDULE FOR PERCENTAGE - A ° , R PER EN AGE MIX OF VCT-1 AND \, VCT-2, TYP I A103 0.0 A1.01 1 2DOO SCHEDULE O1 JGENTLE O N A JAM S - OPERATORY 1 s I E D B LL DOOR DOOR SIZE DOOR FRAME MA K _ 126 I RE R S ! DENTAL NO. W x H TYPE TYPE DETAILS A5.01 r G.. O II IOla 3-O x11-011 1-OII 3 G - - 13 EXIT,PANIC HARDWAREa 0 DOCTOR'5 p ° ., p N 106 DENTAL OFFICE 101b 3'-D" x 7-0" 2 A C - P PL / �✓ ` 1 HANDLE W/CLOSER ti NOTE 5 1 1 11 1 II A TENANT 104 3 O x �-D 1 A C -f - � � , b � a ,. F � 10 NOTE 12 1 A7.0113 105 31_011 x �'_D1' 2 A C , - - a A5.01 1 IMPROVEMENTS L � z � �t. � � r `a\\\� A1.01 6 1 1 II a .r 1" -.�? .c - ` \ 12 1 0 106 3-011x 7-D 2 A C - - L A \ RECEPTION 1 a ° 101 1 > U _ USIN SS 1 - ,. F B E 10� 3 O x 1 0 2 A C -1 - o1`FIc TIGARD TOWNE SQUARE P. a. a # , u' ° E 109 3-O x 1-02 A C� - Q a 102 3 , SHOPPING CENTER 15EE T 1 TYII 1 11t; - - NO E P 110 3-O x -f-O 1 A C - - - - - fi t,� 4 A�.OI 5 - r a 'b L. __ \ . 16200 SOUTHWEST 111 31`D11 x -11-01' 1 B 8 9 - ACOUSTICAL GASKETING 4 ' �° �. u ` �\ NOTE � A1.01 1 i PACIFIC H 1 G H WAY 114 L- 1 11 I 11 :>. . -". . . > ' ° ° �. 0 SUITE S �." \�t I 115 31-011 x -0 1 A A 13 7 - _ - ° >. I 0 I OR 97224 II I II ,:..J y, ,. g,.��.�,. , -+,^- / A _ TIGARD' U ,! / i h t 16 3 O x � O - - - - - ti ----. � 125 (E) fr a > b n b n U » _ a t c D- a i;> u 128 31_011 x �I_011 1 A 6 7 - - � � %� 6 I; �} U " NO, E' 15 U yl> 4 u � ,l, O y a u C a n i u � � , (I //A/ � ISSUE DATE: 6 April 201 � � _ P 2 NOTE 1= APPLY TRANSLUCENT FILM TO DOOR LIGHT 1 � C - r, 4 -a/.,,;�_ � JOB NUMBER. 323 f /7, "/�� i`" C ` - D NOTE 1� II r MATCH � c�-�C 1,.��+/!' J,/ ,�1,Is� .� -- 1 �b�r7j� �rl��."� �. " 6 . D Ua" DD (E) __� ,v✓ _ y b ool DOOR DOOR DOOR DOOR DOOR00 D R SE S I Z ZE SI ZE SI ZE SIZE 5IZE1 4 12 f22LOOR N I r- N 1/4 = 1 -O F O l.aW 0 = p 9 W W W NN � N Uj N _ N_N _ N ry o o SII o MATCH FLOOR PLAN 0 0 O O 0 0 1 BLDG a o a Q a Q STANDARD SCHEDULES 11 H I I I I0 SOLID CORE PREFINISHED PREF I N 1 SHED HOLLOW METAL, ALUMINUM SOLID CORE WOOD, STAIN, ALUM I NG, Uj SLIP-ON FRAME PAINT STOREFRONT WOOD, STAIN SAFETY GLASS SAFETY GLASS A B C 1 2 3 0 0 0 0 0 0 b.. n .. . ;_3:.w....za. ...vu. sY.nm,.-.-k.m-_.Ts,syv„u_ _...Ks,.,.«.... «,....,xm.:.,,,sr.w...P,-u..,._..,,.» ,..,...:_e,>..,.._. ,._.t«......._,.,:...'.,.„,,.,.. .<-.._.......a,.._ ..,a.:-_.s„.'a....._.W.._a. .. ...„...sv......,.e.n... E IG" SHEET N ARCHITECT RATING TEST FILE - -•°- - = £s- - / VALUE 7 � -- EXISTING BEARING AND FURRING WALL 3016 nw gravenstein street C001 `� FIRE ca ' mas washing ton 98607 SOUND v. 360.798.3801 F -- EXISTING COLUMN AND STRUCTURE f. 360.833.0585 INSULATION:INSUL 11b�\ NOTE 7 I - - . � 'S f ACOUSTICAL BATT ` "" NEW WALL CONSTRUCTION DECKING: I 5/8" GWB � , STRUCTURE: ♦' ` \ 2' x 4' FLUORESCENT LAY-IN FIXTURE STL JOISTS, SEE A4.01 OR A4.01 ALT ---------- CEILING: - --- --- , " CEIL INC• W O s" ROUND REc SS , y \ E ED FLUORESCENT DOWNLIGHT � �Cf)n (2) LAYERS 5/8" GWB FINISH .45 SCNED TO O 6II ROUND RECESSED DOWNLIGHT T A1N T B E I ` 117 4 CEILING MOUNTED FLUORESCENT ORE ENT N A n PENDANT NT r 00 ,. F ./o II : no CzW SOFF T DO 'N 48 LONG CEILING MOUNTED FLUORESCENT WITH ACRYLIC T.O. I T ASE IORK TO DIFFUSER , X/1" i r \ IT CABINET, BELOW , ALIGN F.O SOFFIT EXIT SIGN r TO IT W/ F.O. CABINET Ali II 2-O 21-011 � CABI ET II r______ MIN. MIN.N. GWB __ii___� CRANE LIGHT FANTASTIC II, SINGLE TRACK MOUNT, f � � , PELTON $ - S'-011 O O -- FVIC, ROUGH IN BY CONTRACTOR SEE 5/A5.01 120 NOTE 5 ful 6I I �ATT ACOUSTICAL � ARC INS O SPEAKER, CEILING MOUNT, FVIV, SEE NOTE O �• ' 112 NOTE S 2 INSULATION NOTE 2, TYP , / ,r , [„ Cf GWB - -- -- _- A2.02ERIC, ��� IART i IISIII' IIII 1 G C bG \1 b\b. b 9\C %b v, i t. f., \ /J i f / \ — / =- 1 rf i(i''(• ` f / /i— II I III - _- � _- I I- .42.00 O2 O ) O 6V . SP E A K ER V O LU M E C O N TRO L W AL L MOUNT N T'c) S_O11 GWB, WHERE NOTE3TY OCCURS, SEE 3/45.01 ACT ' 10-0 11 . HVAC SUPPLY GRILLE BNOTE 9 • 4 2 TYP 03 SEE F/A4.01 HVAC RETURN GRILLE OR E/A4.01 ALT NEEXPIRES: 06.3 0.20 12 SIGNED: 04.06.12HVAC EXHAUSTMPERIMETER B � '-O � ----- NOTE I— jL__r2 T 5tE T OTE 1NTS I ® NOTE 4, 1. SEE E/A4.01 OR B/A4.01 ALT FOR HEADER PENETRATION FRAMING 0 - f10 TYP 0 GWB 2. SEE 1/A5.01 FOR TYPICAL ACP SUSPENSON SYSTEM 121 108124 r GWB S-O" 3. SEE 2/A5.01 FOR TYPICAL ACP SUSPENSION SYSTEM PERIMETER 4. GWB CEILING, CEILING JOIST SCHEDULE A/A4,01 OR A/A4.01 ALT AND SUSPENDED GWB CEILING 3/A5.01 FOR FRAMING OPTIONS 109 5. COORDINATE EXHAUST DUCT, SOFFITSIZE AND LOCATION WITH IT CABINET REQUIREMENTS, SEE INTERIOR ELEVATION (E) EXTERIOR LIGHT FIXTURES TO REMAIN, TYP 2 2 -0II 1. EXHAUST INTERLOCK FAN OPERATION WITH AISLE LIGHTING rVI 125 123 � _ '�7_ EXHAUST FAN W/ THEMOSTAT OPERATION AT IF, MAKEUP AIR FROM i / NOTE 7 REVISIONS DATE V CEILINGSPACE VIA SOUND BAFFLED DUCT DOWN WALL TO 1-0ABOVE DA-1 TO IT 104 AEINE O 9. CENTER ACP AND LIGHT FIXTURES ON OPERATORY CHAIRS BELOW TYPICAL ALL LOCATIONS CWB 0 6-0 NTE 4, TYP ' WB 10. FIRES RINKER HEADS= LOCATE AT CENTER OF 3 ACOU5TICAL CEILING PANEL HALF PANEL INTERDENT il -OCWB 8 SPANEL REVEAL 0 1101 SE Tech Center Drive Suite 195 0 TO IT Vancouver, WA 98683 00 f 'n CABINET SPRINKLERNOTE- PROVIDE 2 OVERSIZE RING/. BATT NUL SLEEVE, OR ADAPTER THROUGH HEAD* 0 ALL SOUND CEILING TILE TO ALLOW FOR FREERATED WALLS / 126 MOVEMENT OF AT LEAST 1 INCH IN ALL > 0 / DI ECTIONS COVER W/ OVERSIZED I` Al ESCUTCHEON N T L E lo AM / Y Y WRITING SURFACE, BELOWSEE 42.00 FOR \ oe PROVIDE RACEWAY AND LOW VOLTAGE CABLING FOR COMPLETE SPEAKER WALL TYPE DEIN Tim L I II SPEAKERS AND VOLUME CONTROL UNITS � TERMINATIONS FYIY, COILSYSTEM; CABLE AT EACH SPEAKER POSITION WITH ENOUGH LENGTH TO BE EXTENDEDI= 106 DENTAL OFFICE O PtEABEITE; COIL MINIMUM 4'-0" CABLE aVOLUME CONTROLS AND i� ____ __ ,O'-OS IT TENANT 701 wT. ACOUSTICAL NAL N ALL CEILING ' 9- C , _ _C"'I1,_f,,G-:U;.','1`>.,)d'-�\/\;/--,ry!.�."I'-{'�y-`;c�'.��a'IJJVaI't//✓„'^�\```\�rI,.7..,ll���!f f'_”��__`'-I-�A,:_,,.b�./--°j>�i;:�>\i\_\ti., _Ga bJb.V.;.bb:: •y bI.G 1...p ... rGk•,-'b 4 ba.-`ISC T Gb b,b G y ba b ..ob .. hc,I%. m.b b p a GG U 'h .._. OAF F UNOIMPROVEMENTS tl� VP R OV E E N TS 1}NT,5L ` TIGARD TOWNE SQUARE SHOPPING CENTER O ACP 9 ACP � 9 , 911a 16200 SOUTHWEST PACIFIC HIGHWAY Li SUITE S f '/ ' ------� J' TIGARD OR 97224V �WB ' SA�U NOTE P 1> 1> 1, ISSUE DATE: 6April 2012 LAN _�AINC JOB NUMBER 323 G '> 4 12 REf=LEC7EI:� ILIAPLAN N 1/4 1I- 1-0 11 fpo .dWg O REFLECTED CEILING PLAN NOTE= ALL WOOD MEMBERS SHALL BE FRT WHEREPARTIAL E ON-HEIGHT C��-�I�,WHERE CODES REQUIRES NON-COMBUSTIt3LE BEARING WALL ERIC CONSTRUCTION JCOLD FORMED STEEL SCUD SCH EDuLE LANCIAULT �41"t�3 �Cl��EplJ�.�E I II 4-O MAXIMUMCOLD FULL HEIGHT WALL INFILL PARTIAL HEIGHT NON-BEARING WALL WALL TYPE OPENING # OF JAMBS ARCHITECT E _ H IGHT ,51uD � T TRACK HEADER DER FRAMING ELEVATION '@ XRAY OPENING 3 5/811 4 FT TO 6 FT 2 I 11 II __7 r---- 100STUD: 35055162-33 3501125-33 3505125-18 'a7 24 OC 3016 nw gravenstein street 3 5 8" I I I I 6 STU T FT TO 8 FT _______ camas washin ton 9860 D � RACK HEAD FRAMING, 5EE / 3 40051 b2-33 � EA I I TRACK: � g 7 ,4 1 v. 360.798.3801 L3x3x18GA x UJIDTI-I OF TRACK EA aEtAIL B 3 5/8" UP TO 12 FT 3 CROSS PIECE W/(-��� I - i I (E) ROOF/FLOOR 12'-O" STUD: 350S1b2-43 350T125-33 3505125-18 0 24" OC f. 360.833.0585 EN OFDOUBLEI I I END HEA STu W/ DER W/ C3) #I OD • #10 SCREWS EA END I I ASSEMBLY i I I SCREWS A b" ► 1 , TRACK= 3501125-43 E LEG , TRACKS WOOD POST, 4 FT TO 6 FT 2 I II T 14-O _ 11 TYPICAL EACH SIDE OF „ � 6TUz7 3505162-68 3501125 33 3505125-18 � 24 OC 6 I I PASS-THROUGH OPENING 6 FT TO 8 FT 2 q � , GENERAL NOTA - TRACK: - 400T 125 43 'a� EA END OF 1 RA 3501125 54 611 UP TO 12 FT 3 i i SLIP TRACK W/(3) #8 _ 1, fY WD KG AS I I 16 O STUD: (2) 3506162-43 350T125-33 3505125-18 0 24 OG CONTRACTOR BL REQ'D BY EQUIP I , SCREWS, EA END RA TOR SHALL FRAME NOTES. TRACK: (2) 350T125-43 INTERIOR PARTITIONS IN X SUPPLIER, LAG Tl-IROUCxN aB�. STUD -1- DESIGNED 15 BASED ON 5 P5F MINIMUM #8 SCREW, EA SIDE L CEJ L J L HEADER, 5EE SCHED I I 14GA DIETRICH® 18'-011 STUD: (2 - _ _ ACCORDANCE WITH THIS D ) 3505162 b8 350T125 33 3505125 18 0 24 OC SHEET OR IN ACCORDANCE LATERAL PRESSURE. FULL HEIGHT STUD/TRACK, SEE i i "SLIP TRACK" x 2'-6" W/ Q -2- DEFLECTION LIMIT OF L/240 FOR BRITTLE I I TRACK: (2) 350T125-54 WITH 5H T A4.01 A � ( I INFILL SCUD FRAMING, SCHEDULE FOR S I ZE � SPAC I NG I I l3) #1 O SCREWS, EA END EE LT. FINISHES. I I HOWEVER, CONTRACTOR N SEE SCHEDULE 201-011STUD (2) 4005162-54 4001125-33 4005125-21 a'7 24 OC SHALL NOT MIX DETAILS X OPEN I NG � X- RAY yj r TRACK: (2) 400T 125-54 q � FROM BOTH SHEETS. NOTIFY 2x012 WALL PARALLEL TO ROOF JOIST 22'-0" STUD: (2) 4005200-54 4001125-33 400,5125-21 '@ 24" C O ARCHITECT AND AHJ WHICH = r X-RAY ARi"1 #8 SCREW 'c� 8 OC TYP i FRAMING SHEET 15 SELECTS O WALL STU 2x012 1RACK: (2) 400T 200-54 i �� D O i 24 OC, UNO „ i 11 24-O STUD: 6005162-68 bOOT125-33 600,5125-30 '@ 24" 0C � (E) CIP #8 SCREW TYP T125-43 x 4 3/4 W/ (6) #8 SCREWS � CONC 5 TO JAMB STUC) r—RM6 TRACK= 6oOT 200-43 A L B 1_ II 26 O _ (3) #8 SCREWS TY �� _ 1 11 STUD: 600,5162-68 SOOT 125 33 6006125-30 0 24 OC J J � L (NON-P.T.) 4 FT TO b FT (2) 6005125-33 000 „ P 1 - 1 -O TRACK: - 2 RA BOOT 200 54 UP TO 8 FT (2) 600,5 125-43 „ 2 II I �5`TUD8 O STU _ i D= (2) 60051b2-33 BOTTOM boot 125 33 600,5125 30 'a7 24 0C L3x3x 18GA x WIDTH OF 1"1 TRACK' SEE DETAIL '�` UP TO 12 FT (2) 6005125-68 0 TRACK= (2) SOOT 150-33 TRACK 10 EA FULL HT STUD � CLIP FLG $ BEND TRACK W/ (5) #8 4'-O" MAXIMUM 1-011 11 C2) #S SCREW 30STUD: (2) 6005162-43 BOOT 125-33 600,5125-30 0 24 OC W/ C3) #10 SCREWS INTO VERT i �,�' �� � �� SCREWS TO JAMB OR L2x2x54 MIL xl/2" LEG AN C3 9 24 OC AND ) HILTI X DNI i � � (E) ROOF/FLOOR TRACK: l - SS THAN RA 2) SOOT 150 43 (0.145110SHANK) POWDER � LE STUD WIDTH W/ l5) #8 AS,5EMBLY SC � REWS EACH LEG ACTUATED FASTEN 1 � ' �`u'( ER 11 C ' #8 SCREW � S OC TYP _ ----, �------------------------------------- ---, � --- I. COLD FORM STEEL STUDS TO MEET A5TM C645 INSTALLATION 10 MEET A,5TM C154 EMBED 10 M1N JAMB SEE SCHEDULE , , T125 TRACK x WALL WIDTH WALL PENETRATION 4005162-33 aEA 400T 125-43 2. COLD F ORM STEEL STUDS SIZE DESIGNATION PER STEEL STUD MANUFACTURERS . ERIC MOHAS LAI� CIAULT C OSS PIECEE W (3) REINFORCING CING ASSOCIA110N (SSMA) I I I I ;. #10 SCREWS, EA END I 1 TRACK W/#8 J6= L J SCREWS 0 6 OC 3. 3625 MAY BE SUBSTITUTED FOR 3505 0 D D 0 D D SEE NOTE #1 L3x3x54 EACH SIDE x 1/2" OX 1--I - 12'-O" MAX N T TIO ° . LESS THAN STUD WIDTH FADER PE E RA N SIZE , , CAMAS WA PA C I A HEIGHT GHT NON-B A I NG WALL #8 SCREW, EA SIDE 14GA DIETRICH® R L E E R L ELEVA�'ION 442 Cg �"YPl CAL INTERIOR NON-BEARI NCI U)ALL 1151-IP TRACK" W/(3) #8 STUD j TRACK HEAD FRAMING, SEE ��+ PENETRATION AT 16'-0" MAX 5 TUD NE1614T FULL HEIGHT poll SCREWS, EA END I — ( ) O STUD/TRACK SEE I ' L3x3x18GA x WIDTH OF TRACK EA DETAIL B C E ROOF , I , I END OF HEADER W/ (3) #10 FU HEIGHT STUD LL E D WOOD POST JOIST, TYP SCHEDULE FOR SIZE I � � � I � 1 11 1 1 FU HEIGHT SCREWS A LLSTU /t cK E LEG 1 WHERE SPACING 11 D RA , SEE RACK 'c� 8 O OC OR EXPIRES: 06.30.2012 11 SCHEDULE FOR SIZE SPACING EA END OF WALL LESS OCCURS c� �� SIGNED: 04.06.12 I THAN 13'-0" LONG,NCS, SEE X_RgYS 1 1/2 Lax EA SIDE OF SCHEDULE • JAMB STUD (2) #6 SCREWS IN 1 � • WALL PERPENDICULAR TO ROOD JOIST 1 ' VERTICAL SLOTTED HEADER SEE SCHE i I D JL JL JL I I HOLES 5/8" DIA. EXP ANCHOR - 1 DBL STUD " 1 „ EMBED 511 Q COLUMN 1„ 0 STU"Lmom;) TRACK '� INFILL STUD FRAMING, ON TES: . 11 1. ' _ I 6 X SEE SCHEDULE „ 1/2 AT CONTR OPTION UNO ALT JAMB �I 1 = I�_O 11 < #1 AT PLYWOOD PECK USE (2) #8x1/2 LONG SCREWS • ATTACHMENT AT FQN WALL AT METAL DECK USE (2) #8 SCREWS /2" = 4 � 2 OC, UNO #8 SCREW 0 (o , AT CONC. PECK USE (2) 0.145"� PAF 1/4" WALL PENETRATION - STAGGERED O r Tri DE1"I I�I NG NON-BEARING WALL (E) CIP 43 MIL MIN TRACK (FULL i " CO FORMED CONIC SLA BOXED JAMB STU S LD R ED STEEL SCUD SCHEDULE B 0 D PER HT OF JAMB STUD) OR J � J J (NON-P.T.) 11, L SCHEDULE MATCH STUD THICKNESS, i 11 L3x3x54 x 1/2 LE55 THAN STUD 2')12 WHICHEVER IS GREATER L3x3x18GA x WIDTH OF 1/2" e 11 L5TUD BOTTOM t CK ,5_ - MI = RA EE DETAIL A WIDTH W/ (4) #8 SCREWS TO N FLG WIDTH 1 1/4 HEIGHT STUD SPACING STUD SIZE TRACK 0 EA FULL HT STUD i 2 _ 1 JAMB W/ (2) 0.145 DIA. PAF'5 W/ (3) #10 SCREWS I 1 11 II RE INTO i „ 11 �� 8-O 24 OC 3505125-18 1/4 TO CONC (EMBED 1 1/2 MIN) - #8 SCREW 0 b OC TYP VERT LEG AND (3) HILTI � 1 11 II 110 ]�)'P W/ (4) #8 SCREWS TO TRACK 10-O 24 OC 3506125_18 X-DNI (0.145 SHANK) I REVISIONS DATE ABOVE AT E3RG WALL BACK-TO-BACK JAMB i 2x112 I 11 11 POWDER ACTUATED L3x3x54 x 1/2 12-O 24 LE55 THAN STUD STU 6 OC 3505125-21 II - D PER SCHEDULE _ FASTENER, 1 EMBED � WIDTH A. 51 I 11 11 , E W/ (4) 8 .. DE # • PLAN 14-O 24 OC 350,5162- �• ° 33 SCREWS TO JAMB - W/ (2) 0.145 • 16'-011 24" 0G 350,5162-43 (2) #8 6 ° �� CREW DIA. PAPS TO CONIC (EMBED 1 : - 11 \ 11 d I II II W 24 1/2 MIN) - W/ (4) #8 SCREWS TO � - . � ' a 181-011 16 OC 4006162-33 i � OC � WOOD POST TRACK ABOVE AT BRG WALL '° ° .. . I 11 II ° 20 O WHERE OCCURS 'c� X-RAYS a . .-- . . 16 OC 4005162-43 INTER®E N T a - 1 II � #8 SCREW 22-O 16" OC 400,5162-54 I, ,� 1101 SE Tech Center Drive � 24 OC - -- Suite 195 1 11 II 24 O 16 OC 600,51 b2-33 � . _ Vancouver WA 98683 BOXED JAMB STUDS PER 4 ADD L Lax AT WALL 26-0 1611 OC 6006162-43 -------------- ° Q. ° N T PE T IONS OVER SCHEDULE ERA ED LE ER I II 28-o IrbiloC 6005162-43 CEILING JO I S�fi SCHEDULE Id° #6 SCREW EA STUD TYP ° ° ° : ° 6-011301_0►I lb" OC 6005162-54 • G #8 SCREW EA STUD TYP e ° SPAN . . P JO I St SPACING JO I St 51 ZE REMARKS a °° ° I. CO FORM 11 LD R EEL 5TUD5 TO MEET A5TM C645, INSTALLATION TO MEET A5TM C154 °. ° ZOGA TRACK W/ 1-1/4 GA TRACK W/ 1-1/4" FLANGES W/ (; ENTLE 1 11 6 O 16 OC 3625125-21 A- aA. ° FLANGES W/ HILTI X-DNI 0.145" HILTI X-DNI 0.145" SHANK POWDER 2. COLD FORMED STEEL STUDS SIZE DESIGNATION PER STEEL STUD MANUFACTURERS „ 4. 11 - SHANK POWEDER ACTUATED ACTUATED FASTENERS 'c� 24 O.C. A,5SOCIATION (,5SMA) 81-010 l b OC 3625131 21 ° •° I II 11 ° FAST N S 9 24” 11 W/ 1" MIN EM 12-O . EER O.C. W/ 1 BED I6 OC 3 . a .. 626131-33 NOTE 1 ENTAL MIN EMBED 161_011 1611 OC 600513 -43 NOTE 1 ®ENTAL OFFICE �1�F'lC,�L INTERIOR NON-��.4RING WALL I N TER10R NON-�3E,4121NC* Ulr4LL J,4h? 5 TC! ,4 7'�,4C TENANT D X1!"1 N7' a? �CRr4�' OP NTNG JAP1 5TU A 1. INSTALL MID,5PAN LAT SU 1� � ���C1-11'fi N LATERAL SUPPORT OF � � COMPRESSION ION FLANGE IMPROVEMENTS I 1 I I AALL 1 4 JAM55 I 1 1 I EXTEND M1L FRAMING TO NT i i i i i i STRUCTURE � 8'-0" OC OR TIGARD TowNE SQUARE-, XRA'*100' C'm"U LJ � I LJ EA END OF WALL LESSSHOPPING CENTER PASS-7HIR i i THAN 8'-0" LONG, SEE 6FIRE-RATED SEALANT I 1 SCHEDULE { ED LE 16200 SOUTHWEST N�"5 ASSEMBLY a) RATED WALLS, #8 SCREW, EA ,5IDE I I ,,.. 0 WALL HEAD AND PIPE i i 14GA DIETRICH® 1 1 PENETRATIONS i i "SLIP CRACK" W/(3) #10 i i HEADER, SEE SCHED PACIFIC HIGHWAY SCREWS 'c� EA CRO55 ; ; SUITE S ACOUSTIC SEALANT ; ; MEMBER = CEILING TIGARD, OR 97224 A,5 5C H _ ED 'a7 NON FI I I iCV RE RATED WALLS I I . - I I I I I I I I (2) I I CONTINUOUS PIPE BEADS I I L GOU511GAL 5 A ANt - ACOUSTIC OUST I L G 5 A ANT TY -------- ISSUEE L P DATE. 6 April 2012 UNDER EA STUD TRACK WALL PARALLEL TO ROOF JO 15T p JOB NUMBER: 323 - I I }i 11 a CEILING SYSTEM HOLD GWB 5/8 OFF I 1 WHERE OCCURS FLOOR 4 FILL WITH MTL STUD, SEE .. . . AC - OUST IG SEALANT SCHEDULE FOR 5IZE INSTAL SUS SYS p' L TEM P WALL ,5PAC I NG ANGLES IN CONT ACOUSTIC SEALANT, TOOL GLEAN, TYP „ 1 a9 eCHEP, 5EE PLAN T J. Y 5/8 TYP T*100FICAL1®. GW TY B P RESILIENT I I II I _ LU A5 AS - B II 1 E I I 1 20 O GA T TRACK K / W 1 FLANGES W/ HI 11 AAft SCHED-► I I aL Ilo HORIZONTAL VERTICAL WALL i i X-DNI, 0.145 SHANK POWDER • I ACTUATE FAS 11 FLOORING D FASTENER 24 OG, INTERIOR INTERSECTION - I II N�fiERSECt I ON FLOOR A6 SCHED •� 1 ..; EMBED 1 MIN (E) CIP CONC SLAB FRAMING w • (NON-P.T.) ------- --- . . NOTE: TYPICAL ACOUSTIC DETAILS SHALL BE USED AT ALL WALLS INDICATED A6 �g ---- ----- /I I\ /111 `�` #6 SCREW, EA FLANGE ACOUSTICAL i7AILS 7%rf= l CAL FAR7171 Uj NTS VARIE5 am " 0 NOTE= ALL WOOD MEMBERS SHALL BE FRT ERIC WHERE CODE REQU I RE5 NON-COMBUST I BLE FULL HEIGHT STUD PER WALL CONSTR UCT I ON SCHEDULE LANCIAULT D1 � ' FULL PEIGilt NON-BEARINGS WALL WALL NEIC1-It °SCNEDI.ILE NOTES BRAC 5cl-I DULL ARCHITECT � ou s-ru W/ INTERIOR NON-BEARING PARTIAL D BLE D • , � � FULL 1-IEIC�Nt TRACK rt0 MATCH M COLD FORMED STEEL STUD SCHEDULE ` � TRACK4 WOOD PO5T, WALL STUD ; � � WALL SCUD W/#S scREWS � 1211 Oc WALL WEIGHT SCHEDULE �cE SIZE MAX �L �acm PER SCHEDULE 1. BASED ON 55MA (STEEL STUD 1 11 3016 nw ravenstein street TYPICAL EACH SIDE OF , • TO EACH FLANGE. (NOTE: 3505162-33 �1-O (01-011 9 STU i i WALL D MANUFACTURERS ASSOCIATION- ICBG camas, Washington 98607 PASS-THROUGH OPENING � ACK-TO- ACK STU S WITH W 1 11 1 11 B B D EB ' -4943 COM 051T WA SIGN. (2) 3505162-33 9-O 8-O BRACE, }- , , 2 ER-4943P P E LL DE v. 360.798.3801 ON THE OUTSIDE MAY BE USED) �= NT Stl,�SIZE SCUD 3P�4GINCs #8 SCREW � 1-EEICs 1 11 1 11 f. 360.833.0585 DI GDT STUD SPACING STUD SIZE1 � , 6005162-33 10-O 6-O (�! WD BLKG AS REQ D B't' EQUIP I P S TO FLANGE 1 11 11 �� X 5U I A THROUGH ST ,�'� �- �� �� 2. BASED ON FULL HEIGHT CONTINUOUS 8-O 24 OC 3505125-18 SCI-� 1�� PPL ER, LAGDBL UD TYP , �, 8 O 3505125-33 24 OC SHEATHING (MINIMUM OF 08 GYPSUM) ON (2) 6005162-33 12'-O" 8'-O" II �J L J L DEADER, 5EE SCDED ' ''' CLIP FLG BEND TRACK BOTH SIDES. ATTACH TO FRAMING WITH A 101-01124 OC 3505125-18 BRACE SCHEUDLE NOTES �. A / ( ) 8 � W5 TO MINIMUM OF #6 5CREW5 1@ 12" OC. Q � , � � AND ATTACH W 3 # RE - 11 CsENERAL NOTE• 1 11 � rj , 11 101-0113505125 33 24 OC TUD FRAMING, SEE 12 O 2411OC 3505125-2� JAMB OR L2x2x54 MIL x 8 LESS cn SCHEDULE i ' ' 3. BASED ON A MINIMUM DEFLECTION OF I. WHERE BACK-TO-BACK STUDS ARE THAN STUD WIDTH W/ (3) #8 1 11 11 CONTRACTOR SHALL FRAME 14-O 24 OC 3505162-33 JI�' „ L/240 AND 5pof MINIMUM LATERAL LOAD. USED, ATTACH TOGETHER WITH #8 TRACK TO _ X R , , SCREWS EACH LECs 12 O INTERIOR PART I T I ONS IN 1 11 11 Q Lii OPENING 'c� X-RAY 3505125-33 24 OC SCREWS � 12 OC STAGGERED A _ MATCH WALL , , , 11 ACCORDANCE WITH TH 15 16-O 24 OC 3505162-43 � j� 4. A 5CREW5 SHA THREAD-FORMING - X-RAIr ARM SIZE AND � OR RA -CUTTING WITH OR WITHOUT A MINIMUM OF� FROM EDGE OF STUD 181-01116 OC 4005162-33 - i THICKNESS 14'-0" 3505125-33 24"OC R RED R TYP UNO. SHEET OR IN ACCORDANCE Q SELF DRILLING POINT. SCREWS SHALL BE WITH SHEET A4.01. HOWEVER, 1 II II - i 20-O 16 OC 4005162-43 p WALL PENETRATION INSTALLED AND TIGHTENED PER o, CONTRACTOR SHALL NOT 45 , 2. BRACES TO BE INSTALLED AT , 1 11 11 MANUFACTURER COMM N ATI ONS. MIX TAI 5 FROM 130TH i RER RE E D DE L R 1 11 11 - _ HOWEVER ANGLE MAY RANGE 22 -O 16 OC 4005162-54 � (E) C I P 16 O 4005125 33 24 OC i � �i MINIMUM SPACING IS THREE SCREW o 0 SHEETS. NOTIFY ARCHITECT TY ICA INT I O H A 4 0 MAX BETWEEN 40 AND 50 FOR I II II ( � CDNC SLAB � L �� � � DER 24-O 16 OC 6005162-33 , , JAMB SCI-�EDULE DIAMETERS. MINIMUM OF (3) THREADS CLEARANCES IF NEED BE. AND AHJ WHICH FRAMING NOTE AT DOORS USE BACK-TO-BACK STUDS a6 JAMBS (NON-P.T.) , 1 11 'Irbil J J � J � � OF 18'-O" 6005125-33 24"DC SHALL BE ENGAGED. SHEET Is SELECTED i 26-O OC 6005162-43 WAU TYPE CiFIENING WIDTH 81UV4 i 28-011 16" OC 6005162-43 L3x3x 18GA x W I DTD OF ; D2 STUD BOTTOM TRACK, SEE DETAIL L A 350 4 FT - 6 FT 2 i NOTE: 3625 MAY BE 5UB5TITUTED FOR 3505 TRACK 0 FU DT STU -------------- - R EA LL D _ _ 6 FT 12 FT 3 1 11 II 35D 30 O 16 OC 6005162-54i W/ (3) #10 SCREWS INTO � 400 4 FT - 8 FT 2 (2) #8 SCREW MULTIPLE STUD JAMB PER CEILING J01 ST 6CHEDU VERT LEG AN (3) N I T I 11 400 UP TO 12 FT 3 1"11 L5/GAUGE SCHEDULE L� 11 L 9 24 OC Ilo _ SCHEDULE. ATTACH TOGETHER i - P600 4 FT 12 FT 2 I. COLD FORM STEEL STUDS To MEET A5TM C645, X DNI (0.145 SHANK) L------ W/#8 5CREW5 '@ 12" OC FULL >�IL� MIN tHIGKNI=SB GAUGE SPAN J015T SPACING JOIST SIZE REMARKS INSTALLATION TO MEET ASTM C154 POWDER ACTUATED �� ; NOTE: 3625 MAY BE SUBSTITUTED FOR 3505 HEIGHT TYP 30 .0312 20 FASTENER, 1" EMBED �� •' 33 .0346 20 6'-O" 16" OC 3625125-21 ` , ".' #8 SCREWS � 12 OC FULL HEIGHT #8 SCREW 12 OC TYP To EACH FLANGE TYP 43 .0451 18 s'-o" I6" OC 362513 -21 2. COLD FORMED STEEL STUDS SIZE DESIGNATION PER _ __-- 54 .0566 16 STEEL STUD MANUFACTURERS A550CIATION (55MA) '--------------" , I 11 11 WALL STUD , , 68 .0113 14 12-O 16 OC 3625131- 33 NOTE 1 II _ 3i 91 .1011 12 _ � W/ ( 8 5CREW5 RTIAL A HEIGHT NON A I N T125 43 x 4 a 6) # RE ,_ „ � P R L �� R G WALL #8 SCREW TYP i � 16 O 16 OC 6003131-43 NOT 1 � �a��,_._�.-,-.��.�w�..-�.-_ � ��.��.�n�._ TO JAMB E u 6 i i ELEVATION 0 XRAY OPENING �� 1• 1. INSTALL MIDSPAN LATERAL 5UP T OF COM 510 FLANGE (3) #8 5CREW5 TYP PDR PRES N LA GE , _ (E) ROOF ERICTIIO ASIA Cr r 6 . " �1,T • 2 JOIST TY onoM O , P f3 BRACE PER � II 6005125-33 S�12ClC�URE SEE NOTE #1 L3x3x54 EACH SIDE x 1/2 0 SCHEDULE LE55 THAN STUD WIDTH r. ' ' (E) ROOF DECK i i CLIP FLG BEND TRACK W/ (3) #8 Chi #8 SCREW EA 51 DE A. , ,. SCREWS TO JAMB OR L2x2x54 MIL •'� � W� 14GA DIETRICN �� _ .. p _- _w "SLIP TRACK" WI(3) #10 , i , , i i x 1,� LE55 THAN STUD WIDTH W/ (3) �' OF € _ ,, #8 5CREW5 EACH LEG LL {� SCREWS 0 EA CROSS � � � � � � � �, , T CK TO E ROOF 11 ,► RA MEMBER , i i E #8 SCREW 0 8110C. TYP 10 1"IIN i BUNDLED JAMB-PER SCHEDULE MATCH WALL JDI5T TYP � WOOD POST , r � 18 GA TRACK TO WHERE WALL STUD PER GAUGE EXPIRES: 06.30.2012 � � IZE AND � � � � MATCH WALL SIZE FULL HEIGHT TRACK TO MATCH SCHEDULE OCCURS 'Q7 '`�` SIGNED: 04.06.12 WALL SIZE AND THICKNESS X"R'd`Y5 WALL STUD PER (2) #8 5CREW5 IN WALL PENETRATION SCHEDULE WALL PARALLEL t0 ROOF JOIST VERTICAL SLOTTED DOLES, TYP TYPICAL INTERIOR HEADER OVER 4'-O" DBL STUD COLUMN NOTE JAMB PR PLAN TRACK TO #1 AT PLYWOOD DECK U5E (2) #8x 1/2" LONG SCREWS MATCH WALL 7YOFICAL :�EMISIN6 AALL AT METAL DECK USE (2) #8 SCREWS SIZE AND AT CONC. DECK USE (2) 0.145"(D PAF If 130TTOM 01= GAUGE Q 3/4 - 1 -OZ 18 GA CONT TRACKWALL L 121_011 MAX � FULL HEIGHT P05T5 AT XRAY OPENING NESTED XXX5131-54 TYP U.N.O. (OMIT AT roll WALL WALL ELEVATION W/ OPNG 8'-0" MAX) CLIP FLG BEND TRACE W/ (4) #8 • ,? SCREWS TO JAMB OR L2x2x54 MIL x 1'2LE55 THAN STUD WIDTH W/ (4) � Q If #8 5CREW5 EACH LEG REVISIONS DATE !1 I � � / #8 SCREW 0 � 12 12"OC TYP 1 CUT FLANGES AND BEND WEB AND /1 VA I S TO MAINTAIN 2 11 RE t 6 CRIPPLE STUD W/ (4) #8 ATTACH TO UNDERSIDE OF ACOUSTICAL s A ANt L E L MAXIMUM BRACE E 1/4" 5CREW5 TO JAMB STRUCTURE WITH (3)#8 SCREWS 12 MINIMUM LENGTH. MINIMUM 1'P NOTE: ABOVE CEILING HEIGHT INTERDENT /'� #8 SCREW TYP C / t*6 . 11 Za�IZ t��l(..I1�l . r L3x3x54 x 1/2 LESS THAN STUD SILL TRACK STUD BRACE 51ZE AND SPACING PER 1101 SE Tech Center Drive ..:.' ..;- = :::• =- - W/ (4) #8 TH A. SIDE 5EE ALSO B/A4.01 FOR SHALL BE CONTINUOUS X SCHEDULE Suite 195 - Q SCREWS TO JAMB W/ (2) 0.145 ALTERNATE FASTENER NO SPLICES ALLOWED. Vancouver, WA 98683 1 - A A TO CONC ( 1 DIA. P F 5 EMBED OPTION IN LIEU OF WELDING = CUT FLANGES AND BENT WEB AND 1/2" MIN) - W/ (4) #8 SCREW5 TO TYPICAL AT SILL ATTACH TO TOP OF WALL WITH TRACK ABOVE AT BRG WALL HORIZONTAL WOOD POST (348 SCREWS MINIMUM NTERJECTION WHERE OCCURS � X_RAYS WALL PENETRATION #8 SCREW 0 12"OC STAGGERED STUD SIZE AND SPACING PER GENTLE 5CH EDULE BOXED JAMB 5TUDs PER ATTACH TRACK TO CONCRETE FIRE-RATED SEALANT SCHEDULE ° - _ 11 - .a - DENTAL #8 SCREW EA STUD TYP 43 MI MINT CK (FULL HT OF WITH HILTI X DNI 0.145 d> PAF s L RA LL ASSEMBLY 0 RATED WALLS, a - . 024"OCOC TYP UNOJAM STUD) TO MATCH WA ZE aWALL HEAD AND PIPE DENTAL OFFICE PENETRATIONS a ac4 ACOU5TIC 5EALANT TRACK W/ 1-1/4" TENANT 0 NON-FIRE RATED WALLS p a FLANGES W/ H I LT I X-DNI 0.145 I ' IMPROVEMENTS SHANK POWEDER ACTUATED 11 11 #8 SCREW a) 12 DG TYP UJA S CTION FASTENERS ') 24 O.C. W/ 1 LL E a - MIN EMBED PIPE (2) CONTINUOUS BEADS ARD T A ANT TY TIG OWNS SQUARE ACOUSTIC 5 E L P 11 11 1 H 1111777 UNDER EA STUD TRACK s' SHOPPING CENTER MULTIPLE JAMSTU5 PER NON- ARING WA JAMSTUD 1 200 SOUTHWEST CEILING SYSTEM HOLD GWB 5/81 OFF a .t a a d SCHEDULE , PACIFIC HIGHWAYWHER OCCU s FLOOR 4FILL WITH ATTACHMENT Xfi`AY OPENING ACOS IC 5 A ANT SUITE S INSTALL SUSP SYSTEM WALL �` a ✓ _ #8 SC WTO EACH STUD C 51 . a - RE BRAE zE AND ANGLES IN CONT ACOUSTIC . a TIGARD, OR 97224 s ACIN P G PER SCH E DUL . E - 5 A ANT TOO CLEAN, TYFASS-7HROU6H - . E L L LE P AALL ` 5/8" TYP � 11 GWB, TYP a 3x3x54 MIL x 8 LE55 THAN STUD 2 - 1 1 " T - W/ (4) 8 5CREW5 TO WIDTH # RE - CUT FLANGE6 AND 3/4 - 1 O JAMB - W/ (2) 0.1454> PAPS TO ATTACH TOT P DFBWALL WITH AND VERTICAL WALL � 1� CONC (EMBED 108" MIN) - W/ (4) #8 (348 SCREWS MINIMUM I NTER5ECT I ON FLOOR V2 , SCREWS TO TRACK ABOVE ISSUE DATE: 6 April 2012 JOB NUMBER: 323 jw2 NOTE: TYPICAL ACOUSTIC DETAILS SHALL BE U5ED AT ALL WALLS INDICATED A5 Og I 4 TYP LS TYPICAL JAMB TO FLOOR CONNECTION ALTERNATE AC -0-US71CAL BRACE CONNECTION AT TOP OF WALL INTERIOR 3/411 = I _011 (NOTE SIMILAR AT TOP) U) - FRAMING T"'rFICAL AOS `NJAM55 T*YOFICAL PARTITION. MILE II � II 3/�- - 1 O VARIES ;a ■ #12 GA. SPLAY WIRE BRACING GROMMET IN PLANE OF EACH RUNNER 1 ERIC COORD 1'-211 �," VERTICAL ANGLE - 450 (12' O.C. #12 HANGER WIRE 0 4-O LOCATION PLAM TYP IN BOTH- DIRECTIONS. 144 SQ.FT. O.C. IN BOTH DIRECTIONS ' " ' ALL HANGERS AND SPLAY =iv IN FEILD 3 O ALL ELEMENTS BMAX.) START WITHIN 4OF WALL ALL ELEMENTS WIRES TO HAVE A MIN. OF L A N At'';1k I A mum LIP 3 TURNS IN I" OF RUN ARCHITECT - 1/6" MATERIAL THICKNE55 W/ I VERTICAL SEISMIC 15M1C E = I HIGH CONTRAST PER CODE I V 1 OC % RUT AT 12 . . 1 k, 7� BACKGROUND COLOR ST 3016 nw gravenstein street I 4" HIGH WHITE NONGLARE FIN15H 450 TYPICAL camas, Washington 98607 COUNTER I INTERNATIONAL v. 360.798.3801 ER ONAL G A HIC R P f. 360.833.0585 SUPPORT, I PICTOGRAM, RAISED 1/32 SEE A2.01 SEE D/A5.01 ; BATT INSUL WHERE _ _ MAIN RUNNER NN 45 TYPICAL FEDERAL STANDARD 595B _ SCHEDULED 1 cv _ I - . r (V I BLUE COLOR NO. 15090 NONGLARE FINISH BACKGROUND SLIP ON METAL � �� 3 5/8" APPLIED PLAM MTL FRAMING '- PANEL TYP. 3/4" LETTERS, CONTRASTING FRAME ASSEMBLY CROSS TEE W/ 5/8II GWCOO B EA SIDE COLOR NONGLARE FINISH, MOM RA15ED 1/32", 5AN5 SERIF, SEE � NOTE; CRO55 TEE AND MAIN BEAM SHALL HEAVY TY _-- MEN BE E Du SIGNAGE SCHEDULE FOR TEXT ACL--- AND HAVE INTERSECTION AND SPLICE STRENGTHS OF AT " GRADE 2 ROUNDED BRAILLE, " LEAST 180 L55 IN COMPRESSION AND TENSION RAISED 1/40", LOCATE 3/8" O�NOTE: CROSS TEES AND MAIN BEAMS SUPPORTING LIGHT PLAM AT BASE. BELOW LETTERS FIXTURES OR MECHANICAL SERVICES SHALL HAVE SAME LOAD CARRYING RR G CAPACITY RE;=;0"CEF710NUGITBECTION, �-ALL ELEMENTS7"rF :�00R HEAC�RA 15ED TEXT, SEE � �- IN� SII III SIGNAGE SCHEDULE FOR TEXT - ON 1 = 1 —O 311 _ �I_OII reception section I.dwg 4 de00 .dw = g X10 SCaIC� a101202.dw g CONTRASTING BACKGROUND C'f COLOR w 5PAGER BAR TO INHIBIT PERIMETER c--=iBRAILLE, EXCEPT WHERE SIGN IS SCHEDULED OVER DOOR COMPONENT 5Pfi2EADIN6 1'_211 \_ 1 II 2-�' n���� D w 'I 1/8" MATERIAL THICKNE55 ATI- #12 GAS OG, MAX HANGER WIRE W E TACTILE SIGNS, TYP. ® 4 O �r p (VARIES W/ TEXT) II7r-,IInIn\\VInfI u AGOU5 GL O 5 U5P 5Y5TEM,8 MAX. GROMMET t HEAVY DUTY COORD SEE A2.01 BATT INSUL WHERE LOCATION SCHEDULED SIGN SCHEDULE Sr1 .. IN FEILDe -Ff 'e- SL I P ON METAL SICrN FRAME ABSEMBLY it ID READING REMARKS TYPE I =�V I I A THESE DOORS,O_ E D RS TO REMAIN UNLOCKED LOCATE ABOVE TO INTERIOR t ACP WHEN � 2 WALL ANGLE CANMAS,W COUNTER i Lill WHEN BUILDING 15 OCCUPIED DOOR 4942 WALL TYPE AS SCHEDULED I `n B EXIT INTERIOR �,� SUPPORT, , _ SEE D/A5.01 N I =�r C UJOMENACCESSIBLE PICTOGRAM INTERIOR NOTE: HANGER WIRE ATTACHMENT AT STRUCTURE SHALL SUPPORT 100 LB5 OF r NOTE: ATTACH GE I L I NC 5U5P SYSTEM cv D MEN TO WALL ANGLE � (2) ADJACENT - AC CES5IBLE PICTOGRAM INTERIOR I111111F — 15 WALLS A I %J AM PPL EDAM PL I II _ 3 5/8" MTL FRAMING L _ _ A%r EXPIRES: 06.30.2012 PANEL TYP. 3 1 0II de005_dwg L — IN PERIMETER GWB EA 51DE SIGNED: 04.06.12 II ► u 3 = -O a101201_dwg �t PLAM AT BA5E. 11 1 1/2" METAL SIGN AS SCHEDULED CHANNELS RECEI=710N UGT T I N D00 OR OPENING / � 4-O1' O.C. Q I. 1/8 FURRING NG 111 = 1-OII _ 2.dwg CHANNEL reception rection n / II 6EE A2.01 2x2 x16 GA CONT. ANGLE 'a) 16 O.G. _ i \ _ _ FAST T O _ EN O STUD UJ/ 2 I/2 .