Loading...
Specifications (6) arraa STOA I EKA, ARCHITECTS SPECIFICATIONS for Lease Buildings Tigard Towne Square Shopping Center Pacific Hwy ( #99) @Durham Road Tigard, Oregon t_ecsy A1 4:6 4 , RO : , RT R. K EAVE O , •L.TGO 4, 6 6 9 OF Project number 01 -46 & 02 -39 December 12, 2002 SFA STRUCTURAL ENGINEER - 503 - 641 -8311 CITY OF TIGARD Approved 1>1: Conditionally Approved ( ): For only the work as described in: RECEIVED • PERMITNO.13UP —Od5' See Letter to: Follow ( � ) ) BEC 3 0 2002' Job Address: Zp S Vi PAc l nc W Y RD t. By: BAIAN [,/iC oG� Date: 2 - / o Gay of TIGARD 6775 S.W. 111` Avenue, suite 20, Beaverton OR. 97008 BUILDING 503- 644 -4222 office 503 - 644 -6567 fax EKA @teleport.com www.stoainternational.com Section 08325 - Page 1 Access Doors SECTION 08325 - ACCESS DOORS 1.00 GENERAL 1.01 WORK IN OTHER SECTIONS Section 06200 - Finish Carpentry: Installation Section 07600 - Flashing and Sheet Metal: Roof Hatch All other doors 1.02 RESPONSIBILITY Each trade installing concealed work, to which access must be available and /or required, shall furnish access doors and frames as herein specified to the General Contractor for installation under Section 06200. 2.00 PRODUCTS 2.01 ACCESS DOORS A. Access Doors shall be "Milcor" Style DW, AT, or ATR as manufactured by INLAND STEEL PRODUCTS CO., or approved equal. Sizes shall be as shown on plans, in no case smaller than 2'- 0" x 2' -0" where human passage is necessary. 2.02 LOCATION As called for in this specification, access doors in the entire building at all enclosed and inaccessible furred areas, such as enclosed areas under stairs, furred ceiling areas where height of furred area is 2' -0" or greater, etc. Location of access doors to be determined on job site by Architect. Inaccessible furred areas include all exterior canopies and overhangs. 2.03 LOCKS Lock shall be flush, screwdriver operated, with metal cam in all interior areas. Key operated with cylinder lock in all exterior areas or where shown on drawings requiring same. 2.04 FIRE RATING Access panels penetrating a one -hour firewall shall be one hour rated type access door with Fire Underwriter's Label. 2.05 FINISH All access panels installed in walls and ceilings, called for on finish schedule to be painted, are to receive paint. Color to match adjacent walls /or ceilings. END OF SECTION Section 08700 - Page 1 Finish Hardware SECTION 08700 - FINISH HARDWARE 1.00 GENERAL 1.01 DESCRIPTION In the Door Schedule on the Drawings, hardware is listed for the various doors. 1.02 RELATED WORK SPECIFIED IN OTHER SECTIONS Electric panel doors Access doors Toilet compartment doors Installation of finish hardware is described in Section 06200 of these Specifications. 1.03 CODES AND STANDARDS A. Comply with all pertinent codes and regulations regarding exits. Verify that hardware specified herein complies in all respects with those requirements and promptly notify the Architect of all discrepancies. B. Hardware finishes listed are U.S. Department of Commerce "Standard Finishes for Builders Hardware ", except where proprietary finishes have been taken from manufacturer's catalogs. 1.04 SUBMITTALS A. Within 15 days after award of contract, and before any materials or items are purchased, submit to the Architect a complete schedule of all finish hardware proposed to be installed, giving manufacturer's name and catalog number for each item. This shall in no way be construed as permitting the substitution of items for the specific items described in these Specifications unless the item is found to be not available in time for installation in this Work and the substitution is approved by the Architect. B. Carefully study the Drawings and these Specifications and determine all finish hardware required for the proper and complete finishing of the Work. Include all required finish hardware in the submittal, whether or not the item is included in the Hardware Schedule. 1.05 PRODUCT HANDLING Furnish all hardware with each item clearly marked or numbered for easy cross - reference with the Hardware schedule. Deliver all finish hardware to the job site in the original containers with all labels intact and legible. Verify that each item is complete with all necessary pieces and is properly wrapped and cushioned to prevent damage prior to installation. Section 08700 - Page 2 Finish Hardware 2.00 PRODUCTS 2.01 FASTENINGS Furnish all hardware complete with all necessary screws, bolts, and other fasteners of suitable type and size to anchor the hardware in position for hard use and long life. All fastenings shall harmonize with the hardware as to material and finish. Furnish fastenings where necessary with expansion shields, sex bolts, toggle bolts, or other anchors approved by the Architect, according to the material to which the hardware is to be applied and the recommendations of the hardware manufacturer. 2.02 LOCKSETS AND CYLINDERS A. Verify operation, hand of doors, and function for each opening as scheduled and furnish heavy -duty lock cylinders with 2 -3/4" backset. B. Verify finish to match doors. C. Six (6) pin lock cylinders only by Best Lock Co. to conform to Owner master key system. D. Furnish matching lock cylinders for special doors as scheduled where the lock is furnished by door manufacturer. E. Provide lock reinforcing units to hollow metal door manufacturer as required. F. Provide lock and latch bolt -front plates to match bevel of door edge where required for flush fit. G. .Provide lever- handled operation at each door and side required to be handicap accessible by the Oregon Codes or ADA. H. Furnish construction cores for cylinders. Permanent cores and keying will be furnished and installed by Owner. 2.03 KEYING A. Provide two keys for each lock. B. Locks shall be keyed alike or keyed differently, in accordance with keying schedule to be approved by the tenant prior to keying. C. All locks shall be master - keyed. D. Tag each set of keys with cloth tag, labeled with door number. Furnish four (4) of each master key. Send by registered mail to Owner. Key all locks to Owner master key system. Key all locks per Architect's instructions and Owner's requirements. Furnish six (6) master keys. Send by registered mail direct from lock manufacturer to Architect. r Section 08700 - Page 3 Finish Hardware 2.04 MANUFACTURERS ACCEPT. ITEM MANUFACTURER SUBST. Locksets Best Closers LCN(4100 Russwin series) Norton Corbin Butts Stanley Hager McKinney Lawrence Trim Cipco Stanley Builders Brass Baldwin Brookline Stops Ives Pemko Zeero Weiss Exit device Von Duprin Corbin Russwin Thresholds Pemko Weatherstripping Pemko Zeero 3.00 EXECUTION 3.01 DELIVERIES ' Make all necessary trips to the site to deliver finish hardware items in a timely manner to permit orderly progress of the Work. Stockpile all items sufficiently in advance to ensure their availability in the time sequence required. 3.02 HARDWARE SCHEDULE Furnish the items in the amounts indicated on the Drawings or required for a complete and operable facility. END OF SECTION L.