Loading...
Report (3) Main Office Salem Office Bend Office " P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Te s tin Inc ♦ Phone (503) 664 3460 Phone (503) 589-1252 Phone (541) 330 -9155 g� FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER May 6, 2002 T0208788 ,City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 itt cOPI 9 Department Buildin De artment • Re: Dollar Tree -tor - T igard cA _ 06200 SW Pacific Hi hc�way — Tigard Q ' �v Permit No.: BUP2001 -00458 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: • Reinforcing Steel /Concrete — Compressive Strength Testing ✓Installation of Cast -in -place & Epoxy Anchors .V tructural Masonry tructural Steel — Shop and Field, Includes Verification of Welder Certifications, Material Certifications and Weld Procedures All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respe `e ' submitted, CARL /' TESTING, INC. a , Hietpas F. Hiet J p • !' lity Assurance Manager 4FH/Is cc: STOA Intemational /EKA Architects — Bob Klas SD Deacon Corporation VLMK Harsch investment Corp. P:'WORD REPORTSFlNLTRR02087880208788 05-02-02 fr • CARLSON TESTING, INC. INCOMPLETED ITEMS LIST (NCL) May 6, 2002 TT0208788.CTI Project Name: Dollar Tree Store - Tigard Project Address: 16200 SW Pacific Hwy — Tigard, OR Permit No: BUP2001 -00458 DATE ITEM # INSP. DATE ITEM DESCRIPTION COMPLIANCE CTI SIGN -OFF CORRECTED 1 JP 03 -20 -02 4 embedment instead of 5" embedment Engineer accepted. J. Piland 03 -28 -02 below roof at 4.3 /A -B. 2 JP 03 -20 -02 Need welder qualification /procedure for Provided and reviewed. J. Piland 03 -28 -02 SMAW process. 3 JP 03 -20 -02 Weld at lower flare bevel per original detail See CTI report dated 03- 28 -02. J. Piland 03 -28 -02 10/S3. Straps installed at correct T. Kastel 03 -25 -02 4 TK 03 -22 -02 LSTA30 straps installed at wrong end of roof. location. (1) 3 /4" anchor installed at existing panel, detail 5 SS 03 -27 -02 8 on S.3 was a "spinner ". (9) of (10) installed Acceptable per RFI #21 J. Hietpas 05 -06 -02 correctly at this point. Anchors installed at far (end anchor) side and column satisfactory. cc: STOA International /EKA Architects — Bob Klas City of Tigard Building Dept. SD Deacon Corporation VLMK Harsch Investment Corp.