^ TYPE 5-12 SCREWS n• ACOUSTICAL fit) s _ SEALANT 11_111 \ •e T HM 2-roll a.• - �— FRAME, - . . - % IGN INS -e'• AL.LAt I ON ,� .6 _. - •; SNT DISSIMI A RCROUT SOLID .. MATERIALS A LS Q -ko = ACOUSTICAL REVISIONS DATE KIM GASKETING _ ROOM 516NA6E I I ,I III 3 = 1 -O c 103201.dwg, signschedule_dwg, deO12_dwg HMr-RAME` �l IIS - IIIIIII .Ii� I,IIIIIIiI I _cn rl I Q 4 • -d � a-a�IIIiI�i • r'� _ _I 3 u = I I-O I I ' .I • .x a _ f_,-e � _de_00 _ 6 .d_ w g 3-11-_-_- �-' - 1 1S T IUI VD I I I ii e� -.- III IIIIIIIIa IIl I0IIII1I2 I 80III0III.IdI I III wII g OT PPORT REQUIRED I iIIiIIIIIIN I IOII I IT IIE!l l= 1 (2) L AY ER SIIIIiI IIi�I IDNTEE TR AD EINL T PER 38" SPAN OF COUNTER X 1101 SE Tech Ce nt e r D riv e3X24FLAT STOK STEEL THI5UNLESS OTHERWIS NOTED Suite 195PIECE CAN REMAIN UNFINISHED Vancouver, WA 98683(MOUNT TO STUD INDIDE WALLLENGTH SHOULD BE MIN. 3,1PLYWD cX-3OFDEPTH OF SUSPENDED WELD EDGE sEE A2.01 4 N r COUNTER SEE A2.01I 1X1j1X24„, g" SQUARET U55 STEEL 1L8 PLYWD RADIUSED PLASTIC END CAP WELD EDGE ABACK-TO-BACK eACOUSTICAL 1/$rPLYWD41 BY WATERLOG NOTE= PRIMED EXPL05Ep STUD (FOR ILLUSTRATION ONLY, � - � I SEALANT MOUNTING AND READY FOR PAINT DRYWALL TO BE TO FACE OF WALL KERF ' CONDITIONS GENTLE. AROUNDHORIZONTAL PORTION OF SUP O T 4FTER SUPPORT IS INSTALLED HM FRAME, DENTAL 61 GROUT 50LID3 5/13IL FRAMING W/ 5/81GWB EASIDE DENTAL OF F I CE NOTE= LOCATIONS TO BE DETERMINED BY CABINET MARKER SUGGESTED TENANTLOCATION5 HAVE BEEN NOTED ON ELEVATION VIEWACOUSTICAL CRECEF71COUN'"I"ER GA5GETING IMPROVEMENTSSUFFORTCDU� TTAI TYPIl � IQ reception section 3_dwg :2 NO SCALE COUNTER SUPPORT DETAIL 31111-011 de00I.dwg 311 = 11-0 I_ II de009.dwg TIGARD TOWNS SQUARE SHOPPING CENTER 16200 SOUTHWEST 12'-o” MAx PACIFIC HIGHWAY '-O" OC SUITE SWALL AS SCHED MTL STUD TO STRUCTURE 'SQUARE TRUSS STEEL TIGARD, OR 97224 DETAIL SEE NOTE 12 PT 2x6 WD BLKG, CONT � TADED ROD _, i EL PIECE CAN REMAIN CONTINUE CARPET OVER BLOCKING W/ 3/1611x 2 % BED OF SEALANT WASHER, EA END UNFINISHED (MOUNT TO U'LINE 3 � 1/8" PLYWDSLAB ON GRADE -3 STUD IN51DE WALL SUPPOR BIOI-22A SUBPALLET, SIZE 11 me,(3) 1/2 AS REQUIRED BY ISSUE DATE: 6 April 2012 AS REQ'D JOB NUMBER: 323DETAIL SEE NOTE 12/A5.01 X FIELD DRILL HOLE IN LIGHT TRACK ANUFACTURER —KN ------ --- CHAIR 57C`)h'F MTL STUD FRAMING .a I, , OI, i ilIL II3 I de011_dwg LU B-LINEBII 5TRUCT 0 EA INTERIOREND OF 3/16x 2" 5Q WASHER,_'.% _ TYP SUBPALLET TRACK LIGHT ASSEMBLY, ATTACH AS DD0R T5HDLC) RECOMMENDED BY MANUFACTURER CONCEAL COUN7ER SUPPORT 3 1I-OITRACK L ISUFFOR7 1 II 1I- II reception section 4.dwg 11 1 1-0 11 deoIo.dwg I - - I ERIC LANCIAULT 1" x 1/2" 4" CONT P05T FORMED PAINTED WOOD!T5PLASH -Jof 1-4 ARCHITECT PLAM SELF BACK _ TRIM AROUND CABINET , TYP EDGPLAM COLOR EDGE PLAM EDGE 3016 nw gravenstein street ; i BAND 5ET IN 5NT camas,washin ton 98607 AS SCHEDULED washing ton 360.798.3801 f. 360.833.0585 =tw ---------------- 1-2 " 5TL TUBE, NOTE= ALL PRIMED ADJUSTABLE PLAM SAME CONT WELD 5HELV ING ° ° COLOR SUPPORT, 5EE 12/A5.01 SCREW A5 NECE55ARY FOR PROPER ATTACHMENT _ - 0 MTL STUD FRAMING A5 U ' SCHED LAB COUN7ERTOF A OFERA70R%r CCUN7ER ARn 1 -1011PVC EDGE • 1gg � Y " PLAM SELF BAND � III x 1/2 ��t� i�CP�L� - G i PAINTED WOOD EDGE, TYP 5ET IN 5NT SET I N 5NT ' O lf. iuli II iI;; TRIM AROUND PLAM TY CABINET, TYP P G: _ ®; ___ _ NOTE: ALL �- _ NOTE- MOISTURE -4 i_ -- -- - - .- PLAM SAME _ COLOR RESISTANT GORE -\` 7- NOTE' MOISTURE OF -i — CONT WELD COUNTER RE515TANT CORE ;i ---— --- PLYUJD 'a� -.1 - COUNTER N all CUR `�\`.`_.r SUPPORT, 5EE 12/A5.01 �r /i � `� SCREW COR WELD) A5 li O U `� NECE55ARY FOR EXPIRES: 06.30.2012 SIGNED: 04.06.12 i' PROPER ATTACHMENT PIPE _ INSULATION ti iii it iii � ' � �%------ PIPE --- PIPE INSULATION PLAM TYP I jvi r U a JAI xi - - MTL STUD FRAMING A5 SCHED Il T%rF I CAL LA\/ T%rfz I CAL HAS 1 NK 1 = V-011 REVISIONS DATE FULL HT PLAM BACKSPLASN GROMMET INTERDENT PLAM SELF 1101 SE Tech Center Drive. COORQ EDGE Suite 195 LOCATION PLAM COLOR IN FEILp PLAM -- AS SCHEDULED Vancouver, WA 98683 COLOR RED, YELLOW OR GREEN AS INDICATED ADJUSTABLE C7ENTLE 3 5/8" MTL FRAMING = SHELVINGDENTAL Nr W/ 5/8" GB EA 51E C14 ° ° DENTAL OFFICE APPLIED PLAM PANEL TYR TENANT IMPROVEMENT o PLAM AT BA5E- TIGARD TOWNE SQUARE SHOPPING CENTER - 16200 SOUTHWEST PACIFIC HIGHWAY RECEPTION UN TO 57'E`R1L1ZA710N COUN7EIRTOF SUITES 1- 11 TIGARD OR 97224 1 = 1 -O 1 = 1O ISSUE DATE: 6 April 2012 JOB NUMBER: 323 LU INTERIOR DETAILS A5002 ERIC LANCIAULT ADJU6TABLE WIRE DIVIDER, GWB, PAINT DRILL HOLE IN SHELF, 10 GWB, PAINT GWB, PAINT GWB, PAINT 3016 PAINT ARCHITECTARCHITECTOPEN 3016 nw gravenstein street MELAMINE camas, washington 98607 INTERIOR — v. 360.798.3801 q4.1. f. 360.833.0585 .020 B 01VCP 5.0 5.01 A5.01\_._: �� 21_11ll I�1 ALL 4 3_O . pL-3 5-1 PL 3 " BOX 3 O PL-2 3 O EDGES, CLR P L 3_O PL-2 TYP PLAM LOCK TOP L CLR CLR PL-1 DRAWER, TYP \ /-3L PLAM KN 3/4" ADJUSTABLE FAX COUNTER L. (4) EQUAL SHELVING �, 6'-O" INTERMEDIATE SUPPORT AS BASE AS 5CHED BASE AS SCHED, TYP 11 N ECESSARY FOR U COUNTER LATER 15 DEEP, TYP FINISH SURFACES SUPPORT, COORDINATE W COMPUTER 0 GLAZING, TYP LOCAT I ONS 15 U5. 10:2. us . I cr= Buell01:0-f= IcEt Bue, II 5�. 105, 101 1/41 11-0 ie0l.dw - u g 1/4 - 1 O ieol_dw 1/4 - _ �� � �� �� � �� 1 9 1 O ieo l.dw - g 1/4 - 1 -O ieol.dw 114 = 1 -O ieol.dw 1/4 = 1 -O ie0l.dw g g g NOTE= SEAL ALL INSTALLED ACCESSORIES TO PREVENT MOISTURE PENETRATION OF WALL SURFACE, TYPICAL d 3�EQ. I, SINK MIRROR AR GWB, TYP 12 DEEP 2'-S" 4EQ, 12"DEEP bf 2'-g" 4EQ, 12"DEEP � 24x36 i GWB, TYP � MIRROR / \ / PLAM, PLAM ON GWB E C TU011 I,��CI�LM �` PTDW 1'-0" 2'-0" 3'-411 0. II, 1 ----- ----- ----------- ---- ----- - - - ----- TYP TY - - /f E P 11 GRAB BAR 5.O LEDGER 3'-r 1'-O' - 3 El -413 O 1 - - 'a) EN WA _ 1 O O TOP DRAWERLu 1 1_411 o W r LOCK,TYP t CAM r U4 O =tit WA ( FE:]I r�D ^ , _ _ 4942 W i 1 1 D i rn O7 U- 1 1 - �'' ' 1 N � / OF CT A5 TY r: 11 B E, P - MODESTY ^,if 1"�' PIPE AN PLAM CONCEALED P E LED COUNTER EL FLUSH CONTROL ON OPEN INSULATION SU PPORT TYP SE /A5.01 E D ,TYP SIDE OF WATER CLOSET . EXPIRES: 06.30.2012 SIGNED: 04.06.12 T I lad 1 NI A Mf N 1 4 trm-N 1/4 1 1-0 11 leol-dwe 0 0 m N 1/4 — 1 —O 11 i 7 1 1 _ II II ® 11 it 1� 1� �• .dwg 1/411 = 11-011 ieo7.dwg 1/411 - ]I-oil i�o2.awg 1/4 = 1 -O ieo2.dwg 1/4 = 1 -O ieo2.dwg 1/4 = 1 -O ieo2.dwg NOTE= SEAL ALL INSTALLED ACCESSORIES rD% TO PREVENT MOISTURE PENETRATION OF WA 5.02 LL SURFACE, TYPICAL Q GWB, TYP � SINK 4 MIRROR GWB, TYP 2 EQ GWB, TYP 24x36it 2'-3" 12"DEEP flie2_g2'-S", 12"D P 1'-3' MIRROR VERTICAL RR R ER L / PLAM ON GWB TOW GRAB BAR / \ / N - rt 21_O11 rE 11 „ ------- ------- ------- 1 ----- - 10L. 1 1_O 10 5.02 TYP SCD 314 4 \ I / cv 4" \ i„ Q GRAB BAR 6 = BACKSPLASH BACKSPLASH 3-6 -O _ LEDGER ' PTD " 0 � -4 END WA 1 1 u.� LL _ O } W N r 4 p _ - O i— U - � _ ' ------ — It 7 -S- LU U- -111 21_111 C4 _—�`,' _ ? PLAM, TYP --- ----------- \ / \ O PLAM, TYP 11 \ i \ O i� MODESTY REVISIONS DATE i - J - ; - - - - - - - - - - - --- — !Y - -- c� cv m O �� _ rn — cY1 �11�t � — u i _ +- cv CT BASE, \ \ / \ / - - PANEL c., LU d) N \ / 1'—C!" ig x TYP - 1_/11 -� 1 PIPE 1'-10" 4EQ 24" DEEP 2'-6" 2'-O" PLAM, TYP MODESTY CONGEALED FLUSH CONTROL ON OPEN — INSULATION 109 1 PLASTER BIN B SUPPORT S /A5.01 A EE D SIDE OF WATER CLOSET FJ tD PANEL M N 110 'til I 1 � N 110. SAB 10clCONSULT I ®°� CIONIBUL7INTERDENT �. I 1101 SE Tech Center Drive /4 - 1 O eOC_dw _ 1 4 - Suite 195 1/4 - 1 O ieO&.dwg g 1/4 - 1 -O ie06-dwg 1/4 1 O ie04.dwg 1/4 = 1 -O ie04_dwg / 1 O ieo�.dwg 1/4 = 1 -O ie0l.dwg Vancouver WA 98683 ADJUSTABLE l 1) S"d? OPENING IN COUNTER (1) 8"(P OPENING IN VERIFY TOP W/ SST COLLAR COUNTER TOP W/ 55T W/TENANT GWB, PAINT COORDINATE SHELVING, TYP C 11 EXHAUST DUCT GWI3 PAINT COLLA W/ 3 WI 11 2 Q 12 R DE C-zUJB PAINT 1404 E DEE � LOCATION W/ 5EQ 12"DEEP '"02 FILLER AS IT 1 -O TYP 1' GWB, PAINT, TYP �� RED PLAM SURROUND 6EQ, 12"DEEP TYP OPENING IN SEQ 12 DEEP 5EQ 14 DEEP O FILLER AS IT GENTLE / \ CAS WO K CCURS E R OCCURS �- ENTAL -f- 7/- \ MIN S 3/4" (P HOLE - -- FILLER AS IT --- _ PLAM TYP - - - - - - `t '`r ---- ---- ---- ---- ---- PLAM TYP ---- ---- ---- ---- ---- --- -- --- _-- --- LAM, TYP --- ---- / \ AT TOP FOR N -�-i -I-- -�-I -�- - `-I OCCURS -/- FULL HT PLAM FULL HT PLAM ` / 7 `�` `�' - -I - - --\- -f-- - - - - �' �- WIRING, POSITION BACKSPLASH, TYP BACKSPLASH, FULL HT PLAM FULL HT PLAM II II PLAM, TYP _ _ / \ CENTER FRONT TO O 5EQ, 1, BACKSPLASH = = BACKSPLASH, TYP PTD - - -- 1-10 TYP o o DENTAL OFFICE BACK �, 24 DEEP 1 9 APPLIED OVER 6EQ, 24 DEEP 10Is - ------- ------- -- _ — — — — PLYWD, TYP = 24 DEEP TENANT - / \ � \ _ = FIXED SHELF W/ (10) o \ / o - - - _ --- -------- -------- _ _ O o IMPROVEMENTS II II II -- -- - --- ---- 2"� VENT ILATION -' - - ----- ----- ----- ,� _, ----- ----- ----- ----- ----- ----- - iv HOLES \ \ \ / _ �,, c� — AIR FILTER 2. OPEN 3-S l+/-) TIGARD TOWNE SQUARE -2'"6'� ACCESSIBLE ADJUSTABLE VENT 1'-316' OPEN, NO BASE, '-1O 6'1 FOR REFUSE SHOPPING CENTER 11 CLR OPEN TO FLOOR SHELVING, TYP YELLOW RED GREEN CONTAINERS 10200 SOUTHWEST PACIFIC HIGHWAY -5 T Af=-I ISLL 11 IL . IIctSTERIL .!� Uhl I I I Ict STERIL . 11cl I 1cf STERIL . SUITE S IIS 1/4 - 1 O ielo.dw 1/4 - 1 O iell.dw - - - :2 1/4 _ _ :21 _ " _ TIGARD OR 97224 1/4 - 1 O 1e03.dwg g G g 1/4 - 1 O ie l l.dwg 1/4 - 1 O ie l.dwg - 1 O iel l_dwg 1/4 - 1 -O ie l l.dwg 5.02 COO NOTE= NARROW RD � �� PANEL TOWARD X-2 WHERE W/ DENTAL 1 -2 , VERIFY FRONT OF GOORD W/ DENTAL SUPPLIER OCCURS SUPPLIER � 4'-2", VERIFY10 QP RATORY CHROME ISSUE DATE: 6 April 2012 CLOSET ROD JOB NUMBER: 323 A W/END CAPS PASS-THROUGH XRAY � B GWB, PAINT 1-S DEEP FIXED 5.02 \ LOCATE TYP CABINET, PLAM, WHERE XRAY u_ 5.02 UNDERCOUNTER A 3/4 MELAMINE OCCURS \ APRON PLUMBING AS FAR TO 5'02 ,� SHELF Ic LU V 5 O OPENING -, XRAY CENTER HANGER, } SIDE AWAY FROM SST BASE CABINET WHERE \ / WHERE C APRON W/SST COLLAR SUPPORT OCCU S � CD COLLAR AS 111111111110 OCCURS ON 9 o CLOCK SIDE � R � PT POSSIBLE HANGER �� � - 4 BACKSPLASH 5 EQ 1'-S" FIXED 3/4" Uj 18 DEEP,TYP VERIFY XRAY CABINET r a MELAMINE INTERIOR LOCATION ----' - _ -- , - L S I W/ ZE _ SHELF DENTAL EQUIPMENT _ l 1 _ _ — 1 1 N SUPPLIER O $ O i \ _ __ � � rn - 1 - CA 1 N N L _ Ell 1 _ ATI N PLAMit CONCEALED COUNTER Sk S11 „ 5"(P OPENING W/ 1 11 „ E LED TER �_0 OPEN BASE FOR--I -10 6-O 55T COLLAR CONCEALED SUP O T EQ EQ. EQ. LL R P R 11 BASE CABINET WHERE , SUPPORT, SEE D/A5.01 24 EE �' �' L CPU LOCATION REFUSE CONTAINER D OCCURS ON 9' o'CLOCK TYP, SEE D/A5.01 = TYP _. . T'Yof=. T IL Uhl 114. Lu IIS 1114 - 1'- ieo 1/4 - 11-0" ie09_dwg 1/4 = 1 -O ie09.dwg5 1/4 = 1 O" ie09.dw 1/4 = 1 -O ieOB.dwg 1/4 = 1 -O ie08.dwg 3.dwg g COORDINATE CEPH ATTACHMENT LOCATION W/ DENTAL EQUIPMENT VENDOR n n REFER TO DENTAL EQUIPMENT VENDOR SHEETS,TYPICAL I�IFI' UJITN N.S. REP. VENT TO OUTSIDE (1) 3"OR (2) 2" CAS (AIR/WATER SEPARATOR) FLUSH-MOUNTED YEERIC SINGLE-GANG JUNCTION ANCHOR WOOD POSTS ON BOTH ROUTE TO REMOTE SCH. 40 PIPE LANCIAULT BOX W 1" CONDUIT FOR PAN UNIT UPPER WALL SIDES STRUCTURE EABOCABINET AND PA CONNECT TO HOSE o ° COORDINATE AREA FOR AIR INTAKE, STRUCTURE ABOVE AND PAIRED FIBER OPTIC CABLE BRACKET. YE�1zhF�r sTUDs,sEEG/A4.01 ORC/A4.D1 ALT W/OWNER CONNECTION TO % VACUUM LINE FROM Q LOAD CENTER, ARCHITECT DEDICATED COMPUTER. o0 CONTRACTOR TO PROVIDE � � TREATMENT ROOM o SEE E3.00 2 PIPE FOR �I o PULL-STRING � � 1 1/2��SCH.40 ol AIR INTAKE 3016 nw gravenstem street MIN.SLOPE 1/4" PER 10' (2) TRANSFORMERS camas,washington 98607 DRILL HOLE THROUGH STUDS MOUNTING SIDE CONNECT TO INTAKE HOSE BOOST TRANSFORMER REMOTE AIR v. 360.798.3801 CABINET TO FEED POWER FROM OF CABINET �� 2 DEDICATED ELECTRICAL OUTLETS AS NECESSARY MANIFOLD f. 360.833.0585 X-RAY UNIT TO MASTER CONTROL. (NEMA 6-15R). ( ) WOOD POSTS, FLOOR ( TO CEILING FLUSH-MOUNTEDg DRAIN LINE 8 MAX o 0 SINGLE-GANG JUNCTION PAN UNIT LOWER WALL _ 1-1/2"SCH.40 PIPE BOX W/CONDUIT,TO I I BRACKET. I — W/DIRECT WASTE IY CONNECTION REMOTE LOW LOCATION DESIGNATED BY �1 COORDINATE HEIGHT } DENTAL EQUIPMENT _ WITH ELECTRICAL UNIT R LTA — VA AG VOLTAGE VENDOR I I �� srs SHUTOFF PANEL 14) FLUSH-MOUNTED HEIGHT ISSIDE BRMIIN,NEDATOAhLOW FOR 3 MAX SINGLE-GANG JUNCTION RU VERIFY THAT THE PASS THRU WILL ®oo BOX fel CLEAR ALL CABINET FIXTURES A n (BACKSPLASH,FAUCET.ETC. WITH CONTROL CABLE � G 2 MAX DATA/ REMOTE DENTAL EQUIPMENT VENDOR PRIOR r UN I _ VA 1/2 MNPT MAIN TO CONSTRUCTION CONTROL CHASE �� srs NOTES: AIR LINE 1. 1/2" FNPT SHUT-OFF VALVE AND A 4 FT. PRESSURE HOSE 2. AIR DISTRIBUTION PIPING: 1/2"TYPE"L"OR"K"COPPER A SECTION VIEW B O WOOD VERTICAL POSTS ON EITHER SIDE VIEW 3. ALLOW 12"SERVICE CLEARANCE ON ALL SIDES \ SIDE OF PASS THRU CABINET. 0 o PLAN VIEW ENTAL \/ACAIR FANO no scale a901,dwg no scale a901.dwg 5ACKINC-7 no scab a901.dwg PLAN VIEW VERTICAL WALL STUDS D PLACED 16 O.C.FA!55-7HR0U(5H B. T MODEL TRIMMER, X-RAY EXPOSURE BUTTON (TYP.) 2 GANG SWITCH BOX ES E CThOMASLANCRULT � FVIV no scab a901.dw ELECTRICAL CONTRACTOR IS g FINAL CONNECTIONS BY DENTAL POWER CONNECTION RESPONSIBLE FOR FOLLOWING FLUSH-MOUNTED SINGLE GANG 0 EQUIPMENT VENDOR �—•• i ALL LOCAL CODES FOR ROUGH @ 44 AFF JUNCTION BOX ES &® 3/4" VOLTAGE T INSTALLATION. HENRY SCHEIN TO / CONDUIT U LOW O MAKE FINAL CONNECTIONS W/ PULL-WIRE BETWEEN EXPOSURE CABLE FROM EACH PUMP, WATER SUPPLY `. 44 AFF, p BUTTON &X-RAY MASTER ry COMPRESSOR TO BE CC'�l'�AS, VSA STUB OUT AND TERMINATE ELECTRICIAN TO PROVIDE A CONTROL/UNIT VERIFY WIRING REQUIREMENTS CONTROLLED. PROVIDE& ' 4942 BETWEEN EXPOSURE BUTTON O INSTALL CABLES;VERIFY CABLE 0 2" 0 0 {!Ji WITH 90 8 COMPRESSION FLUSH-MOUNTED SINGLE GANG I �+ STOP 3„ o o a ® AND X-RAY MASTER a ®'� O SIZE W/ DENTAL EQUIPMENT JUNCTION BOX&4 CONDUIT CONTROL UNIT WITH / VENDOR W/ PULL-WIRE FROM REMOTE MANUFACTURER'S INSTALLATION ° ° ° ° CONTROL TO X-RAY UNIT I I I MANUAL. I o 0 0 �: I I �: a AIR &VAC. REMOTE PANEL KIT. SINK DRAIN HOSE I I 1L� LL o FVIC EXPIRES: 06.30.2012 BUTTONS MUST BE CENTER ON LL DRAIN @ 21"A.F.F Q ii ii Q SIGNED: 04.06.12 (A) ARC DRAIN OUT��, o ____ __ ______ o MOUNTING PLATE � u u � WALL OR 3'-4"AWAY FROM SEE G/A9.01 ° ° ° ° ii ii OPENING INTO ROOM WHERE �� PLASTER TRAP FVIC DUAL CONTROL , - ERIC F LANCIAULT ELECTRICALG N ELECTRICAL NOTES f� tul _..: ARCHITECT EXISTING BEARING AND FC Clj F __` 4uFURRING WALL 1 PROVIDE POWER TO EXTERIOR 51C�NACE CONNECT, - - - i _ O 116 _-- =---=--_=� COORDINATE WITH SIGNAGE CONTRACTOR 3016 nw gravenstein street /f l -- EXISTING COLUMN AND NOTE; PROVIDE OW camas, washin ton 98607 � DEP ER � CONNECTIONS TO ALL washing ton SIGNAGE f LOCATIONS AS DESIGNATED BY SIGN . 360.798.3801 360..833.833.05855 / VENDOR; COORDINATE LOCATIONS AND NUMBER OF f. NEW WALL CONSTRUCTION SIGNS W/ VENDOR PRIOR TO BID NEMA 5-20, ISOLATE GROUND IN IT CABINET i C p -- DATA, SINGLE • ' O,� Q GI -�, --- - - i a -r* O MOUNT DUPLEX CONVENIENCE OUTLET 18" AFF, 2 1D DATA, DUPLEX TYPICAL, Nr( —---- FC GFCIF�CI -- ,, >� �,% \ _.____--_--_ 4D DATA, QUADPLEX CONTROL 4 KILL SWITCHES FOR OPERATORY XRAY ' O (X-U, COORDINATE HEIGHT W/ DENTAL EQUIP. VENDOR, I N C U E O MICROWAVDUPLEX CONVENIENCE OUTLET SEE F/A9.01. FINAL CONNECTION OF SWITCH 5 E XRAY . EQUIP BY DENTAL I S � P SU PPLIER g .� QUADPLEX POWER ER F0_1CONVENIENCE OUTLET, SURFACE II O CONTROL 4 KILL SWITCHES MOUNT TO NES FOR OPERATORY XRAYD 'c) 56FLOOR�� �� (X-2) COORDINATE WEIGHT W DENTAL EQUIP. VENDOR, QUI V N OR f 1.LL_ L111C - SEE F/A9.01, FINAL CONNECTION OF SWITCHES 4 XRAY ,�I�; �- 4 -- --DATA, SURFACE MOUNT TO 114 FLOOR BY DENTAL EQUIP SUPPLIER 113 DEDICATED DUPLEX 6 CONTROL 4 KILL SWITCHES FOR PAHO CEPH (X-3), CONVENIENCE OUTLET OCOORDINATE HEIGHT W/DENT AL EQUIP. VENDOR, SEE F/A9.01 c � QUADPLEX CONVENIENCE � \� OUTLET 4 POWER CONDUIT AND 2I DATA CONDUIT FOR VGA 9 O 0 O CABLE FROM WALL DUPLEX MUD RING TO PATIENT ' Or QUADPLEX CONVENIENCE CHAIR (VGA CABLE FVIV) COORDINATELOCATION W/ OUTLET, HALF DEDICATED CHAIR UTILITY CENTER DENTAL QUI _ E P VENDOR AND _� i 2 R EE K/A9.01 .•,, �, � , LOCATE BELOW SLAB. DApn0E -rr �0 _ �`� \ � w i 112 - ® -- CONNECTION TO EQUIPMENT g CPU LOCATION, FTIT, WITH CPU DATA JACK AT 18" AFF X Esc THOMAS � WITH CONDUIT TO ABOVE CEILING AND MUD RING At SLA'CMULT r K / \ - d XRAY CONTROL KILL SWITCH 12 AFF FOR VGA CABLE, SEE NOTE 7; MOUNT POWER OUTLET ATla" AFFCOORDINATE LOCATIONS WITH GPU XRAY CONTROL USN MOUNT AND CASE OL c-'_ry -''°_--' V -1 BUTTON SEE F/A9.01P A O , r-i: a RKY 0 / �;� _ _120 �� ULTRA SONIC '`� `� _,. �� CLEANER _ EP I LE ER '�, O _ CA , �A 8 -- - V-1 -- ABOVE COUNTER LOCATION 9 FLOOR MOUNTED UTILITY CENTER, SEE K/A9.01 O 2 ' (D4 D -- LOW VOLTAGE AIR/VAC PROVIDE (1) DEDICATED CIRCUIT TO DENTAL VACUUM Q " _ 13 = E REMOTE PANEL, SEE E/A9.01 1 O DV-1 I N ADDITION TO DEDICATED CAT • � � �, � �, ng �_______ _ �� th O ED G RCUIT FOR VACUUM FYIC EQUALIZER VE-1 Al NAND PIECE 2"E"' CLEANER , ® ,: lUifi -- WIRELESS DEVICE, FTIV 11 (4) CAT 5e FROM P05 TO IT CABINET (EXTENDED SEE N/A9.01 STERILIER/ _ —---- ---- . -- ' 1 11 eG I O DEMARC), LEAVE 10-0 MINIMUM COIL EA LINE ABOVE AUTOCLAVE �` -- INTRAORAL XRAY IN CABINET IT CABINET EXPIRES. 06.30.2012 �t ., . X-1 SIGNED: 04.06.12 g e 4�• ` � /_ o . , - ___� ROUGH-IN BY CONTRACTOR, FINAL CONNECT ION BY DENTAL 11 " '� `• - , � :,,� \ �' `•`ti• ._ __ _____ ____________ -' � 12 BELOW SLAB � POWER CONDUIT, 2 DATA CONDUIT � �.,, � \ • � . `,` �j A: °�•°� r__--r--._ _. � ___ ', � i EQUIPMENT VENDOR GFCI GF I`I ^�" II, _ (FOR USB CABLE CONNECTION FROM COMPUTER TO __ _ /� �, ,-_-- _._ __ r--__.__.._ SCANNER -- CABLING FVIV) COORDINATE WITH TENANT O `\ L — -- _ . _ _ X 2 INTRAORAL XRAY - 0 � ' 9 -` `'`r ` i ``• ` v ,s4 _ WALL-MOUNTED, ROUC�N-IN BY CONTRACTOR FINAL 110 13 PANO CEPH COMPUTER LOCATION, MOUNT B.O. CONNECTION BY DENTAL O 11 OUTLETS X36 AFF GFCI — ----� �--C��I-- ------- �, ;: '1-_____________._______1_ EQUIPMENT E DOR ,-:. VENDOR 1 l \ ' �. \` ��Y%� ,> ,% TRIMMER (4) DATA ((2) DATA 14 , l2) CONSOLE) (1) DUPLEX \•` `�" -- PAHO CEPH XRAY ROUGH-IN 14 ----- X-3 O POWER, GROUNDED, ABOVE LAY-IN CEILING GRID FOR GFC BY CONTRACTOR FINAL WIRELESS DEVICE, INSTALL CABLING TO IT CABINET LAT E __--t i r . .a _ A CONNECTION BY DENTAL 0 fi r' -J� I i- ` \X! �� 9F �'VACUUM /� TERMINATE DATA 4 CONSOLE CABLING AT IT CABINET 0 _�_� I c� . , \ \ S EQUIPMENT VENDOR (TERMINATION Y T \ \, FORMERTERMINATION VENDOR) Q 124 , — 109 �' > � OUTLET 208 V f , i i LOCATE sry ,� �• \� � O � W f� I � 15 L E EP IN ACCORDANCE WITH ALL CLEARANCE f 9 O �`�` - � � ', r' -_ _ --T O REQUIREMENTS F.� - �...�_ \ g � IV-8-. • ,/ 4 ' ' `•;'-� `\ ER DATA INS O 2D 16 MOUNT POW / IDE BASE CAB I NET W/ WIRE 2D �.. O MANAGEMENT t0 GROMMETS, COORDINATE WITH �\ 7t I�fi CASEWORK VENDOR Q 123 REVISIONS S ONS DATE W01`1EN C> O COORDINATE POWER DATA LOCATION FOR PAHO \ -ON CEPH WITH DENTAL EQUIPMENT SUPPLIER, SEE ALSO = J - u I105 107 D/A9.01 \�Nl >,`\ � (D ELECTRICAL CONTRACTOR TO COORDINATE W/ �i INTERDENT � •, 5 � .� � \ , I I . n.,, � 1''fECN,4NICAL CONTRACTOR FOR MECHANICAL EQUIPMENT , I 1101 SE Tech Center . CONNECT Dnve CONNECTIONS LOADS C AS REQ UIRED. Suite 195 _ COORDINATE WITH LANDLORD ANY ADDITIONAL Vancouver, WA 98683 _ _- PR NS FO T "- 1 I R ENANT �> � CT LE CA S R L ERVIC 103 = PROVIDE ALL POWER LOW VOLTAGERACEWAY � 2 I, ear- � OR COMPLETE SCOPE ��- CABLING AS NECESSARY F i 6 s COORDINATE LOW VOLTAGE CABLING REQUIREMENT WITH 12LOW VOLTAGE TERMINATION VENDOR GENTLE, 1> P. U `\ f \ � „ AL OW VOLTAGE` L L L AGE TERMINATIONS SHALL COMPLY WITH I, ti -- --- . -- --- AN5I/TIA-5ro8-A � ENTAL 4p - - 106 SEE A2.02 FOR PUBLIC ADDRESS SPEAKER SYSTEM p. , DENTAL OFFICE CE I: u r n .. •\ r 12D d b..... n E TION � ---- TENANT 101 -3 U 1 l�!E.J: 4p 24 IMPROVEMENTS � 10 . 2 G TIGARD TOWNE SQUARE y ,> ---- --- --— --_ --- CENTER °1> D SHOPPING b u y 4 G ,, n t ti titi`�. C1 _-.2�? _ 16200 SOUTHWEST �. UI 12 I c PACIFIC HIGHWAY G wA Y SUITE S `-., .� ,ti. ,L;,'1•.;},�1%" � U. f �/ r--____ __ __ - - - ---_:i ` % �/f _______.__ ______.-__. .____ __ ___ moi' `-_ _ .// � •// �. I � p � r TIGARD OR 97224 '., 1 be" r ♦, I'1 - r :y, . ..,y - . U .. c - � 1 � U p . U L .iyU �Al /, , i' '1 c '. v �r, � a. � U ' O o U •I> P 19 ,p °' ' r n 1, > ° t , b >'F, I / _ s'" _... 1 . - '$ __ `,.\.+ Y !.�^'' Vin, ✓ . u. u 'h t ' f - f3 ' 4 ISSUE DATE: 12012 :� _ t f �a JOB NUMBER: 323 �� ,i�.:'°r':' �"' �,.�\ f}�<-�-``a ,,�,�.-'`,: ;,I• h ., z o t• c.A. n U � 1 b ° 4 e�'' I} p e. ♦�{�7j ONLY {��/y�P�1t_ 140T IT 1 4 12 LECTRICAL i NLU p O I•dw e11 11 g ELECTRICAL . y LAYOUT 1/4" s s LANCIAULT MECHANICAL EQUIPMENT CONNECTION SCHEDULE � AR H T HES( DESCRIPTION HP KVA PH. VOLTS C. ��viRE CIRCUIT REMARKS 1 RTU-1 10.00 3 208 1" 3- 6 A-14,16,18 50A3P OCP-VERIFY 3016 nw gravenstein streetcamas,vtleshingtan 98607 2 RTU-2 10.00 3 208 1 3-#6 A-213,22,24 50A3P OCP-VERIFYv. 360.790.3801 3 NOT USED "' ICA " Ylk '2 f. 360.833.0585 4 EWH-1 4.50 1 208 1" 2-#10 A-37,39 r 5 EF-1 0.05 1 120 1/2" 2-#12 B-31 RUNS CONTINUOUS SOME SYMBOLS MAY NOT APPEAR ON DRAWINGS 1 I' DASHED SYMBOLS INDICATE EXISTING DEVICE CEF-1 0.05 1 120 1/2" 2-#12 A-3 ON ` / AISLE 103 LfGI--1T#ISG ELECTRICAL PANEL �1/NAME ����t� �i ASSOC. 7 CEF-2 0.05 1 120 1 2 2- 12 B-31 SE BRANCH CIRCUIT IN WALL [1R CEILING E NOTE 1 SELO�,i ;; BRANCH CIRCUIT EXPOSED h (TYPICAL TO NEW) INC. 8 CEF-3 0.05 1 120 1/2 2-#12 A-3 { N / AISLE 103 LIGHTING --� - - ® ® ® ® - ® --- -- - ® ® - -- ®® ® "?`I I ELECTRICAL PANEL EXISTING W/NAME CONSMTm BRANCH CIRCUIT IN FLOOR OR EARTH P MECTMAL ENGWEMS 9 CEF-4 0.05 1 120 1/2" 2-#12 A-3 ON W/ AISLE 103 LIGHTING (TYPICAL TO REMOVE) BRANCH CIRCUIT EXISTING 4111 WE 83rd Street E F - - - - - - ELECTRICAL PANEL EXISTING W/NAME 10 CFF-5 0.05 1 1 - 20 1 2 2- 12 A O A 1 � �! l / � 3 N ��/ ISLE a3 LIGHTING TE r101`�IE LINE ,�� � 11 CF_F-6 ? LIGHTING TEL �L TEL TEL (TYPICAL TO REMAIN) 7rlal574-0199 (503)286-2458 Q.aS 1 120 1/_ 2- 1_ A-3 ON / AISLE 103 -I�HTING fix ( �Q)5t4-0209 DARKER LINES INDICATE NEW COMMUNICATIONS OUTLET tnay@a�� "•c 12 RP 1 2 1 -_ 0.05 1 120 - T} INDICATE / 1/_ - �12 A 41 ,I , LIGHTER LINES EXISTING �--f D 1 DATA CABLE OUTLET PROVIDE EACH 211 2 DATA CABLE OUTLET OUTL ETDITII I" C. MOTE 1. EXH FAN SHALL BE THERMOSTAT CONTROLLED AT 70 DEG F. HASH MARKS = LIE WIRES TO ACCE551BLE (NO HASH MARKS = 2 WIRES + 1 GRND) 41)(p 4 DATA CABLE OUTLET , C I INCx .ATTIC. �- CHUNG MAKE-UP AIR PROVIDED FROM CEILING SPACc RU SOUND BAFFLED DVT. t I = T J TELEVISION OUTLET HASH MARKS -- � OF MIRES W/ HARD WIRED GROUND PANEL SCHEDULE A. LOCATION: MECHANICAL 11 0 � DISCONNECT WtFUS ESLIGHTIFG r IXT1R�-FLUCR�SCENT-RECESSED MOUNT 1225A. BUSS 120/208v 3ph 4w MAIN (LUGS) DISCONNECT NO T DESCRIPTION KVA 8KR 8KR KVA DESCRIPTION T NO 0 PHOTO T t _ ©T ELECTRIC CEL_ IIi r LIGHTING FIXTURE-FLUORESCENT-SURFACE MOUNT 1 L .LTG - BUSINESS AREA 0.41. 20A Al20A 0.72 DCO - IT D 2 TC TIME CLOCK 3 L LTG - AISLE, CLG EXH FANS 0.84 20A B 20A 0.18 DCO-ISO GRND IN IT D 4 5 L LTG-WOMEN LAB,STERIL,CONSULT,aPER 1,4,6 0.68 20A C 20A 0.72 DCO - BUSINESS OFFICE D 6 LIGHTING FIXTURE-FLUORESCENT-W/ NL NIGHT LIGHT 7 L LTG - OPER 2 3 5 7 8 9 0.74 20A A 20A 0.36 DCO - BUSINESSFFIC EMERGENCY BATTERY INVERTER WP WEATHER PROOF (� E D 8 �-�- BKR CIRCUIT BREAKER 9 L LTG -SAFF, MECH,MEN,MAN,DOCTOR 0.44 20A B 20A 0.72 DCO - BUSINESS OFFICE D 10 11 D DCO - MANAGERS OFFICE, MENS 0.72 20A C 20A 0.90 DCO - CONSULTANT, VVIFID 12 ; _ LIGHTING FIXTURE-EXISTING SHOWN DOTTED PEC PHOTO ELECTRIC CELL . (TYPICAL TO REMOVE) NEC NATIONAL ELECTRICAL CODE 13 D DCO - DR. OFFICE 1.08 20A A 50A 10.00 RTU-NORTH (E) X 14 115 SPARE C8 20A 8 3P 161 LIGHTING FIXTURE-EXISTING SHOWN LIGHT LINED 17 SPARE CB 20A C 18 CEILLINGISPACEEHOREASCNOTTEED.E BOX TO ACCESSIBLE (TYPICAL TO REMAIN) 19 SPARE CB 20A A 50A 10.00 RT SOUTH (E) X 20 CONDUIT HOME RUN FROM DEVICE BO)( TO PANEL 21 SPARE CB 20A B 3P 22 LIGHTING FIXTURE-MALL MOUNT AS CIRCUITED. 23 SPARE C8 20A Cl 1 24 LIGHTING FIXTURE-RECESSED AIR / VAC CONTROLLER 25 SPARE CB 20A A 20A 0.36 ROOF TOP GFCI OUTLETE D 26 ° ( SUPPLIED BY VENDOR, INSTALLED BY CONTRACTOR, 27 SPARE CB 20A B 20A SPARE CB 28 0 LIGHTING FIXTURE-CEILING FOUNT VERIFY PRIOR TO ROUGH-IN. 29 SPARE CB 20A C 20A SPARE CB 30 31 SPARE CB 20A A 20A 2.70 DV-1 VACUUM #1 M 32 LIGHTING FIXTURE-WALL SCONCEW/ WITH 33 M DA-1 AIR COMPRESSOR 4.00 30A B 2P 34 LIGHTING FIXTURE-BRACKET MOUNT DCO DUPLEX CONVENIENCE CUTLET 35 2P C 20A 2.70 DV-1 VACUUM #2 M 36 CKT CIRCUIT 37 H EWH-1 WATER HEATER 4.50 30A A 2P 3$ LIGHTING FIXTURE-EMERGENCY BATTERY PACK AFF ABOVE FINISH FLOOR 39 2P B 20A 0.50 VE-1 VACUUM EQUALIZER X1 40 BFG BELOW FINISHED GRADE 41 iM RP-1 -- 0.05 200 C - -SOA--- - -- - - SPARE-C S• - - - - ---- - --- - --- 2 P � - _ - -- - - LO CALCUL-ATION - - CIRCUIT BREAKER CODES LQ �_ LIGHTING FIXTURE-EXIT LIGHT '?-Cl ISTC d �r A FIXTURE TYPE - LETTER UNDERLINED S`C �s�r£A'F � OCCUPANCY SENSOR � � LIGHTING 3.11 S = SHUNT TRIP BREAKERS -��` ' �v LTG 125 (i) NUMBERED HEX SYMBL]LS3 REFER TO 3.89 * = EXISTING C.B. - ALL OTHERS NEW - (N} NEW LOAD ro � OCCUPANCY SENSOR - 360° -- - - - - - - RELAY ro MOTORS 9.45. 9,45 SPARE= CIRCUIT BRI=A#�ER ANMECHICAL EQUIPMENT CONNECTION SCHEDULE LRGST @ 25% 1.00 . BLANK- C.B. POSITION_ ` OCCUPANCY SENSOR RELAY LETTERER HEX SYMBQLSs OUTLETS 5.76 5.75 K = KITCHENDUPLEX CONVEN I ENCS OUTLET (DCO) REFER TO SHEET NOTES _ DEDICATED OUTLETS 0.00 L = FIGHTING Q ',�� DEMAND OUTLETS@50 M = MOTORS S SAFETY TYPE DCO , # D D KITCHEN 0.00 D = OUTLETS 120V W/ GROUND FAULT PROTECTION OTHER SYMBOL SHAPES DEMAND KITCHEN 0.00 H = FEAT REFER TO OTHER EQUIPMENT CONNECTION EXPIRES 12/31/131 SCHEDULES AS NECEDED. HEAT 4.50 4.50 X = MISCELLANEOUS QUADPLEX CONVENIENCE OUTLET _--- MISCELLANEOUS - --- -- --- --- _- ---__- -- -0 - --- - �0 Vii = WELDERS � DED LCATED DCO (HARD/I S❑ WIRE GROUND) 20 AMP :50 20. - --- - ------ NOTD. TC = 0 DEDICATED OUTLETS DEDICATED DCO (SPECIFIC EQUIPMENT) DOTTED SYMBOLS REFER TO DEVICES TO BE � K = 0 DEMAND KITCHEN OUTLET 208V - AS NOTED REMOVED. DASHED OR DOTTED CONDUIT LINES ON DEMO SHEETS ARE TO BE VERIFIED BEFORE ' ,'UNTION BOX REMOVAL. THESE ARE USUALLY INDICATIONS OF o _ SURFACE OR UNDERGROUND RAN CONDUIT. -- -- '' CONNECTED KVA 43.32 - 120.33 AMP 0 FLOOR MOUNTED OUTLET AS NOTED CONNECTION TO EQUIPMENT DEMAND KVA 45.10 = 125.27 AMP I�OTEIR I?•RIVEN DEVICE PANEL SCHEDULE B LOCATION: MECHANICAL 115 = DEVICE LIVER COUNTER 4wMAIN ! �� � LIGHTING SWITCH - SINGLE POLE 1225A. BUSS 120 208v 3h NO T ! DESCRIPTION KVA BKR BKR KVA DESCRIPTION T NO , LIGHTING SWITCH - SECTION AS NOTED �\ 1 D DCO - OPER.-7 (CHAIR) 1.90 20A Al20A 1.90 DCO - OPER.-8 (CHAIR) D 2 '3 LIGHTING SWITCH - THREE WAY li 3 D DCO - OPER.-2 (CHAIR) 1.90 20A BI 20A 0.80 X-RAY OPER.-7,8 X 4LIGHTING SWITCH - FOUR WAY • 5 D DCO - OPER.-9 (CHAIR) 1.90 20A Cl20A 1.08 DED_ CKT STERILIZATION D 6 LIGHTING SWITCH - DIMMER REVISION DATE 7 X X-RAY OPER.-9 0.80 20A A 20A 0.50 SONIC CLEANER D 8 - LIGHTING SWITCH - KEYED 9 SPARE CB 20A B 20A 1.20 STERILIZER #1 T D 10 LIGHTING SWITCH - PILOT LIGHTED 11I3'I SC Tech Center Drive 11 D DCO - OPER.-2,3,5,7,8 0.90 2QA C 20A 1.20 STERILIZER 2 D 12 Shite 195 13 D DCO ® OPER.-5 (CHAIR) 1.90 20A Aj 20A 0.18 DCO - STERIL RATION D 14 $R SWITCH - MOTOR RATED Vencc over,trilA 98683 15 D DCO - OPER - 1 (CHAIR) 1.90 20A B 20A 0.18 DCO - LAB D 16 17 X XRAY, OPER 4,6 0.80 20A C 20A 1.15 LAB TRIM D 18 lS OR $OC WALL SWITCH TYPE OCCUFPANCY SENSOR 19 D DCO - OPER 4 (CHAIR) 1.90 20A A 20A 1.20 LAB LATHE D 20 21 D CCO - OPER - 1,4,6 0.54 20A B 20A 1.20 LAB VACUUM D 22 23 x SIGN CIRCUIT 1.00 20A C 20A 0.90 MICROWAVE STAFF LOUNGE D 24 25 X XRAY- OPER 1 0.80 20A A 20A 1.22 DCO - STAFF COUNTER, REFRIGERATOR,IFI D 26 27 D DCO - OPER 3 (CHAIR) 1.90 20A B 20A 0.00 SPARE CB D 28 29 D DCO- PANO 0.54 20A C 20A 0.72 DCO- RECEPT, AISLE D 30 31 - D DCO MECH, CEF-2, EF-1 0.28 20A A 20A SPARE CB32 DENTAL OFFICE 33 X PANG CEPH x-RAY 1.80 20A B 20A - SPARE CB - - - - 34 I'! 35 X XRAY, OPER 2 0.80 20A C 20A SPARE CB 36 TENANT 37 D DCO - OPER.-6 (CHAIR) 1.90 20A A 20A SPARE CB 38 THSHEETAO , O5 r FOR DENTAL M � 39 X X-RAY OPER 3,5 0.80 20A B 20A SPARE CB 40 � 41 D DCO- OPER 9, AISLE 118 1 0.361 20A Cl20A IZARE CB 42 EQUIPMENT �Lt3 D CAECULT�IaIi CIRCUIT BREAKER CODESTigard Towne Square LIGHTING 0.00 S = SHUNT TRIP BREAKERS LTG 0 125% 0.00 * = EXISTING C.B. - ALL OTHERS NEW - (N) NEW LOAD Shopping ��� Center 1 6200 Southeast MOTORS 0.00 0.00 SPARE= CIRCUIT BREAKER Pacific Highway LRGST @ 25% 0.00 BLANK= C.B. POSITION Suite OUTLETS 30.45 10.00 K = KITCHEN Tigard, Or 97224 DEDICATED OUTLETS 0.00 L = LIGHTING DEMAND OUTLETS@5t1% 10.23 M = MOTORS ISSUE DATE: 6 April 2(112 KITCHEN 0.00 D = OUTLETS ,145 Nld' BER: 323 DEMAND KITCHEN 0.00 H = HEAT tu HEAT - - 0.00 0.00 X = MISCELLANEOUS RERI�XCS­On MISCELLANEOUS- 7.60 7.60 W = WELDERS 140T,APPROVED WITH THIS,'PEM WELDERS TC - 0 DEDICATED OUTLETS RECOlm"'ICAL K = a DEMAND KITCHEN momrm ziYMBOLS CONNECTED KVA 38.05 = 105.69 AMP U U S Hc L1:5 DEMAND KVA 27.83 = 77.29 AMP Em"R I LANGIAUL-U ARCHITECT 3016 nw gravenstein street CA-41 ILI i camas,washington 98607 E YIL A J -C)1: v. 360.798.3801 f. 360.833.0585 4/ !"A 2 EXAM TRACK LIGHT VENDOR FURNISHED "Z coAL CONTRACTOR INSTALLED 2 A ATHAY ASSOC. WC. AL C-(�Tm 411 W 8-3rd Street VANCONER, WA. 98665 A )574-0129 (503)286-2458 fax (3430)67209 T rathay0athayeng.com n7 114 X A L E AZ 113 A-7 x N.L. I)OC I �_, ,�:! ?" , C' I\ ; \ ► ID A, 112 1115 < B 120 ------ A AL V X 2'"A--- ----- -- 2 TV --------- "A 211V A ff —A, A 0P F-t k'A 1 A-9 119 F 122 -A A A I - A-5 B U11 Ic X A < W\/ 10197 </ NEI 1<1 124 110 AL- A A U 4----4-- \A - i m I I 333111 D < ff R > \N, \,2 Kl-'>/Z.111 U ALI AE AE D -D A F3 EXPIRES 12/31/13 Av- L </ I N.L. 109 FF,i�i FD (C'F--,, /4��<. 0 N X X 105 kA 104 2 U /> 01 Y A E D A 0 107 fTfffA N.L. A-3 C A-1 REVISION DATE ALL CEF N.L. ON W1 LlS AE INTtRDENT < EXCEPT CEF-2 A 1101 SE Tech Center Drive A 1003 X 106 X Suite 195 X 0 126 Vancouver.WA 98683 A AL 0 C C dfiglft m = Nagy2 N.L. AE $0 C � fl nl A DENTAL OFFICE A A TENANT C IMPROVEMENTS �0 FIF-1 A 101 C Tigard Towne Square% 0 f---------------I 102 Shopping Center X 0 16200 Southwest Y Pacific Highway Suite 5 Tigard, Or 97924 LIGHTING SHEET NOTES: ISSUE DATE: 6 aprif 2012 P%EFERENCE ONLY L JOB NUMBER: 323 EXTERIOR EMERGENCY EGRESS LIGHTING AS REQUIRED, FIELD VERIFY EXISTING EXTERIOR EMERGENCY EGRESS NOT APPROVED WITH THIS PERMIT Uj LIGHTING LEVELS FOR EXTERIOR PATHWAY FOR BUILDING EGRESS AS REQUIRED BY APPLICABLE CODES. MAINTAIN A MINIMUM OF I F.C. EMERGENCY LIGHTING LEVEL. PROVIDE NEW EXTERIOR EMERGENCY EGRESS LIGHTING WHERE EXISTING CONDITIONS DO NOT COMPLY WITH CODE REQUIREMENTS. E LE T 313"1 C An L LIGHTING NO H arm L Main N 0 In 0 Ad� 2. 0 SCALE: 1/4 3400 'Az .FT. '574, -24,513) f" 1 rathI 'rn i ERIC i i / LANCIAULT ARCHITECT 1 / 3016 nw gravenstein street camas,washington 98607 v. 360.798.3801 f. 360.833.0685 C40NMXTM CAL ENMEMS 2, 11 .3rd Street VPM0WAA WAS 98665 (380)574-0199 (603)286-2468 fax 87 f 0I! ,T 1116 ----- i 17 1 , f I ,� ----- REFER TO DETAIL 2 } l E- EO.Q1 FOR 10.00 B-5 SE yEj.;co m ,� > B-24r.11CROWAVE SEE-� L--- ---- LOCATION AND HEIGHT. -r' t�� < 1� 1 — f B 7 2 C. ABODE CEILING n - \ B-2 113 +50 _ REFER TO DETAIL' ; �AFF > 114 21E3.00 �,}- Imo. I t ! 1 \\\ '; B-4 �; \ ' r E LEASE �- � CAT�E CABLE31A � f __ COILED AT OUTLET AND 10 AT IT CAB. 3 12 ROUTE E CONI�UITS i r .� f i f i s / ANDER SLAB 1 �. , �, -� D 2 �� j j t -___ � J //` `� y Y r/, •ter.. i ' \ f s VERIFY A 1 - _ ,� ./ 2 1 R F R TQ DETA.L E E } 116 -- --------- _. --` ELECTRICAL / \ 21E3.00 a ` ` \\B-2g l ALL s f Cp c \ ( r ' 10197 Ff{.i{F Com,fa 2 --, ------- . -- - 38 119 B-10 `\ A—• - , 5 A-32,3 - 1 ULTRA SONIC � �� -D � � �� � AIR VafC � B-3 , � I � 8 -13cl CEF-2 �� i .f CONTROLLER 1 REFER TO D CLEANER T07 A-41 - - mY �F .Qo B�$ HAND PIECE Sr�R .�zER/ { i-� i EXPIRES 12/ 1 3 1 CLEANER AUTOCLAVE -- - \ \ SEE NIA9.01 -------- — �j °� 'ti ,>�X, C E E—3 112 DED. _ B-39 B-21 \\\, ,� � Q .fc UAD 10{ 8�1 OPER('2 ATOPOWER �\ .-- - -- ,+ -�----- � cEF-5 €� lei � �,, `��,. '\ 1 I � ,;�� { 01 ,til � � _ REr ER TO \D IL / i — 1 i I 8-27 1 �� 21E3.00 ` - 110 Jfff \ / _ L_— i —18 / \ REFER TO DETAIL '' \ f RIA-11 \ T��I�I�ER __ 21E3.00 1 -� / 17 B-37 1 -� X e�, � QEF PROVIDE 2CONDUIT IN TENANT SPACE (VERIFY �J SITE). \\\\\ /JJ \ `''\ \�- � -- \1\i-`� � f \ A14- y ' �o � {� EXTEND r� r c- r r� r a B-3 I �` `�/ '; . 1 s; > f LATHE - -- - - EXTcND TO NEW PANELS LOCATION. PROVIDE NEW CONDUCTORS. / � r ti , � � . , 1 . 1 1>, , \ \� s B-22 CONNECT NEW PANJ ELS COMPLETE. � � - /\ , � 1 VACUUM { {�( r ' 1 T'' -Y j� \\\ `z` } 2 YACtJ.f7Yf I A � � 1'�i.1�'i�`.i A\I�-r i—{< s a ■ J f Z �. 4—#310, 1 �6 � ��,�. � �_� .��� \ � FORMER , _ ' , r \ ' `� /� i I ABOVE 7 ' REVISION DATE < REFER TO D IL �, I \�;c I1ERDENTINT 1101 E Tech` Center Drive /r a to e C� 195 ON € D A-12 f F NP 2 D ' A i, ,_ ,a \ ul r�QGr _. � iii s i _8 Jancc��rver,"A .,8683 .�. t _ 1 , ti 123 ' '`\ i RIIFY F f F !—V ! �t� 1 4�%' REFER TO DETAIL �, i r''P / -�_ `�" .8 {�,, —jo, — 2E3.Qo V , QN I \\ _ ROOF i 104 ( i\\\ ' I06 VERY i/ `J \�./ -N \ \ r T,' ! ` DATION 1 ` _ .» 125 f i-y%J / \ / i. �t J ! e } j —25 \ F= .� MCH 111 SEC 1 1 < / UJ � 1 S PEDENTAL OFFICE \ THIS rTj r � V1 225 225 AMPTENANT \ - - -- -120/208V 120/2081 \. 2 a 30 4W 30 4W IMPROVEMENT 200Ati i A-0,8�1D -A PNEW NEWJ` ,.: 103 — 2 M M \ / REFER �� DETAIL ' .\ G— Tigard Town Square I 200AMP C� 200AMP P C --- ----- _ 2IE3.o0 ShoppingCenter '/'J'i 1126 6-15 ` i/ti r 2 \\ ` 16200 Southwest - Pacific Highway {» 2 / 106 } Suite 2 - Tigard, r 97224 10 ISSUE DATE. 6 a- r112012 OB NUMBER: 323 2 .r - i \.1�/l i 2 1 ,l l Uj EXISTING EXTERIOR METER1 AIN SERVICES. VERIFY LOCATION AND DETAILS ON SITE. ,g \�\\\ 102 (nEl FCTRICAL mmm \., 10 2 C. I I i B-23 I 314 C -- PUWEK 2D 3 PARTIAL ONE LINE DIAGRAMS NORTH , a s I 2 L A NE "i :i": i-J- i I i / / ii'/ i iiii � i-------Li ; • ;J /i/ �/ � �/"�. I W KE POWER PLAN ,1 SIGN CIRC VERIFY L,CATION R — R r . SCALf-= V4 - r—� 1 HEX N O TES. ■ !� 5EE 150 1 E0.01 '` REFER TO SHEET E#.GQ FQR t��ECI�A.NICAL CONNECTION' SCI�EDULE AND PANEL SC�IEDULE5 ERIC SECTION 26 0501 - GENERAL PROVISIONS SECTION 26 0502 ELECTRICAL SYSTEMS SCHEDULE SECTION 26 0520 - BASIC (MATERIALS AND METHODS SECTION 26 0520 _ BASIC MATERIALS AND METHODS SECTION 26 0526 - GROUNDING PART 1 GENERAL - PART 1 GEI;•ERAI_ PART 1 GENERAL 2. 08 FIRE BARRIER MOLDABLE PUTTY. PART i GENERAL 1, 01 CONTRACT DOCUMENTS: 1. 01 SYSTEMS INCLUDED UNDER THIS DIVISION: 1, 01 GENERAL: A. U. L, listed, 3M Brand fire barrier moldable _putty Type IMPS or NPP. 1, 01 GENERAL: ARCHITECT A, The General Conditions and General Requirements listed in Index to A. fork includes but is not necessarily tImIted to the fol towing outlined A. Materials listed set type and quality standards for the project, Materials PART 3 EXECUTION A. General Conditions and General Requirements as listed in Index to Specifications aPPtY to the work or' Division 26, systems as welt as the general wiring to the project. listed are those desiredMaterials ateriats aPFrvied as 'equal' sha t t not change 3. 01 MOUNTING HEIGHTS-. SPec►f.cat i ons apply to work under this Section. 3016 nv ravenstein street • •• i carnal washin ton 98607 1. 02 SCOPE 1. 02 EASE BID Shalt include the general wiring to the build#n and the quality or intent of Contract Documents, If 'approved' materials are not A. Demirel shall be as follows unless indicated otherwise b specified note on B. Provide a complete grounding system extension as shown and as required b ,washing ton 0 0 q Y PP Y P P 9 9 Y g Y Pr v i de all tabor, materials, equi ptent, transport at ion, and services following systemst found equal to specified f�ed .teas upon v,sus l inspection or test, they she t 1 be the drawings. Devices shall be totaled above or below top of wainscoting, a.ascot,ng, the NEC and the local enforc t ng authority ri th common groundi.ng point at the /_ 360198.3801 necessary to supply, install, complete, adjust, rake operable and balance A. Power wiring to equipment provided in other Divisions of the Contract. removed and replaced with specified materials without additional cost. Sole adjacent to tackboards or bulletin boards and shall not cut through metal trim main distribution center. f. 360.833.0585 systems indicated on Division 26 contract documents. Alt systems shalt be Power connections shalt be made under this Division. decision as to 'as equal' acceptability shalt reside with the Engineer. or be located in tackboar=ds. Coordinate with Architectural Drawings prior to PART 2 PRODUCTS comp t ate and opefab i e. B. Genera t Wiring r i and Illumination lum i na ion = stem 1.02 MATERIALS IDENTIFIED: rou h-i n. Ver i fY all heights prior to rou h-i n. 2. 01 CONDUCTORS-. Review alt contract documents for reference to work to be provided b Section C. Signal and Communications Systems.- A. Alt materials shalt be new, of current standard manufacture and design, and Control switches for ti his, 45' to center tine A. Main System Ground. Bare stranded copper per N. E. C. (Verify existing) %� P Y 0 Y 9 g Y PP P t g sf \ 2 Include c lade a t t such work in base b#a#. 1. Data/Tete hone Duct, .lacks, Cabling i n System t U. L. listed sled for intended application.f cat�on. B, Bonding n Jumpers: Verify f existing.st r n . � P 0 Y PP 0 R / Q m � e Coordinate (convey) the electrical connection requirements as shown on the F. Other Wa?r�c as Indicated in the Contract Document. 1. 03 MATERIALS NOT LISTED: Convenience ou�tets. halt mount 10 „o center tine C. Bonding Conductors Equipment:vent: Co er per NEC requirements. Green Y q 9 s q P PP P q contract documents for the HVAC un#is with the mechanical contractor. Not i fY 1, 03 SYSTEMS NOT INCLUDED ENDERTHIS DIVTS-ION+ A. Provide a t l items such as relays, control transformers, signal trarsforrers, over counter 45 to center tine i nsa tat i on. the architect in writingof an proposed discrepancies far resolution prior to A. Low voltage wiring ( less than 100 volts) associated with the Functional circuit extensions and device or equipment connections etc. that are Telephone 2. 0 GROUND �'���'� � ASSOC Y P � � P $ 9 � � P 2 U D CLAMP HVAC equipment purchase. control of heating and vent itat ing, air conditioning or water heating control, necessarily part of the finished system and required for logical functioning watt mount - desks 18' to center line A. Code approved. '�+. 1. 03 DRAWINGS: refrigeration controls or dental equipment. of the system. watt hung 'Handset 45' to center tine PART 3 EXECUTION C0N8MTw1iQ A. Electrical Draw i ngs, Drawings are diagrammatic, hone runs may be regrouped END OF SECTION 1. 04 UNAPPROVED (MATERIALS: Fire A l arra System Alarm Devices 80' 3. 01 INSTALLATION: or rerouted for a more economical installation if desired. Do not atter A. Remove and replace with specified materials if so directed b Architect, Lights over lavatory mirror 6` -6' A. The cold waters sten shalt be used as the mains stem ground. Bond to a P P Y 0 Y Y Y � 4� l �-�td S'�eS# circuit functions or switching arrangements. The Architect reserves the right without additional cost to Owner. Panetboards (to top of trim) 6' -5` minimum size 2 inch metal cold water pipe, 20 feet of which must be in contact 9 0 P P P S VVI + + ti to make minor changes in the locations of equipment without additional charge 1. 05 WORKMANSHIP: Fire Alarm Putt Stations 48 to center line with ..he ear..h, Verif existing.00 Y 9 (a3o}574 -ot99 (603)286_2468 provided such request is made Prior to rough-in,in, (Plus or minus 60 . ) A. Shalt be best standards of industry and shalt conform to specification 3. 02 RACEWAYS AND CONDUITS: B. Bond all new drainage, sprinkler system communications conduits, fax (360)574-3209 B. Architectural and Mechanical Drawira s, Check Architectural Drawings to - methods. Un-workman-like work shall be removed and replaced at no additional A. Routing: Run conr_eated except where detailed as exposed or where surface and all electrical distribution systems to r ratha ai:ha . . ground as required�red b NEC. n ir`� � c+a 9 0 SECTION 26 0, 03 COZIES A�•ID STANDARDS P g P P Y 9 q Y � coordinate location of outlets and switches with cabinets or other I I cost. metal raceways are specified; or by written permission where it is difficult END OF SECTION requirements. Check Architecture for door swings. Locate switches on the tock 1. 06 COORDINATION OF WORK: or impractical to conceal. z F b PART 1 GENERAL + � heating , B. Outlet and Switch Box Placement.- side or moors. Locate outlets i n or above back-splash above countertops. A. Cooed':r.a Coordination�.n w€th plumbing rl lines,ries, neat#y. and ventilating tat�n a�,�ct work, etc. ,P9 P 9 9 . . ,. with 1, 01 MATERIALS: � _ , Before submitting his bid the Contractor .alt familiarize himself with the back-to-back to eliminate i€t i nate s ace use conflicts, 1, I n stud walls t s back to oo,ck boxes are not allowed.lowed. Se urate boxes in A g A. Alt materials shat( be Listed by the Underwriters Laboratory and bear the p P nrchitecturat and M Mechanical t tans. a1 ati n equipment e a L Locations s of e u i en shown on chose PART 2 PRODUCTS adjacent rooms b a rn j n i mum of one stud. plans govern. Coordinate theinstallationof the egectrical systems includingseal wherever standards m. approval have been established and such service is 2, 41 CONDUITS. All wirin shall be in conduit. 2. Outlet and Switch Box Placement: Provide box extensions as required to but nt limited to) panels, disconnects, boxes, conduits, tights, and device , normally provided by them. Adhere to all local requirements for materials A. Rigid Metat Conduit. Not dipped galvanized steel, Genera( Electric, bring metallic box flush with final watt surface. q so as to prevent space use conflicts. 1. 02 RO Repub t i c, U. S. Stee t, Nat i ona t or e ua l R G. Materials,,a t s: A t t conduits is above rade shalt be metal unless indicated P i1 P q 0 � 1, 02 PROJECT SITE: . � �_ _ C. Uncompleted let Item ss ed Ito s< Glut-lets orequipment shown on the tans w F th no supply E. Electrical Meta E t�c Tub i h Seamless,ass shat ad�zed or hot dipped eai a tvar�i zed otherwise. Size ze nc�n-meta t t i c conduits to accommodate grounding h conductors. P , P PP Yg PP 0 0 9 A. Visit the pro•ect site and determine local conditions that affect this . conductors or conduit indicated shall be completed as required. Alt devices i steel. Sizes shown on the drawings complete project Rigid drawin s are for metal conduits unless shown otherwise. and equipment shalt be and o operable at ccom letion, portion of the contract. C. Plastic Conduit: (PVC) PotYvinYtchloride, UL approved. Batdwin, D. Minimum Sizes: 1. 03 CODES AND REGULATIONS: D. Items not Understood or Omitted: Prior to bidding, refer to the Architect _ Corton or approved equal. For underground use only. Use only where code 1. Power: 1/2 inch. A. Install electrical work in strict conformance to the rules and regulations all items in the plans and/or spec i f i cat i ons that are in conflict, not allows. 2. L i ght i rig: Hoyte Runs - 3/4 inch. Switch legs and runs between outlets 112 understood or incomplete so that addenda may be issued to make corrections or of legally facility an bodies having jurisdiction over the construction nand D. Flexible Metallic Conduits: Shall contain separate grounding conductor, inch. clarifications. Equipment shown on the plans or listed in the specifications use of the facility and the National Electrical Code latest edition. galvanized steel armour. (Maximum length 72'. Not approved for general wiring. E. Usage: 1. 04 PERMITS: 1. Dr Locations: Columbia, Triangle or equal. 1. Electrical [Metallic Tubing: Use where exposed on ceilings, above suspended shaft be included as if ratted for on both, y g q g P 0 r p = A. Arrange and a for all permits is and inspections actions of the work done. Mork 1, 04 SPECIFICATIONS, g pay P P 2, WetLocations or Exposed to Weather. Liquid tight, neoprene or vinyl ceilings, in attic hottow cavil watts or cavities of block watts. Not , , , A. Materials, shat[ not be concealed until inspections have been made. Turn over jacket. Anaconda Sea ttite, Type UA or equat 9 P y approved for buriat, exterior areas, or casting in concrete, Maximum size two 1. The specifications describe the quality of materials desired by written s�rtificotes of iaspectiEnS to the Architect. E. 'IMC' type cable, (2) inches. Conduit in hollow cavity of block watts being fitted with concrete P 9 1. 05 WARRANTY: pp Y P • Y shalt be rigid steel instead of EDIT. � description catato number. Materials fisted are inose desired -and matt 1. Approved only for �0 air branch circuits where allowed b code. - A. The Contractor shalt and hereby, does warrant that all l �eater i a l s (except be used- unless- written per�iissiora has been granted to use equal on better , s, - 2. Galvanized steel armour. 2. Rigid Galvanized Sleet Conduits= Use where raceways are cast into quality materials b other manufacturers, specified otherwise) are new, free from defect, of current standard , q y y � , 3, Insulated green ground conductor, minimum size X12- AWG, concrete, solid masonry, exposed on wails, exposed t© weather or in hazardous 2. Approval to use materials of other manufacturers shalt in no way reduce the manufacture and design, of the quality, rating and type as shown or specified; 4. Final hone runs shalt be EMT and separate conductor in Common Areas. areas requiring liquid tight, dust tight or explosion proof wiring. and that an defect existin within the warrant eriod, due to i o er or standards of qua t i ty set- by the spec i f i cat ions. If materials i nsta t ted... do not y � 9 y p p � 5, Manufacture- AFC Cable System, Inc. , Type MC. I n operatories Type HFC 3. Flexible I�deta t i i c Conduits: Use to connect e l ectr i ca t apparatus subject to meet the standards set b the specifications, the shalt be removed and defective withomaterut ad or workmanship, shalt ne corrected and resulting da..age (health care rated redundant round cables). vibration, such as motors, fans, etc, , and to connect recessed ti htin replaced with specified by without additional cost to the Owner. repaired withou[ additional cost to the Owner. � , � � length 72'. g Not g P P F. Iron-meta E 1 i c Sheath Cable: Not approved, fixtures i ra suspended ceiling t i ng i nsta t tat i ons. Maximum . 1. 06 WARRANTY PERIOD: . . B. Insta t tat i oni The specifications i cati ons list the method of Installation t lat i on to be G. F i tt i n s: approved for enera t w i r i n , sP _; 0 PP 9 9 „ � � . A. One (1. year after suAstant i a t completion orad/or occupancy. followed and types of materials to be used. The type of materials used shalt _ Y1. Rigid Conduits: 4. Surface meta( raceways may be used on where spec or rior f yp YP END OF SECTION 9 Y Y Y P Y P fit tie -a tication, Materials - + improperly �nsta�t ted or of a type not suitable[alt t o a) Bushings n s Insulating l at i n type with tlra _ round i n tugs s where required red, a nova t for remodel work where i t i s not practical ca l to conceal wiring. r i n . PP YP g 9 YP -grounding 0 � PP P 9 for the application shalt be removed and replaced with suitable materials 2. EDIT and Flexible Conduit: Fittings - All steel set screw type, 5. PVC Conduit: Where code use permits, raceways buried directly in the earth P 0 YP P Y Y without additional cost to the Owner. re-insutaced. Fittings with die cast aluminum or of metal components are may be rigid Sch. 40 ottrin� Echloride (PVC) sized to accommodate grounding PP P Y 9 P /' / g 9 1. 05 'AS BUILT' DRAWINGS, not acceptable. Steel City oraPProved. substitution. conductors. Elbows shalt be rigid steel conduit wrapped with Scotch #51 tape. A. Electrical Contractor shalt provide o the Owner two red tine drawing 2 i f : ' " t O e aI a 2, Os CONDUCTORS: G�. MC Cab le there code use permits,is approved for �0 am branch circuits. P 0 P PP P reflecting alt deviations at i ons from original na t e t e-ctr i ca i design. Drafting i n shall be A. Copper-. So t i d #12 AWG mini,gum size a to #10 AWG, Stranded for: sizes zes #8 Hoyte runs shat t be EMT and copper conductors in Cor union Areas. 0 G 0 �P P oPP neat, readable and complete. and. larger. Fire a t arra and signal circuits to be stranded. F. Installation: 1. 06 AS EQUAL SUBMITTALS, B. A E um i num: Not aPP square roved. 1. Cut ends of all l conduits and ream. Make all joints water tight. A. Provide the Electrical Engineer and Architect each with one copy of CSI C. Insulation, Fittings shall be compatible with conduit used, secured water tight, and form Substitution Request Form and one set of catalog cuts of the submittal [SECTION1. Genera(: Type TIfWN, THHN. a smooth transition from conduit to fitting. Make at ( bends with no P 26 0504 _ DEMOLITION e � flattening R , , , � , , � equipment. Faxed submittals ..sh�ttnot be .accepted. Approved for bidding' 2. Recessed Fixtures, baseboard heaters or other high ambient temperature or wrinkling with a bender designed for use with the conduit used �3 1ST, does not constitute an unqualified approval of the product. All conditions of locations. Type THHN, 2. Conduits encased in concrete shalt be securely attached and anchored to �� � �10197�41 � quality, function, size, safety, style and appearance shalt be as specified. PART 1 GENERAL 2. 03 CUTLET LOXES: prevent movement during pouring, tamping and vibration of the concrete. Ends q Y Y Y appearance P P 0 P g P g �- 1. 07 APPROVAL 'IF SHOP DRAWINGS: 1. 01 GENERAL: A. Steel, as best suited for the job intended. 4 inch square by 1-172 inches shalt be seated with factory seats. Replace conduits containing concrete as A. Approval of she drawings does not re�;ove the Contractor's re uirernents to A. Existin devices and hardware shalt not be reMoved unless called for or more dee for genera use. Device covers shall match finish to be applied directed b Architect. PP P g q 9 P g PP Y comply with the intent nt f t Coremoval i nth Drawings, t c= .. -i i concrete. ,r �. p y to o he a)nt -act Documents, For shop drawing submittals o a o e D awings, _x_ep abandoned conduit and wiring. shah be removed, to watts, For concrete block use square shouldered device covers so that .pox C_nduits may be run n concrete slab-s or floors as listed below with a that atter design conditions, electrical requirements, dimensions, functions, can fit into block cavity. Steel City, RAC® or approved substitution. minimum of 1 inch concrete over conduits. Boxes shatI be ftush and of EGON 4 manufactarer, mode t� type, P , style, installation t tat{on res cements etc. E t shalt t B. Provide ide cult i ngand patching n gexisting of ex�st i n9jurfaces where re u i red for 2. 04 PULL AND . N`T ICN BOXES: sufficient sufficient depth to allow connecting conduits without thou[ reinforcing � Y 1 3, 4 remain the responsibility of the Contractor to make all necessary adjustments, electrical work. Patch and f ini-sh surfaces tomatch adjacent surfaces. AGeneral Use: Steel, with baked enamel finish and screw covers, NEMA 1 steel. .,�,P� ~` alterations, supply changes, trade coordination, etc. , required to provide 1. 02 CONDITION OF EXISTING SYSTEMS: enclosures. Alwalt or approved substitution, Stab Thickness Maximum Conduit Diameter �D D complete and o rahte systems. Any deviations from Contract Specifications A. Existing electrical systems are assumed functionally and operationally B. Exterior Use: Cast aluminum with threaded conduit hubs and water tight 2' None shalt be clearly noted in bold letters as such, complete and working except as noted in Contract Documents. Notify Architect screw covers, 2 1/2' 172IBES 12/31/13 1. 08 SUBMITTAL DATA, in writing of any discrepancy or ma t funct i oi prior to commenc i r0 on-site work. C. Installation-. 3 174' 374' FExP A. Provide the Architect with a complete set of catalog cuts r h in Commencement © on-site work shalt constitute t t t t are 3 /2 - 5' 1' a c s o shop drawings c f o to s a t ecce ante of existing systems 1, Junction boxes and uEl boxes shalt be insta led so that he 1 P � P 9P 9 Y P Y of all items that are to be provided for the project. The submittal set shall as functionally and operationally complete and working except as prior noted. accessible at all tires. The Contractor shall be required to provide include a cower sheet indicating Project name, Architect, Engineer, and PART 2 PRODUCTS sufficient putt boxes to conform to Code requirements whether shown or not, 4. Conduits run beneath the vapor barrier under concrete floor stabs are Contractor's nate, address, telephone and fax numbers. The submittal shall 2. 01 PRODUCTS USED: If a box is required in inaccessible place, provide access pare., classified as underground and shalt be PVC. contain a complete set of alt types of material to be provided under this A. Devices or hardware being replaced shalt be as specified for new devices or, 2. 05 FLOOR BOXES: 5. Swab out all conduits clean and dry before conductors are installed. Contract. P rt€al subm i eta l s will not be accepted and will �e returned as i f not specified,��ed of equal 1 gua l i tY to hardware generally EY used € i the existing st i i9 A. Boxes.- For casting n9 i n concrete dual level,ve t adjustable e type for flush £. Runi n neat rows with smooth uniform bends. Sup-port m t t i leruns from disapproved. Make corrections and alterations as noted on returned drawings area, floor mounting, pressed steel, Floor boxes are supplied with operatory chair Uhistrut hangers in alt exposed areas, spaces above ceilings or risers. it w i thou[ add i t i ona t charge where proposed materials do not conform to PART 3 EXECUTION and installed complete by electrical contractor. Verify requirements and Diagonal, crossed ed or haphazard, non-supported runs will not be allowed -- __ ------ { specifications or project requirements. 3. 01 EXAMINATION: details with chair supplier. 7. Alt conduit penetrations of fire rated watts, ceilings or floors shalt be B. Submittals should include at a minimum the following (Plus an product that A. AIt relocations, reconnections, and removats are not necessarit indicated 2. 06 SWITCHES AND RECEPTACLES: seated with specified fire barrier putty. The amount of caulking shalt be in YP Y P P Y � differs from specified product): on Drawings. Alt such work shalt be included without additional cost to Owner. A. Switches and receptacles shalt at( be of the same manufacture, style and relation to the rating of the surface being penetrated. Comply with Conduits and Fittings Verify existing details and requirements on site, type, requirements of the Product (Manufacturer and local codes. Maintain rating of Conductors 3. 02 REMAINING HARDWARE: B. Switches: 20 ampere, 120/277 volt mechanically quiet type, white handle. Penetrated item. Floor boxes and Fittings A. Unless specifically indicated to be removed either by note or symbol, ail Specification grade. Federal Spec. #W-S-896d. 8. Sealing of Conduit Penetrations, Seat around conduit penetrations through Outlets & Plates devices or hardware shown as existingshalt remain in lace and in service Manufacture SPST 3 Wa watts or floors between conditioned (heated) and unconditioned spaces. P M v P Switches & Plates except abandoned wires shall be removed. Hubbell CS1221-W CS.1223-W 3. 03 WIRES AND CABLES- Occupancy ..enjoys 3. 03 MAINTAINING CONTINUITY: P & S 20AC 1 W 20AC-3 W A. Marking and Coding.- Switchboards odinySwitchboards (With She Drawings) A. Where a device or hardware is indicated to be removed and device(s) which AH � -W 193-W 1. W�rin shall be rotor coded �o conform to standard practices of the 1 91 P 9 9 Circuit Breakers are to remain are fed through this device or hardware the feed to these Leviton 1221-2-W 1223-2-W industry. r - g Lighting Fixtures, and Associated Control Equipment devices to remain sha 1 t be ma.i nta i ned. Extend raceways or provide a new feed C. Receptacles= 2. 120/208 volt system shalt be so t i d colors with white neutral. REVISION DATE Energency/Lighting/Packs as required. 1. Duplex Convenience Outlets: 15 ampere, 120 volt, 2 wire with U-slot ground, A-Phase - Black Tete hone/data;; distribution raceway system arks and cabling. White. Shat( be of same manufacture as switches. Reference Hubbell #CR5252-W. B-Phase - Red I T T P Y Y j 9 1.09 TEMPORARY FACILITIES: 3.04 REPAIR OF DAMAGE: 20 ampere, 120 volt where noted Reference Hubbe l 1 CR5352-W. Provide 20 amp C-Phase - Blue 1301 SE Tech Center Cirive A. Provide temporary electrical power for construction purposes as outlined in A. If, in the course of demolition, a device, hardware, building portion, or receptacle on all dedicated circuit receptacles, 3. All control wiring shalt be tabeted and tagged with each conductor Suite 190 Division 1. General Requirements, Section 01 5700, 'Temporary Construction tine of service ( i. e, electrical branch circuit or feeder) required to remain 2. Provide GFIC type receptacle where shown on drawings or required by NEC or identified. Vancouver,%AJA 98683 and Facilities', (Su tementar Genera Re uirements. ) is damaged, the Contractor shalt repair the damage or replace with new UBC, 'Feed through' protection not allowed. Reference Hubbell GF5262-W. 4. Power feeders using ail black insulating wiring shall have phase identified PP Y q 0 P 9 P 9 .� 9 0 0 1. 10 WORKIMEN, material to restore the original condition or provide a better condition. 3. Safety Type Duplex Convenience Outlet: 15 am ere, 120 volt, 2-wire with with colored vinyl tape at all terminations andsplices. A. Employ a sufficient number of ,journeymen electricians and supery i sots to 3. 05 EXTENSION OF FEEDERS, u-s t of ground. White. Sha E l be of carne manufacture as switches. Reference 5. Identify all feeder or branch c i r-cu i t toads in the same pane tboards. insure orderly completion of the work. A. Alt existing branch circuits which are in or pass through the work area Hubbell HEL8200SGW, B. Insulation `value: 1. 11 INSPECTIGNS AND TESTS: which are to remain shall be relocated and/or extended as necessary to 4. Specialized Outlets: As indicated on Drawings. 1. Alt wire contained in the same raceway shalt have an insulation value to A. All electrical work shalt be inspected before concealment. Uncover wont maintain service from the panetboard they are served from. Some existing 5. Hospital Grade: Provide hospital grade outlets in all patient care areas match the highest voltage between conductors of all circuits contained therein, am aim im concealed and not inspected if so directed by jurisdiction having authority or branch circuits requiring extension may not be indicated on Drawings, Verify (Exam, operatories, etc. ) #HBL 0200 W C. Products, project Voltage)., - - Project Engineer. re requirements on site Prior to bid. D. Sensors (Low Duai Technology, ceiling mounted. 1. Puttin : Use putting compounds as recommended by the wire manufacturer; do afflKaFm B. Test all feeders and branch circuits, etc. , for shorts and grounds prior to 3. 06 DISPOSAL OF PCB CONTAMINATED ELECTRICAL EQUIPMENT: Provide with ceiling mounting bracket, isolated auxiliary relays ( I no, 1 nc), not exceed recommended putting tensions; leave sufficient pigtails at each I'I energizing. A. Dispose of PCB contaminated electrical equipment in a manner in compliance power pack, and additional stave relay packs (where required for mufti-circuit j-box or cabinet for make up. D E N-UA L 0 F mF I Co"E C. Alt systems shalt be tested, adjusted and balanced for proper operation, with applicable rational, state, and local codes. Provide proof of incineration rooms) of correct voltage. The Watt Stopper #DT-200 with power pack #B120E-P END OF SECTION The Owner and/or his official representative shalt be instructed in their use of PCB contaminated ballasts to the owner or #B277E-P, stave pack #S120/277/347E_P as needed, or approved equal, For 360 _ and shown ail controls and - - operating procedures. The operation of the systems .�. 07 DISPOSAL OF FLUORESCENT AND H. I. D. LAMPS: degree Covera e Watt Stopper #DT 3{30 or approved red equal. oP n9 Pr` Pe Y 9 9 PP PP shalt be demonstrated in the presence of the Owner and Architect. A. Dis ose of fluorescent and H. I. D. tams in a manner in corn Fiance with E. Occupant Sensors (Line Voltage): Dual Technology, ceilingmounted. 300 D. Provide i h applicable P P P P er T-� r equa t. NCE �1.'V 1-r( o de t e Owner with three t 33 sets of all t o small n and maintenance national, state, and local codes, Provide written roof of proper degree coverage. Watt Stopper DT .�So or roved operatingP P P g g PP PP q IMPROVEMENTS manuals and i nstruct i ons necessary to property operate and maintain the disposal to the owner. F. Occupancy Sensors (Wall Switch Type): Watt Stopper #WS-200, or approved NOT APPROVED WITH THIS PERMIT systems. egua t. E. Test all mechanicat equipm=ent connected to insure proper rotation and END OF SECTION G. Tr im: phas i ng. 1. Genera t. Single piece un-breakable nylon, White. Tigard Towne urig F. Check the horsepower of a t t motors connected against the size of heater 2. Weatherproof, Hubbell #WP26M (horizontal #WP26MH) (cast a l un i num). Shopping Center e t elments in the starters. If they do not match, rot€fy the motor supp t i er to 3. Use standard sizes i n all locations except on masonry or block watts. Use 16200 -Southwest provide the correct size and type. Type S© plates. Pacific Highway 1 1 i- F i= 2 DEFINITIONS AND ABBREVIATIONS-. 2. 07 SUPPORTING DEVICES-. A. NEC. National Electrical Code. A. Condu i ts: E. CO�TRACTO�, In this Division if the Specifications refers to the 1, Sin te. Securely support raceway within 3 feet of every 90 degree bend, Tigard, O r 97224 Electrical Contractor. outlet box, junction box, device box, cabinet, conduit body, and other C. FURNI SH: Except as otherwise defined in greater detail, tern t 'furnish' is termination with approved straps, clamps, or hangers. Space supports every 10 ISSUE C3}�TE_ 6 aprii 2012 used to mean supply and deli ver to project site, ready for unloading, feet maa x i mum.. Securely mount raceway supports, boxes, and cab i nets in an JOB NUMBER: 323 unpacking, assembly, installation, etc. , as applicable in each instance. approved manner by. D. INSTALL-. Except as otherwise defined in greater detail, term ' install' is a) Expansion shields in concrete or solid masonry.P P Y used to describe operations at project site including unloading, unpacking, b) Toggle bolts on hollow masonry units. assembly, erection, placing, anchoring, applying, working to dimension, c) Wood screws on wood. f i n i sh i , cur i n� protecting, cleaning and similar o erations, as applicable d) Metal screws on metal. E L E 1lg I;mT KOm It'Ok Am L in each instance. E. PROVIDE: Except as otherwise defined in greater detail, the term 'provide' 2. Multiple: Kindorf Channels with approved conduit straps or clips. SpacedPE"S means furnish and install, complete and ready for intended use, as app t i cab le 10` -0' on eentersR in each instance. B. Kindorf Channel installed exposed to the weather (an exterior use) shall P Y END OF SECT I EN be9 a 1 van i zed. LA r w a aam* LLI "M 9" C6 . ERIC SECTION 26 2417 - SERVICE AND DISTRIBUTION SECTION 26 5100- LIGHTING FIXTURES SECTION 27 2010 - VOICE AND DATA COMMUNICATIONS ROUGH-IN AND CABLING ffti,I IN 010 LArv%wo A ULT PART 1 GENERAL PART 1 GENERAL 2. 01 DUCT SYSTEM FOR VOICE AND DATA SYSTEMS 1. 01 GENERAL: 1. 01 GENERAL: A. Provide a roughed-in conduit system when concealed in walls or floors, ARCHITECT A. General Conditions and General Requirements as listed in Index to A. General Conditions and General Requirements as listed in Index to with cabling to all devices. Terminations and trim by others. Specifications apply to work under this Section. Specifications apply to work under this Section. B. Wiring and distribution components shalt be provided and installed as 3016 nwgravenstein street 1. 02 `MIRK DIVISION: B. Provide new l i ght i ng fixtures typ i ca l in each location of type indicated. described i n paragraph 2. 02, Active components such as switches, hubs, camas,%mashington 98607 A. Jt i l i ty Company.- No newwork to d s project. Provide with new lamps of wattage as shown. Letter designates f i xture type. routers, IP phones, UPS units, servers, patch pane t s or computer workstations v_ 360.798.3801 B. Electrical Contractor: Provision, iristatlation, connection and UL approved, are not included in this scope of work. f. 360.833.0585 energization of all new systems from the tenant service point. Refer to the C. All exterior Lighting fixtures shall be UL approved for wet/damp locations C. Products,- drawings. roducts;drawings. and bear the (abet, and shall be approved by landlord prior to instattation. . 1. Products shalt conform to those specified in other sections of the PART 2 PRODUCTS Specifications. 2. 01 CONDUITS. PART 2 PRODUCTS 2. Conduits: Run conduit from j-box at each voice/data outlet location to A. Underground Feeder: Schedule 40 PVC with long sweep rigid steel elbows 2. 01 BALLASTS: access ibte ceiling space (provide conduit access sleeves u above ceiling in �' wrapped with Scotch #51 tape, f p 9 pp p A. Vol(age: Alt l ba l l acts shalt l oe 120 volts for oath interior;or and exterior hard ceiling rooms ar�d -above lay-i r� ceiling t i rdg systed�, to provide continuous B. Above Grade Feeders= Rigid galvanized steel or EMT, Refer to Section 26 lighting fixtures unless noted otherwise, pathways to IT cabinet. 1'C at each outlet. See Section 26 0520. AAY & A (Co. 0520 for conduit usage. B. Ftuorescent: Shalt be electronic ballast, ETL-CBM certified, UL approved, 3. Boxes and Mud-rings: See Section 26 0520 for j-box. Provide mud-ring to 1C 2. 02 CONDUCTORS: tow heat, low noise, class P. 'A' sound rated, 10% maximum harmonic match watt depth requirements and to match device requirements. A. Feeders: Stranded copper sized as shown on the drawings (substituted distortion, Program Start, 'mvott'. Advance, Howard Industries, ` °'� pp g g Triad by 4. (*taunting Boards: Site telephone beard is existing, in aluminum shalt have equal ampacity). MagnaTek, Osram/Sylvania. Ballasts shalt be compatible with T-8, 32 watt 5. Provide a #6 bare wire copper grounding conductor to the IT cabinet from C,� S t 2. 03 PANELBOARDS: rapid start energy saver tamps. Provide number of ballasts in each fixture as the main building ground bus. A. Cabinets., Code gauge gatvan ized or pickled steel .with factory finish of required for multilevel switching where indicated on Drawings. 2. 02 VOICE AND DATA DISTRIBUTION SYSTEM VANCWNM1% SVA. 98M baked enamel or lacquer. For surface or flush mounting as shown. Dead front C. Execution: Factory installed in lighting fixtures where possible. Alt A. Provide a complete and operable voice/data signat distribution system. k�(3:60)15174-0199 (503)2,85-2450 safety type. Hinged doors with keyed alike tacks, with lift Latch for opening. ballasts shalt be easily accessible for service and maintenance and provided Provide all non-active components necessary for a complete and operable i$x ( %!aye g CoBoxes shalt be '5-3/4 inches dee b 20 inches wide b len th as re uired. with at1 disconnects as re _uired b NEC Art. 410. 73(G) distribution cablin s stem. Provide all equipment not Noted as Vender ����V�����V���.aa� P y y g q q y 9 y Wireways shalt be a minimum of 6 inches wide top and bottom, 5 inches each 2. 02 LAMPS., Furnished Vendor Instatted (FVIV). side. A. Incandescent Lamps: 130 volt, pear shaped, medium base, inside frosted, B. Provide all labor, materials, equipment, services, skilled installer, and B. Bus Work: Hard drawn copper for all panelboards. Wire terminals shall be 2000 hour. supervision necessary for the installation of at communication cabling boxes, compression type with non-oxide conductive paste for accepting aluminum B. Fluorescent Lamps: Rapid start, 50001:(, 48 inch T-8, 32 watt or as noted raceways, and jacks, conductors, and required for fixtures less than 48 inches tong. C. Refer to Paragraph 2. 01 for raceway, back board, power and grounding C. Future Provision.- Where 'space' or provision is called for, provide all C. Execution: All incandescent lamps shall be new at time building is turned components and requirements, necessary hardware so the spare is ready to accept circuit breaker (or switch over to the Owner. All lamps shalt be new when installed. They shall arrive D. General system description: Voice and data distribution system shalt be as applicable) without additional hardware. at the jobsite in new, unbroken cases and be installed in fixtures after CAT 5e with patch panels in IT cabinet. Patch panels (FVIV), Provide the D. Circuit Breakers: Common trip, single handle. Minimum AIC ratings shalt mounting. Alt lamps shall be wiped free of construction dust at completion of proper number of cables to every outlet shown in the Drawings, System shalt be U. L. Rated at 10,000 amperes at 208 volts. the project. be star configuration. Leave 2 feet spare cable coiled at each outlet 1. General Use: Molded case, thermal magnetic, bolted to bus, amperage and 2. 03 EMERGENCY BATTERY INVERTER UNITS: termination point and 10 feet coiled in ceiling space above IT cabinet. All poles as indicated in Panel Schedules. A. T-8 Lamps: Provide a one-lamp, 1400 tumens minimum unit mounted inside terminations to be performed by data termination vendor. 2. Ground Fautt Circuit Interrupter Type: Provide for exterior building ballast compartment. Wire to switch protected tamp with nor-mat power tarps, E. Cab te: 4 twisted pair, 24 AWB, CAT 5e, blue sheath, Berk-Tek outlets, wet location outlets, hazardous Locations, and for all circuits where Lithonia PS1400, Bodine B50, or as approved. 'LANMARK-2000'. indicated; and in addition, where required by UBC, OSHA or NEC. 2. 04 LIGHTING FIXTURES: F. Structured cabling system shalt adhere to ANSI/TIA-568-C, D; 3. HACR Type Circuit Breakers: Provide HACR rated circuit breakers on a(( A. rim finishes shalt be as specified with no scratches, damaged surfaces and ANSI/TIA-568-C. 1; ANSI/TIA-563-C. 2; ANSI/TIA-606-A; ANSI/J-STD-607-A, and heat pump and air conditioner branch circuits. clean at the time of acceptance. ANSI/TIA-942-2 standards with respect to pathways, distribution, 4. Appliance Circuit Lock-offs: Provide padlock lockable circuit breaker B. Lenses and Diffusers= At time of acceptance, at( shalt be new with no administration, and grounding of the system. Terminations, by others, shalt handle lock-offs for all circuits serving permanently installed appliances scratches, chips, cracks or splits. Fluorescent fixture tenses shall not be comply with requirements Section 27 2011. over 3003VA or 1/8 hp per ITEC 422-21. less than 125' in thickness. G. Varrantyd One year from time of system acceptance for parts and tabor to 5. Multi-Wire Branch Circuits: Provide mutt:-pole circuit breakers to serve Lighting Fixture Schedule: remedy defects in material or workmanship. multi-wire branch circuits as required by NEC. Type A 2'X4' 2-Lamp fluorescent lay-in troffer with Al2. 125' tens. Lithonia E. Panelboard Types: #2GT8-2-32-A12125-120-GEBIOIS or equal in DayBrite, Lightotier, Columbia, 1. 225 amperes or less: Square D NOOD, or equal. Metal ux, H. E. W i L t i ams, or as approved. (62 VA) 2. 400 amperes or mored Square D I-Line or equal. Type AE Same as Type A, except with an emergency battery/inverter unit. G. Labeling: Label all circuits showing load served in Panetboard Schedule. Lithonia #2GT8-2-32-A12125-120-GEB10IS-EL14 (62VA) SECTION 27 2011 - VOICE AND DATA COMMUNICATION TERMINATIONS Typewritten only. Panel Schedules shall reflect final room naves, not names Type AL 2'X4' 2-Lamp fluorescent lay-in troffer with 0. 125` Al2 lens. Lithonia shown on plans. Provide permanent tamicoid label on Panel. #'cGTB-2-32-A12125-120-GEBIOIS or equal in DayBrite, Lightotier, Columbia, 2. 01 TERMINATIONS H. Manufacture shalt be same company as main switchboards. Mount panelboards Meta lux, H. E. WiIIiams, or as approved. (62 VA) A. Alt Mork, this Section, by others (FVIV). This Section is included for with top up 6'-6' and anchor securely to building structure. Type B 8' recessed fluorescent down Iight, Atzak core 1-32 Watt TRT tarps. informational purposes. Lithonia ## LF8N-1/32TRT-F801A-120 or equal in Omega, Lightotier, Hato, or as B. Terminations shat( comply with ANSI/TIA-568-B. PART 3 EXECUTION approved. (33 VA) C. Voice/Data Modules: Levi-ton 512443 (White on top and blue on bottom) 3. 01 BRANCH CIRCUIT: Type BE Same as Type B, except with an emergency battery/inverter unit. universal T568A/B. A. All branch circuits shall be run concealed where possible. Lithonia # LF8N-1/32TRT-F801A-120-EL or equal in Omega, Lightotier, Hato, or D. Jacks: Cat5E: White at top of faceplate: Leviton 5G108-BW5. Blue at Bottom B. In general, branch circuits shalt contain three phases and a neutrat for as approved. (33 VA) of faceplate: Leviton #5G108-BL5. 120/208 volt, three phase, four wise systems. Branch circuits shalt be on Type C 6' recessed fluorescent downtight, Alzak cone 1-13 Watt TRT tamps. E. Faceplates: 2 Port, Leviton 42080-2WS. 4 Port: Leviton 42080-4WS. 1 Port: opposite phases to balance neutral toads, Branch circuits that share a neutral Lithonia ## LF6FN 1/13DTT 609A 120 or equal in Omega, Lightotier, Hato, or as Leviton 42080-1WS. conductor shalt be served from mutti-pole circuit breakers controlling all approved. (16 VA) F. Face Plates: Singte Gang, four module. PJ, circuits sharing the neutral conductor. Type D ACORN mini-pendant Lithonia #11994-GW-120. Mounting height at 6'6' to G. 19' Relay Rack: Ortronics Mighty Mo III Steel Relay Rack, Btack, 48'H x S`� �eISTC � C. Home runs sha l t conform to the following-. bottom of tens. Verify floor to fixture mounting height with tenant prior to 19' Double Sided, Leniversal 5/8' - 5/8' - 112' alternating hole pattern using rati 1 197 1. 120/208 volt circuits where load is more than 1000 watts and run is more installation. ( JA 12-24 mounting screws. t' than 50 feet, minimum wire size shalt be ##10 AWG copper. Type E 48' tong, 2 tarp surface acrylic wraparound, Lithonia LB 232 120 H. Rack Mount patch panels: Siemon MAX patch panel, MX-PNL-48, modules to D. Extend the branch circuit from the panetboard to the disconnect, mount the GEBIORS or equal in DayBrite, Columbia, Lightotier, ;Metalux,HEWiLliamps, or as match outlet modules, black, starter and wire through to the final connection of the apparatus to be approved. (62VA) G. 'Aire Management: Panduit 2RU Double sided with pass through, #NCMH2, connected. Type T Petton and Crane Light Fantastic If, Single Track Mount, Supplied by I. Module and cabte identification and labeting: Per applicable MECO 3. 02 Low Voltage Gables (70 Volts or Less): Dental Equipment Vendor. Electrical contractor shall install fixture and ANSI/TIA-568-C Standards. cY 13, 3A A. In inaccessible, concealed spaces run cables in raceway. In accessible, connect power complete including controls. Verify details acrd requirements J. Acceptance Testing: Test each cable to applicable ANSI/TIA-56$-C standards, ��D D unfinished areas cables may be run exposed without raceway. prior to rough-in. Provide owner with hard copy printout of test results within three days of B. Run exposed cab tes para ttet to or at right angtes to building structure Type X Molded thermoplastic Exit Sign with stencil face, red letters, tests. t i ries. Do not run exposed cables on floors or in such a way that they emergency battery back-up, self d i agnos i s. Number of faces as requ i red. 1EXPIRES 12/31/131 obstruct access to, operation of, or servicing of equipment. Keep cabtes 6 Lithonia #LHOM-S-W-3-R-120/277-EL N SD HOMO or equal in Duat-Lite, McPhitben, inches minimum from hot water pipes. Sure-titer, Lighttier, or as approved. Cd Support cables every 3 feet with permanent clips, straps, staples, or Type Y Remote twin head emergency tight. Powered from exit sign. Lithonia tie wraps approved for application and which wilt not cause cables to be #ELA-W-T-NX-H1206 or equal in Dual-Lite, McPhilben, Sure-lites, Lightlier, as SECTION 27 3117 - PUBLIC ADDRESS SYSTEMS pinched or, deformed, approved by the Landlord. D. Securely attach clips and straps with nails or screws. Do not use wire or 2, 01 SPEAKER SYSTEM tape to support cables. PART 3 EXECUTION A. Provide a complete and operable public address signal distribution system. E. Bundle only cables of same systems together, 3. 01 INSTALLATION: Provide all non-active components necessary for a complete and operable 3. 03 CONTROL WIRING: A. Recessed lighting fixtures shalt be set parallel to building lines, flush, distribution cabling system. Provide all equipment not noted as Vendor A. Provide all control wiring associated with equipment or systems provided atigned, with no light leaks. Where they are set in suspended ceilings, Furnished Vendor Installed (FVIV), See Sheet EO. 01. and included as part of this Division. Unless specifically indicated, control plaster or tite rings shalt be provided and fixtures shalt be connected to B. Cab te: Be(den, 2 conductor 18 AWG (shielded). Note: 4 conductor wiring associated with the function and control of heating, ventilating, junction boxes with 60 inches of flexible conduit. Junction boxes shalt be acceptable). Leave 2 feet spare cable coiled at each outlet termination point exhaust, hydropic pupping, water heating equipment or operation of dampers, set away from opening to allow fixture to be dropped out. See details on and 10 feet coiled in ceiling space above IT cabinet. All terminations to be dentat equipment, or similar is not covered under this Division, drawings. Coordinate with ceiling diffusers and sprinkler head. performed by data termination vendor. 3. 04 RECEPTACLES: B. Fixtures run in continuous rows shalt be mounted at a uniform height unless C. Ceiling Speaker with volume control: Bogen SMIEZ, FVIV. A. Provide the correct type and style of receptacle for phase and voltage of shown otherwise. Align both horizontally and vertically. D. Tite bridge for speakers: Bogen SMTB, FVIV. device to be plugged in. 3. 02 ANCHORING AND SUSPENDiNGd E. 10 Matt Attenuator (volume control): Bogen AT1OA FVIV. . 3. 05 ACCESS PROVISION: A. Recessed fluorescent fixtures installed in suspended ceilings shall be 9 r p g F. Speaker Amp= Bogen TPU-I5 ( 15 speakers or Less). Bogen TPU-3o (16 speakers A. Panels: Provide 4 - 3/4' and 2 - 1' spare conduits stubbed up from each supported independent of the ceiling system by the Electrical Contractor. or more), FVIV. . . . flush mdounted (recessed in watt) brunch circuit panel to accessible ceiling Provide and install #12 iron wire from two opposite corners of the fixture to REVISION DATE space, or attic space if hard ceiling. the building structure. Instatt four seismic clips in addition to the wire B. Watts: Where required for passage of open wiring provide conduit sleeves supports. TT through watts, 50`/. spare capacity minimum. B. Surface mounted fixtures shat( be anchored to or supported from outlined 110 1 SE Tech Center Drive 3. 06 EQUIPMENT PROVIDED BY OTHERS: members or from bridging between structural members as outlined above. A. It shalt be the responsibitity of the Electrical Contractor to verify Anchors shalt conform to specified types found in other sections of this Suite 195 nameplate data on all mechanical Equipment and dental equipment prior to Specification. Provide ceiling spacers as required. Vancorrver,E1VA 98683 rough-in. Where direct connection is to be made to equipment, provide code C. Alt anchors shall support the weight of the fixture plus 150 lbs. disconnect as required. Provide at( disconnects as indicated on drawings. D. All building bracket type fixtures shalt be securely mounted to outlet 1. Provide fusible disconnects for refrigeration and/or air conditioning boxes or secured to buildings with approved anchors, E N T L compressor motors, motors without overload protection, and as specified or E. The surfaces of all fixtures and lenses, interior and exterior, shalt be shown on the drawings. wiped free of construction dust at the completion of the project. . Provide non-fuse disconnects for motors having overload protection, F. Noisy sy Bat tact: Replace any and a t l ballasts (fluorescent or H. I. D. ) deemed equipment not in site of panelboards, or as required otherwise by code excessively noisy by the Architect at no additional cost to the Contract. on IS war- authority. END OF SECTION 1JEMMMMMARM 3. Starters shalt be furnished by others and instatted under Division 16 work unless specified otherwise, END OF SECTION Frin - FNTSF Tigard Towne Square hT� ���. ShoppingCenter 1 6200 Southwest NOT APPROVED WITH THIS PERMIT Pacific Highway Suite 5 1r9 Or 97224 ISSUE DATE: 6 apri(2012 J0D NUMBER. 323 lam M NON MAI k L OR=C Tmn"ffft'I I.;An L SPE CIS IN a rLAR ANN bm E N01b SECTION 21 1010 - WATER BASED FIRE SUPPRESSION SYSTEM - REMODEL 3. Know how to test the system. A. Keep premises free from waste material and rubbish and at completion of work 3.18 CUTTING AND PATCHING sheet metal, 6 inches long roll formed to fit round insulation shape. remove all rubbish and surplus material, leaving job "broom clean". PART 1 - GENERAL 3.6 GUARANTEE A. Prior to cutting any existing work, locate all concealed utilities to eliminate any C. Upper Attachments: 3.4 CHANGE ORDERS possible service interruption or damage. ERIC 1.1 SCOPE A. The entire fire protection installation, as specified under this Section of the 1. Provide necessary unistrut or angles. Secure to Purlins or Joists. Specifications, shall be guaranteed for one (1) year against defective equipment, A. Should changes be authorized which in the opinion of Contractor requires B. Provide information to General Contractor as to where finished surfaces must be a. Unistrut - threaded rod terminate with washer and 2 nuts. A. Furnish all materials, labor, equipment, working plans, etc., to install a materials and workmanship. additional payment, do not start work until receiving written notice from cut and restored to original conditions. b. Angles - "C" clamps for threaded rods with retaining clip. LANCIAULT complete automatic sprinklers system throughout the areas of the project. Architect. Revise existing head locations as required for new room layouts. Provide new 3.7 EXTRA STOCK 3.19 TESTS D. Lower Attachments: Shall be as follows, unless otherwise indicated heads. 3.5 GUARANTEE ARCHITECT A. Furnish the minimum number of spare heads required (not less than two (2) A. Testing Equipment: Provide all necessary pumps, gouges, connections and 1. UNI-STRUT Clamps: B. The work shall also include, but not be limited to, the following items: heads of each type). Furnish in cabinet at each riser with sprinkler wrench, all A. Guarantee equipment and installation, per Division 01 General Requirements. similar items required to perform tests. a. Copper or PEX: TouchDown II Strut Clamp by Sioux or 3016 nw gravenstein street in accordance with NFPA Pamphlet No. 13. Include written guarantee of compliance stating repairs and replacement of approved equivalent. camas,washington 98607 1. Revision of existing system for remodel areas. defective equipment and workmanship will be corrected at no expense to B. General: b. ABS/PVC: Unistrut Clamp-Wrop pipe with(2) layers of Scotch v. 360.798.3801 2. New heads in new ceilings. Owner. 33 Tape. END OF SECTION 1. Test all piping prior to concealment, insulation being applied, and f. 360.833.0585 C. Notify Architect, Fire Department and Owner 48 hours prior to existing system 3.6 TEMPORARY SERVICES connection to equipment, fixtures or specialties. shut down. Verify shut down times with Owner and Fire Department before 2. Leaks: Repair all leaks and re-test until stipulated results are achieved. PART 3 EXECUTION proceeding. SECTION 22 0500 - COMMON PLUMBING REQUIREMENTS A. Temporary water and sanitary services by General Contractor. 3. Notification: Advise the Architect 48 hours in advance of each test. 4. Before operating any equipment or systems, make thorough check to 3.1 COORDINATION D. Coordinate sprinkler design with all trades involved, as required to facilitate 3.7 VISITING PREMISES determine that systems have been flushed and cleaned as required and installation of sprinkler system. PART 1 GENERAL equipment has been properly installed, lubricated and serviced. Check A. Coordinate work of this section with all other trades. Exchange shop drawings A. Contractor, before submitting his bid on work, must visit site and familiarize factory instructions to see that installations have been made accordingly with other trades to ensure a thorough coordination effort between trades. E. Maintain supervisory personnel on job to coordinate work with other trades. Be 1.1 DESCRIPTION himself with all visible existing conditions. No additional allowance will be and that recommended lubricants have been used. prepared to field redesign and adjust sprinkler system as required to best utilize granted due to lack of information of visible existing conditions. 3.2 PIPE SUPPORTS space available for all concerned at no additional cost. Maintain sprinkler A. Related Documents: Drawings and general provisions of the Contract, C. Requirements: system integrity and approved operation. including General and Supplementary Conditions and Division 01 Specifications B. The submission of a bid will be considered and acknowledgment on part of Hanger Rods - Size & Spacing Schedule - Maximum Hanger Water and Waste Sections, apply to work of this Section. bidder of his visitation to site. 1. Plumbing: Fill waste and vent pipe with water and test for 2 hours. WEIGHT MINIMUM 1.2 QUALIFICATIONS OF CONTRACTOR Prove tight under a minimum head of 10 feet of water. PIPE PER FOOT HANGER COPPER ABS/ PEX 1.2 SCOPE 3.8 EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITE 2. Domestic Cold and Hot Water Systems: Test hydrostatically at 1-1/2 (WITH WATER) ROD SIZE TYPE L PCS PIPING A. The Contractor for the fire protection installation shall be a licensed Fire times working pressure, but not less than 125 psi for 4 hours. Protection Contractor in the State of Oregon, regularly engaged in the A. Provide labor, material and complete system described and shown. Provide any A. At the time of examining the drawings, specifications and site and prior to 3. Repair leaks and retest until leaks are eliminated. 1/2" 1.0 1/4" 6' - 2'-8" installation of automatic sprinkler systems and other fire protection equipment, incidental work not shown or specified which can reasonably be inferred or submitting a bid, the Contractor shall make certain he understands all 3/4" 1.4 1/4" 6' - 2'-8" LarryL. Grimes and employing workmen experienced and skilled in this field. taken as belonging and necessary. requirements thoroughly. 3.20 BENEFICIAL USE " 1„ 2.1 1/4- 6' - 2 8 Engineer 1.3 STANDARDS 1.3 DEFINITION B. If, in the opinion of the Contractor, there are omissions or conflicts in drawings A. When Contractor determines work is substantially complete and ready for 1-1/4" 2.9 3/8" 6' 4' 2'-8" or specifications, the Contractor shall clarify those points with the Architect beneficial use, request inspection to establish date of substantial completion in 1-1/2" 3.6 3/8" 6' 4' 2'-8" 7510 N.E.VANCOUVER MALL DR SUITE 100 A. The Fire Protection System shall be designed and installed to comply with the A. "Contractor" as used in this Division refers to Mechanical Contractor. before submitting the bid. accordance with Division 01. 2" 5.2 3/8" 10' 4' 2'-8" VANCOUVER,WA.98662 (360)254-9234 following standards and/or codes of the latest issue: E-E-MAIL PARALG®COMCAST.NET B. "Approval" means approval of Architect. C. The omission of the expressed reference to any item of labor or material 3.21 START-UP AND SUBSTANTIAL COMPLETION 2-1/2 7.9 1/2 10 4 2'-8" PJ 1. NFPA Pamphlet 13 - Sprinkler System, Latest Edition. necessary for the proper execution of the work, in accordance with present day 3" 10.8 1/2" 10' 4' 2'-8" --------- C. "Provide" means furnish and install completely. practice, shall not relieve the Contractor from furnishing and installing some. A. Prior to substantial completion inspection, provide start-up, test and adjustment B. The sprinkler system design is to be based on the rules governing light hazard of each item of mechanical equipment by qualified field personnel. Coordinate END OF SECTION occupancy. D. "Or approved equivalent" implies during substitution request prior to project D. Drawings are diagrammatic and do not show all offsets, bends, elbows, etc., controls furnished with equipment and system operating controls. Calibrate and bid. which may be required for proper installation of work. Such work shall be integrate to operate as specified. Systems balancing can be uncompleted at this SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT C. System to be designed with swing arms for all pendant heads. Pendant heads to verified by Contractor at building site. Provide additional bends, offsets as time. be centered two ways in ceiling tiles. 1.4 BONDING required by riser and main locations, or other conditions, to complete work at no additional cost. Right is reserved to make reasonable changes in outlet B. Coordinate with General Contractor to establish a substantial completion date. PART 1 GENERAL 1.4 DRAWINGS A. Check Division 01 for bonding requirements. locations prior to roughing-in at no additional cost. General Contractor to notify Architect of some. 1.1 SCOPE A. Preparation of calculations and working drawings is the responsibility of the 1.5 CODES AND STANDARDS E. Drawings and specifications are complementary and what is called for by one 3.22 FINAL INSPECTION Fire Protection Contractor. Nicet 3 level Fire Protection Engineer minimum. shall be as binding as if called for by both. Items indicated are not necessarily A. Provide labeling of piping and equipment as described in Contract Documents. A. General included in Specifications. A. Final Inspection shall take place after all Substantial Completion Inspection B. Shop or working plans to conform to N.F.P.A. 13 paragraph "working plans" "punch list" items have been completed and the enclosed request form and 1.2 SUBMITTALS (A) through (PP). 1. The plumbing systems shall be updated and modified in accordance with 3.9 SITE CONDITIONS completion documents have been received by the Architect. Review of "As Built the following codes and standards, but in no instance shall the standards Drawings", Balancing Logs and "0 & M" manuals will be done at this time. A. Required for pipe markers. C. Working drawings to show structure, reflected ceiling plan and mechanical be less than the requirements set forth herein. A. Information on drawings relative to existing conditions is approximate. During systems. a. National Electric Codes progress of construction, deviations found necessary to conform to actual 3.23 REQUEST FOR INFORMATION <-(��0 PROFF b. State Department of Public Safety conditions shall be reported to Architect for determination of procedure to be PART 2 PRODUCTS �.,��- G r NE 1.5 APPROVALS C. Standards of Underwriters' Laboratories (U.L.) followed. Contractor is responsible for any damage caused to existing systems. A. In order to expedite questions originating from contractors and suppliers during 1� Ly'� 820 d. American Standards Association (ASA) Promptly notify Architect if utilities are found which are not indicated. the bid period and construction, a facsimile procedure has been developed. This 2.1 IDENTIFICATION 7 A. All work will be installed for the approval and/or acceptance of the following: e. Occupational Safety and Health Act (OSHA) procedure will allow 24/hr/day, 7 day/week access to the design engineer's f. Local Governing Codes 3.10 COORDINATION office. Many times the person who needs to be reached is busy on the phone and A. Piping Markers: Pipes shall be labeled with "glue-on" labels manufactured by 1. Fire Marshall of the City of Tigard. g. Compliance with all applicable local, state and federal codes and difficult to reach, it is hoped that this procedure will provide a more timely W.H. Brady Company, or Seton. For pipe covering sizes up to and including 1- OREGON 2. Architect. Assoc at on.Conform with regulations of National Fire Protection A. end thattudy Architectural, notconfl't, Fire Protection, and between Mechanical work lectrical and workawings to the of other trades. response to questions. inch outside diameter,to 2 nch outside diameter, 3/4`inch lett 2rs;inch abolvet2-inch For outs de diameter, 2- v&Z Y 13,N91� ) B. Submit six (6) sets of completed Shop Drawings the Architect for consultant h. E.T.L. - Electric Testing Laboratories Verify exact distances and available space to provide equipment consistent with B. We recommend submitting questions prior to the deadline for the last addendum inch letters. The pipe markers shall be identified and color coded as follows: 9/QR}, 0 review. Calculations to have N.F.P.A. #13 style summary sheet. 2. The plumbing system shall be installed in accordance with the Uniform room allocated. during the bid time in order that proper, formal response can be made. The last �. G Plumbing Code as amended by the State of Oregon, latest edition. addendum is usually issued 7 days prior to bid. Color EXP JUNE 30, 2013 C. Furnish four (4) sets of reviewed Working Drawings to the authority having B. Because of limited space and multiplicity of services, it is mandatory that strict Service Pipe Marker Background jurisdiction for approval. 1.6 PERMITS coordination be maintained by Contractor between the Plumber, Sheet Metal 3.24 CERTIFICATES Contractor, Heating Contractor, Fire Protection Contractor, and Electrician, to Cold Water "Domestic Cold Water Supply" Green D. Retain one (1) set of consultant and authority having jurisdiction approved A. Obtain and pay permits and licenses required. provide optimum use of room available. A. Furnish certificates of compliance with Plumbing Code signed by Chief Hot Water "Domestic Hot Water Supply" Yellow Working Drawings with any corrections required by the above reviews on job Inspector of Code Body, covering plumbing, roughing-in, and finish. Hot Water "Domestic Hot Water Return" Yellow site. Required changes to submitted designed system by authorities having B. Pay for and obtain inspections by State and local bodies as required to show C. Coordinate with General Contractor to provide Construction Schedule for jurisdiction will be done at no cost to Owner. compliance therewith. Owner approval. B. Copy of Chlorination Report PART 3 EXECUTION E. Contractor agrees that Shop Drawing submittals processed by the Engineer are C. Pay all utility fees. 3.11 SUPERVISION C. Final payment will be withheld until Certificates and Chlorination Report are not Change Orders; that the purpose of Shop Drawing submittals by the received. 3.1 PIPE MARKERS Contractor is to demonstrate to the Engineer that the Contractor understands the 1.7 MATERIALS A. Maintain qualified supervisory personnel on job to coordinate work and space design concept, that he demonstrates his understanding by indicating which utilization with other trades involved. Supervisor must be completely familiar END OF SECTION A. Provide with flow arrows indicating flow direction. Pipe markers to be placed equipment and material he intends to furnish and install and by detailing the A. Except as otherwise permitted by specification designation all material shall be with operations and requirements of equipment being installed and be on each side of wall penetrations and a maximum of 20 feet on center. Pipe fabrication and installation methods he intends to use. new of standard make and where applicable, conform to ASME, NFPA or other responsible for job during entire construction period. Prior to request for final markers to be placed on pipe risers from equipment. requirements and have UL listing. Select equipment to fit space provided. inspection, be certain that equipment and controls are functioning properly. SECTION 22 0523 - VALVES F. Provide Architect with two (2) sets of approved Working Drawings with the 3.2 WATER PIPING LABELING Acceptance Stamp of the authority having jurisdiction. One (1) set for B. Pressure vessels to be ASME Code in accord with laws of State of Oregon. B. Supervisor shall answer all service calls and complaints by the Owner for the construction records and one (1) set for Owner. first thirty days of system operation. Provide Owner with necessary names and PART 1 - GENERAL A. Label all water piping downstream of reduced back pressure preventers C. Maximum allowable variation from stated capacities, plus 10% to minus zero. phone numbers. "DANGER - UNSAFE WATER" Seton label acceptable. 1.6 AS-BUILT DRAWINGS 1.1 SCOPE 1.8 MATERIAL SUBSTITUTIONS C. Mechanical drawings and specifications are arranged for convenience only and A. Provide "clean" blackline type As-Built Drawings showing all deviations from do not necessarily determine which trades perform various portions of work. A. Provide valves as described in Contract Documents. END OF SECTION Contract Drawings. Drawings shall be accurate. A. Use of brand names is for the purpose of description and fixing quality and does not eliminate requirements of meeting specifications. D. Before shutdown of any utility service for new connections, coordinate with and 1.2 Valve rating shall exceed respective system operating pressures. All valves shall be B. As-Builts to be very specific about locations of concealed pipe. notify Owner, City and utility. line size unless otherwise indicated. Selection of valve trim materials shall be as SECTION 22 0700 - PLUMBING INSULATION REVISIONS DATE B. Requests for review of other brands per INSTRUCTIONS TO BIDDERS. recommended by manufacturer for temperature and pressure applicable. 3.12 SAFETY PART 2 - PRODUCTS C. Submit certification of specification compliance or a statement of variations with 1.3 SUBMITTALS PART 1 GENERAL request for review or request will not be considered. A. In accordance with generally accepted construction practices, Contractor is 2.1 GENERAL solely and completely responsible for conditions of job site, including safety of A. Required for all valve types used. 1.1 Provide insulation of equipment, fixtures, and piping as described in Contract D. Equipment arrangement is based on one specific manufacturer but intended to be persons and property during performance of work. This requirement applies Documents. A. Ail materials, equipment, valves and devices installed and/or furnished under typical of the makes approved. Spaces allotted on drawings for equipment are continuously and is not limited to normal working hours. this Section shall be new and approved for use in the fire protection installation maximum. Equipment requiring more floor space or larger service area will not PART 2 - PRODUCTS 1.2 SUBMITTALS INTER®ENT by the authorities, agencies, codes and standards having jurisdiction. be acceptable. B. Compliance with Federal Department of labor Occupational Safety and Health Administration Standards, latest Edition, will be responsibility of Contractor. 2.1 MATERIALS AND MANUFACTURERS A. Required for all items. 1101 SE Tech Center Drive 2.2 SPRINKLER HEADS E. "Or approved equivalent" requests for review shall be processed during project Equipment, service platforms, belt guards, etc., to meet OSHA requirements. REFERENCE ONLY Suite 195 bid period prior to bid and contract award. See instructions to bidders in Section A. Manufacturers: Jenkins Bros.; Kennedy Valve Mfg. Co.; Stockham Valves & Vancouver WA 98683 A. General: All heads shall be Factory Mutual approved for application and 1. C. Engineer's construction review is for determining compliance with technical Fittings, Inc.; Crane Co.; Hammond; Walworth Co.; The Wm. Powell Co.; PART 2 PRODUCTS NOT AP.PR( VED WITH THIS PERMIT ' installation. Wet type as required and of one manufacturer. provisions of contract documents and is in no way intended to include review of Milwaukie, Lunkenheimer Co.; Nibco; Vic, Apollo; or special as specified. F. Where the word "only" follows a manufacturer's name and model number, no Contractor's safety measures in, on, or near Construction Site. See 2.1 FLAME AND SMOKE RATING B. Heads to be quick response type. other product will be considered. Architectural General Conditions. B. Ball Valves: To be used up to 3" size on water piping systems 150 psig or less. Crane Co.; Milwaukie; Hammond or Jenkins. A. Descriptions: All insulation material hazard ratings, as tested by procedures of C. Exposed Heads in Finished Ceilings: Semi-recessed type with satin chrome- 1.9 SUBMITTALS 3.13 MAINTENANCE DATA AND OPERATING INSTRUCTIONS ASTM E-84, NFPA 255 and U.L. 723, not to exceed a flame spread index of plated escutcheon cup. 2.2 VALVES SCHEDULE 25 and a smoke developed index of 50. PVC fitting covers and accessories such A. Product Data: After award of contract and before starting work, submit (7) A. Provide 3 copies for approval in 3-ring hard cover notebook prior to acceptance as adhesives, cement, etc., provided with a component rating as listed above. GENTLE 2.3 MATERIALS complete sets of equipment brochures to Architect for review. of installation. Section and tab each portion to correspond to this Specification: Jenkins number unless otherwise indicated. All products and their shipping cartons provided with identification of the flame spread index and smoke developed index. A. Above Ground Pipe and Fittings: 1. Format of Submittals 1. Certificates. A. Plumbing: a. Provide section in submittal for each manufactured item. 2. As-Built Drawings. B. Data Required: Catalog data to show compliance with flame and smoke rating. DENTAL 1. Pipe, fittings, and joining methods shall be in accordance with NFPA- b. Include name, address, and phone number of each supplier. 3. A brief, type-written description of system and how it functions. 1. Ball Valves: Water 13. C. Submittals - 4. Manufacturer's literature for equipment. Milwaukie BA-200 (threaded), BA-250 (soldered) or Jenkins 90OT; ?" C. Manufacturers: Certainteed, Knouf, Manville, Schuler and Owens-Corning. 2. Lock type Plain End Fittings not allowed. 1) Shall be delivered to Architect for approval (15) working 5. Instruct Owner's representative in operating system and on each item of through 2". DENTAL OFFICE days prior to ordering of equipment for processing. equipment and its maintenance. 2. Hose End Ball Valve with cap and chain: 2.2 PIPE INSULATION TENANT B. Hangers: Per NFPA Pamphlet No.13. 2) Partial submittals will not be accepted and will promptly Milwaukie BA-150H. be returned as disapproved. (in the event that resubmittals 3.14 AS-BUILT DRAWINGS 3. Swing Check Valves: Water A. Description: One piece, multipurpose preformed glass fiber pipe insulation with C. Grades, Changes and Joints: are required, unless otherwise noted, resubmit only the 3/8" - 3" 1222; solder end; bronze. vapor barrier jacket, k of 0.25 at 75 degree F mean temperature difference IMPROVEMENTS required items.) See Section 01 3300. A. Record changes in concealed piping runs, equipment locations or other pertinent 1/4" - 3" 92A; threaded; bronze. similar to Schuler "Micro-Lok AP" jacket. 1. Grade lines to permit complete drainage at low points. Make direction 3) Bind in 3-ring binder with hard cover information on a set of drawings. Locate below floor lines by dimensions from 2-1/2" & larger: 624; flanged: I.B.B.M. changes with fittings and run lines plumb and parallel with building 4) Section and tab each portion of submittal data building lines. At close of job, transfer changes to clean set of black lines and B. Above Ground Hot Water: surfaces. Where threaded pipe utilized, use clean cut American National corresponding to this Specification turn over to Architect. Final payment will be withheld pending receipt of "As- Pipe Size Temperature Insulation Thickness taper threads to standard lengths so made-up joints leave no more than Label each item to correspond with specifications Built Drawings." PART 3 - EXECUTION 1/2" to 2" Up to 200 degree F 1" TIGARD TOWNE SQUARE three threads exposed. Apply approved pipe compound to male threads i.e., 22 1117 SHOPPING CENTER only. -- Label each item to correspond with contract 3.15 EQUIPMENT PROTECTION 3.1 INSTALLATION C. Above Ground Cold Water 0 documents i.e., PEX Piping Pipe Size Temperature Insulation Thickness 7 620 SOUTHWEST 5) Submit Manufacturer's catalog data for each manufactured A. General: Keep all openings closed with plugs or caps to prevent entrance of A. Install valves with stems in vertical position with handles upward if possible. 1/2" to 2" 55 degree F and below 1/2" d PART 3 - EXECUTION item. foreign matter. Protect all piping, fixtures, equipment against dirt, water, Valves may be rotated with stems in horizontal position. In no case are valves to PACIFIC HIGHWAY W 6) include and underline/highlight pertinent dimensional and chemical, or mechanical damage, both before and after installation. Temporary be installed with handles down or with stems in less that horizontal position. D. Below ground cold water: Not required. SUITE S 3.1 GENERAL rating data, manufacturer, model number, fixture, figure cap all piping at the end of each work day. Provide caps on all piping when number relating to specific item. rough-in is complete. Do not remove until finished. Any equipment or 3.2 ADJUSTMENT E. Alternate Hot or Cold Water Insulation: TIGARD, OR 97224 A. Install in accord with standards referenced earlier. 7) Include and underline information showing performance apparatus damaged prior to final acceptance shall be restored to original compliance, i.e., capacity, etc. condition or replaced at no additional cost. A. Adjust packing for free operation of handles and leak free operation. Insure that 1. Flexible, elastomeric, expanded closed cell insulation, thickness ?" 0 3.2 INSTALLATION SCHEDULES 2. Review is for general compliance with contract documents and to handles have adequate clearance for proper operation. Material meeting flame spread of 25 or less and smoke developed of 100 U demonstrate Contractor understands design concept. Review does not B. Finish: Protect all equipment and materials until in service. Any visible rust or or less as tested by ASTM E 84-81a. Provide in tubular or slit tube A. As construction dictates. Shop Drawings to be complete and approved prior to waive or supersede any requirements of contract documents. No corrosion shall be removed as directed prior to installation. B. Operate each valve checking for tight shut-off and full flow. Inspect operation form. Thermal conductivity of 0.27 at 75 degree F mean temperature as any installation. responsibility is assumed for correctness of dimensions, details, or to insure that stem is not bent. Replace any bent stems, or damaged valves. tested by ASTM C177 or C518. Water vapor permeability 0.17 (ASTM ISSUE DATE: 6 April 2012 electrical characteristics. C. Store in clean dry area. Leave in shipping container or provide plastic sheet to E96, procedure B). Maximum water absorption - 3% by weight (ASTM JOB NUMBER: 323 3.3 CONCEALED PIPING entirely cover. Do not allow to sit on concrete or grade. Provide 2 x 4's or D 1056). Q � plastic sheet for equipment and fixtures. Provide 2 x 4's to place all piping on. END OF SECTION 2. Contact Joint Sealer: Armaflex 520, BFG construction adhesive No. C) A. Fire protection piping shall be installed above the finished ceiling in all areas PART 2 PRODUCTS - Not Used Wrap with plastic sheet. Failure to comply with above will result in rejection 105, Therma-Cel 950, NOMACO or IMCOA equivalent. 6 that have suspended ceiling. and removal of equipment, fixtures and piping. 3. Manufacturer: Armaflex, Rubatex, CSG Ultrafoom, Therma-Cel, Iq 6 PART 3 EXECUTION SECTION 22 0529 - PIPE SUPPORTS IMCOA or NOMACO. c*4 3.4 INSPECTION AND TEST 3.16 CLEANING 4. Thickness per 2.2B and C above. 0 3.1 REQUIRED WORK N A. All flushing, inspections, examinations and tests required by the A. Thoroughly flush out new piping PART 1 GENERAL 2.3 FITTING, FLANGE, VALVE, AND PIPE TERMINATION INSULATION: authorities/agencies having jurisdiction shall be arranged and paid for by the A. Contractor is responsible for location and size of framed openings provided by Fire Protection Contractor, as necessary to obtain complete and final acceptance General Contractor. B. Remove tags and shipping labels from fixtures and appurtenances. Thoroughly 1.1 SCOPE A. Description: Preformed PVC insulated fitting cover similar to Manville Zeston 0 of the Fire Protection System. The Fire Protection Contractor shall deliver a clean fixtures with approved domestic non-abrasive cleaner. 2000 to be secured over fittings insulated per above for various services. o copy of all certificates of such inspections to the Architect. B. Contractor is responsible for sleeves, inserts, etc. A. Provide labor, material and complete system described and shown. Provide any SPECIFICAT10NS 3.17 PAINTING incidental work not shown or specified which can reasonably be inferred or 3.5 COMPLETION C. Provide information to General Contractor as to where finished surfaces must be taken as belonging and necessary. PART 3 - EXECUTION cut and restored to original conditions. A. Materials shall comply with Section 09 9000. A. Complete the automatic fire sprinkler system ready for operation, in all respects 3.1 PIPING INSTALLATION C) as soon as possible. When the system is complete and ready for continuous 3.2 WORKMANSHIP B. Surfaces shall be prepared and paint applied in accordance with Section 09 PART 2 PRODUCTS 6 operation, activate the system for its intended use. After the system has been 9000, Painting. A. Install in accordance with manufacturer's recommendations. Seal all insulation (n activated for continuous use, water charges, if any will be paid by Owner. A. Run piping parallel to building, keep as inconspicuous as possible, and grade 2.1 PIPE SUPPORTS to maintain continuous vapor barrier on domestic cold water piping. Insulation evenly. Set equipment plumb and true with easy access to maintenance. Off-set C. Items Painted: continuous through hangers, floors, walls, etc. Provide 6 inches long 22 gauge co B. Prior to the opening date, instruct the Owner and his selected personnel in the piping as required to provide proper and necessary clearance. Miscellaneous Metal: Apply one coat of primer followed by one coat of rust- A. Approved Manufacturers: Anvil Corp. (ITT), Michigan, Fee & Mason MFG. steel sleeve at each pipe penetration. N operation of the sprinkler system. resisting enamel to any uncoated (bare) metal and to all surfaces where factory Co. (ATO, Inc.), Carpenter Technology Corp., Pipe Shields, Inc., Tolco or UJ B. Provide adequate clearances for repair and service of mechanical equipment. applied finish is broken including threads of galvanized pipe, steel hangers, approved equal. B. Insulate valve bodies, bonnets, and grooved pipe fittings utilizing Zeston 0 1. Immediately recognize whether the main valves are in open or closed rods, anchors, bases, supports, and equipment. preformed pipe covering. Insulate valve bonnets and unions in cold water L MS0101 N position. 3.3 CLEANING UP B. Pipe Covering Protection: Provide pipe cover protection at hangers on all piping with material of some thickness as adjacent pipe covering. Use insulating 2. Know how to drain the system. continuous vapor barrier insulated piping. Pipe support sleeves to be 20 gauge cement and field-applied fire retardant jacket, or large size pipe covering as required for neat appearing installation. END OF SECTION 3.5 Install thermal expansion absorber per manufacturer's recommendations and drawing SECTION 23 0500 - COMMON HVAC REQUIREMENTS D. Drawings are diagrammatic and do not show all offsets, bends, elbows, etc., details. which may be required for proper installation of work. Such work shall be C. Piping to be insulated to fixture stop or equipment stop. verified by Contractor at building site. Provide additional bends, offsets as SECTION 22 1119 - DOMESTIC WATER SPECIALTIES PART 1 GENERAL required by riser and main locations, or other conditions, to complete work at E R` S 3.2 On handicap lavatory exposed water and waste piping, provide "Lav Guard" or "Trap END OF SECTION no additional cost. Right is reserved to make reasonable changes in outlet Wrap" pre-fit insulation. Color to be ivory or taupe. 1.1 DESCRIPTION locations prior to roughing-in at no additional cost. LANCIAULT PART 1 - GENERAL 3.3 Flexible, elastomeric, expanded closed cell insulation SECTION 22 4000 - PLUMBING FIXTURES AND APPURTENANCES A. Related Documents: Drawings and general provisions of the Contract, E. Drawings and specifications are complementary and what is called for by one 1.1 SCOPE including General and Supplementary Conditions and Division 01 Specifications shall be as binding as if called for by both. Items indicated are not necessarily A. Slip insulation on piping before piping and fittings are assembled keeping Sections, apply to work of this Section. included in Specifications. ARCHITECT slitting of insulation to a minimum. A. Provide domestic water specialties and their installation as described in Contract PART 1 - GENERAL Documents. 1.2 SCOPE F. Coordinate with General Contractor to provide Construction Schedule for B. Longitudinal joints, as necessary, to be at top of pipe. 3016 nw gravenstein street 1.1 SCOPE Owner approval. 1.2 SUBMITTALS A. Provide labor, material and complete system described and shown. Provide any camas,Washington 98607 C. Seal butt joints and longitudinal "slits" with joint sealer. A. Furnish and install plumbing fixtures specified and/or scheduled on drawings. incidental work not shown or specified which can reasonably be inferred or 3.7 COORDINATION v. 360.798.3801 A. Required for all items. taken as belonging and necessary. f. 360.833.0585 D. Wrap valve bodies and fittings with insulation and seal with adhesive. 1.2 SUBMITTALS A. Study Architectural, Structural, and Electrical Drawings to the end that there is 1.3 DEFINITION no conflict between Mechanical work and work of other trades.r all tVerifyexact PART 2 - PRODUCTS A. Required foaproducts. END OF SECTION q p distances and available space to provide equipment consistent with room A. "Contractor" as used in this Division refers to Mechanical Contractor. allocated. 2.1 ACCESS PANELS 1.3 FIXTURE MANUFACTURERS B. "Approval" means approval of Architect. 3.8 SUPERVISION SECTION 22 1116 - DOMESTIC WATER PIPING A. Fire rated, all surfaces; U.L. Listed 16 gauge flanged steel frame, 20 gauge A. Drainage Products - steel door with concealed pin hinge and screw driver security latch/lock system. C. "Provide" means furnish and install completely. A. Maintain qualified supervisory personnel on job to coordinate work and space Prime coat. 1. Smith utilization with other trades involved. Supervisor must be completely familiar - PART 1 GENERAL 2. Watts D. "Or approved equivalent" implies during substitution request prior to project with operations and requirements of equipment bein9 installed and be B. All surfaces; 16 gauge flanged steel frame, 14 gauge steel door with concealed 3. Zurn bid. responsible for job during entire construction period. Prior to request for final 1.1 SCOPE pin hinge and screw driver security latch/lock system. Prime coat. 4. Prior approved equivalents. See Plumbing Schedule. inspection, be certain that equipment and controls are functioning properly. 1.4 BONDING A. Provide piping and installation as described in Contract Documents. 2.2 WATER FLEXIBLE CONNECTOR B. Vitreous China - B. Supervisor shall answer all service calls and complaints by the Owner for the A. Check Division 01 for bonding requirements. first thirty days of system operation. Provide Owner with necessary names and 1.2 SUBMITTALS A. Brosscraft ""S eedi Plumb Plus" 3 4" and less, Falcon Stainless, Inc., 1and 1. American Standard p / phone numbers. larger, or approved equivalent, Must be line size of cold and hot water.to and 2. Kohler 1.5 CODES AND STANDARDS LarryE. Grimes A. Required for all products. from heater. 3. ZurnC. Mechanical drawings and specifications are arranged for convenience only and 4. Crone A. General do not necessarily determine which trades perform various portions of work. 5. Prior approved equivalents. See Plumbing Schedule. Engineer PART 2 - PRODUCTS PART 3 - EXECUTION 1. The heating, ventilating and air conditioning system shall be updated and D. Before shutdown of any utility service for new connections, coordinate with and 7510 N.E.VANCOUVER MALL DR SUITE too C. Faucets - modified in accordance with the following codes and standards, but in no notify Owner, City and utility.j VANCOUVER,WA.98662 (360)254-9234PJ 2.1 STANDARD PIPE AND FITTING CLASSES 3.1 Provide and install water flexible connector at cold and hot water inlet to water heater. instance shall the standards be less than the requirements set forth herein. E-MAIL PARALG®COMCAST.NET i, A. General: Pipe classes listed in Pipe and Fitting Schedule are to be used. 3.2 Provide and install access panels where indicated on drawings. 1. Delta a. National Electric Codes 3.9 SAFETYb. State Department of Public Safety Standards are to be latest revision. D. Stainless Steel Fixtures - C. Standards of Underwriters' Laboratories (U.L.) A. In accordance with generally accepted construction practices, Contractor is d. American Standards Association (ASA) solely and completely responsible for conditions of job site, including safety of B. Pipe and Fittings: END OF SECTION 1. Just e. Occupational Safety and Health Act OSHA p y (OSHA) persons and property during performance of work. This requirement applies 2. Elkay f. Local Governing Codes continuously and is not limited to normal working hours. j 1. Class G: 3. Acorn g. Air Moving and Conditioning Association (AMCA) Pipe: ASTM 1388, Type L. hard drawn copper water tube. SECTION 22 1316 - SANITARY WASTE AND VENT PIPING 5. Prior approved equivalents. See Plumbing Schedule. h. American Society of Heating Refrigeration and Air Conditioning B. Compliance with Federal Department of labor Occupational Safety and Health Fittings: ANSI 1316.22, wrought copper, solder joints. Engineers (ASHRAE) Administration Standards, latest Edition, will be responsibility of Contractor. Threaded ends: ASME 131.20.01 PART 1 - GENERAL 1.4 FIXTURE TRIM & APPURTENANCES I. Sheet Metal and Air Conditioning Contractors National Equipment, service platforms, belt guards, etc., to meet OSHA requirements. 2. Class H: Association (SMACNA) Pipe: ASTM B88, Type K. Soft drawn copper water tube. 1.1 SCOPE A. Furnish and install plumbing fixtures with necessary trim, stops and traps. j. Compliance with all applicable local, state and federal codes and C. Engineer's construction review is for determining compliance with technical Fittings: ANSI 816.22, wrought copper, brazed joints. regulations. Conform with regulations of National Fire Protection provisions of contract documents and is in no way intended to include review of A. Provide and install waste and vent piping systems within buildings to 1. Furnish and install stops with escutcheons at sink, lavatories, water Association. Contractor's safety measures in, on, or near Construction Site. See 2.2 UNIONS AND FLANGES termination on site as indicated on Contract Drawings. closets. k. A.R.I. - Air Conditioning & Refrigeration Institute Architectural General Conditions a. Stops: 1/4 turn ball valve by BrossCraft, McGuire, or Zurn. I. E.T.L. - Electric Testing Laboratories A. Unions: 1.2 SUBMITTALS Connect with flexible chrome plated tube or NSF flexible 3.10 MAINTENANCE DATA AND OPERATING INSTRUCTIONS connector. 1.6 PERMITS 1. Provide unions at each threaded or soldered connection to equipment and A. Required for all products. 2. Furnish and install 17 gauge chrome plated brass P-trap. Trap arm with A. Provide 3 copies for approval in 3-ring hard cover notebook prior to acceptance ��0 PR�FF tanks as indicated on the drawings. soldered bushing. A. Obtain and pay permits and licenses required. of installation. Section and tab each portion to correspond to this Specification: 2. Unions shall be located so piping can be easily disconnected and of type 3. Aerators and pop-ups completely vandal proof. Trim with replaceable specified in following schedules: PART 2 - PRODUCTS7820 and interchangeable assemblies. Hot and cold water faucet to open B. Pay for and obtain inspections by State and local bodies as required to show 1. System balance logs and drawings. 9 Screwed Copper or Brass Pipe: Sizes: 2" and smaller. Union towards center. compliance therewith. 2. As-Built Drawings. �, \L 150 Ib. cast brass, ground joint, brass to brass seat, with threaded 2.1 STANDARD PIPE AND FITTING CLASSES: 3. A brief, type-written description of system and how it functions. ends. 1.5 PIPING: See Sections 22 1116, 22 1117, 22 1316 - PIPE AND FITTINGS 1.7 MATERIALS 4. Manufacturer's literature for equipment. Complete sets of �EGON A. General: Pipe classes listed in Pipe and Fitting Schedule are to be used. manufacturers instructions for operation and maintenance of mechanical 'S 2.3 PIPE JOINTS Standards are to be latest revision. A. Waste Above and Below Floor: Class M A. Except as otherwise permitted by specification designation all material shall be equipment, including replacement parts lists, wiring diagrams, belt type �,9 G<Y 13y X91 �� new of standard make and where applicable, conform to ASME, NFPA or other and size if belt driven, type of bearings on unit and motor, control !, A. General: Pipe and fittings shall be mounted using methods and materials B. Pipe and Fittings: B. Vent Piping Above and Below Floor: Class M requirements and have UL listing. Select equipment to fit space provided. diagrams and literature, bound in 3-ring notebooks. Provide suppliers recommended by manufacturer, in conformance with standard practice and directory with subcontractors and suppliers names, addresses and DIP JUNE 30, 2013 applicable Codes. Cleaning, cutting, reaming, grooving, etc., shall be done 1. Class M: C. Potable Water Above Grade: Class G or PEX 1.8 MATERIAL SUBSTITUTIONS telephone numbers. with proper tools and equipment. Hacksaw pipe cutting prohibited. Piping ABS-DWV: 5. Instruct Owner's representative in operating system and on each item of shall conform to ANSI Standard B 31.1 as applicable. Pipe & Fittings: ASTM D2751 D. Potable Water Below Grade: Class H or PEX A. Use of brand names is for the purpose of description and fixing quality and does equipment and its maintenance. Solvent Cement: ASTM D2235-93o not eliminate requirements of meeting specifications. j B. Copper and Brass Piping: OR 1.6 CHLORINATION 3.11 AS-BUILT DRAWINGS PVC-DWV: B. Requests for review of other brands per INSTRUCTIONS TO BIDDERS. li 1. Above Grade Soldered Joints ASTM B32: Pipe cut evenly with cutter, Pipe & Fittings: ASTM D2665-94, D2122-90 A. General: Upon completion of all tests and necessory replacements, all new A. Record changes in concealed piping runs, equipment locations or other pertinent ream to full inside diameter; end of pipe and inside of fittings thoroughly ASTM D3311-92 domestic water piping shall be disinfected. Chlorination shall be accomplished C. Submit certification of specification compliance or a statement of variations with information on a set of drawings. At close of job, transfer changes to "clean cleaned and polished. Joint uniformly heated, and capillary space Solvent Cement: ASTM D2564-80 by personnel in employ of firm licensed in this specialized type of work. After request for review or request will not be considered. set" of black lines and turn over to Architect. Final payment will be withheld completely filled with solder, leavingfull bead around entire All the above to be listed in the Latest Edition of U.P.C.the and marked work has been accomplished, provide the Owner and Architect a statement from pending receipt of As-Built Drawings. circumference. with IAPMO Label. the laboratory indicating the water is suitable for human consumption. D. Equipment arrangement is based on one specific manufacturer but intended to be a. All Copper Piping and Joints: Sweat copper type with 95/5 or Engineered Control Products Inc. typical of the makes approved. Spaces allotted on drawings for equipment are 3.12 EQUIPMENT PROTECTION 96/4 tin-antimony solder or silvabrite 100 solder or approved 2.2 PIPE JOINTS maximum. Equipment requiring more floor space or larger service area will not equivalent. B. Method: The system shall be charged with a chlorine solutions of at least 50 be acceptable. A. General: Keep all openings closed with plugs or caps to prevent entrance of b. Valves, Cast Fittings or Bronze Fittings: Harris Stay-Silv-15 or A. General: Pipe and fittings shall be mounted using methods and materials PPM residual chlorine. The solution shall be distributed evenly throughout theforeign matter. Protect all ductwork, fixtures, equipment against dirt, water, ,� Handy & Harmon recommended by manufacturer, in conformance with standard practice and system. The strong chlorine solution shall remain in the system for a minimum E. Or approved equivalent3, requests for review shall be processed during project chemical, or mechanical damage, both before and after installation. Temporary Sil-Fos. applicable Codes. Cleaning, cutting, reaming, grooving, etc., shall be done of 24 hours. The strength of the solution shall be confirmed at over 10 PPM at bid period prior to bid and contract award. See instructions to bidders in Section ca all ductwork at t n 9 p p p r the of each work day. Provide caps on all ductwork C. Use only lead free solder. with proper tools and equipment. Hacksaw pipe cutting prohibited. the end of the 24 hours period. Alternate method per UPC allows use of solution 1. when rough-in is complete. Do not remove until finish or for temporary heat. 2. Screwed joints: Use Teflon tape or Teflon liquid dope applied to male at 200 ppm for 3 hours. Any equipment or apparatus damaged prior to final acceptance shall be restored threads only. B. ABS System Joints: F. Where the word "only" follows a manufacturer's name and model number, no to original condition or replaced at no additional cost. 3. Below - Grade Brazed Joints ANS!/AWSC5.8 C. Samples: Bacteriological samples shall be submitted to a certified laboratory other product will be considered. a. Brazed using following type rod. 1. Solvent cement, gasket-type or special procedures per manufacturer's who shall certify that the water is suitable for drinking. B. Store in clean dry area. Leave in shipping container or provide plastic sheet to 1) Copper to copper connections. recommendations and IAPMO Standard IS 11-87 as indicated in the 1.9 SUBMITTALS entirely cover. Do not allow to sit on concrete or grade. Provide 2 x 4's or a) AWS classification BCUP-4 copper phosphorus latest edition of the Uniform Plumbing Code. 1.7 CLEANOUTS plastic sheet for equipment. Wrap with plastic sheet. Failure to comply with a (6% silver). A. Product Data: After award of contract and before starting work, submit (7) above will result in rejection and removal of equipment. REVISIONS DATE b) AWS classification BCUP-5 copper phosphorus C. PCV-DWV Joints: A. General: Provide Jay R. Smith, Watts, or Zurn, cleanouts where indicated, and complete sets of equipment brochures to Architect for review. (15% silver). required by Code. Some size as main with maximum size of 4". C. Return and exhaust air systems shall not be used during construction. All duct 2) Copper to brass or copper to steel connections. 1. Solvent cement, gasket-type or special procedures per manufacturer's 1. Format of Submittals rough-in openings into return and exhaust air systems shall be sealed air tight. a) AWS classification Bag-5 silver (45% silver). recommendations and IAPMO Standard IS9-95 as indicated in the latest 1. In floors, nikalloy finish, Smith 4023. a. Provide section in submittal for each manufactured item. After installation of flexible duct and grilles, seal grilles air tight. Architect will 3) Do not use rods containing cadmium. edition of the Uniform PlumbingCode. 2. In walls of finished space,p Smith 4472. b. Include name, address, and phone number of each supplier. approve removal of seals when space is clean and ready for air balance. b. Brazing Flux 3. In exterior areas, Smith 4243. C. Submittals - Balancing Contractor will remove seals. 1) Approved manufacturers - 4. Provide tiling flanges in tile floors. 1) Shall be delivered to Architect for approval (15) working j a) "Stay-Sil White Brazing Flux" by J.W. Harris Co. PART 3 - EXECUTION 5. Secure cleanout cover with stainless steel flat head screws. days prior to ordering of equipment for processing. 3.13 CLEANING b) High quality silver solder flux by Handy & 2) Partial submittals will not be accepted and will promptly INTERDENT Harmon. 3.1 INSTALLATION 1.8 TRAP PRIMERS be returned as disapproved. (in the event that resubmittals A. Replace filters in air moving equipment operating during construction prior to 1101 SE Tech Center Drive are required, unless otherwise noted, resubmit only the turning job over to Owner. Suite 195 A. General: Piping installed as indicated, direct as possible without unnecessary A. Automatic Trap Primer Unit: Provide entire trap primer units complete as required items.) See Section 013000. PART 3 - EXECUTION offsets or fittings and parallel with building lines. Vertical risers plumb. indicted with piping, valves, all equipment components and appurtenances. 3) Bind in 3-ring binder with hard cover 3.14 LUBRICATION Vancouver,WA 98683 4) Section and tab each portion of submittal data 3.1 PIPING INSTALLATION: B. Slopes: Horizontal piping shall slope uniformly without sags or humps to B. In-Line Type: Automatic trap primer valve Complying with ASTM-D-1784, corresponding to this Specification A. Lubricate equipment properly before being ut into erv'c�T �� provide for complete drainage of systems. Drainage piping shall slope at 1/4 NSF approved. Smith 2699-1 with integral backcheck assembly, P.P.P Model -- Label each item to correspond with specifications RE � � ly �lyLY A. General: Piping installed approximately as indicated, direct as possible withoutinch per foot minimum. P-1 & P-2. i.e., 23 3713 3.15 PAINTING' unnecessary offsets or fittings and parallel with building I' nes. Vertical risers �Q����R����WITH T �S PERMIT Label each item o correspond with contract plumb. All valves accessibly located. END OF SECTION 1.9 TRAPS documents i.e., Diffusers A. Materials shall comply with Section 09 9000. Aw" ENTLE 5) Submit Manufacturer's catalog data for each manufactured B. Slopes: Horizontal piping shall slope uniformly without sags or humps to A. General: Provide traps on all fixtures connected to soils stems except for item P Y P B. Surfaces shall be prepared and point applied in accordance with Section 09 provide for complete drainage of systems and elimination of air. Low points SECTION 22 3300 - ELECTRIC WATER HEATERS fixtures having integral traps and arrange so discharge from a fixture will not 6) Include and underline/highlight pertinent dimensional and 9000, Painting. shall have drain valves, accessiblylocated. g pass through more than one trap before reaching sewer. All traps shall have rating data, manufacturer, model number, figure number seal of not less than 2" nor more than 4". relating to specific item. C. Items Painted: DEII`IN�TAL PART 1 - GENERAL 7) Include and underline information showing performance Miscellaneous Metal: Apply one coat of primer followed by one c oat of rust-END OF SECTION B. Exposed Traps: Exposed traps for fixtures shall be chromium plated brass tube compliance, i.e. cfm capacity, etc. resisting enamel to any uncoated (bare) metal and to all surfaces where facto r Y1.1 SCOPE as specified under Fixtures. applied finish is broken including threads of galvanized pipe, steel hangers, ENTAL OFFICE SECTION 2 1 - PART 2 PRODUCTS - Not Used rods anchors grilles, bases supports, and equipment. 2 117 PEX PIPING A. Furnish and install electric water heaters as specified in Contract Documents. 1.10 PLUMBING FIXTURES INSTALLATION 9 PP � Sheet Metal: n Apply one coat of flat black point to the inside of unlined ducts PPY P TENANT visible through grilles and registers from finished spaces. 1.2 SUBMITTALS A. General: Provide new plumbing fixtures fixtures oft e specified on drawings and PART 3 EXECUTION PART 1 - GENERAL P 9 YP P 9 !� IMPROVEMENTS quality shown. 3.16 ELECTRIC CONNECTIONS A. Required for all products specified and/or scheduled on drawings. 3.1 CLEANING UP 1.1 STANDARDS 1. Fixtures: Complete with fittings, supports, fastening devices, faucets, A. Electric Contractor runs wiring, provides and installs disconnect switches, valves, traps and appurtenances required. A. Keep premises free from waste material and rubbish and at completion of work mounts starters and makes line voltage connections to equipment furnished P 9 A. ANSI/AGA LC-1 PART 2 - PRODUCTS 2. Vitreous Ware: Non-absorbent china of even color or unmarked. remove all rubbish and surplus material, leaving Job "broom clean". under this Contract unless noted under Specific items. Wiring by Mechanical to TIGARD TOWNE SQUARE 3. Porcelain Lined Ware: constructed of smooth, sound iron castings, conform to Electrical Division wiring methods. 1.2 SUBMITTALS 2.1 ELECTRIC WATER HEATER properly finished and provided with first quality high temperature 3.2 CHANGE ORDERS SHOPPING CENTER enamel. ._ 3.17 CUTTING AND PATCHING 16200 SOUTHWEST A. Required for all items. A. General: Provide electric water heater with glass lined tank, glass fiber 4. Warranty. All fixtures warranted not to craze, color or scale. A. Should changes be authorized which in the opinion of Contractor requires r2 insulation, heavy gauge steel jacket, 150 psig working pressure, UL listed, 5. Escutcheons: Brass chrome plated. additional payment, do not start work until receiving written notice from A. Prior to cutting any existing work, locate all concealed utilities to eliminate any PACIFIC HIGHWAY (? magnesium anode, with thermostat stepped electric heating, double ole manual 6. Fixtures set connected to soil waste vent and water supplies in neat Architect.PP A t 9 P � pp possible service interruption or damage. PART 2 - PRODUCTS P P 9 � reset high limit immersed thermostat. finished and uniform manner. SUITE S @7. Connections: Equal height, plumb and set at right angles to floor, wall 3.3 GUARANTEE B. Provide information to General Contractor as to where finished surfaces must be TIGARD, OR 97224 m 2.1 SYSTEM COMPONENTS: B. See plans for capacity. or both unless otherwise required or specified. cut and restored to original conditions. . 9 8. Fixture Locations: As shown on Architectural Drawings. A. Guarantee equipment and installation, per Division 01 General Requirements. v A. Tubing: Cross-link polyethylene listed to ASTM F876 and F877 and certified C. Manufacturers: Lochinvor, Rheem, Rudd, A.O. Smith, Bradford White and 9. For counter mounted fixtures provide white silicone caulking compound, Include written guarantee of compliance stating repairs and replacement of 3.18 TESTS to NSF Standards 14 and 61. Test to pressure 100 psi. State. Dow Corning #780 or G.E. Construction Sealant on counter top before defective equipment and workmanship will be corrected at no expense to �= inserting lavatory to ensure proper seal. Caulk under rim of fixture Owner. A. Testing Equipment: Provide all necessary pumps, gauges, connections and r-- B. Appurtenances: Manifold fittings, adaptors, plugs, bend supports, fasteners,, D. Heater labeled to meet ASHRAE 90A standard. before inserting into counter. similar items required to perform tests. ISSUE DATE. 6 Apnl 2012 stop valves, fittings, firestop sealant and tools. 10. Seal faucets to lavatory with plumbers putty under faucet. 3.4 TEMPORARY SERVICES JOB NUMBER: 323 Q 2.2 SEISMIC BRACING FOR WATER HEATER 11. All gaskets and compression rings to be neoprene rubber. Wax is not B. General: LID C. Color Code allowed. A. Temporary water and sanitary services by General Contractor. A. As manufactured by Spacemaker Model No. E-25 for 55 gallon tanks and 12. Install shutoff and union upstream of trap rimer. Adjust trap rimer for T 9 p p p p P 1. est ductwork prior to connection to equipment. ao P d 1. Cold Water Blue or White below. Use E-50 for tanks above 55 gallon to 100 gallon tanks. proper flow to maintain trap seal. 3.5 VISITING PREMISES: 2. After completionof of requirements above and immediately before starting 92. Hot Water Red 13. Secure water closet to flange with brass toilet bolts brass luted toilet tests clean or replace air filters. 9 P p N ACCESSORIES bolts not allowed. A. Contractor, before submitting his bid on work must visit site and familiarize • a 9 �o D. Manufacturer: Wirsbo, Vanguard, Zurn Pex. 14. Handle on flush tank ADA water closet to be located on wide side of himself with all visible existing conditions. No additional allowance will be 3.19 TEMPORARY HEAT A. Thermal Expansion Absorbers stall. ranted due to lack of information of visible existing conditions. 9 9 d A. Thei mechan cal system may be used for temporary heat under the following N PART 3 - EXECUTION 1. Bladder type for use with potable water systems. 1.11 PIPING INSTALLATION B. The submission of a bid will be considered and acknowledgment on part of conditions: 0 2. Acceptable Products - bidder of his visitation to site. 0 `� 3.1 INSTALLATION a. Therm-X-Trot ST-12 by Amtrol A. Set floor drain drainage flange and flashing collar slightly below membrane 1. Approval of use by Owners Representative. SPECIFICATIONS level. 3.6 EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITE 2. The return and exhaust air ductwork is tightly sealed prior to the return A. System to be installed in accord with the Uniform Plumbing Code as amended and exhaust air grilles. 3 by the State of Oregon, latest edition and manufacturer's installation PART 3 - EXECUTION B. No water piping is to be wired or supported in an other way from waste or A. At the time of examining the drawings, specifications and site and prior to 3. The units run on all outside air and the outside air temperature is above P•P� 9 PP Y Y 9 9 P P P INN instructions. vent system. Pitch water Imes to low points and provide ball t hose end submitting bi e tin a d the Contractor shall e certain he r Y p p type g mak tai understands all 40 degree F. r 9 a 3.1 Electric Water Heaters on Concrete Floors: Provide wood or steel stand with minimum valve with ca and chain. requirements thoroughly. 4. „ p qFilters are in place in the units and changed frequently ever 14 days 9 q Y ( Y Y Q B. Piping may be used for, 1-1/2 and less. of R-10 insulation between floor and bottom of heater, maximum) to prevent accumulation of dirt on the fins of the coil. 2 C. Provide and install polished nickel plated split-plate escutcheons of sufficient B. If, in the opinion of the Contractor, there are omissions or conflicts in drawings 5. if the filters are not frequently changed, the Contractor will have the U') 3.2 TESTING 3.2 Pipe PTRV discharge to termination as indicated on drawings. diameter to cover pipe sleeves where exposed pipes go through walls floors and or specifications, the Contractor shatl clarify those points with the Architect coils in the units steam cleaned at his expense to original factory p ceilings. before submitting the bid. conditions. cv A. Test complete system at 100 psi. 3.3 Anchor water heater to wall using two (2) anchor straps. Fasten anchors in accordance LOwith manufacturers recommendations and as construction dictates. C. The omission of the expressed reference to any item of labor or material 3.20 BENEFICIAL USE UJ o3.3 PEX PIPING END OF SECTION necessary for the proper execution of the work, in accordance with present day MS0,u2an N 3.4 Provide and install water flexible connector at cold and hot water inlet to heater. practice, shall not relieve the Contractor from furnishing and installing some. A. When Contractor determines work is substantially complete and ready for A. PEX piping must be insulated per State of Oregon Code, beneficial use request inspection to establish date of substantial completion in q P P accordance with Division 01. D. Provide sealant on all exposed and or raw edges and sheet joints such as United 2.2 DUCT SEALER a. Supply, Return and Exhaust Systems: Thirty ounce (30 oz.) glass A. Efficiency: Mery 11, 46% ASHRAE 52.1 1999 Duct Sealer, water based, or approved equivalent. fabric, fire retardant and airtight, weather resistant, coated with 3,21 START-UP 3.2 APPLIED LOCATIONS A. Approved Products neoprene on both sides, Ventfabrics, Inc. "Ventg(as". 1. 2" thick for existing rooftop units. ERIC A. Provide start-up, test and adjustment of each item of mechanical equipment by 1. S2 by Duro Dyne C. Volume Dampers qualified field personnel. Coordinate controls furnished with equipment and A. Supply Duct 2. Versa Grip 102 by hardcost Inc. PART 3 EXECUTION system operating controls. Calibrate and integrate to operate as specified. 3. Water Base Duct Sealer by United McGill Corp. 1. General: Provide adjustable volume dampers at all duct junctions on lowLANCIAULT Systems balancing can be uncompleted at this time. 1. Externally or internally insulated. pressure supply, return and exhaust ductwork where indicated and in 3.1 EXECUTION 2. Internal insulation required where indicated on drawings. branch ducts for each supply, exhaust and return openings for adjusting B. Coordinate with General Contractor to establish a substantial completion date. PART 3 EXECUTION air volumes. Dampers installed with end bearings and regulators. A. Install clean set of filters prior to air test and balance after Architect has given ARCHITECT General Contractor to notify Architect of some. B. Return Duct a. Bearings: Provide end bearings for dampers manufactured by approval for removal of seals over diffusers and grilles. 3.1 Fabricate ducts to be straight and smooth with joints neatly finished. Young Regulator, #656; Ventlock #607. 3016 nw gravenstein street 3.22 FINAL INSPECTION 1. Not required within building envelope unless noted for internal insulation 2. Single Blade Dampers (B): B. Provide 2 additional sets of filters for tenant's use. on drawings. 3.2 GENERAL a. General: Single blade dampers job or factory fabricated of no camas,Washington 98607 A. Final Inspection shall take place after all Substantial Completion Inspection less than 24 gauge galvanized steel, and no larger than 12" x 48", v. 360.798.3801 punch list items have been completed and the enclosed request form and C. Exhaust Duct A. Where internal acoustic insulation is required, increase duct size to provide clear reinforced or crimped for rigidity, with pivot rod extending END OF SECTION f. 360.833.0585 completion documents have been received by the Architect. Review of "As Built inside dimensions shown, with interior surfaces to unlined duct aligned with through duct. Drawings", Balancing Logs and "0 & M" manuals will be done at this time. 1. Not required within building envelope unless noted for internal insulation surface of internal insulation at transition point. 3. Multi-Blade Damper (B): on drawings. a. General: Opposed blade damper shall be factory fabricated, and END OF SECTION B. Metal Ductwork used where width of single blade damper would exceed 12" or as indicated. END OF SECTION 1. Bare Metal Rectangular Ductwork: "S" and drive, Pittsburgh and 4. Regulators: SECTION 23 0593 - TESTING, ADJUSTING AND BALANCING FOR HVAC Government locks or "Ductmate" or "Ward" shall be used for all low a. Accessible Damper: Regulators locking type with lever handle, pressure rectangular duct except for exterior ductwork. position indicator and lock nut as manufactured by Young PART 1 GENERAL SECTION 23 0900 - INSTRUMENTATION AND CONTROL FOR HVAC 2. 1" Sound Attenuated Metal Rectangular Ductwork: "S" and drive, Regulator #403; Ventlock #641. Pittsburgh and Government locks or "Ductmate" or "Ward" shall be b. Plaster Surfaces: Regulators concealed type with lever, position 1.1 SCOPE PART 1 GENERAL used for all low pressure rectangular duct except for exterior ductwork. indicator and lock nut enclosed in round die-cast box with female threads to accept male threaded chrome plated cover as A. Provide all necessary instruments for testing, adjusting and balancing of HVAC 1.1 COMPLETION REQUIREMENTS C. Round ductwork with couplings with duct sealer applied to inside; 1" minimum manufactured by Young Regulator, Model 315, Ventlock. systems. overlap. Sheet metal screw at 90 degree all around. C. Acoustical Tile Surfaces: Regulators concealed type with lever, A. Upon completion of the work, the Contractor shall instruct operating personnel position indicator and lock nut enclosed in deep die-cast box with 1.2 DESCRIPTION and provide three (3) complete sets of operating and maintenance instruction 3.3 SEALING adjustable threaded cover as manufactured by Young Regulator booklets. Provide one 1 hour of time to instruct Owner's personnel in I ` () p Series 15. Larry L. Games A. Provide the services of an independent firm as specified hereafter; specializingoperation of the system. A. Duct Sealing: in the balancing and adjusting of air and water systems (should not be associated Engineer or owned by the Contractor). The work generally to include the following: 1. Seal all longitudinal ductwork seams. PART 3 EXECUTION 1. Adjust supply, return and exhaust volumes to the amounts shown, within PART 2 PRODUCTS 2. Seal all transverse joints. Not required for "Ductmate", "Ductmate 5% variation except as approved (10% total variation out-to-out). Junior", "Ward", or "TDC" joints unless undo pressure loss occurs. 3.1 Turnvanes installed permanently in ductwork in 90 degree elbow so that no vibration of 7510 N.E.VANCOUVER MALL DR SURE 100 2. Adjust outside air dampers for minimum outside air requirements 2.1 TEMPERATURE CONTROL WIRING VANCOUVER,WA.98662 (360)254-9234 3. Seal all Snap-Lock elbow gores. vanes occur. indicated. PJ E-MAIL PARALGOCOMCAST.NET 3. Adjust fan speeds and motor drives for required air volumes. A. All control wiring (line voltage or low voltage), required to complete the 3.4 INSTALLATION 3.2 Flexible connections installed at inlet and outlet of ceiling exhaust fans. 4. Provide equipment data for all fans with equipment identification, motor temperature Control System, system shall be installed by the Contractor in !I data, drive data and operation data on motor. accordance with Division 16 and all Electrical Codes. Do not provide more A. Ductwork 3.3 Install regulators. In hard ceilings install concealed type damper regulator. 5. Test rooftop units in full cooling mode with clean air filters. than 9 wires in any conduit for power wiring. 1. Erect all duct work true to dimensions indicated, straight and smooth on 3.4 Install dampers securely to duct in a manner that damper fits against sheet metal walls, 1.3 Test and Balance firms: Air Balancing Specialty,Inc.,lnc5 3-235 89 Precisionaire 2.2 120 VOLT WIRING inside with neatly finished joints lopped in direction of air travel. bottom and top. Cut internal insulation to allow damper to fit against wall. Seal all cut Northwest, 503.651.3120. Neudorfer Engineers, c., 503-235-8924. 2. Install supply ducts above return or exhaust ducts where possible, edges of internal insulation. A. 14 gauge stranded, 600 volt insulation minimum. provide long, straight duct drops to diffusers for proper diffuser PART 2 PRODUCTS - performance. Not Used 2.3 LOW VOLTAGE WIRE 3. Change in duct size or shape necessitated by interference with other END OF SECTION work shall be made using rectangular equivalents of equal friction loss PART 3 EXECUTION A. Type THHN conductors of not less than 18 gauge stranded and with two wires without extra cost. for each run. SECTION 23 3713 - DIFFUSERS AND GRILLES 3.1 PROCEDURES END OF SECTION 2.4 THERMOSTAT CABLE A. The air system is to be adjusted in accordance with standard procedures and PART 1 GENERAL recognized practices of the Associated Air Balance Council and as approved by A. 8 or 12 conductor - 18 AWG solid copper wire insulated with high density SECTION 23 3116 - NON-METAL DUCTS the Architect. polyethylene enclosed in brown PVC jacket. 1.1 SCOPE PR�FFS B. Air System Balancing PART 1 GENERAL A. Provide and install diffusers, grilles and related items as described in Contract ��� �G I xv PART 3 EXECUTION Documents. �' 7820 `� 9 1. Minimize throttling losses caused by balancing dampers and other 1.1 SCOPE restrictions. 3.1 INSTALLATION 1.2 SUBMITTALS A. Furnish and install non-metal ducts and related products as described in Contract OREGON 3.2 SUBMITTALS OF BALANCING A. The control equipment and connecting wiring shall be installed in a neat and Documents. A. Required for all products. V, alb workmanlike manner by trained mechanics. �� C Y 13,19 �CD !i A. Complete balancing log of all air outlets indicating actual field measured air 1.2 SUBMITTALS volume and percentage of design air volumes. Provide Drawings identifying 3.2 All exposed conduit shall be run parallel to or at right angles to the building structure, PART 2 PRODUCTS Y Ci� location of all outlets. and shall be concealed in all finished spaces. A. Required for all products EXP JUNE 30, 2013 B. Complete equipment data sheets, indicating actual equipment performance, 3.3 All concealed temperature control wiring shall be in accord with NEC latest edition. 2.1 AIR DISTRIBUTION PRODUCTS model numbers, bearing and belt data, motor nameplate data, and final balanced PART 2 PRODUCTS Following manufacturers are approved to supply air distribution equipment provided all items motor data. 3.4 Provide conduit in wall or on column for all thermostat wires. can be supplied to meet specifications: Anemostat, Barber-Colman, Carnes, Titus, Krueger, C. Additional Data: Provide all additional data as provided by Associated Air A. Remove thermostat from existing location and install where indicated on 2.1 INSULATED FLEXIBLE DUCT Metal Aire, Price. Balance Council (AABC) Standard forms drawings. A. Assembly, including liner, vapor barrier and insulation listed under UL A. Modular Core Ceiling Diffuser Standard 181 as a Class I flexible air duct and complying with NFPA standards D. Provide six copies of the above completed information to the Architect for B. Provide junction box for mounting of thermostat at 4'-0" above finished floor. 90A and 90B. Mold and mildew resistant. 1. Steel construction, square neck with minimum of 4 cores. review and insertion into the Operating and Maintenance Data. 2. Finish: Baked white enamel. 3.5 COOLING ONLY THERMOSTAT B. Factory made assembly consisting of CPE, polyethylene or polyester core 3. Manufacturer: Price SMCD; Frame type 6 for surface mounting and 3.3 COMFORT BALANCE bonded to a spring steel wire helix and supporting a fiberglass insulating blanket Type 34 for T-Bar mounting. A. Honeywell T87F with TG587F guard. and low permeability outer vapor barrier. A. The Balancing Contractor shall visit the site 14 days after final balance and B. Ceiling Exhaust or Return Grilles: (ECG) make adjustments to the system to provide for specific areas of tenant B. Mount thermostat on junction box at location indicated on drawings; calibrate, C. Application complaints set 70 degree F Cooling.. 1. Eggcrate for installation in 2' x 4' lay in T-bar ceiling panel system or 1. Supply in conditioned spaces - R4.2 gypsum board ceiling. 3.6 EXISTING COOLING/HEATING TIME SWITCH THERMOSTAT 2. Finish: Baked white enamel. END OF SECTION D. Manufacturer: Thermoflex M-KE, Flexmaster equivalent or approved. 3. For 2' x 4' T-bar provide extensions as required for lay in application. A. ount thermostat Mon junction box at locations indicated on drawings; calibrate. 4. Price 80C serves for surface mount. SECTION 23 0700 - HVAC INSULATION Set 75 degree F. cooling and 70 degree F. heating, occupied hours; 80 degree F 2.2 UNINSULATED FLEXIBLE DUCT 5. Price 80TB for T-Bar installation. cooling, 62 degree F heating during unoccupied hours. Set evaporator fan to run continuously during occupied hours, intermittently during unoccupied mode. A. Assembly including fiberglass cloth fabric listed under UL Standard 181 as PART 1 GENERAL Class I flexible air duct and complying with NFPA Standards 90A and 90B. PART 3 EXECUTION B. Units with economizers, provide wiring and relays to integrate refrigeration and Mold and mildew resistant. REVISIONS DATE 1.1 SCOPE economy cycle operations. Set refrigeration to operate at 55 degree F and 3.1 Notify Architect when building is completed to such a point that temporary heat can be above. B. Factory made assembly consisting of coated woven fiberglass cover bonded to a classified as permanent heat. If the Architect agrees, remove the temporary caps from A. Provide and install HVAC insulation as described in Contract Documents. spring steel wire helix. the exhaust and return ducts and complete those systems installation. 3.7 Provide all wiring, relays and additional control items to make complete and operating 1.2 SUBMITTALS systems. C. Application 3.2 Install all diffusers, grilles and associated devices in accordance with Manufacture's instructions. A. Required for all items. 1. Return in conditioned spaces - R0.0 PART 4 - SEQUENCE OF OPERATION 3.3 Adjust pattern of supplies to those shown on plans. D. Manufacturer: Thermoflex S-TL, Flexmaster or approved. N roved. 1 T ER®E PART 2 PRODUCTS EXISTING 4.1 E ING ROOFTOP UNITS 3.4 Correct any undesirable noise or draft problems associated with grilles, diffusers and 1101 SE Tech Center Drive 2.3 CINCH BANDS mounted dampers. Devices with loose or vibrating parts shall be replaced. Suite 195 2.1 DUCT INSULATION A. Evaporator fan to operate continuously with outside air damper open during occupied hours. Fan runs intermittently during unoccupied hours. Fire/Life A. Nylon, 3/8 inch meeting flame spread of 25 and smoke developed of 50. 3.5 Using white silicon caulking compound, caulk around the perimeter of diffusers and Vancouver,WA 98683 A. Description:j p Safety and integral unit mounted smoke detector stops unit functions and closes grilles at hard ceilings, 1. External Insulation: outside air damper. B. Manufacturer: Panduit, Tyton or approved. a. 1.5 lb./cu.ft. density glass fiber blanket with vapor barrier jacket, B. Cooling and/or heating enabled from thermostat. At 55 degree F and below, 2.4 HANGER STRAP END OF SECTION k of 0.24 at 75 degree F mean temperature difference, similar to cooling from economizer control modulation of outside and return air damper. Manville "Microlite" ' with F SKL jacket. Refrigeration cooling above 55 degree F with outside air damper 100% open. A. UL Listed for use in Return air plenum space. b. Double layer ofpolyethylene bubbles sandwiched between 2 Outside air damper returns to minimum position at 75 degree F outside air SECTION 23 3723 HVAC GRAVITY VENTILATORS layers - 9 of reflective aluminum sheet anti bacterial. Installed tolled tight temperature and on call for heating. B. 1-1/2 inch wide, adjustable with releasable clasp. to duct R-4.3 vapor barrier less n .0 / J P p a than 0 2 perms TVM or GENTLE equivalent. C. Outside air damper fails to - q p ai s closed position. C. Manufacturer: Thermoflex Flex Tie or approved. PART 1 GENERAL Tape - Venture 1581A aluminum foil coated, pressure sensitiveuF.NTAL adhesive, UL-181A-P and UL181B-FX, nFoil or equivalent. 4.2 CEILING EXHAUST FANS, CEF-1, 3, 4, 5, & 6 2. Internal Insulation: Matt faced acoustical board with thermal PART 3 EXECUTION 1.1 SCOPE conductivity not to exceed 0.23 at 75 degree F mean temperature, and a A. Enabled/disabled from light switch by Division 26. ®ENTAL OFFICE minimum sound absorption coefficient of 0.50 at a frequency of 250 or 3.1 INSTALLATION A. Provide and install gravity ventilators and related items as described in Contract 0.75 at a frequency of 1000. 4.3 CEILING EXHAUST FAN, CEF - 2 Documents a. Must not use glue-on insulation holding devices 0 o es in interiorTENANT- 9 9 A. Hang duct from structure with hanger strap at 5 0 on center maximum. ducting. A. Enabled/disabled from cooling only thermostat to maintain setpoint temperature. 1.2 SUBMITTALS ,, b. Manville Linacoustic with anti-bacterial coating. B. Provide duct sealer on 3 inch metal collar, slip flexible duct onto collar with I M P ROVE M E NTS 4.4 EXHAUST FAN, EF-1 minimum 3 inch coverage and secure with cinch strap. A. Required for all products. INSULATION DUCT LOCATION R-VALUE A. Operates continuously. END OF SECTION PART 2 - PRODUCTS TIGARD TOWNE SQUARE Not within conditioned space: 2.1 ROUND ROOF HOOD SHOPPING CENTER On exterior of building, on roof, END OF SECTION � in attic, in enclosed ceiling space, SECTION 23 3300 - AIR DUCT ACCESSORIES 16200 SOUTHWEST j in exterior walls, in garage, in crawl spaces. R-8(1) A. Spun aluminum of low silhouette type. Mountingg pedestal to be arranged for A SECTION 23 3113 - METAL DUCTS curb mounting. Provide with bird screen and bacckdraft damper. PACIFIC HIGHWAY REFER ONLY Supply air ducts above ceilings or in PART 1 GENERAL L SUITE S � interior walls with HVAC equipment su I PPY B. Provide with factor prefabricated 8 inch high insulated roof curb. l � air temperature < 55 or > 105 degree F. R-3.3 PART 1 GENERAL y P 9 ��`�`App P 9 1.1 SCOPE LVED �� L i TH THIS P�FM T TIGARD OR 97224 co C. Manufacturer: Greenheck GRS series hood and Model GPR roof curb. Acme, NOTE: Requirements apply to supply ducts, whether heated or mechanically 1.1 SCOPE A. Furnish and install accessories in ductwork as described in Contract Documents. Cook, Penn or approved equivalent. p cooled. Mechanically cooled ducts requiring insulation shall have a vapor U retarder, with a perm rating not greater than 0.5 an all i j p g g d joints sealed. A. Furnish and install metal ducts and related products as described in Contract 1.2 SUBMITTALS Documents. PART 3 - EXECUTION (1). With approved weatherproof barrier. A. Required for all products. ISSUE DATE' 6 April 2012 2 1.2 SUBMITTALS 3.1 INSTALLATION JOB NUMBER: 323 o PART 3 EXECUTION A. Duct Sealer PART 2 PRODUCTS A. Secure roof hood curb to structure. Secure roof hood to curb. See detail on 00 drawings. 3.1 DUCT INSTALLATION 2.1 ACCESSORIES ai PART 2 PRODUCTS CN A. Install in accordance with manufacturer's recommendation. External insulation A. Turning Vanes END OF SECTION o with joints and seams lapped 3 minimum and stapled 3 on center; wired where 2.1 ABOVE GROUND METAL DUCTS N required. Benjamin Foster 85-20 adhesive utilized as r o q � squired. Lap insulation a 1. General: Provide turning vanes in rectangular miter elbows. Vanes minimum of 6 and seal vapor barrier jacket _ ac t to duct surface where insulation' �. p j a ere suction A. Ducts, plenum chambers and casings of zinc coated, lock forming quality steel factory or job fabricated. Use factory fabricated vane spacing rails for SECTION 23 4100 PARTICULATE FILTRATION it o types meet. sheets meeting requirements of ASTM A653 with G 60 coating. maximum spacing of 2 on center. 2. Vane spacing rails to be minimum 24 gauge for ducts operating under 2" 6 B. Install mat finish surface on air stream side. Secure insulation to cleaned sheet B. Standards: All ductwork shall conform to latest ASHRAE, SMACNA, NFPA S.P. with single wall vanes. PART 1 GENERAL metal duct with continuous 100 percent coat of adhesive and with 3 4 inch Ion 90 A, and UL requirements. 3. Vane spacing rail t minimum U; SPECIFICATIONS � / " 9 q p ing i s o be m mum 24 gauge for ducts operating at 2 mechanical fasteners 1 inches hes on center maximum and at no more than 2 from om S.P. or over with double wall vanes. 1.1 SCOPE 4 any cut or exposed edge. Pin all duct liner. C. Round Ductwork 4. Manufacturers: Tuttle & Baily "Ducturns", for ducts operating below 2" S.P., or approved equal. Airson "Acoustiturn" for ducts operating at 2" A. Provide and install filters and related items as described in Contract Documents. 0 1. Adhesive to be water based, Duro-Dyne WSA, Hardcast 1A-901, United 1. Up to 14 in diameter - Snap-Lock longitudinal seam type. S.P. or over, or approved equal. C) McGill Uni-tack or approved equivalent. 1.2 SUBMITTALS 2. Mechanical fastener to be Duro-Dyne with NC-1 nylon stop clips or D. Duct Hangers and Supports: All duct hangers and spacing for low pressure, B Flexible Connections ,n approved equivalent. Glue-on type not allowed. round and rectangular ductwork shall conform to latest SMACNA Standards A. Required for all products. co C) unless otherwise indicated. 1. General: Flexible connections shall be installed on inlet and outlet duct CN C. Accurate) cut liner n r Accurately and thoroughly coat ends with adhesive. Butt joints tightly. connections of fans and ventilating units and at building expansion joints, Top and bottom sections of insulation shall overlap sides. If liner is all one E. Supplementary Steel: Provide all necessary supplementary steel for support or approximately where indicated. Fabric shall be of weight and strength of PART 2 PRODUCTS opiece, folded corners shall be tight against metal. Ends shall butt tightly attachment of equipment and duct supports in shafts and between building service required, properly fitted to render airtight. Fabric of sufficientan cv together. MS0103 structural members. width to provide minimum space of 4 between connected items. 2.1 FILTERS 2. Centrifugal Fans: DUCT FITTING SYMBOLS HVAC SYMBOLS DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE ---- ------ OUTS 1 D E AIR V E N T I LAT I O NREQUIREMENT5SA SOUND ATTN. SHEET METAL SINGLE LINE ` �D ------------- NET VENTILATION REQ VENTILATION --- ERIC - SA SOUND ATTN. SHEET META DO = R=D LESS THAN 15° ----------- L (DOUBLE LINE) ROOM AREA AREA OCCUPANCY * PEOPLE OSA RATE AREA OSA RATE TOTAL PROVIDED SYSTEM LANCIAULT 5 PIECE ELBOW BARE OR INSULATED METAL DUCT (SINGLE LINE) 102 BUSINESS OFFICE 204 FT2 204 FT2 5 OCC/1000 FT2 = 1.02 5 CFM/OCC = 6.38 CFM 0.06 CFM/FT2 = 15.3 CFM 21.68 CFM 45 CFM EXIST RTU-1 15°-30° 106 DOCTORS 164 FT2 164 FT2 5 OCC/1000 FT2 = 0.82 5 CFM/OCC = 5.13 CFM 0.06 CFM/FT2 = 12.3 CFM 17.43 CFM 23 CFM EXIST RTU-1 ARCHITECT W _ _ _ BARE OR INSULATED METAL DUCT (DOUBLE LINE) 101 RECEPTION 223 FT2 223 FT2 30 OCC/1000 FT2 = 6.69 5 CFM/OCC = 41.81 CFM 0.06 CFM/FT2 - 16.73 CFM 58.54 CFM 49 CFM EXIST RTU-1 3016 nw gravenstein street ?R=W 103 AISLE 177 FT2 177 FT2 - OCC/1000 FT2 = - - CFM/OCC = - CFM 0.06 CFM/FT2 = 13.28 CFM 13.28 CFM 8 CFM EXIST RTU-1 camas,washington 98607 RADIUS FLEX DUCT (SINGLE LINE) 108 AISLE 173 FT2 173 FT2 - OCC/1000 FT2 = - - CFM/OCC = - CFM 0.06 CFM/FT2 = 12.98 CFM 12.98 CFM 8 CFM EXIST RTU-1 V. 360.798.3801 ELBOW f. 360.833.0585 ROUND DUCT: UP OR DOWN 105 CONSULT 73 FT2 73 FT2 5 OCC/1000 FT2 = 0.37 5 CFM/OCC = 2.28 CFM 0.06 CFM/FT2 = 5.48 CFM 7.76 CFM 5 CFM EXIST RTU-1 OVER 30° B 109 LAB 69 FT2 69 FT2 5 OCC/1000 FT2 = 0.35 5 CFM/OCC = 2.16 CFM 0.06 CFM/FT2 = 5.18 CFM 7.33 CFM 5 CFM EXIST RTU-1 RADIUS ELBOW s- B BUTTERFLY DAMPER 107 MANAGER 111 FT2 111 FT2 5 OCC/1000 FT2 = 0.56 5 CFM/OCC = 3.47 CFM 0.06 CFM/FT2 = 8.33 CFM 11.79 CFM 7 CFM EXIST RTU-1 RADIUS 111 MECHANICAL 75 FT2 75 FT2 2 OCC/1000 FT2 = 0.15 5 CFM/OCC = 0.94 CFM 0.06 CFM/FT2 = 5.63 CFM 6.56 CFM 5 CFM EXIST RTU-1 ( ) T T THERMOSTAT: WALL MOUNTED 110 MEN 63 FT2 63 FT2 - OCC/1000 FT2 = - - CFM/OCC = - CFM - CFM/FT2 = - CFM - CFM 3 CFM EXIST RTU-1 TURNING ELBOW RND S S SENSOR H��VANES OVER 30° 115 STORAGE 53 FT2 53 FT2 2 OCC/1000 FT2 = 0.11 5 CFM/OCC = 0.66 CFM 0.06 CFM/FT2 = 3.98 CFM 4.64 CFM 3 CFM EXIST RTU-1 ELEVATION ELEVATION [ RA RETURN AIR: UP OR DOWN 104 WOMEN 57 FT2 57 FT2 - OCC/1000 FT2 = - - CFM/OCC = - CFM - CFM/FT2 = - CFM - CFM 3 CFM EXIST RTU-1 10.05 OCCUPANT DIVERSITY = 0.99 AIR DISTRIBUTION EFF. = 0.8 16 FM [ MITER ELBOW ® [ OSA OUTSIDE AIR: UP OR DOWN 2 C 164 CFM EXIST RTU--1 f- SA SUPPLY AIR: UP OR DOWN 127 AISLE 85 FT2 85 FT2 - OCC/1000 FT2 = - - CFM/OCC - - CFM 0.06 CFM/FT2 - 6.38 CFM 6.38 CFM 24 CFM EXIST RTU--2 110 �-- AIR VOLUME CFM FROM ABOVE FROM ABOVE 126 OPERATORY 1 111 FT2 111 FT2 20 OCC/1000 FT2 = 2.22 15 CFM/OCC - 41.63 CFM CFM/FT2 -- - CFM 41.63 CFM 64 CFM EXIST RTU-2 -�- 8x8 E--- DIFFUSER NECK SIZE �• OFFSETS 125 OPERATORY 2 113 FT2 113 FT2 20 OCC/1000 FT2 = 2.26 15 CFM/OCC = 42.38 CFM - CFM FT2 = - CFM 42.38 CFM 78 CFM EXIST RTU-2 6 B 4W BLOW DIRECTIONS / Lar L. Grimes ,. B - = - _ -- _ - I 11 6 � RB REBALANCE EXISTING DIFFUSER TO THIS CFM 8 AISLE 166 FT2 166 FT2 OCC/1000 FT2 CFM/OCC CFM 0.06 CFM/FT2 12.45 CFM 12.45 CFM 24 CFM EXIST RTU-2 SUPPLY SUPPLY & ° (30)-~ RELIEF AIR CFM THRU UNDERCUT OF DOOR 124 OPERATORY 3 108 FT2 108 FT2 20 OCC 1000 FT2 = 2.16 15 CFM OCC = 40.5 CFM - CFM FT2 = - CFM 40.5 CFM 38 CFM EXIST RTU-2 En Ineer 15 MAX / / / PA g RETURN AND FLOW DIRECTION 123 OPERATORY 4 108 FT2 108 FT2 20 OCC/1000 FT2 = 2.16 15 CFM/OCC = 40.5 CFM - CFM/FT2 = - CFM 40.5 CFM 38 CFM EXIST RTU-2 7510 N.E.VANCOUVER MALL DR suITE goo CEF--1 CEILING EXHAUST FAN N0. 1 vaNcouvER,wA.ssss2 (360)254-9234 122 OPERATORY 5 109 FT2 109 FT2 20 OCC/1000 FT2 = 2.18 15 CFM/OCC = 40.88 CFM - CFM/FT2 = - CFM 40.88 CFM 38 CFM EXIST RTU-2 E-MAIL PARALWOMCAST.NET 12" 15MAX 30° » EF-1 EXHAUST FAN NO. 1 _ _ _ B � 121 OPERATORY 6 110 FT2 110 FT2 20 OCC/1000 FT2 - 2.2 15 CFM/OCC - 41.25 CFM CFM/FT2 - CFM 41.25 CFM 39 CFM EXIST RTU-2 U N - R RTU-1 ROOF TOP UNIT N0. 1 _ _ RETURN E 120 OPERATORY 7 109 FT2 109 FT2 20 OCC/1000 FT2 2.18 15 CFM/OCC - 40.88 CFM - CFM/FT2 - - CFM 40.88 CFM 38 CFM EXIST RTU-2 RECTANGULAR TAP ° _ _ _ » C CONNECT TO EXISTING -- - - - -- 117 OPERATORY 8 109 FT2 109 FT2 20 OCC 1000 FT2 2.18 15 FM 0 C 40.88 CFM CFM FT FM 40. M F T RTU-2 C C 2 C 88 CF 38 CFM EXIS R U 2 15 MAX � � � �� / / / TRANSITION C1 REMOVE TEMPORARY _ _ - _ _ _ CAP & CONNECT 116 OPERATORY 9 1 F 1 FT 0 53 T2 53 2 20 OCC 1000 FT2 3.06 15 FM OCC 57.38 CFM CF FT2 "B" IF TO DIFFUSER / C / M/ CFM 57.38 CFM 54 CFM EXIST RTU-2 E EXISTING TO REMAIN 112 PANO CEPH 33 FT2 33 FT2 20 OCC/1000 FT2 = .66 1 CFM/OCC = 1 F - F - - - 0 5 2 38 CFM C M FT CFM 12.38 CFM 1 CFM EXIST RT OR GRILLE / 2 -- 2 E RTU-2 W1 K CAP EXISTING 114 STAFF LOUNGE 125 FT2 125 FT2 5 OCC 1000 FT = .13 5 CFM OC = 19.53 CFM 0.06 CFM FT = - ,,, + r �W1 2 / 2 3 / C / 2 9.38 CFM 28.91 CFM 26 CFM EXIST RTU-2 K1 TEMPORARILY _ _ _ ,, LY CAP EXISTING _ _ _ _ �► 119 STERILIZATION 142 FT 142 FT2 5 OCC 1000 FT2 0.71 5 CFM OCC 4.44 CFM 0.06 CFM FT2 10. 5 CFM 15.09 CFM 3 CFM XI RT U-2 W2 B-� TURNING B R RELOCATE EXISTING / / - / 6 0 F EXIST R U 2 W1 VANES W2y VANES SUPPLY & 25.1 OCCUPANT DIVERSITY = 1.00 AIR DISTRIBUTION EFF. = 0.8 461.4 CFM 541 CFM EXIST RTU-2 SUPPLY & RETURN ----oe_e___--i X REMOVE EXISTING W2 RETURN * PER ASHRAE 62.1-2010 TABLE 6-1 AND 2010 OMSC TABLE 403.3 W2 MITER ELBOW BRANCH MITER TEE RECTANGULAR PR�FFss EXHAUST fAN 5CHEDULE NES 7820 ' 9 DESIG CFM STATIC WATTS BROAN WEIGHT REMARKS DUCT CONSTRUCTION DETAIL PRESS OR MODEL N0. LBS TRANSVERSE REINFORCING 1 N W.G. HP OREGON b 01 9 AT JOINTS EF-1 125 0.5" 100 L150L 23 OPERATES CONTINUOUSLY '9iQ co MINIMUM R REINFORCING ��� JH CEF-1 75 0.25"DIMENSION87 L100 1 2 23 CONTROLLED FROM HALLWAY LIGHTS - SEE ELECTRICAL DRAWINGS EXP JUNE 30, 20131 SHEET DRIVE ANGLE SIZE I 1 2 - OF METAL SLIP H CEF--2 105 0.25 100 L150 23 CONTROLLED FROM HI LIMIT THERMOSTAT LONGEST GAGE AND MAXIMUM MIN. ALL SIDE,S FOUR IN.LONGITUDINAL H. _ CEF-3 105 0.25" 100 L150 1 2 23 CONTROLLED FROM HALLWAY LIGHTS - SEE ELECTRICAL DRAWINGS INCHE ( SPACING REIN SIDES BETWEEN PLAIN HEMMED ALTER,NT FORCED CEF-4 75 0.25" 87 L100 1 2 23 CONTROLLED FROM HALLWAY LIGHTS - SEE ELECTRICAL DRAWINGS TRANSVERSE S SLIP S SLIP BAR SLIP BAR SLIP JOINTS &/OR RECOM- RECOM- RECOM- RECOM- CEF-5 75 0.25" 87 L100 1 2 23 CONTROLLED FROM HALLWAY LIGHTS - SEE ELECTRICAL DRAWINGS INTERMEDIATE MENDED MENDED MENDED MENDED REINFORCING GAGE GAGE GAGE GAGE CEF-6 105 0.25 100 L150" 1 2 23 CONTROLLED FROM HALLWAY LIGHTS - SEE ELECTRICAL DRAWINGS 00 0 UP THRU 12 26 NONE REQUIRED 1 26 26 24 24 0 PROVIDE WITH A BACKDRAFT DAMPER 13 - 18 24 NONE REQUIRED 1 24 24 24 24 O2 PROVIDE WITH ELECTRONIC SPEED CONTROLLER 19 - 30 24 1X1 X1/8 @ 60 IN 1 - 1 24 1 24 24 31 - 45 22 11yX1"X1 8" @ 60 IN 1 - - 22 22 (1) TRANSVERSE REINFORCING SIZE IS DETERMINED BY DIMENSION OF SIDE TO WHICH ANGLE IS APPLIED. SMACNA RECOMMENDED HANGER SIZES REVISIONS DATE TABLE 5-2 FOR ROUND DUCT DUCT STRAP MAXIMUM STRAP HANGER DIAMETER HANGER SPACING U N I S TR U T "7!/��,," HOOD BEAM CLAMP BEAM, JOIST OR CHANNEL HANGER LOAD RATED BACKDRAFT DAMPER INTER®ENTP 7965 STRAP FASTENERSDO NOT PROVIDE 1101 SE Tech Center Drive WITH PREFERRED FASTENERS ( DO FOR COMBUSTION Suite 195 UP thru 26" ONE 1"x22 9v. 10 f t. T '� SET SCREW � � STRAP ) ATTACHMENT AIR OPENINGS Vancouver,WA 98683 _ r - 27" thru 36" ONE 1"x18 ga. 10 f t. • DOUBLE WASHER HVAC CONTRACTOR ' ---- ------------------- ---------------------------- ----- HANGER '�- WASHER--�.. ------------------- ----- NUT --- TO PROVIDE PRE-FAB !� STRAPS ROOF CURB P1000 UNISTRUT 37 thru 50 ONE 1x16 a. 10 f t. � g i ' \\ / ROOF LEVELING CURB, __- ------------------- - ------ BOTTOM „ „ _- __- CHORD � � LINE SEE ARCHITECTURAL AohEmNTLE tj 51 thru 60 TWO 1x18 a. 10 f t. � PLANS 9 LOAD RATED FASTENER OF »MAXIMUM 12 - ASH R / JOIST SPACING SQUARE DUCT _ _` DENTAL W E � TO UNIT X �.\ ``�� /fvv;: 1.X ),/`` h 61" thru 84" " "`� TWO 1x16 a. 10 f t. t g DOUBLE NUT & WASHER 3" SLING TO ROOF DECK DENTAL OFFICE LOAD RATED FASTENER 'L t DOUBLE - - AVOID NOTE: SECURE PREFABRICATED ROOF R T HANGER STRAP U ED 0 CUB 0 LEVELING CURB NOTES. WASHER » 'TENANT NUT & BAND OF SAME SIZE DISRUPTION OF WITH Y SHEET METAL SCREWS AT 12 O.C. SECURE 2 SEE ALLOWABLE STRAP AND ROD LOADS IN TABLE NOTE: HANGERSTR41?-J' WASHER SCREWS MIN AS HANGER STRAP INSULATION » S R HOOD TO PREFABRICATED CURB WITH Y2 SHEET METAL _ _ IMPROVEMENTS 5 1 PAGE 5 8 OF SMACNA STANDARDS. CAN SUPPORT UNISTRUT BETWEEN BOTTOM ANGLES WITH ALL THREAD SCREWS _ 2 EACH SIDE ROD WHERE SPACE IS AVAILABLE SQUARE DUCT LOWER ROUND DUCT LOWER EXTERNAL LOADS ARE NOT ACCOUNTED FOR. BAR JOIST 9 PP B 7 6 5 UPPER ATTACHMENT PARALLEL STRUCTURE HANGER STRAP HANGER ATTACHMENT HANGER ATTACHMENT ROOF CAP DETAIL TIGARD TowNE SQUARE SEE TABLE 2-2 FOR DUCT GAGE SCHEDULE PAGE MO.01 NO SCALE MO.O1 NO SCALE M0.01 NO SCALE M0.01 NO SCALE MO.0 NO SCALE SHOPPING CENTER 2-22 OF SMACNA STANDARDS. REFERFaNCE ONLY 16200 SOUTHWEST V 5 SEE APPENDIX FOR DUCT METAL WEIGHT. NOT APPROVED WITH THIS PE [T PACIFIC HIGHWAY 0- 1" LONG MTL FLEXIBLE DUCTMAX ( SUITE S a LEADING EDGE SECURE TO STRUCTURE 10'-0" LENGTH) 0 U �-- END ROUND OR FLAT "UNITED McGILL" TIGARD, OR 97224 NOTE: SIMILAR AT GYP BOARD CEILING EXCEPT DAMPER ROD OVAL DUCT EITHER UNITED McGILL it c� BEARING SR * TLR REDUCING A HANGER STRAP EXTENDS DOWN TO CONCEALED REGULATOR BOX, YOUNG MODEL SIDE AS SHOWN SR TXL ( ) SUPPLY LOLOSS TEE 2 SA METAL 315 ONLY LOLOSS 90 R S EXISTING C 0 S 0 OR7 FLEXIBLE DUCT U) RETURN , CURB FULL SECURE TO STRUCTURE ----may (MAX( 10 0 LENGTH SEAL OPENING ALL AROUND i, RADIUS ) END FLAT OVAL DUCT ISSUE DATE: 6 April 2012 r T DUCT BEND BEARING r'� SIZES AS SHOWN JOB NUMBER: 323 HANGER STRAP --� » r FLEXIBLE CONNECTION - x- 0 � REQUIRED `�. Q Q TO DUCT FLANGE 00 B FULL R00 L COUPLING F o DISTANCE BETWEEN TAKE- PULL+n - PULL INNER LINER OF FLEXIBLE DUCT TIGHT AND SECURE WITH PANDUIT BEND OFFS TO BE 8 DUCT DIA. NOTE: `y STRAP REQUIRED ° WHERE POSSIBLE OTHER ACCEPTABLE MITERED 90 N k X 2" COLLAR -� B FITTING & TYPES » 12" MINIMUM ELBOW WITH ROUND DUCT SIZES "UNITED UNITED McGILL 1 SA METAL NOTE: PANDUIT STRAP PULL VANES SHEET METAL CAN OF METAL AS SHOWN -"0 SR * TXLR INNER AND OUTER LINES ( ) E IF DROP TERMINATES IN ROUND ' ' SCHEDULES REDUCING LOLOSS O TIGHT UNDER STRAP AND 12 MIN. EXTENSION E ELBOW TO HORIZONTAL, DUCT �' EN ELBOW TO BE 1" SA METAL. 12 MIN SECURE GRILLE TO CEILING TIGHTEN SECURELY. Y-BRANCH BEFORE FLEX DUCT 90 CROSSAND DETAILS i. 4 � SYSTEM CONNECTION a -- INSULATION SECURE DIFFUSER TO CEILING C) SYSTEM LOW VELOCITY FLEX DUCT ROOF MOUNTED UNIT TO TYPICAL LOW VELOCITY DUCT r4M O DUCTWORK CONNECTION 3 TOP CONNECTION AT GRI LLE 2 DI FFU SER INSTALLATION ri CONSTRUCTION DETAILS MO-01 NO SCALE M0.01 N 0 SCALE M0.01 NO SCALE M0.01 SCALE: NONE N i ERIC LANCIAULT ARCHITECT 3016 nw gravenstein street camas,washington 98607 v. 360.798.3801 f. 360.833.0585 /y OU I ET Vii, OPf�- ATOR, 00 `\ 4W \ arry L. Grimes FFFEn sneer 7510 N.E.VANCOUVER MALL DR SUITE 100 \ ; VANCOUVER,WA.98662 {360}254-9234 0 1 25 ! 7 0 UP TO E-MAIL PARALGOCOMCAST.NET V 6x6 RO F CAP' \ ,. - \� 8x8 ' 9x9 \ / B fix M 4W OPEoRY a%y ---�— i / 140 -- \ 9 \,��. \ ,� ;r \ STORAGE 1 �'', �` 1 43 4W �\ i" \'' ; ''` �, v\ 16 115 5"0 PANG W O 35 }_ ,� 6X6 7820 B 6 6 7 4W O f\ 112 — 9 0 UP T \ " \ /' ` `2 REGON B /\x,,''/ /� ; /`\ \ ��\ I ROOF CA �G �� \/ RAT ' CES Rco Y B 90 s�\ D '- L `� N 4 -6x6— 6 i DCP JUNE 30 2013 6x6 � , / v`v ATT1 TES T 1 IN // 4W DOWN TO 1'-0� CEDING 140\ `; �� - I ' / \` ABOVE DA-1, V� 8ACE 9x9 - -- ------- - I-- \ ' f9 u 0 fi 60 -�, 110 v � r B � 6 \ r I s i OPAtORY 6x6 \ UP TO i /; i; , 255 R 12 1x 2 Fti CAOOF` \ * j ` /\,\ 18x18,/` ATOS' 121 CtEti ' / —f - {- - ---- -------- --- i I 110 14 12 9x9 _ jA n 6 I ' �x6 4No W 6�� 9 REVISIONS DATE j ' , \ / �\ 9x9 f _- ( r 6 ERATY 3 �; / / I I -- --- �` \ T ` \ 4 6��� TO 1 --- --- ---- --- ------` - - ! i E6 B�`� B \� s ;� 18x18 l '� i �`, \ 0 CAP 8 // SOF TOP 11th \\ ' - - - - UP 6 6 ATf E ATED {,RTU-2) / _ \.\ :� i ,C , ECT TO - 4 STI \ ; ` i - ,'' _ � 63'0 -' --- r - , - 1010 o INTERDENT ;'290 y i fl i i \ti, / OPEf�A ORy ---- ----� --� - ---;-------- 1101 SE Tech Center Drive v v 9x9 yv �; '\ 'too, 6x6 B B Suite 195 v '' \ ,/ (t1019`IEN — -4W— ---- -- -- L 1 — i Vancouver,WA 98683 / I 95 N L— — — — —1 MAMA ER /. 6x6 i 3 4 ERAS O 2 — - I — — — —— ' ATTT ATED UP-" \ -- - -- -� — \ , BEXISTIN(. TON ,C' CT�TO 6x6 ! RE�OF' T UNIT RTI _2\ 0 '' = - - - 6x6 I — /` f ----- 6B� i (!'BTU 1) B 14 0 6 L �- 0 / ; (; ENTLE d xfi - -- 1 % 4W B i I ! ' ; »�f 16"0 ! Lit TP4 L, B 100 r� 5LE ' �' -' ! ' 18X18 ''�- A � � � I --- - --- � ----- �---� - `\ ,-�: �, f,, s�� 1 xs r-- DENTAL OFFICE G 4W REFERENCE ONLY NO TENANT 10, APPROVED WITH THIS PES \ IMPROVEMENTS 0 0 o i ; - 10x10 1 I DOG OR"S ----- -- 1 \ I ONOTE 12 a —LMT THERMOS — , 235 - ---- --- - - . _ , _ - - i 9x9 1. HI TAT FOR QEF 2 TIGARD TOWNE SQUARE \ ` \ - I-- ':. OPERATION. ET AT 7 0 - T S 707 SHOPPING CENTER 1x14 2. CONNECT TO TOP OF IT CABINET, 140 _-- - -'- 16� VERIFY SIZE. 16209 SOUTHWEST - - t F - 01 FOR NEW MINIUM \ \ ' - 3. SEE SHEET M0. PACIFIC HIGHWAY (A \ v ------- ------- `v `v 10 B R� ION 12*0 ---- -- OUTSIDE AIR SETTING e ; 4 L SUITE S r . FELD VERIFY LOCATION OF UNIT — -- — - 300 j 5 -- '`' 12 1 __- WHERE LOCATION DIFFERS FROM THAT T 1 GAR D, O R 97224 12x12 j � � � -- -�---_ _ _ @ O ; » a 15 15 28p `�g y j INDICATED, NOTIFY ARCHITECT PRIOR o — 4W- - -_ - --- --- -- -! W - 9x9 ' TO COMMENCING WORK. \\\\\\ TYP 2 �1+ - -- __ ___ ___ 5. VERIFY NEW ROOF CAP IS A MINIMUM \ `\ I I I V00 , 1 ( -! 4W--I r L f s 14x 4 0 i I I t OF 109—W AWAY FROM ANY OUTSIDE ISSUE DATE: 6 April 2012 i INTAKE ON EXISTING ROOF TOP UNITS. JOB NUMBER: 323 , a Q i !! i N ' r O ! , , d' LO tu 'N T1 HuAC TI MVAC FLOOR PLAN FLOOR PLAN 0 2.0 N LO coti O N r M N196 b C .- E Km" I v _ r x �r'C ' '`• __ _-_ PLUMBING LEC ND ARCHITECT . 116/ 1"A10 3016 nw gravenstein street EXISTING WALL CONSTRUCTION camas,washington 98607 I � , .� � �.,..._ v. 360.798.3801 p / � EXISTING STRUCTURE f. 360.833.0585 ,% / j rz-.•.W. G- -- m - NEW WALL CONSTRUCTION I / v J f S_l..-___ i__ .__. __._ _... A - DENTAL AIR, COORDINATE LOCATIONS W/DENTAL EQUIPMENT SUPPLIER - / V DENTAL VACUUM, COORDINATE LOCATIONS W/DENTAL f \` � y ti\\ %- -- \ EQUIPMENT SUPPLIER, SLOPE MINIMUM OF J" PER 10'-0" 10 'Y / �` TOWARD DV-1 r�-C T_ V - BELOW SLAB DENTAL VACUUM LINE, COORDINATE 11114 SIZE 4 ROUTE W/DENTAL EQUIP. VENDOR; USE 45 _. 113✓`--..fi�-r,--',------2��"a-- ---�\;' -. ---1'1- _-- s_�I r _ DEGREE ANGLE CSONNECTIONS WHEREVER P OSSIBL E117 TO ENSURE PROPER VACUUM FLOW; PIPING TO BE PVC UNLESS OTHERWISE REQUIRED X ------ A------ - 1/2" OVERHEAD COPPER DENTAL AIR LINE, COORDINATE ROUTE W/DENTAL EQUIPMENT SUPPLIER 10 NOTE' SEE P .01 FOR PLUMBING SCHEDULEFIIA CSPECIFICATIONS 1125-1 x PLUMBINGNOtE 11V------ r=-"Y --------2 ERIC THOMAS LANCIAU�LT_ _EF - 2� 11A COLD WATER REDUCED PRESSURE DEVICES, SEE 1/P1.010 1 20 \/\ '/.v -- -__-- -�- ,I 1,-�N o °� O2 TES T AT TIME OF INSTALLATION SUBMIT TEST REPORTS -------J DA-1 TO AHJ PRIOR TO FINAL APPROVAL 1 EIRI IZ/a ICl` DENTAL VACUUM ASSEMBLY, DV-1, FVIC, SEE B/A9.01, C) AMA S, WA EW -1 W/1i2 WASTE DIRECT CONNECTION TO WASTE LINE SEE � 4942 B/A9.01. 3" EXHAUST LINE TO EXTERIOR; ,112" CW FOR CLEANSHIELD WATER SOLENOID WITH SHUT-OFF VALVE OF E-- L= � W/�112" FNPT END FITTING; AMALGAM SEPARATOR, SEE Ili / / 10/A"�,, / '.V'/ !/'�/'4`'p�•;<//`'\`�/\``\\\\�`, � C ,f // \ / \,.__---/-`� �_,-i\iaQ` /` ,r 4 \ \✓;'Q'�"---_ i a �w_e_______. EXPIRES: 06.30.20 12ELECTRIC DATER HEATER, SEE 5/P1.01_2\ ___-- SIGNED: 04.06.12 DENTAL AIR COMPRESSOR, DA-1, FVIC, SEE A/A9.01 ANDOPiORA0.05, W/ 2 AIR INTAKE FROM EXTERIOR DOWN TO UNIT121 O . PROTECT ROOFTOP AIR INTAKE FROM RAIN, INSECTS 11110ANIMALS; PROPERLY FLASH PENETRATION HS-1 CW SHUT-OFF � 44" AFF W/ REDUCED PRESSURE DEVICE I'II I,,'•�;\-/%`.I../`'--<�/`\\__p.i',,.\�,_-�i_�_�\\,- ,1 z-frIy _ p.f✓s x�,i "-Y A.= -...._..>..„ . ----P-�D..._.._...._:.._.,....7 .-n. _s�J L- 1.-_..-.....-�.p.- .I i D D_ D •. .. OO1102 FOR T R IM ME R, S EE H / A 9.01. TRIMMER M MER FV I V WT-1, SEE 10 ` , ? DENTAL AIR ll/ 90° COMPRESSION STOP S E TOABOVE COUNTER FOR NAND PIECE CLEANER V E'c R� I6 F Y ` F> LOCATION W/ TENANT PRIOR TO ROUGH-IN SEE124 109 1 4 N /A9.01, HAND PIECE CLEAN F vIv 1Y EMERGENCY EYEWASH 10$ POINT OF USE WATER COOLER, FVIV W1114 Y POLYPROPYLENE FILTERED WATER LINE, FVIV 123-4i C — < 1A OFFSET PLUMBING BELOW HANDSINK FOR MAXIMUM CLEARANCE TO ADJACENT BELOW COUNTER REFUSE gio CONTAINER 11 t� t EV IS10 N S DATE T 71 E. 107 12 FLOOR MOUNTED UTILITY CENTER, SEE K/A9.01125\ DENTAL AIR VALVE STOP ON STUB SET � 61ABOVE COUNTER, VERIFY LOCATION W/ TENANT PRIOR TO ROUGH-IN, SEE I/A9.01 INTERDENTVACUUM LINE CLEANOUT IN WALL 1101 SE Tech Center Drive Suite 195 15 VACUUM NOTE) Vancouver, WA 98683T03 REFER ANUFACTURER'S PRE-INSTALLATION GUIDE PROVIDED BY EQUIPMENT F =fATC= FOR SPECIFIC SIZING OF STUBUP, TRUNK AND Yr.126 IA RANCH LINES. r O B TERMINATE TRUNK LINE IN MECHANICAL ROOM W/�-- . -UP 3" AFF. CONTRACTOR TO PROVIDE106 VERTICAL STUB GENTLE 12 FPT ADAPTED ON END OF STUB-UP. SIZE OF ADAPTER TO BE DETERMINED BY TRUNK AND PUMPINTAKEDENTAL PIPE SIZES. R `EPTICN 0 C. BRANCH LINES ARE TO BE "SWEEPING" 90 DEGREE DENTAL OFFICE TURNS TO AVOID VACUUM LOSS. A Y FITTING SHALL101 �U �5BE USED TO BRANCH TWO LINES TOGETHER. TENANT 102 IMPROVEMENT P TIGARD TOWNE SQUARE pSHOPPING CENTER 16200 SOUTHWEST PACIFIC HIGHWAY SUITE S TIGARD OR 97224�1 /�1CL ��� $ } I> N© APPROVED Ir �rT I� PERMIT ISSUE DATE: 6 April 2012 "rCUT 1 4 12 JOB NUMBER:LUMBIN6 I I XTURE N 1/4 1 CFPOI-dwq 0 PLUMBING Uj FIXTURE LAYOUT 1/411 = 11_011 LLI PLUMBING EQUIPMENT SCHEDULE AND SPECIFICATIONS WATER CALCULATIONS TENANT TOTAL WATER E R I Ca CONNECTION DESIG. DESCRIPTION F X RE FITTINGS REMARKS 1. ASSUMED PRESSURE IN SPACE COLD WATER SUPPLY FIXTU RE UNITS LANCIAULT CW HW V W ID G I TU NO. FIXTURE WSFU SPACE FIXTURE AP-1 ACCESS PANEL -- -- -- -- -- METAL WITH SCREW DRIVER LATCH, EMDORF, J.R. SMITH 12x12 SIZE AT TRAP PRIMER, PRIME COATED 45 PSI CW CW HW ARCHITECT ET-1 EXPANSION TANK 3r4" -- -- -- -- AMTROL ST-12 2. PRESSURE LOSSES 27.63 PSI WSFU WSFU WSFU 1 EYE WASH 1.0 1.0 0.75 0.75 3016 nw gravenstein street EW-1 EYE WASH 'i2" 1i2" -- -- -- -- GUARDIAN G1848LH-1 WALL MOUNTED EYEWASH INSTALL SO EYE WASH STATIONS CLEARS FAUCET OF S-2 A. RPBA-1 WATTS 1Y4" 909 MQT 3 HAND SINK 2.0 6.0 4.5 4.5 camas,washington 98607 RHEPRESSURE DROP @20 GPM FLOW 9 PSI 1 KITCHEN SINK 1.5 1.5 1.13 1.13 v. 360.798.3801 EWH-1 ELECTRIC WATER HEATER 1" 1" -- __ __ 540 L 83VRS2-2, 50 GALLON, 4.5 KW OPERATING WEIGHT: DRAIN VALVE WITH WATTS N0.8A HOSE VACUUM BREAKER AND PTRV SET FOR 115•F DELIVERY TEMPERATURE SEE DETAIL 5 B. ELEVATION - 8 FT 3.63 PSI 1 JANITOR'S SINK 3.0 3.0 2.25 2.25 f. 360.833.0585 54o Bs 1.0 C. FIXTURE 15 PSI FD-1 FLOOR DRAIN -- -- 1'i2" 2" -- -- J.R. SMITH FIGURE 2005-A-8-U PRIME TRAP TOTAL LOSSES 27.63 PSI 2 LAVATORY 1.0 2.0 1.5 1.5 , 2 SINK 2.0 4.0 3.0 3.0 HS-1 HAND SINK (ADA) i2" i2" 1'i2" 11i2" __ ELKAY LRAD 1517-6Y2'DEEP 18 GAUGE STAINLESS STEEL. LKAD 35 FAUCET, DELTA 711 LS-HDF, SINGLE LEVER HANDLE. TAILPIECE, 3 TRAP PRIMER 0.5 1.0 1.0 STRAINER P-TRAP AND ARM Y4 TURN STOPS. SUPPLIES INDIRECT WASTE 3. PRESSURE AVAILABLE FOR FRICTION 17.37 PSI 1 TRIMMER OUTLET 1.0 1.0 1.0 IWR-1 RECEPTOR -- -- 1'r2" 2" -- -- JR SMITH 3101 Y-12 CAST IRON FLOOR SINK - 8Y2"SQ TOP NO GRATE PRIME TRAP 2 WATER CLOSET 2.5 5.0 5.0 -- SEDIMENT BUCKET -- i 4. MEASURED LENGTH 100 FT 1 "SOV 1.0 1.0 1.0 JS-1 JANITOR SINK �r2» i2" 1'r2" 3" -_ __ FIAT MODEL NO. TSB CR1100 28"X28"X12" OR MUSTY 2422 WITH FAUCET, CHICAGO NO. 897 WITH INTEGRAL, STOPS, CAULK SIDES ADJACENT TO WALLS WATER TIGHT. 25.5 21.13 13.13 DRAIN HOSE THREAD SPOUT AND VACUUM BREAKER 5. 130% OF MEASURED LENGTH ALLOWANCE FOR 130 FT KS-1 KITCHEN SINK 'r2» ir2„ lira" 11r2„ -- -- JUST SLX-2233-A-GR-10Y2'DEEP WITH J-35 STRAINER FAUCET: DELTA 711 LS-HDF WITH GOOSENECK. PROVIDE WITH TAILPIECE, INSTALLATION P-TRAP AND ARM, Y4 TURN STOPS AND SUPPLIES FAUCET: DELTA 523 WFHGMHDF. PROVIDE WITH TAILPIECE, P-TRAP AND PROVIDE MV-1 SEE DETAIL 3 6. PIPE SIZE PRESSURE DROP, PSI/100 FT. PLUMPING SYM PO L5 L-1 LAVATORY (ADA) �1 "2" ire" 11'4" 11r4" - -- KOHLER K-2202-4 19" ROUND ARM, Y4 TURN STOPS AND SUPPLIES 1.0 ITEM 3 17.37 , W WASTE �, > _ __ GUARDIAN G 3600 THERMOSTATIC MIXING VALVE WITH HIGH LIMIT Y4 TURN BALL STOPS AND SUPPLIES MOUNT BELOW COUNTER. SET FOR 85'F. HIGH LIMIT SET AT 99F X 100 = X 100 13.36 13.36PSI/100 Grimes MV-2 MIXING VALVE r2 r2 - -! ` STOP. ANSI 358.1-2009 ITEM 5 130 ® - ® - - V VENTlar L CW COLD WATER RP-1 RECIRCULATION PUMP -- i2" -- -- -- -- GRUNDFOS UP15-4287, 3 GPM 0 14 FT, Y25 HP, 115V-1 PHASE PROVIDE WITH STRAP-ON AQUASTAT AND PUMP MOUNTED CONTROLLER SET 113•F ON, 115•F OFF 7. USE 10 PSI/100 FT TO MAXIMUM VELOCITY OF 10 FPS -�-�- ' ' HW HOT WATER Engineer • • • HWR HOT WATER RETURN RPBA-1 REDUCED PRESSURE 11r" __ __ __ -- -- WATTS 1Y4" 909MIOT 9 PSI PRESSURE LOSS ® 19 GPM PROVIDE WITH BRONZE STRAINER AND 909AG-F AIR GAP SEE DETAIL 1 a.. 7510 N.E.VANCOUVER MALL DR SUIE 100 BACKFLOW ASSEMBLY 1.0 4 SYSTEM -" �� SOV SHUT OFF ALL VALVE VANCOUVER,WA 98662 (360)254-9234 RPBA-2 REDUCED PRESSURE 3r4„ -_ __ -- -- -- WATTS 3/4" 909MIQT 12 PSI PRESSURE LOSS (� 7.5 GPM PROVIDE WITH BRONZE STRAINER AND 909AG-F AIR GAP SEE DETAIL 1 P'� �I�"-� U UNION E-MAILPj PARALG�COMCAST.NET BACKFLOW ASSEMBLY 1.0SIZE O GPM WSFUPTRV PRESSURE/TEMPERATURE RELIEF VALVE RPBA-3 REDUCED PRESSURE 3r4" __ __ -- -- -- WATTS 3/4' 909MIOT 12 PSI PRESSURE LOSS @ 7.5 GPM PROVIDE WITH BRONZE STRAINER AND 909AG-F AIR GAP SEE DETAIL 1 �2" 3.4 4 VTR VENT THROUGH ROOF BACKFLOW ASSEMBLY 1'0 © CONNECT TO EXISTING S-i SINK 1,2" y2" 1112" i,2» ELKAY DLR 2522-10 10" DEEP, 18 GAUGE STAINLESS STEEL FAUCET: DELTA 711 LS-HDF WITH GOOSENECK. PROVIDE WITH TAILPIECE, 3/4„ 8 10 Cl REMOVE TEMPORARY CAP AND CONNECT WITH LK35 STRAINER P-TRAP AND ARM, Y4 TURN STOPS AND SUPPLIES 1" 17 22 > > > _ __ ELKAY MOD. LRAD 2522, 0'a' DEEP, 18 GAUGE TYPE 304 STAINLESS FAUCET DELTA 4380 SINGLE LEVER WITH HOSE SPRAY TAILPIECE 4 TO EXISTING li S-2 SINK r2 r2 1r2 2 - STEEL. LKD 35 STRAINER P-TRAP AND ARM, Y4 TURN STOPS AND SUPPLIES SEE DETAIL 10 11/4" 32 55E EXISTING TO REMAIN O TO-1 TRIMMER OUTLET 1/2" -- -- -- -- -- PROVIDE HOSE ADAPTOR OUTLET. MOUNT OUTLET AT 44" AFF. VERIFY @K CAP HOSE SIZEKI L, TEMPORARY CAP TP-1 TRAP PRIMER 'r2" COPPER TYPE-- -- -- -- -- PRECISION PLUMBING PRODUCTS MODEL P-1, P-2 IAPMO APPROVED. PRIMER DISTRIBUTION UNITS OR MANIFOLDS AS REQUIRED PER CODE. PROVIDE SOV SEE DETAIL O CHART A-4, AFF ABOVE FINISHED FLOOR SEAT OLSONITE NO. 95SS WHITE OPEN FRONT LESS LID FOR ELONGATED 10 PSI/100 FT, AND A-3 W WITH W-1 WATER CLOSET 2 ire» __ 2,. 3„ -_ -- AMERICAN STANDARD CADET N0. 2383.012, ELONGATED BOWL, SIPHON BOWL WITH SELF-SUSTAINING HINGE. PROVIDE LATEST EDITION OF UPC, AS / O JET. 1/4 TURN STOP AND SUPPLY. AMENDED BY THE STATE OF I 1.6 G.P.F. OREGON � WT-1 WASTE TRAP -- -- 1�i2" 1'i2" -- -- GLECO GT-64, ZURN Z1180-1Y2" WVTR I \>O PR PRE FORMED BOOT PROTECTION REQUIRED ON CW, HW AND W WHEN FRONT APPROACH IS USED (4 DFU) > PPR �• NE�,`I Q FLUSH LEVER TO BE LOCATED ON OPEN SIDE OF TANK }-IREADS`MOUNTED l Vcw / 7820 �' q 60"AFF _ T V ' 1"HW EI- .01 / GOREGO � CD Jf HWR. / � Y 13y 19 . 1�cw - / - 2"VTR RY L. G�� / (11 DFU) ECP JUNE 30, 2013 / . •/��, i .• • � CIW � � J / �.�► l \ fCW �/. 11101 /EWH -\ II ' '000,1 / / y7CW /� � 1Y4 Cw I TRAP .� CONVECTED TO VAC. 2"V 2 VTR DRAIN� Hw 1"CW 3 W DFU OUTLET co-1 IV 1 CW (32 DFU) l 3"WQ0=j lYCW Tp_ 4 BENND L-1c .000 / 4"W 1"HW i I 1 cw .- UII 00f .IQ��_ / -�I I•��U4'4„R�P-2 >_ I/ \ \ 3"W2 FD-1 REVISIONS DATE YVHW � cw47�_ OVER� /OVER O NOTE / 0000-0� /3 w � \�fo� 1. VERIFY LOCATION AND - (13 DFUNTERDENT)fHW � MOUNTING HEIGHT FROM � it C---� N ARCHTECTURAL / T\ 1101 SE Tech Center Drive • / \ Suite 195 • DRAWINGS • � �4 cw • I / I \ Vancouver,WA 98683 I _ \ WT-1 • � I I I QW w U �'4 HW °� RPBA-1 = 19.13 WSFU - I / % cw I - li�1 � .�=�-1 � N L Fm RPBA-2 - 1.00 WSFU _ 3�1N 1 _ RPBA-3 = 1.00 WSFU W = 34 DFUOrlin • = 13.13 WSFU l N V = 30 DFU - &jEmmTAL I - DENTAL OFFICE \ B WATER RISER DIAGRAM VENT & WASTE RISER DIAGRAM BEHIND TENANT � P1.01 NO SCALE P1.01 NO SCALE . J IMPROVEMENTS [Hsi RECIRCULATION PUMP T 1 GARD TOW N E SQUARE UNION UNION ,�COLD WATER AQUA SHOPPING CENTER CK VALVE SOV STAT SUPPLY 10200 SOUTHWEST SOV -� I RECIRCULATION 1057 TO CW TO 6" DIRT LEG PACIFIC HIGHWAY a. I t PUMP CONTROL FIXTURE FIXTURE REFERENCE ONLY SUITE S 4____ ______. _______ NOT APPROVED WITH THIS PERMIT HOT WATER TIGARD, OR 97224 0 RETURN MV-1 I �� - ----- ------� ► SCREW DRIVER 2 HOT WATER COLD WATER SUPPLY SET 105°F I I s I STOP VALVE a TO FIXTURES I I o I I FLEX-CONNECTOR VENT IN WALL UNION v _ CK VALVE U) UNION EXPANSION TANKET-1 I I j -�- I ISSUE DATE: 6 April 2012 ( ) I I I I JOB NUMBER: 323 UNION I I �\ I I STRAINER WITH DRAIN TO SYSTEM SPACEMAKER I I I ' TRAP PRIMER VALVE CW IN VALVE, CAP & CHAIN SEISMIC � TAIL PIECE & „ E I I ASME APPROVED T. & P. I I MIN. F 12 ABOVE FLOOR BR ACING P TRAP �i 1 I T 1 RELIEF VALVE, DISCHARGE I 1 I --------------- co � r I SEE SPECS DSIZEI I 77 ( ) FULL TO S-1 W 1 AIR � I L J I I ao / ® ® r I I I I rn GAP PRIMER DISTRIBUTION II I I �- STRUCTURAL WALL CLEANOUT I I ,� I I SYSTEM AS NECESSARY SOV I SOV MEN N STEEL OR (WCO-1) I ' I I ,� I Uj WOOD MV-1 I i �,'�VyV I I AIR GAP J0 ICT LES STAND SLOAN OPTIMA I I r I I RPBA-1: 3'-0"AFFSV C) WITH R-10 _ I I ,' I I.-ACCESS PANEL (AP-) „ REDUCED W ice' MIX 60A, SYMMONS ______________ RPBA-2: 4-6 AFF I, IV INSULATION WASTE IN WALL 4108, APOLLO TMV I I {IF REQUIRED) RPBA-3: 6'-O"AFF PRESSURE TO INDIRECT Im AND DETAILS BELOW FLOOR -� L___________________J BACKFLOW WASTE ti3 FLOOR LINE y NOTE: EXPOSED PREVENTER RECEIVER V M-9vq C) ,, VERTICAL WATER SUPPLY PRIMER LINES TO co BE RIDGED COPPER REDUCED BACKFLOW 3 2 PIPE 1 0 5 ELECTRIC WATER HEATER �- SINK CLEANOUT MIXING VALVE DETAIL TRAP PRIMER DETAIL PREVENTER DETAIL N ul P1.01 NO SCALE P1.01 NO SCALE P1.01 NO SCALE P1.01 NO SCALE P1.01 NO SCALE 0 N ERIC LANCIAULT ARCHITECT Q DEMOLITION NOTES: GENERAL NOTE: 3016 nw gravenstein street camas,washington 98607 — 1. REMOVE EXISTIN WATER CLOSET. REMOVE DO NOT DISTURB ADJACENT TENANTS v. 360.798.3801 I CLOSET TRAP AND RISER. 1 PLUMBING TO FIXTURES �l CONAuIQN WALL. t. 360.833.0585 O II CAP W BELOW FLOOR. REMOVE VENT TO 5 BELOW STRUCTURE AND TEMPORARILY CAP. 4 Q REMOVE CW TO TENANT SOV AND CAP O 0. 1Y2„CW �-- ;�_�r— . - �_ --w 1Y2„CW 4 W �--—� a L Ja 'w W 2• REMOVE LAVATORY, FAUCET, TRAP, TRAP _ — ARM SUPPORT, STOP AND SU L_J 2 POR S SUPPLIES. 3 , REMOVE CW TO TENENT SOV AND CAP. II REMOVE HW COMPLETELY. R II REMOVE WASTE II TO BELOW FLOOR AND CAP. REMOVE VENT II TO 2) V. 3. REMOVE JANITORS SINK, FAUCET, DRAIN AND TRAP. CAP WASTE BELOW FLOOR. REMOVE VENT TO %*VTR. TEMPORARILY CAP. 'arry L. 1. Grimes REMOVE CW & HW TO SOURCE AND CAP. Engineer 4. VERIFY WATER HEATER LOCATION. REMOVE CW TO REMOVE 144 CW. REMOVE HW TO 7510 N.E.VANCOUVER MALL DR SUITE 100 VANCOUVER,WA.98662 (360)254-9234 FIXTURES. REMOVE PTRV DISCHARGE. Pj E-MAI• P ARALG@COMCAST.NET 5. ASSUMED LOCATION OF TENANT SOV. CAP 3 PLUMBING DEMOLITION FLAN 2.0 3/16 _ f-0” D PRO s E\� IN G �0 A 7820 `� y t � QUIET QUIET 1 < OPERATORY 9 OPERATORY 9 REGON '' via , ria v� 9 co r - cw c � RY 1Ni L. O C o O � 4 wp E 1Y CW �� i 0 EXP JUNE 30 2013 2 +• " 1Y CW E 2 II 1Y47CW 4W — - 3W 4"W (D � _ o REF \> --- f 13�"VTR , KS Q NOTES: ', � 0 l STAFF 1. 3Y4 RPBA-3 OVER �4 — _ s-raEF OVER 144" — - - - N - - - - - LOUNC /\ OPERA 8 �' � 114 H A15LE n4 l� 7 � Y 3 ` 2. VERIFY LOCATION H DRAWINGS & � fi HW ARCIGHT FROM :,.� :� ' -- EXPOSED ` STG ` +�'`\ , \ RASE 1 5TOFAGE-1 ONE WALL \ � 1�i SOV W/HOSE - `` PANo 1�TRAP PA o cE THREADS - - - G o ~` CEPH C I�VECTED TO - ° x-3 j 1T MOUNTED 60"AFF H x-3 IT OUMET CUUM PUMP REVISIONS DATE OPERATORY /WHWr4 CWi ! ABOVE aPERATORY TL � VACUUM PUMP ,t t2o 2 V1 I _ 1/— , C5TERILIZATION " I CN. " — t+ 5T i I AT10N yy CW _ ct�l. 1 CW � �-- - JS-1E lffl= INTERDENT OPERATORY - / � 1"CW 'r I ---_' ��s (j' -- 1101 SE Tech Center Drive I` I EWH, 1 OPERATORY Suite 195 ^\ ��` ( 1.0 H --V� Vancouver,WA 98683 �� c �"HW o �.� 3"wOPERATOIRY - ?SIB AJ OPEIRATO I U �► -T � N \ �`"— MEN ElmmTLE HS- 1 CW 3"W 1 WT-1 OPERATORY 3 \ iD�r.NTAL t LAS OPERATORY 3 \\ �,� I ri qg ' ENTAL OFFICE\. A15LE D �, +� �- AISLE TENANT - Cl t23 -D 0 OPERATOR 1 4 - - 1D IMPROVEMENTS WOME 0 Tp � D WOMEN 2 FD-1 D1 104 —.t MANAGE CONSULT E ATO Y 2 4S , BEHWD .�� , r MAva Cx CONVTIGARD TOWNE SQUARE 5l1LT t25 ilk O _P R R �, OPERA ORY 2 �, 2"W � I ' ,� " SHOPPING CENTER L. ........ )- 0 E NNC CST° L Y' 16200 SOUTHWEST T APPROVED NVITH THIS PERMIT PACIFIC HIGHWAY +' � \�`� ' SUITE S AI5L_ - F AISLE 103 103 I TIGARD, OR 97224 CU OPERATORY 1 - O T ,, - ' OPERATTORY 1 ,- ! O o l I U) 0 ! O I2OGTOEZ5 ' DOCTOR5 ISSUE DATE: 6 April 2012 JOB NUMBER: 323 Q M RECEPTION O RECEPTION ! O ti 1A E USINE55 I 1wi OFA 0 ! POFFICEO r N N CO t LA 0 _ PLVMBING U UUU0 1 U , C) — , N FLOOR P r N N 2 TI WATT FLOOR PLAN TI WASTE E VENT FLOOD FLAN U") UA �I N 2.0 3/16" ® Y-0" 2.0 3/16" = f—Or